View
1
Download
0
Category
Preview:
Citation preview
1
Charlie Wetzel, PE, PTOE
County Traffic Engineer
Seminole County Florida
Signal
Performance
Metrics
• Purdue University introduced Purdue Coordination Diagram Concept (2009)– “visualize the temporal relationship between the
coordinated phase indications and vehicle arrivals on a cycle-by-cycle basis”
• Joint Research Program with Indiana DOT, Purdue University, Econolite, PEEK, and Siemens - Indiana Traffic Signal Hi Resolution Data Logger Enumerations
• Utah DOT worked with Purdue and INDOT to develop SPM website (2012)
Brief History of SPM
2
• Advanced Loops for Full Reporting, Simple Communications for Split/Phase Data
• Supported Controllers– Econolite - Cobalt (Any firmware), ASC/3 NEMA (App version
2.50.00+ and OS 1.14.03+), 2070 with 1C CPU module (32.50+)
– Intelight - MaxTime (1.7.0+)– Peek - ATC Greenwave (03.05.0528+)– TrafficWare - 980 ATC (76.10+)– Siemens - M50 Linux / M60 ATC (ECOM 3.52+, NTCIP 4.53+)– McCain?
• UDOT software
What You Need
3
• Worked with FDOT and UDOT to start the initial installation in January 2015
• After break in firewall configured, link went “public” in February 2015
• Initial deployment – 39 signals
• Currently at 207 signals
• Using Trafficware (Naztec) ATC Controllers and advance loops
• Computer/storage requirements (ave 23MB per day per controller – for 200 controllers this is 4.4G per day and 1.7T per year)
Seminole County SPM Deployment
4
Setup
5
• SPM Configuration Tool – Add New Signal
Signal Setup
6
• SPM Configuration Tool – Detector Setup
7
Main Screen
8
Metric - Purdue Coordination Diagram
9
Metric – Arrivals on Red
10
Metric – Approach Delay
11
Metric – Approach Volume
12
Metric – Purdue Phase Termination
13
Metric –Split Monitor
• Recent consultant retiming project– Looked at AoG to adjust offsets–Reviewed Gap Outs to find extra time
• Before/After or On/Off studies
Current Uses
14
On/Off Analysis
15
16
UDOT’s SPM Site http://udottraffic.utah.gov/signalperformancemetrics
17
Metric –Red Light Monitor
Metric –Speed
18
Metric –Turning Movement Counts
19
Purdue Link Pivot
• Another tool in the Traffic Engineer’s Tool Box– Coordination improvements / retiming– Maintenance– Before/after (on/off) studies
• Great first step– Further development on reporting (range options, historical
comparisons), possible optimization would go a long way
• Staff and/or time needed to run reports and analyze results– We’ve requested new person for next fiscal year– Consultant could run time-based reports– For us, it should coordinate well with FDOT D5’s proposed
AAM efforts
Take Away
20
• Big question – how will new SPM systems in Florida be implemented and who will do them?–Consultants–Manufacturers
Take Away
21
ATMS.Now Purdue Logging
22
Questions or Comments
23
Charlie Wetzel, PE, PTOE
cwetzel@seminolecountyfl.gov
http://spm.seminolecountyfl.gov/signalperformancemetrics/
Recommended