View
8
Download
0
Category
Preview:
Citation preview
Standard Signs ManualNEW, CHANGED, OR DELETED 1/2017
PAVEMENT MESSAGES
i
PMA-1...................................PMA-2 (L or R) .....................PMA-3 (L or R) .....................PMA-4...................................PMA-5...................................PMA-6...................................PMA-7...................................
PMC-1 ..................................PMC-2 ..................................PMC-3 ..................................PMC-4 ..................................PMC-5 ..................................PMC-6 ..................................
PMS-1...................................PMS-2...................................PMS-3...................................PMS-4...................................PMS-5...................................PMS-6...................................PMS-7...................................PMS-8...................................
PMW-1 ..................................PMW-2 ..................................PMW-3 ..................................PMW-4 ..................................PMW-5 ..................................
PM-CMA ...............................
Straight Pavement Marking ArrowTurn Pavement Marking ArrowTurn, Straight Pavement Marking ArrowLeft, Right Turn Pavement Marking ArrowRight Left Turn, Straight Pavement Marking ArrowPavement Transition ArrowWrong Way Arrow
Standard Characters - A,B,C,D,E,FStandard Characters - G,H,I,J,K,LStandard Characters - M,N,O,P,Q,RStandard Characters - S,T,U,V,W,XStandard Characters - Y,Z,1,2,3,4Standard Characters - 5,6,7,8,9,0
Designated Bike Detector SystemDesignated Bike SymbolDesignated Shared Lane MarkingHOV Pavement MarkerDo Not Tailgate Pavement DotYield Pavement MarkingsRailroad Pavement MarkingAccessible Parking Symbol
Standard Words - YIELD, EXPRSStandard Words - STOP, LANEStandard Words - BIKE, XINGStandard Words - PED, ONLYStandard Words - SCHOOL, AHEAD
Pavement Marking Areas
APPROVED DATE OF REV.
1/1/03NOTES:
26.5 X 72 42 X 114
a 37 60
b 35 54
c 7.5 12
d 9.5 15
efghijkl
mnopqrstuvwxyz
SIZEDIMENSION
1. All dimensions are in inches.2. The 26.5 X 72 size shall be used for bike trails and bike lanes only. PMA-1
Straight Pavement Marking Arrow
APPROVED DATE OF REV.
1/1/03
NOTES:
45 X 60 72 X 96
a 19 31
b 26 42
c 14 23d 4 7e 23 37f 3.5 6g 24 39h 17 27i 7.5 12j 25.5 41kl
mnopqrstuvwxyz
SIZEDIMENSION
1. All dimensions are in inches.2. 45 X 60 size shall be used for bike trails and bike lanes only.3. Arrow to be designated left (L) or right (R).
PMA-2(L or R)1/1/06
Turn Pavement Marking Arrow
APPROVED DATE OF REV.
1/1/03
NOTES:
54.5 X 95 87 X 152
a 19 31
b 26 42
c 14 23d 4 7e 37 60f 58 92g 7.5 12h 18 29i 17 27j 24 39k 3.5 6l 9.5 15
m 18 27n 15.5 25opqrstuvwxyz
SIZEDIMENSION
1. All dimensions are in inches.2. The 54.5 X 95 size shall be used for bike trails and bike lanes only.3. Arrow to be designated left (L) or right (R).
PMA-3(L or R)1/1/06
Turn, Straight Pavement Marking Arrow
APPROVED DATE OF REV.
1/1/03
NOTES:
82.5 X 60 132 X 96
a 19 31
b 26 42
c 14 23d 4 7e 23 37f 3.5 6g 24 39h 17 27i 7.5 12j 25.5 41kl
mnopqrstuvwxyz
SIZEDIMENSION
1. All dimensions are in inches.2. 82.5 X 60 size shall be used for bike trails and bike lanes only.
PMA-41/1/06
Left, Right Turn Pavement Marking Arrow
APPROVED DATE OF REV.
