View
219
Download
1
Category
Preview:
Citation preview
30,000 SF - 201,020 SFAvailable For Sale or Lease
SIEMPRE VIVA BUSINESS PARKBUILDING 17 & 18 San Diego, California 92154
Manufacturing, Distribution, and Warehouse
Siempre Viva Business Park Advantagesn A 116 acre corporate industrial and technology parkn State-of-the-art industrial buildingsn Corporate landscaping and CC&R'sn U.S. Department of Commerce Foreign Trade Zonen Otay Mesa's highest quality business parkn All street, gutter, sidewalk, and utility infrastructure in placen Sustainable building and site designn Walking distance to the Otay Mesa Border Crossing
Otay Mesa Advantagesn New freeways: SR-905 and SR-125n South Bay offers San Diego County's most plentiful labor supplyn Estate and family-oriented homes in Otay Ranch and Eastlake provide spectacular housing for executives and staffn Time-saving reverse commutes against traditional traffic
SIEMPRE VIVA BUSINESS PARK A 2,100,000 SF master-planned, corporate quality industrial park located in the Otay Mesa area of the City of San Diego.
n Building 18 121,970 square feet Now Availablen Building 17 79,050 square feet Plans Complete - Shell delivery in 150 days
n Divisible to 30,000 square feetn Can combine to 201,020 square feet
INDUSTRIAL BUILDINGS FOR SALE OR LEASE
PROJECT SUMMARY
DET
ENTI
ON
BA
SIN
BUILDING 1779,050 SF
PROPOSEDOFFICEAREA
PROPOSEDOFFICE
TRUCK COURT
26 D
OCK
HIGH
LOA
DING
DOO
RS
54'
557'
470'
155'
52'
210'
RAMP
19 D
OCK
HIGH
LOA
DING
DOO
RS
TRUCK COURT
PROPOSEDOFFICEAREA
55'
50'
BUILDING 18121,970 SF
PROPOSEDOFFICEAREA
132'
RAMP
192'
132'
SUITE C
SUITE B
SUITE A
SUITE B
SUITE A
BUILDING 182600 MELKSEE STREET
BUILDING 18 FEATURES
MEZZANINE AREA 5,000 SFBUILDING FOOTPRINT AREA 116,970 SFTOTAL AVAILABLE AREA 121,970 SF DIVISIBLE TO: 30,000 SF
CLEAR HEIGHT 32’ - 34'TYPICAL COLUMN SPACING 50’ X 55’BUILDING DIMENSIONS 210’ X 557’MINIMUM TRUCK YARD DEPTH 132’DOCK HIGH LOADING DOORS 26GRADE LOADING DOORS 4STANDARD PARKING 186STANDARD PARKING RATIO 1.5 / 1,000LAND AREA 7.745 ACRES
n CORPORATE ENTRYn CONFERENCE ROOM BALCONYn 3.0% VENTED SKYLIGHTSn HIGH LEVEL NATURAL WAREHOUSE LIGHTINGn OFFICE SPACE TO SUITn WIDE CONCRETE TRUCK COURTSn ESFR SPRINKLERSn 4,000 - 8,000 AMPS OF 277/480 VOLT 3 PHASE POWER (EXPANDABLE)n AMPLE SEWER AND WATERn 5 EXCLUSIVE INGRESS / EGRESS POINTS TO THE SITE
FLOORPLAN AND FEATURES
RENTAL RATE: $.725 NNN
MELK
SEE S
TREE
T
DET
ENTI
ON
BA
SIN
BUILDING 1779,050 SF
PROPOSEDOFFICEAREA
PROPOSEDOFFICE
TRUCK COURT
26 D
OCK
HIGH
LOA
DING
DOO
RS
54'
557'
470'
155'
52'
210'
RAMP
19 D
OCK
HIGH
LOA
DING
DOO
RS
TRUCK COURT
PROPOSEDOFFICEAREA
55'
50'
BUILDING 18121,970 SF
PROPOSEDOFFICEAREA
132'
RAMP
192'
132'
SUITE C
SUITE B
SUITE A
SUITE B
SUITE A
BUILDING 17 FEATURES
MEZZANINE AREA 6,200 SFBUILDING FOOTPRINT AREA 72,850 SFTOTAL AVAILABLE AREA 79,050 SF
