View
97
Download
4
Category
Preview:
Citation preview
Sheet 1 of 8
CURRICULUM VITAE
Position : Sr. E&I Engineer/ Supervisor : Asst. Construction Manager : E&I Superintendent : Instrumentation & Control System Engineer Name : Somchai Jeenlhong Born : 1962 Nationality : Thai Education : B.BA - Suan Dusit Rajabhat University. Dipl. - Electrical Power , Patumwan Technical College. Languages : Thai / English Contact point : Email : pmcsomchaij@gmail.com Mob. phone: 098–171 3389, 092-843 2880, 099-516-7325 Key Qualification General Over 30 years of professional experience in project execution as position of
Asst. Project Manager Site Manager Project Management Consultant Sr. Instrument Engineer Instrument & control system Engineer Electrical & Instrument Installation Engineer Installation Supervisor Calibration Supervisor Cable test Supervisor QA/QC inspector for E&I
Work role
Engineering for Instrumentation & Control System and SCADA as per project requirement Supervise Electrical and Instrumentation installation work Inspect Electrical and Instrumentation installation work as per Inspection and Test Plan
(ITP) such as DCS, I/O Remote, SCADA, PLC, FGS, Field instrument, cable tray, conduit, cable, impulse line tube, MCC, Transformer, U/G cable, A/G cable ect.
Prepare documentation work such as reporting after inspection complete, planning the work schedule to the upper level.
Engineering experience for Instrumentation work
Instrument index Instrument data sheet Raceway design Instrument Typical Installation Detail Instrument Hook-up Cable Schedule & Termination Instrument Loop Diagram Cause & Effect Flow chart diagram
Mr. Somchai Jeenlhong (Cont’d)
Sheet 2 of 8
International Standard Reference API RP 551, 552, 554, 555, 2001 IEC 60092-359, 60227 IEEE 1042 ISA 912.13 ISO 5167 NFPA 70, 1, 72E, 496 AGA Report no.3
Project experience Span Company Limited Project : IRPC Water Filtration Expansion Period : 2013 - Present Position : Sr. Instrument and Control Engineer, Site Engineer of Project Management Consult (PMC) Role : Supervise and manage the Engineering and Construction work for EPC company
(HydroTeK Co.,Ltd (Public)) as following
Engineering work designing all instrumentation work such as instrument index, instrument data sheet,
instrument typical installation detail, cable raceway installation, cable schedule, loop diagram, function test logic diagram ect.
tracking procurement of all instrumentation materials under Master project execution plan
Inspection of FAT (Factory Acceptance Test) o 1,600 KVA (24/0.4) Transformer as content following
Measurement of Voltage and Vector group Measurement of winding resistance Measurement of insulation resistance Measurement of load loss and impedance voltage Measurement of No-load loss and No-load current Separate source overvoltage withstand test Induced overvoltage withstand test Measurement of oil dielectric strength.
o PLC/SCADA Function test as content following
Inspection of equipment Operator control panel function Module replacement and standby changeover Failures and interaction between different parts of the system Systematic diagnostic tests, including self-test facilities System alarm and report Electrical isolation test Application logic test
Construction work
Supervise EPC company to install Electrical work such as 1600 KVA Transformer, 22 KV system, MCC, UPS, VSD, cable tray, conduit, function test ect.
And supervise to instrumentation work such as PLC/SCADA system,field instruments, racway, instrument calibration, loop test ect.
Follow up and control EPC company to complete MC (Mechanical Completion) system by system and handover from Construction team to Commissioning team until plant start-up and product launch.
Inspect all Electrical and Instrumentation Installation works and release Punch list to EPC company (Categorize Punch A,B & C)
Inspect all Electrical and Instrumentation testing works such as Cable test, calibration work, Loop test and Function test
Advise EPC to prepare MC package (System by system)
Mr. Somchai Jeenlhong (Cont’d)
Sheet 3 of 8
Commissioning Review & advise Commissioning procedure of EPC company Review & advise Completions deliverable steps such Mechanical Completion, Pre-
commissioning, Pre Start up Safety Review, Ready for Start up, Commissioning and Performance test ect.
