Standard Drafting Team Rosters
March 2014
3353 Peachtree Road NE Suite 600, North Tower
Atlanta, GA 30326 404-446-2560 | www.nerc.com
Table of Contents
Project 2007-02 Operating Personnel Communications Protocols Standard Drafting Team ........ 2
Project 2007-06 System Protection Coordination Standard Drafting Team .................................. 3
Project 2007-11 Disturbance Monitoring Standard Drafting Team ............................................... 4
Project 2007-17.3 Phase 3 of Protection System Maintenance and Testing: Sudden Pressure Relays Standard Drafting Team ...................................................................................................... 5
Project 2008-02 Undervoltage Load Shedding Standard Drafting Team ....................................... 6
Project 2009-03 Emergency Operations Standard Drafting Team ................................................. 7
Project 2010-01 Training (PER) Standard Drafting Team ............................................................... 8
Project 2010-02 Connecting New Facilities to the Grid FAC Five-Year Review Team .................... 9
Project 2010-03 Modeling Data (MOD B) Standard Drafting Team ............................................. 10
Project 2010-04 Demand Data (MOD C) Standard Drafting Team ............................................... 11
Project 2010-05-1 Phase 1 of Protection Systems: Misoperations Standard Drafting Team ...... 12
Project 2010-05.2 Phase 2 of Protection Systems: Special Protection Systems Standard Drafting Team ............................................................................................................................................. 13
Project 2010-13.2 Phase 2 of Relay Loadability: Generation Standard Drafting Team................ 14
Project 2010-13.3 Phase 3 of Relay Loadability: Stable Power Swings Standard Drafting Team 15
Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves Standard Drafting Team ............................................................................................................................... 16
Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2 Standard Drafting Team ............................................................................................................................................. 17
Project 2010-17 Definition of Bulk Electric System Standard Drafting Team .............................. 18
Project 2012-09 IRO Five-Year Review Team ............................................................................... 19
Project 2012-13 Nuclear Plant Interface Coordination Standard Drafting Team ......................... 20
Project 2013-03 Geomagnetic Disturbance Mitigation Standard Drafting Team ........................ 21
Project 2013-04 Voltage and Reactive Control (VAR) Standard Drafting Team ........................... 22
Project 2014-01 Standards Applicability for Dispersed Generation Resources Standard Drafting Team ............................................................................................................................................. 23
Project 2014-02 CIP Version 5 Revisions Standard Drafting Team ............................................... 24
Project 2014-03 Revisions to TOP/IRO Standards Standard Drafting Team ................................ 25
1 NERC Standard Drafting Team Rosters – March 2014
Standard Drafting Team Rosters
Project 2007-02 Operating Personnel Communications Protocols
Standard Drafting Team
Chair Lloyd S. Snyder – Manager, Transmission Operations
Georgia Systems Operations Corporation
Member Glen Boyle – Engineer/Instructor PJM Interconnection, LLC
Mike Brost – Vice President, Electric Systems
JEA
Michael Cassiadoro – Director of Reliability Coordination
WECC
Tom Irvine – Manager, Grid Operations
Hydro One Networks, Inc.
Robert C. Rhodes, Jr. – Manager, Reliability Standards
SPP
Stephen Solis – Planning and Operating Standards Compliance
Electric Reliability Council of Texas, Inc.
John Stephens – Director, Power System Control
City Utilities of Springfield
Fred Waites – Team Leader, Training Southern Company
NERC Staff Stephen Eldridge – Standards Developer
North American Electric Reliability Corporation
William Edwards – Counsel North American Electric Reliability Corporation
Marisa Hecht – Supporting Standards Developer
North American Electric Reliability Corporation
Howard Gugel – Director of Standards Development
North American Electric Reliability Corporation
Larry J. Kezele – Manager of Operations
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 2
Project 2007-06 System Protection Coordination
Standard Drafting Team
Chair Philip Winston Georgia Power Company
Vice Chair Bill Middaugh Tri-State G & T Association, Inc.
Member Forrest Brock Western Farmers Electric Cooperative
David Cirka National Grid
Samuel Francis Oncor Electric Delivery
Jeffrey Iler American Electric Power
William Waudby Consumers Energy
Kevin Wempe Kansas City Power & Light Co.
NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation
3 NERC Standard Drafting Team Rosters – March 2014
Project 2007-11 Disturbance Monitoring Standard Drafting Team
Chair Lee Pedowicz NPCC
Member Frank Ashrafi Southern California Edison
Alan D. Baker Florida Power & Light
Daniel J. Hansen NRG
Tim Kucey PSEG Fossil LLC
Jack Soehren ITC Holdings
Vladimir Stanisic AESI Inc.
Ryan Quint Bonneville Power Administration
NERC Staff Stephen Crutchfield – Standards Developer
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 4
Project 2007-17.3 Phase 3 of Protection System Maintenance and Testing: Sudden Pressure Relays
Standard Drafting Team
Chair Charles W. Rogers Consumers Energy
Member John Anderson Xcel Energy, Inc.
Merle Ashton Tri-State G&T Association, Inc.
Forrest D. Brock Western Farmers Electric Cooperative
Aaron Feathers Pacific Gas and Electric Company
Samuel Francis Oncor Electric Delivery
Ervin David Harper NRG Texas Maintenance Services
James M. Kinney FirstEnergy Corporation
Mark Lukas Commonwealth Edison Co.
Kristina Marriott ENOSERV
Michael Palusso Southern California Edison
John E. Schechter American Electric Power
William D. Shultz Southern Company Generation
Eric Udren Quanta Technology, LLC
Scott Vaughan Roseville Electric
Mathew J. Westrich American Transmission Co.
Philip B. Winston Southern Company
NERC Staff Jordan Mallory – Standards Developer Specialist
North American Electric Reliability Corporation
Al McMeekin – Standards Developer North American Electric Reliability Corporation
Phil Tatro – Technical Advisor North American Electric Reliability Corporation
5 NERC Standard Drafting Team Rosters – March 2014
Project 2008-02 Undervoltage Load Shedding
Standard Drafting Team
Chair Greg Vassallo Bonneville Power Administration
Member José Conto ERCOT
Bill Harm PJM
Sharma Kolluri Entergy
Charles-Eric Langlois Hydro-Quebec TransEnergie
Manish Patel Southern Company
Fabio Rodriguez Duke Energy
Hari Singh Xcel Energy
Matthew Tackett MISO
NERC Staff Erika Chanzes – Standards Developer North American Electric Reliability Corporation
Phil Tatro – Technical Advisor North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 6
Project 2009-03 Emergency Operations
Standard Drafting Team
Chair David McRee Duke Energy
Vice Chair Robert Staton Xcel Energy
Member Will Behnke Alliant Energy
Richard Cobb Midcontinent ISO, Inc.
Jen Fiegel Oncor Electric Delivery
Hal Haugom Madison Gas and Electric
Steve Lesiuta Ontario Power Corporation Inc.
Connie Lowe Dominion Resource Services, Inc.
Greg Le Grave Wisconsin Public Service Corp.
Brad Young LG&E/KU
NERC Staff Laura Anderson North American Electric Reliability Corporation
Steve Crutchfield North American Electric Reliability Corporation
Ed Dobrowolski North American Electric Reliability Corporation
Laura Hussey North American Electric Reliability Corporation
7 NERC Standard Drafting Team Rosters – March 2014
Project 2010-01 Training (PER)
Standard Drafting Team
Chair Patti Metro NRECA
Vice Chair Lauri Jones PG&E
Member Charles Abell Ameren
Sam Austin Tennessee Valley Authority
Jim Bowles ERCOT
Jeff Gooding Florida Power & Light Co.
Mark Grear Constellation
Venona Greaff OXY
John M. Rymer MISO
Stanley Winbush American Electric Power
NERC Staff Jordan Mallory – Standards Developer Specialist
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 8
Project 2010-02 Connecting New Facilities to the Grid
FAC Five-Year Review Team
Chair John Beck Con Edison
Vice Chair Michael Steckelberg Great River Energy
Member Brian Dale Georgia Power Company
Ruth Kloecker ITC Holdings
Stewart Rake Luminant Generation Company LLC
Ganesh Velummylum Northern Indiana Public Service Co.
