Soft Landings. Soft Landings Challenges and opportunities. A revolution in the way we deliver projects. By Roderic Bunn. Seminar chairman: Roderic Bunn, BSRIA. Our speakers. 12.30 Introduction to Soft Landings Gary Clark 12.35 A local authority perspective Mike Chater - PowerPoint PPT Presentation
Citation preview
Soft Landings
Soft Landings Challenges and opportunities
ByRoderic Bunn
A revolution in the way we deliver projects
Seminar chairman: Roderic Bunn, BSRIA
Soft Landings Challenges and opportunities
ByRoderic Bunn
Our speakers
12.30 Introduction to Soft Landings Gary Clark
12.35 A local authority perspective Mike Chater
13.00 Soft Landings and environmental assessment methods - Can they work together? Julie Godefroy
13.25 Soft Landings for Contractors John Whyte
13.50 10 minute Q&A
Soft Landings
Introduction
5
Context: Actual Carbon Emissions
6
Recent research findings
7
Context: Functionality
8
Credit Mark Way - 1990s
– Transforming experience through period in residence on handed-over project
Mark Way - 2004– Developed preliminary Scope of Service
for Soft Landings
UBT / BSRIA - 2009– Soft Landings Framework– Download in PDF for free via
www.bsria.co.uk/bookshop
www.usablebuildings.co.uk
9
What is Soft Landings?
A framework of activities for all key members of a project team
A process for designers and constructors to improve operational performance
after handover
Gives more clarity at the inception and briefing stages about client needs and
operational outcomes
Requires performance targets (such as energy use) to be set and regularly
reality-checked through the project
Places greater emphasis on building readiness activities
Provides for a Soft Landings team on site during the settling-in period
10
11
12
Interdisciplinary user discussion
Test process
Share experience
Highlight barriers
Share data
Contractual implications
Create database of case studies
Define real examples of benefits
Soft Landings User Group
13
Government recognition
Convergence: successes
Innovation and Growth Team
Research needsTechnology Strategy Board (BPE programme)
Low Carbon Construction
Soft Landings Framework
Industry recognition
BSRIA and the UBT (BSRIA SL User Group)
Soft Landings a requirement
BREEAM credit Overtures made by Soft Landings User Group and BSRIA
Soft Landings in BREEAM 2011
14
Convergence: work in progress
Reference in contract forms
BSRIA ITT and PQQ, link to WRAP proposed equivalents for CEP?
Soft Landings as Soft Landings as justificationjustification
Industry Initiatives WRAP consultation on Carbon Efficiency Plan
JCT & NEC contract recognition and revision
Action by JCT via RICS
Government procurement
Schools procurement programme via PfSPilot programme
15
1. Building projects will be judged on their operational outcomes, not their design specifications
2. Practical completion will no longer be the point at which a project team is paid and begins to disband
3. The Defects Liability period will be replaced by Soft Landings-type processes
4. Design teams will take greater responsibility for long-term performance of the buildings they create
5. Final payment in future will be on achievement against a range of Key Performance Indicators
Soft Landings Revelations