Smart Operation in Wastewater 12 March 2014 · 2014-03-13 · Control Advanced Automation Minimise...

Preview:

Citation preview

Smart Operation in Wastewater12 March 2014

Simon Mazier

A Vision of ...

What if ...

Dashboards

Robust, real-time validation of ALLcritical-to-quality signals

Decision support

Management reports

The data in your control rooms could be trusted?

What if ...

Maintenance costs

Reliable, low-maintenance ‘soft’ sensors, to support or supplement data

Sampling & reporting

Process insight

Missing information wasn’t missing any more?

What if ...

Optimal operation

Predictive control of storm events, first flush, load swings, maintenance outages

Minimised costs

Reliable outcomes

Your process could see into the future?

What if ...

Centralised control

Condition monitoring: early warning of sub-optimal performance, auto-optimisation

TOTEX performance

Capital deferment

Your assets were self-monitoring and self-optimising?

What if ...

Asset standards

Live KPI reporting within SCADA: empowers operators, changes culture

Investment decisions

Long term gains

Improvements could be sustained?

What if ...ALL of this was already here?

Data

Univariate / Multivariate

High / Low limit

Frozen signal

Rate of change

T-test: shift in Mean

Q-test: outlier detection / rejection

Signal value vs Process drift / fault

Live signal validation + reporting

Data Quality Monitor for ALL critical signals

DataLive signal validation + reporting

Data Quality Monitor for ALL critical signals

Sensor Quality: any SCADA, any probe

Data

Soft Sensors:Intelligent use of existing data

Soft sensors: more reliable, more robust

Signal reconstruction + inferential sensors

Monitor

self-monitoring,self-optimisingAsset Management

What is ‘normal’?

Transform data into knowledge

Monitor

self-monitoring,self-optimisingAsset Management

Transform data into knowledge

Control

Predictive Control:Optimise operation ahead of time

Predictions of future process behaviour

A system that sees into the future and minimises risk

Control

Advanced Automation

Minimise operator intervention

Minimise risk of compliance failure

Robust operation under all conditions

Integrated control across multiple assets

Aeration energy reduced by 25-35%

Predictive Control:Optimise operation ahead of time

A system that sees into the future and minimises risk

Control Predictive control of and management of risk

Maintain

Identify root cause of sub-optimal performance

Targeted maintenance

Transform data into knowledge

Operator buy-in,Intelligent Maintenance

MaintainSustainable Benefits

Advanced

Process

Control

www.PerceptiveAPC.com

Recommended