US 82 & FM 989

Widening Project

Context Sensitive Solutions Workshop

June 11, 2009

US 82 (New Boston Rd)From 0.1 mi west of US 59

To 0.7 mi west of FM 9892.5 miles

FM 989 (Kings Hwy)From 0.1 mi south of IH 30

To 0.1 mi south of US 820.9 mile

Goals of Project

Relieve congestion

– Add capacity to both roadways

Improve mobility

– Local and through traffic

Enhance safety

– Accommodate left turn movements

– Improve FM 989/US 82 intersection

Provide for pedestrian/bicycle use

Improve driveways/access management

Existing US 82

Two lanes with center left turn lane

No shoulders (US 59 to FM 989)

Two lanes

No shoulders (west of FM 989)

Proposed US 82

Four lane divided urban section

14 ft. outside lanes

12 ft. inside lanes

14 ft. center left turn lane

6 ft. sidewalk

Curb and gutter section

Pecan Street/FM 2878 reconstruction

Future connection with University Avenue

Proposed US 82Typical Section

Existing FM 989

Four 11 ft. lanes

No shoulders

Offset intersection with US 82

Proposed FM 989

Six lane divided urban section14 ft. outside lanes (right turn lane)

12 ft. middle & inside lanes

Raised median with left turn bays

6 ft. sidewalk

Curb and gutter section

Possible 12 ft. multi-use path

Realign roadway at US 82 intersection

Proposed FM 989

Typical Section

Adjacent Land Use

Commercial

Residential

Undeveloped

– Wooded & Pasture

Several Churches

Nash Elementary School in close

proximity

T-Line Route

Wagner Creek

S

Nash Elementary School

StakeholdersAdjacent property owners

TxDOT

Cities of Nash and Texarkana

Bowie County

Texarkana MPO

Partnership for the Pathway

Texarkana Bicycle Club

T-Line Transit Agency and Riders

Nash Elementary School

Utility companies

General public

Project Status

Planning stage

No funding identified for project

Preliminary schematics

Draft Environmental Assessment

One public meeting held in Nov. 2000

– US 82 segment only

– Favorable comments for widening roadway

– Concerns regarding right of way impacts

Still to be done…

Identify Funding

Public involvement/Stakeholder input

–Public meetings

–Workshops

Design

Environmental Clearance

Right of Way Acquisition

Construction

US 82 & FM 989

Widening Project

Context Sensitive Solutions Workshop

June 11, 2009

Recommended