NERC Staff Mallory Huggins – Lead Standards Developer
North American Electric Reliability Corporation
Sean Cavote – Supporting Standards Developer
North American Electric Reliability Corporation
Ed Dobrowolski – Supporting Standards Developer
North American Electric Reliability Corporation
Laura Hussey – Director of Standards Development
North American Electric Reliability Corporation
9 NERC Standard Drafting Team Rosters – March 2014
Project 2010-03 Modeling Data (MOD B) Standard Drafting Team
Chair Bobby Jones Southern Company Services
Vice Chair Reené Miranda Xcel Energy, Inc.
Member Durgesh Manjure MISO
Kent Bolton WECC
Jeff Gindling Duke Energy
Wayne Haidle Basin Electric Power Cooperative
James Teixeira ERCOT
Catherine Wesley PJM Interconnection
NERC Staff Steven Noess – Associate Director of Standards Development
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 10
Project 2010-04 Demand Data (MOD C)
Standard Drafting Team
Chair Mark Kuras PJM
Vice Chair Josh Collins MISO
Member Paul Kure ReliabilityFirst Corporation
Brian Glover Great River Energy
Robert Emmert CAISO
Barbara Doland SERC
Andrey Oks NPCC
NERC Staff Darrel Richardson – Standards Developer
North American Electric Reliability Corporation
11 NERC Standard Drafting Team Rosters – March 2014
Project 2010-05-1 Phase 1 of Protection Systems: Misoperations
Standard Drafting Team
Chair Mark J. Kuras PJM Interconnection, LLC
Member Martin Bauer, P.E. U.S. Bureau of Reclamation
Paul DiFilippo HydroOne Networks, Inc.
Mark Gutzmann Xcel Energy, Inc.
Ted Kramer Duke Energy
Bill Middaugh Tri-State G & T Association, Inc.
John W. Miller Georgia Transmission Corporation
Steve Paglow American Electric Power
Richard A. Purdy, PE Dominion Virginia Power
Tim Seeber ComEd/Exelon
Patrick Sorrells Sacramento Municipal Utility District
NERC Staff Scott Barfield-McGinnis – Standards Developer
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 12
Project 2010-05.2 Phase 2 of Protection Systems: Special Protection Systems
Standard Drafting Team
Chair Gene Henneberg NV Energy / Mid-American
Vice Chair Bobby Jones Southern Company
Member Amos Ang Southern California Edison
John Ciufo Hydro One Inc
Alan Engelmann ComEd / Exelon
Davis Erwin Pacific Gas and Electric
Sharma Kolluri Entergy
Charles-Eric Langlois Hydro-Quebec TransEnergie
Robert J. O' Keefe American Electric Power
Hari Singh Xcel Energy
NERC Staff Al McMeekin – Standards Developer North American Electric Reliability Corporation
Erika Chanzes – Standards Developer North American Electric Reliability Corporation
Phil Tatro – Technical Advisor North American Electric Reliability Corporation
Bill Edwards – Counsel North American Electric Reliability Corporation
13 NERC Standard Drafting Team Rosters – March 2014
Project 2010-13.2 Phase 2 of Relay Loadability: Generation
Standard Drafting Team
Chair Charles W. Rogers Consumers Energy
Member Jeff Billo ERCOT
S. Bryan Burch, P.E. Southern Company
Steven Hataway Florida Power & Light Co.
Jonathan E Hayes Southwest Power Pool, Inc.
Mike Jensen Pacific Gas and Electric Company
Sudhir Thakur, P.E. Exelon Nuclear
Joe T. Uchiyama U.S. Bureau of Reclamation
Benson Vuong Salt River Project
David Youngblood Luminant Energy
NERC Staff Scott Barfield-McGinnis – Standards Developer
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 14
Project 2010-13.3 Phase 3 of Relay Loadability: Stable Power Swings
Standard Drafting Team
Chair Bill Middaugh, P.E. Tri-State Generation & Transmission Association
Vice-Chair Kevin W. Jones Xcel Energy
Member David Barber, P.E. FirstEnergy
Steven Black Southern Company Services
Ding Lin Manitoba Hydro
Slobodan Pajic General Electric Energy Consulting
Fabio Rodriquez Duke Energy - Florida
John Schmall Electric Reliability Council of Texas (ERCOT)
Matthew H. Tackett, P.E. Midcontinent Independent System Operator (MISO)
NERC Staff Scott Barfield-McGinnis – Standards Developer
North American Electric Reliability Corporation
Phil Tatro – Technical Advisor North American Electric Reliability Corporation
15 NERC Standard Drafting Team Rosters – March 2014
Project 2010-14.1 Phase 1 of Balancing Authority Reliability-based Controls: Reserves
Standard Drafting Team
Chair Glenn Stephens Santee Cooper
Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC
Member Gerald D. Beckerle Ameren Services
Howard F. Illian Energy Mark, Inc.