Fluor Daniel Eastern Inc. Project : Chevron Thailand Exploration and Product Ltd. (Remote Start BC Function) Period : 2013 - 2013 Position : Sr. Instrument Engineer Role : Engineering Instrumentation work of 6 offshore platforms for Remote Start Booster
Compressor Function. They are ERWG, ERWH, ERWM, MAWB, MAWC & YAWD. Documents/Drawings designed are as following Instrument index Instrument data sheet Instrument typical installation detail Cable schedule Instrument loop diagram Ect.
Fluor Daniel Eastern Inc. Project : PTT LNG, Maptaput/ Rayong. Period : 2011 - 2012 Position : Sr. Instrument Engineer of Project Management Consultant Role : Comment and inspect instrumentation work for EPC company(GS Engineering and
Construction – Korean) designing all instrumentation work after Piping and Instrument Diagram complete
Rev. IFC such as instrument index, instrument data sheet, instrument typical installation detail, cable raceway installation, cable schedule, loop diagram, function test logic diagram ect.
Inspect and test instrumentation work such as panel installation in CCR, cable laying in CCR, field instrument installation, field instrument cable laying in field, impulse line installation, air supply tube installation, Instrument loop test ect.
Inspect installation work of Fire and Gas System, CCTV and Telecommunication system
Report all inspection and punch list (If any). Fluor Daniel Eastern Inc. Project : PTT Public Company Limited (Platform Compression Facilities Project) – Offshore. Period : 2010 - 2010 Position : Sr. Instrument Engineer Role : Comment Engineering work of instrumentation for EPC Company (Punj Lloyd
Co.ltd.) as detail below Instrument data sheet Process detail design DCS/ESD system SCADA system Instrument installation Interface cables Ect.
Mr. Somchai Jeenlhong (Cont’d)
Sheet 4 of 8
Fluor Daniel Eastern Inc. Project : PTT Ethane Separation Plant (ESP), Maptaput/ Rayong. Period : 2008 - 2010 Position : Sr. Instrument Engineer of Project Management Consultant Role : Comment and supervise Instrumentation work for EPC Company (Samsung
Engineering and Construction Co.Ltd.) as detail below comment Engineering work of Instrumentation at KOREA such as Instrument index,
instrument data sheet, control valves, FGS, instrument hook up, cable list, cable connection list, impulse line tube, air supply tube, DCS & SCADA, instrument hook-up, instrument loop diagram, ITP ect.
attend HAZOP sometime. Supervise construction work during execution at Maptaput Industrial Estate. Inspect field instrument installation, tubing test (Impusle line and air supply), cable
test(Continuity and Megger test) Prepare test reports and punch list (If any).
Alcan Company(Australian) Project : G3 expansion project(Aluminum plant in Australia) Period : 2006 - 2007 Position : E&I Commissioning Engineer Role : Inspect and test Electrical & Instrumentation work on Module prior ship to Australia for
construction such as Inspect the Instrument installation on Module test FB cable by FB communicator test analog and digital cable by continuity test and meggering test. Inspect impulse line by Nitrogen (Pressure test). Inspect lighting fixture installation, test its cable and power up. complete inspection report and test and deliver them with shipment.
Air Liquide (Thailand) Limited Project: T2/Lamchabang Industrial Estate.(Nitrogen plant expansion project) Period : 2004 – 2005. Position : Construction Manager. Role : Managing, planning and controlling Contractors to execute construction with less
conflict. Contractor concerned are Civil and Structure contractor, Mechanical Contractor and E&I Contractor. Daily work is
Check all workdone by constructors and report to up management. Inspect E&I installation such as local lighting panel, lighting fixture inspection, field
instrument installation, conduit, cable installation ect. Inspect E&I testing such as cable test (Continuity test and Megger test), impulse line
and air supply tube Prepare testing report and punch list (If any)
ABB Contracting Limited Project : Pioneer Elastic (Thailand) Co., Ltd./ Samutsakorn. Period : 2002 - 2003 Position : Site Manager (E&I) Role : Project management for E&I work at Site Construction as detail
Visited the existing plant at China(Main Land) for designing new Pioneer Elastic Plant in Thailand
Mr. Somchai Jeenlhong (Cont’d)
Sheet 5 of 8
Design Electrical system (Power supply for the packaged machines) such as Transformer, MCC, Lighting distribution board, cables, cable tray, conduit, lighting fixture ect.