DIVISIBLE TO: 30,000 SF
MINIMUM CLEAR HEIGHT 28’ - 30'TYPICAL COLUMN SPACING 52’ X 54’BUILDING DIMENSIONS 155’ X 470’MINIMUM TRUCK YARD DEPTH 192’DOCK HIGH LOADING DOORS 19GRADE LOADING DOORS 2STANDARD PARKING 141STANDARD PARKING RATIO 1.8 / 1,000LAND AREA 4.2 ACRES
n CORPORATE ENTRYn CONFERENCE ROOM BALCONYn 3.0% VENTED SKYLIGHTSn HIGH LEVEL NATURAL WAREHOUSE LIGHTINGn OFFICE SPACE TO SUITn WIDE CONCRETE TRUCK COURTSn ESFR SPRINKLERSn 277 / 480 VOLT 3 PHASE POWERn AMPLE POWER, SEWER, AND WATERn SHELL DELIVERY IN 150 DAYS FROM LEASE EXECUTION
FLOORPLAN AND FEATURES
BUILDING 178500 KERNS STREET
KERNS STREET
805INTERSTATE
5INTERSTATE
905
905
125
11
DowntownSan Diego
San DiegoIntl Airport
Coronado
Point Loma
TJ IntlAirport
Brown FieldAirport
Otay MesaPort of Entry
Brittania Blvd
Otay Mesa Rd
Airway Rd
Siemp
re Vi
va R
dCross BorderTerminal
N
Inte
rnat
iona
l Bor
der
Pacifi c Ocean
Bldg 17Bldg 18
OTAY MAJOR TENANTS AERIAL
PARK SUMMARYWestern Phase [In Process]
Tenant / User Land Area Total SF
FedEx / Pacific World (14) 12.4 248,136General Dynamics (15) 11.3 225,763Tyson / Circle Foods (16) 9.7 159,631Building 17 4.2 79,050Building 18 7.7 121,970
Total 45.3 834,550
Eastern Phase [Completed]
Tenant / User Land Area Total SF
Hitachi Transport (8) 6.3 112,000Hitachi Transport (9) 12.2 257,972US Joiner/Mattel (10) 7.6 115,290Kojima America (11) 6.4 103,908
Total 32.5 589,170
Siempre Viva Business Park Summary
Land Area Total SF
Central Phase 37.9 670,603Eastern Phase 32.5 589,170Western Phase 45.1 834,550
Total 115.5 2,094,323
Central Phase [Completed]
Tenant / User Land Area Total SF
San Diego Coil Center (SDCC) 4.2 82,000Samwha USA, Inc. (1) 2.7 44,185Triboro (2) 3.5 66,243Pioneer / NYK (3) 3.4 56,120Air Tiger / Art Leather (4) 3.4 56,120UPS-SCS / BOSE (5) 6.2 118,550Iron Mountain (6) 10.0 187,625UPS-SCS / Eaton (7) 4.5 59,760
Total 37.9 670,603
AERIAL
ORIGINAL SIEMPRE VIVA BUSINESS PARK TENANTS AND OWNER USERS
1
2
3
4
5
7
8
9
10
11
14
16
SDCC
FUTURE BUILDING 17
PACIFIC WORLDC O S M E T I C S
VF Corporation
15
6
BUILDING 18
163
54
67
125
15
5
15
OTAY MESAUNITED STATES
MEXICO
POWAY
CLAIREMONTMESA
TIERRASANTA
NATIONALCITY
BONITA
OTAY RANCH
EASTLAKE
DEL MAR
BROWN FIELDAIRPORT
LA JOLLA
POINTLOMA
MISSIONBAY
CORONADO
IMPERIALBEACH
SAN DIEGO
EL CAJON
24MILES
KEARNY MESA22
MILES
UNIVERSITYTOWN CENTER
27MILES
LINDBERGHFIELD21
MILES DOWNTOWN19
MILES
MID-CITY LA MESA
54
67
125
125
125
905905
56
54
94
163
94
52 52
8055
15
15
15
5
8
805
805
8
SANTEE
SPRINGVALLEY
MISSION VALLEY
Freeway access to allSan Diego locations
OTAY RANCH
▪ 23,000 ACRES
▪ MASTER-PLANNED FOR UP TO 40,000 HOMES
57MILES
OCEANSIDE
JAMUL
GRANITE HILLS 361MILES
PHOENIX
51MILES
CARLSBAD
FREEWAY MAP
BFBP
BFBP
SDBP
SDBP
BROWN FIELDMUNICIPAL AIRPORT
TIJUANA INTERNATIONALAIRPORT
Airway Rd
Otay Mesa Rd