David F. Lemmons Xcel Energy, Inc.
Clyde Loutan California ISO
David McRee Duke Energy Carolina
H. Steven Myers Electric Reliability Council of Texas, Inc.
LeRoy Patterson Patterson Consulting
Michael Potishnak Representing NPCC
Mark Prosperi-Porta British Columbia Transmission Corporation
Jerry Rust Northwest Power Pool
Stephen Swan Midwest ISO, Inc.
Thomas Washburn Florida Municipal Power Pool
NERC Staff Darrel Richardson – Standards Developer
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 16
Project 2010-14.2 Balancing Authority Reliability-based Controls, Phase 2
Standard Drafting Team
Chair Doug Hils Duke Energy
Vice Chair Thomas W. Siegrist Brickfield Burchette Ritts and Stone, PC
Member Scott Brooks Manitoba Hydro
Ron Carlsen Southern Company
Howard F. Illian Energy Mark, Inc.
Mike Potishnak Representing NPCC
Jerry Rust Northwest Power Pool
Robert Staton Xcel Energy
Glenn Stephens Santee Cooper
Stephen Swan Midwest ISO, Inc.
Mark Trumble Omaha Public Power District
NERC Staff Sean Cavote – Lead Standards Developer
North American Electric Reliability Corporation
Laura Anderson – Supporting Standards Developer
North American Electric Reliability Corporation
Stephen Crutchfield – Supporting Standards Developer
North American Electric Reliability Corporation
Mallory Huggins – Supporting Standards Developer
North American Electric Reliability Corporation
Laura Hussey – Director of Standards Development
North American Electric Reliability Corporation
17 NERC Standard Drafting Team Rosters – March 2014
Project 2010-17 Definition of Bulk Electric System
Standard Drafting Team
Chair Peter Heidrich – Manager of Reliability Standards
Florida Reliability Coordinating Council
Vice Chair Barry R. Lawson – Associate Director, Power Delivery & Reliability
National Rural Electric Cooperative Association
Member Jennifer Dering – Manager Operations Planning, Transmission
New York Power Authority
Brian Evans-Mongeon – President and CPO
Utility Services, Inc.
Philip A. Fedora – Assistant Vice President, Reliability Services
NPCC
Ajay Garg – Manager, Policy and Approvals Hydro One Networks, Inc.
John Hughes – Vice President, Technical Affairs
Electricity Consumers Resource Council (ELCON)
Jeff Mitchell – Director, Engineering RFC
Rich Salgo – Director, Electric System Operations NV Energy
Jason Snodgrass – Regulatory Compliance Manager Georgia Transmission Corporation
Jennifer T. Sterling, P.E. – Director, Transmission Strategy and Compliance
Exelon
Jonathan Sykes – Manager, System Protection Pacific Gas & Electric
NERC Staff Edward J. Dobrowolski – Standards Developer
North American Electric Reliability Corporation
Stacey Tyrewala – Counsel North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 18
Project 2012-09 IRO Five-Year Review Team
Chair Robert C. Rhodes, Jr. Southwest Power Pool
Vice Chair David Souder PJM Interconnection, LLC
Member Anthony Jankowski We Energies
John Mulhern Con Edison
Ed Rudder TVA
Kevin Sherd Midwest ISO
(Milton) Dave Thoms WECC
Scott Watts Duke Energy Carolinas
NERC Staff Steve Crutchfield North American Electric Reliability Corporation
Laura Anderson North American Electric Reliability Corporation
Laura Hussey – Director of Standards Development
North American Electric Reliability Corporation
19 NERC Standard Drafting Team Rosters – March 2014
Project 2012-13 Nuclear Plant Interface Coordination
Standard Drafting Team
Chair John Gyrath Exelon Generation LLC (Nucler)
Vice Chair George Attarian Duke Energy
Member Mukund “Mookie” Chander Entergy Services Inc.