1/1/03
NOTES:
82.5 X 95 132 X 152
a 19 31
b 26 42
c 14 23d 4 7e 37 60f 58 92g 7.5 12h 18 29i 17 27j 24 39k 3.5 6l 9.5 15
m 18 27n 15.5 25opqrstuvwxyz
SIZEDIMENSION
1. All dimensions are in inches.2. The 82.5 X 95 size shall be used for bike lanes and bike trails only. PMA-51/1/06
Right Left Turn, Straight Pavement Marking Arrow
APPROVED DATE OF REV.
1/1/03
5’ 6” X 19”
a 33
b 69
c 12d 216e 108f 60g 24hijkl
mnopqrstuvwxyz
SIZEDIMENSION
NOTES: 1. All dimensions are in inches unless otherwise indicated.2. Right lane arrow is shown. For left lane arrow, use mirror image. PMA-6
Pavement Transition Arrow
PLACEMENTON PAVEMENT
RIGHTARROW
20 Degrees
20 Degrees
APPROVED DATE OF REV.
Dimensions are in inches unless otherwise indicated.NOTE:
a 281
b 209
c 84d 120e 30f 8ghijkl
mnopqrstuvwxyz
SIZEDIMENSION
6/1/16 PMA-7
Wrong Way Arrow
APPROVED DATE OF REV.
Standard Characters - A,B,C,D,E,F
4’ 8’
a 7.7 15.4
b 48 96
c 2 4d 11.5 23e 17 34f 13.5 27ghijkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMC-1NOTE: Dimensions are in inches unless otherwise indicated.
APPROVED DATE OF REV.
4’ 8’
a 7.7 15.4
b 48 96
c 2 4d 23 46e 11.5 23f 5.8 11.5g 3.9 7.7h 9.6 19.2i 17.3 34.6jkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMC-2
Standard Characters - G,H,I,J,K,L
NOTE: Dimensions are in inches unless otherwise indicated.
APPROVED DATE OF REV.
4’ 8’
a 7.7 15.4
b 48 96
c 2 4d 17.3 34.6e 14.4 28.8f 13.5 26.9g 3.9 7.7h 15.4 30.8ijkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMC-3
Standard Characters - M,N,O,P,Q,R
NOTE: Dimensions are in inches unless otherwise indicated.
APPROVED DATE OF REV.
4’ 8’
a 7.7 15.4
b 48 96
c 2 4d 15.4 30.7e 13.5 26.9f 17.3 34.6ghijkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMC-4
Standard Characters - S,T,U,V,W,X
NOTE: Dimensions are in inches unless otherwise indicated.
APPROVED DATE OF REV.
4’ 8’
a 7.7 15.4
b 48 96
c 2 4d 3.9 7.7e 5.8 11.5f 19 38g 12.5 25h 1 2i 9.6 19.2jkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMC-5
Standard Characters - Y,Z,1,2,3,4
NOTE: Dimensions are in inches unless otherwise indicated.
APPROVED DATE OF REV.
4’ 8’
a 7.7 15.4
b 48 96
c 2 4d 3.9 7.7e 25 50f 13.4 26.9g 15.4 30.7h 9.6 19.2i 5.8 11.6jkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMC-6
Standard Characters - 5,6,7,8,9,0
NOTE: Dimensions are in inches unless otherwise indicated.
APPROVED DATE OF REV.
Dimensions are in inches unless otherwise indicated.NOTE:
Designated Bike Detector System
a 16.3
b 24
c 6d 5e 2f 1.7ghijkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMS-1
APPROVED DATE OF REV.
1/1/03
NOTE:
USE ON4’ WIDELANES
USE ON6’ WIDELANES
USE ON8’ WIDELANES
a 24 36 48
b 48 72 96
cdefghijkl
mnopqrstuvwxyz
SIZEDIMENSION
Dimensions are in inches unless otherwise indicated.