Siempre Viva Rd
Britannia R
d
125
905
905
Cactus R
d La Media R
d
Enrico Ferm
in Dr
Alta R
d
CITY OF CHULA VISTA
CITY OF SAN DIEGO
COUNTY OF SAN DIEGO
FUTURERESIDENTIAL
OPEN SPACECROSS BORDER
TERMINAL OTAY MESABORDER CROSSING
Heritage R
d
UNITED STATES
MEXICO
5
DET
ENTI
ON
BA
SIN
SIEMPRE VIVA ROAD
KERNS STREET KERNS STREETKERNS STREET
LA M
EDIA
RO
AD
DRU
CK
ER L
AN
E
SAR
NE
N S
TRE
ET
1110
1
16
14
2
3PIONEER
5
BOSE
6
NYKDISTRIBUTIONS
SAMWHAUSA UPS-SCS
EATONIRONMOUNTAIN
PACIFICWORLD
KOJIMA AMERICA
CIRCLE FOODS
FEDEX
15GENERAL DYNAMICS
/ NASSCO
HITACHITRANSPORT
USJOINERMATTEL
MDC
SANDIEGOCOIL
CENTER7
CONTAINERFREIGHT STATION
8
4
40 AVAILABLE TRAILER PARKING SPACES
17 79,050 SF
LAND SALE OR BUILD-TO-SUITOPPORTUNITIES
LEASED / OCCUPIED
MEL
KSE
E ST
REET
18121,970 SF
WESTERN PHASE CENTRAL PHASE EASTERN PHASE
9
SIEMPRE VIVABUSINESS PARK
MURPHY DEVELOPMENTOTAY PROJECTS
Siempre Viva Business Park
Brown Field Business Park
Brown Field Technology Park
San Diego Business Park
SR-11 approved
Future 125 connector
County/City Border
Freeway On/Off Ramp
BFBP
BFTP
SDBP
FutureOTAY 2 BORDER
CROSSING
METROPOLITAN AIRPARK
BFTP
BFTP
SUBMARKET MAP
MURPhY DEVELOPMENT COMPANY OTAY MESA ExPERIENCE
OTAY MESA BUILD-TO-SUIT OR LEASE TRANSACTIONSSan Diego Business Park Square Feet
Sanyo: Phase 1 323,745Sanyo: Phase 2 443,000Maxell America 108,000American Home Products 229,000Casio 76,800Hitachi Transport System America 57,600Nippon Seiko / Electrolux 86,600
Total San Diego Business Park 1,324,745
Brown Field Business Park
Masterplanned 2,000,000Constructed:Honeywell 205,800Graphite Design International 84,000
Total Brown Field Business Park 289,800
Brown Field Technology Park
Masterplanned 3,200,000
Total Brown Field Technology Park 3,200,000
Siempre Viva Business Park Square Feet
San Diego Coil Center 82,000Samwha USA, Inc. 44,185Triboro 66,243Pioneer / NYK Distributions 56,120Air Tiger Express / Art Leather 56,120UPS-SCS / BOSE 118,550Iron Mountain 187,625UPS-SCS / Eaton 59,760Hitachi Transport (Buildings 8 & 9) 369,972US Joiner / Mattel 115,290Kojima America 103,908VF Corporation / Other 248,136General Dynamics 225,763Tyson / Circle Foods 159,631
Total SVBP Buildings Constructed 1,893,303
Buildings Available
Buildings 17 79,050Buildings 18 121,970
Total SVBP Buildings 2,094,323
Otay Mesa Corporate Parks Net Land Acres Master-Planned Square Feet Status
San Diego Business Park 80 acres 1,324,745 completedBrown Field Business Park 155 acres 2,000,000 completedSiempre Viva Business Park 116 acres 2,094,323 currentBrown Field Technology Park 50 acres 3,200,000 current
Total 401 acres 8,619,068
hISTORY
For More Information Please Contact
ANDY IRWIN619.710.8000 x13
airwin@murphydev.com
MURPHY DEVELOPMENT COMPANY2750 Womble Road, Suite 102San Diego, California 92106
www.murphydev.com
CONTACT
Recommended