SR 520 Bridggp ge Replacement and HOV Program · 2015-01-07 · SR 520 Bridggp ge Replacement and...

Preview:

Citation preview

SR 520 Bridge Replacement and HOV Programg p g

Seattle Design Commission

John White, P.E. Teal BrogdenGBruce McKean

WSDOT, Project Director KGM, Lighting DesignerHorton Lees Brogden Lighting Design

KGM, Bridge ArchitectHelix Design Group

D t S tDavid L. Dye, P.E.

SR 520 P Di tJulie Meredith, P.E.

S t f T t tiPaula Hammond

Deputy Secretary SR 520 Program DirectorSecretary of Transportation

Seattle Design Commission BriefingSeattle City Hall

July 5, 2012

RAILING

2

REGIONAL PATH

3

Illuminated Bridges- Classic

520 Bridge Color Options

Illuminated Bridges- Classic and Contemporary

520 Bridge Color Options

Illuminated Bridges- Contemporary

520 Bridge Color Options

Illuminated Bridges- Other Examples

520 Bridge Color Options

Color Inspiration – the Evergreen Point Bridge

520 Bridge Color Options

Sentinel Color Options

520 Bridge Color Options

520 Bridge Preferred Color Option

520 Bridge Color Options

520 Bridge Preferred Color Option

520 Bridge Color Options

LAURELHURST VIEW

12

INTERPRETIVE SIGNAGE PLAN

13

WEST SENTINEL BELVEDERE

14

LOW-RISE WEST BELVEDERE

15

MID-SPAN BELVEDERE

16

LOW-RISE EAST BELVEDERE

17

EAST SENTINEL BELVEDERE

18

MEDINA VIEWPOINT

19

USER PERSPECTIVE

20

MATERIALS AND ATTACHMENTS

21

Program Construction Staging – Phase I

22

Program Construction Staging – Full Build

23

Program Construction Staging

24

Recommended