Kevin Donnelly Consolidated Edison of NY
Pete Jenkins Luminant Generation Company LLC
David Schweizer PJM Interconnection
Jerry Whooley PJM Interconnection
NERC Staff Stephen Eldridge – Standards Developer
North American Electric Reliability Corporation
Laura Hussey – Director of Standards Development
North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 20
Project 2013-03 Geomagnetic Disturbance Mitigation
Standard Drafting Team
Chair Frank Koza PJM Interconnection
Vice Chair Randy Horton Southern Company
Member Donald Atkinson Georgia Transmission Corporation
Emanuel Bernabeu Dominion Resource Services, Inc
Kenneth Fleischer NextEra Energy
Luis Marti Hydro One Networks
Antti Pulkkinen NASA Goddard Space Flight Center
Qun Qiu American Electric Power
NERC Staff Mark Olson – Standards Developer North American Electric Reliability Corporation
21 NERC Standard Drafting Team Rosters – March 2014
Project 2013-04 Voltage and Reactive Control (VAR)
Standard Drafting Team
Chair Bill Harm PJM Interconnection, L.L.C.
Vice Chair Martin Kaufman Exxon Mobil Research and Engineering
Member Joshua Pierce Southern Company Transmission Planning
Sharma Kolluri Entergy Services Inc.
Scott Berry Indiana Municipal Power Agency
Hari Singh Xcel Energy
Hamid Zakery Calpine Corporation
Steve Hitchens Bonneville Power Administration
Joe Seabrook Puget Sound Energy, Inc.
Brian Buckley TECO Energy
Mike Swearingen Tri-County Electric
NERC Staff Soo Jin Kim – Standards Developer North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 22
Project 2014-01 Standards Applicability for Dispersed Generation Resources
Standard Drafting Team
Co-Chair Tony Jankowski We Energies
Vice-Chair Tom Pruitt Duke Energy
Member David Belanger Exelon Generation
George Brown Acciona Energy North America
Stephen Enyeart Bonneville Power Administration
Brian Evans-Mongeon Utility Services, Inc.
Jessie Nevarez Terra-Gen Operating Company
Jeffrey Plew NextEra Energy Resources
Dana Showalter E.ON Climate & Renewables
Randhir Singh PSEG Fossil
Eric White MidAmerican Energy
NERC Staff Sean Cavote – Lead Standards Developer
North American Electric Reliability Corporation
Ryan Stewart – Supporting Standards Developer
North American Electric Reliability Corporation
Laura Hussey – Director of Standards Development
North American Electric Reliability Corporation
23 NERC Standard Drafting Team Rosters – March 2014
Project 2014-02 CIP Version 5 Revisions Standard Drafting Team
Co-Chair Philip Huff Arkansas Electric Cooperative Corporation
Co-Chair Maggy Powell Exelon Corporation
Member Steven Brain Dominion
Jay Cribb Southern Company
David Dockery Associated Electric Cooperative, Inc.
Greg Goodrich New York Independent System Operator
Christine Hasha Electric Reliability Council of Texas
Forrest Krigbaum Bonneville Power Administration
David Revill Georgia Transmission Corporation
Scott Saunders Sacramento Municipal Utilities District
NERC Staff Marisa Hecht North American Electric Reliability Corporation
Ryan Stewart North American Electric Reliability Corporation
Scott Mix North American Electric Reliability Corporation
NERC Standard Drafting Team Rosters – March 2014 24
Project 2014-03 Revisions to TOP/IRO Standards
Standard Drafting Team
Chair David Souder
PJM Interconnection LLC
Vice Chair Andrew Pankratz Florida Power & Light
Member David Bueche
CenterPoint Energy Houston Electric, LLC
James Case Entergy
Allen Klassen Westar Energy
Bruce Larsen WE-Energies
Jason Marshall ACES Power Marketing
Bert Peters
Arizona Public Service Co.
Robert Rhodes SPP
Eric Senkowicz FRCC
Kevin Sherd
Midcontinent Independent System Operator (MISO)
NERC Staff Ed Dobrowolski – Standards Developer
North American Electric Reliability Corporation
Mark Olson – Supporting Standards Developer
North American Electric Reliability Corporation
Stacey Tyrewala – Senior Counsel North American Electric Reliability Corporation
25 NERC Standard Drafting Team Rosters – March 2014
Recommended