PMS-23/16/06
Designated Bike Symbol
APPROVED DATE OF REV.
Dimensions are in inches unless otherwise indicated.NOTE:
a 40
b 112
c 72d 6efghijkl
mnopqrstuvwxyz
SIZEDIMENSION
Designated Shared Lane Marking
12/1/15 PMS-3
APPROVED DATE OF REV.
1/1/03
NOTES:
6’DIAMOND
12’DIAMOND
a 15 30
b 72 144
c 3 6defghijkl
mnopqrstuvwxyz
SIZEDIMENSION
1. Dimensions are in inches unless otherwise indicated.2. 6’ size is for bike lanes and bike trails only PMS-4
HOV Pavement Marker
APPROVED DATE OF REV. All dimensions are in inches.NOTE:
36 X 60 54 X 90
a 15 22.5
b 54 81
c 36 54d 60 90efghijkl
mnopqrstuvwxyz
SIZEDIMENSION
PMS-51/1/08
Do Not Tailgate Pavement Dot
APPROVED DATE OF REV.
Yield Pavement Markings
18” 36”
a 18 36
b 12 24
c 6 6d 3-12 3-12e 72 72f 156 240g 30 36h 8 8ijkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMS-6
YIELD TRIANGLE
YIELD AHEAD
TRIANGLE
NOTE: Dimensions are in inches unless otherwise indicated.
APPROVED DATE OF REV.
Railroad Pavement Marking
8’
a 78
b 240
c 288d 72e 192f 24g 18h 36i 16
j FULL WIDTH OF LANE
kl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15NOTE: Dimensions are in inches unless otherwise indicated. PMS-7
APPROVED DATE OF REV. NOTE: Dimensions are in inches unless otherwise indicated.
Accessible Parking Symbol
STANDARD SPECIAL
a 24 36
b 28 41
c 3 4d 32.8 48.8e 32.8 58.8fghijkl
mnopqrstuvwxyz
SIZEDIMENSION
12/1/15 PMS-8
APPROVED DATE OF REV.
NOTE: Dimensions are in inches unless otherwise indicated.
4’ 8’
a 40.8 81.6
b 48 96
c 2 4d 46.5 93efghijkl
mnopqrstuvwxyz
SIZEDIMENSION
PMW-112/1/15
Standard Words - YIELD, EXPRS
APPROVED DATE OF REV.
Dimensions are in inches unless otherwise indicated.NOTE:
4’ 8’
a 36.8 73.6
b 48 96
c 2 4defghijkl
mnopqrstuvwxyz
SIZEDIMENSION
PMW-212/1/15
Standard Words - STOP, LANE
APPROVED DATE OF REV.
Dimensions are in inches unless otherwise indicated.NOTE:
4’ 8’
a 31.1 62.2
b 48 96
c 2 4defghijkl
mnopqrstuvwxyz
SIZEDIMENSION
PMW-312/1/15
Standard Words - BIKE, XING
APPROVED DATE OF REV.
NOTE: Dimensions are in inches unless otherwise indicated.
SIZEDIMENSION
PMW-4
4’ 8’
a 36.8 73.6
b 48 96
c 2 4d 27.1 54.2efghijkl
mnopqrstuvwxyz
12/1/15
Standard Words - PED, ONLY
APPROVED DATE OF REV.
Dimensions are in inches unless otherwise indicated.NOTE: PMW-5
SIZEDIMENSION
4’ 8’
a 56.2 112.4
b 48 96
c 2 4d 46.5 93efghijkl
mnopqrstuvwxyz
12/1/15
Standard Words - SCHOOL, AHEAD
APPROVED DATE OF REV.
1/19/17 PM-CMA
Pavement MarkingAreas
NOTE: All removal areas are computed as rectangles as required by Spec. 2102.
Installation and removal of horizontal bars for railroad crossing pavement message paid for as 24” solid line white.
Recommended