Installing Electrical equipment as per Electrical equipment designed as above. Testing all Electrical equipment such as transformer, cables(Continuity and Megger
Test) and power up. Prepare reports and punch list (If any)
ABB Contracting Limited Project: Bio Fuel Feeding of unit 8/National Power Supply Period : 2001 - 2002 Position : Site Manager (ME&I) Role : .Project management for ME&I work at Site Construction. Work activities are as below
Design a Bio Fuel Silo and conveyor by ABB Mechanical team Design power supply system to equipment such as MCC, cable, cable tray , conduit
ect. Design instrumentation system required for Bio Fuel Feeding for Power Plant unit 8. Test Electrical equipment as designed such as MCC, cables (Continuity and Megger
Test) ect. Calibrate instruments prior installation Test field Instruments also such loop test prior commission start. Prepare inspection reports and Testing report after work complete.
ABB Contracting Limited: Project: 115 KV NPS Substation and SMP Substation Period : 2000 - 2001 Position : Site Manager (Electrical) Role : Construct electrical equipment, test electrical equipment and assist commissioning.
Install electrical equipment in substations (Substation bldg. & Switch Yard) Check Wiring in Relay panels. Test bus bar joint conductivity, resistance , protection relays ect. Assist commissioning
.
ABB Contracting Limited: Project : NPS(SPP 2 x 150MW), Tha-Toom project Period : 1998 - 2000 Position : Site Manager (E&I) Role : Engineering and installation Electrical and Instrumentation for 2 units of 150MW
Install ABB DCS system (Supplied ABB Finland) Install Instrumentation work such as field instruments (PT, FT, TT,LT ect.) cable
tray, cables Install IPB (Isolated Phase Busduct). Product from ABB Germany Install GCB (Generator Circuit Breaker). Product from ABB Switzerland. Install MCC. Product from ABB Finland. Visit ABB CaloEmag/Germany and trained for IPB (Isolated Phase Busduct). And
supervise the installation team how to install at Power Plant in Thailand. Visit ABB Zurich/Switzerland and trained for GCB (Generator Circuit Breaker). And
supervise the installation team how to install at Power Plant in Thailand. Test instrument loops as per designed. Test Electrical and Instrument cable (Continuity and Megger Test)
Mr. Somchai Jeenlhong (Cont’d)
Sheet 6 of 8
ABB Contracting Limited Project : Pulp and Paper Phase-2/ Advance Agro(Public) Co.,Ltd. Period : 1988 Position : Site Manager (E&I). Role : Install Electrical work and Instrumentation work and control work quality as detail below
Install Transformers, MCC, Lighting panel, UPS and battery charger, cable tray, conduit, cable ect.
Install instrumentation work such as DCS, Remote I/O, Marshalling panel, field instrument, Impulse line tube, air supply tube ect.
Inspect installation work of Electrical equipment as above, prepare punch list if any. Inspect all instrumentation work as ITP/Work Procedure. Test cable(Continuity and Megger) and loop. Prepare test reports and punch list (If any)
ABB Contracting Limited Project : Advance Agro/Pulp Mill 2 (Kvaener PupingAB) Period : 1997 - 1998 Position : Site Superintendent (E&I). Role : Construct and pre-commissioning for Electrical and Instrumentation and Control System
as detail below Install Electrical work such as MCC, Lighting system, Local Control Switch, cable
tray, conduit, cables Install Instrumentation work such as DCS, Marshalling panel, instruments, impulse
line tube, air supply tube for control valve, cable ect. Inspect Electrical and instrumentation work such as panels or MCC installation,
cable tray, cable installation, instrument installation ect. Test cable (Continuity and Megger) and test instrument loops ect.
ABB Contracting Limited Project: Paper Machine Phase-1&2/ Advance Agro(Public) Co.Ltd. Period : 1996 1997 Position : Site Manager (E&I) Role : Install Electrical system and Instrumentation work as detail below
Install Instrumentation work such as DCS, Marshalling panels, instruments (PT, FT, TT & LT), impulse line tube, air supply tube for control valve, cables ect.
Install Electrical work such as Transformer, MCC, Lighting system, Local Control
Switch, cable tray, conduit, cables Inspect Electrical and instrumentation work such as panels or MCC installation,
cable tray, cable installation, instrument installation ect. Test cable(Continuity and Megger) and test instrument loops ect. And prepare test report and punch list (If any)
ABB Contracting Limited Projcet : Advance Agro/Pulp Mill 1(Kvaener PupingAB) Period : 1995 - 1996 Position : Site Superintendent (E&I). Role : Construct and pre-commissioning for Electrical and Instrumentation and Control System
as detail below Install Electrical work such as Transformers, MCC, Lighting system, Local Control
Switch, cable tray, conduit, cables Install Instrumentation work such as DCS, Remote I/O panel, instruments, impulse
line tube, air supply tube for control valve, air headers, cable ect. Inspect Electrical and instrumentation work such as panels or MCC installation,
cable tray, cable installation, instrument installation ect. Test cable(Continuity and Megger) and test instrument loops ect.
Mr. Somchai Jeenlhong (Cont’d)
Sheet 7 of 8
ABB Limited Project: Thai Olefins Co.,Ltd (TOC) – BHU unit., Maptaput/ Rayong Period : 1994 – 1995 Position : Site Superintendent (Electrical) Role : Install Electrical system for a new unit of BHU as detail below
Install lighting fixture, conduit, wiring in field. Install cable tray and conduit for power cable from MCC to Motors in field. Inspect installation work for MCC, cable tray, conduit, lighting fixture and wiring. Test cable(Continuity and megger test), lighting wires before power up. Prepare test report and punch list (If any)
ABB Limited Project: Thai Petrochemical Insdustry (TPI), ABS-2 project. Period : 1994 - 1994 Position : Instrument Supervisor Role : Install and test instrumentation work as detail below
Install field instruments( FT, PT, LT & TT), cable tray & conduit, instrument cable, impulse line tube, air supply tube ect.
Calibrate instruments before take them for installation Inspect installation work of field instrument as per typical installation drawing. Test cable (Continuity & Megger Test) Do instrument loop test as per drawings designed. Ready for MC(Mechanical
Completion) and commissioning. ABB Limited Project: Thai Olefins Co.,Ltd(TOC) – Ethylene and Propylene process Period : 1993 - 1994 Position : Site Supervisor (Electrical) Role : Install power system as detail below
Install MCC in Electrical room, lighting fixture in field, cables for motors and wires for lighting fixtures, power plug in field ect.
Install grounding and lightning system, ground rods, lightning rods, bare copper for both system
Install fire alarm system Inspect power system (MCC, lighting system, grounding & lightning system) as per
drawings designed. Test cable for power system (Continuity test and Megger test) Prepare test report and punch list (If any)
ABB Limited Project: Thai Petrochemical Industry(TPI) – PP Plant(Poly Propylene) Period : 1990 - 1991 Position : Instrument Foreman Role : install instrumentation work as detail below
Calibrate instruments prior take them for installation Install instruments such as Flow transmitter, Pressure transmitter, Temperature
transmitter, Level transmitter ect. Pull cable from control room to field instruments Terminate cable in field Inspect instrument installation, panel installation ect. Do loop test and reports
Mr. Somchai Jeenlhong (Cont’d)
Sheet 8 of 8
Chen International Corp. Project: National Petrochemical Co.,Ltd.(NPC) – Olefins process Period : 1989 - 1990 Position : Instrument Foreman Role : Install instrumentation work as detail below
Install field instruments Install tubing (Impulse line and air supply) Pull cables from Control room to field instruments. Inspection instrument installation Test cable (Continuity and Megger test) Test pressure and test leak for impulse line and air supply tube.
Lee Hsien Sein Enterprise Co., Ltd./ TAIWAN R.O.C. Project: Wood Plant expansion Period : 1987 - 1988 Position : Electrical Foreman Role : Install new Electrical system (Plant expansion)
Install lighting fixtures, cable tray, conduit, cables Test cable and lighting system
CGG (Compagnie De Generale Geographique) Project: Oil and Gas Exploration Period : 1985 - 1986 Position : Line Foreman Role : Assist Fench Operator
Work at Labolatory car (Shoot & measure the seismic of land by Computer ) Organize manpower suitable for workload.
Fuji Denki Company Limited Project: PTT Gas Separation Plant (GSP-1), Maptaput Industry Estate. Period : 1984 - 1985 Position : Instrument Foreman Role : Install instrumentation work as detail below
Calibrate instruments prior taking them for installation Install field instrument, JB Pull cables Inspect instrument installation Test cables Assist SCADA specialist complete SCADA system
.
Recommended