SESAME Straits Update on the Straits Traffic … F 6.1 Straits Project 9 Ship... · • Use...

Preview:

Citation preview

– Vi tar ansvar for sjøvegen

SESAME Straits – Update on the Straits Traffic Management system

John Erik Hagen, Regional Director

Norwegian Coastal AdministrationIndonesia 26 September 2016

SESAME Straits - objectives

26.09. Page 3

The primary objective is to develop and validate shared situational

awareness and cooperative decision making between ship's bridge team and

shore based Vessel Traffic Service (VTS) personnel.

Secondary objectives are:

• Just In Time arrival within a Regional Maritime Service Portfolio

• Use existing systems/equipment as far as possible

SESAME Straits - Secure, Efficient and SAfe maritime traffic ManagEment in the Straits of Malacca and Singapore

SESAME Straits - partners

• Project members:

– MPA, NCA, RCN, Vestfold University,

Navtor, Marintek, SimPlus,

KONGSBERG

• Country Agreement:

– Singapore/Norway R&D MoU

• Funding - MAROFF programme:

– Budget approx. NOK 25 mill

• Project Owner:

– Kongsberg Norcontrol IT

SESAME Straits - CONOPS

Hot spot detection Route & Speed

optimization

Ship reports its

position,

destination,

ETA

S-AIS Ship report

C-Scope VTS Centre

Ship alters

speed and/or

changes route

• Shared situational awareness

• Cooperative decision support

• Regional Maritime Service

Portfolio (MSP) Route Advice-JIT:

o Efficient traffic flow

o Reduced navigation risk

o Reduced ship bunkers

o Reduced toxic gas emissions

o Better utilization of port facilties

resources

Ship Traffic Simulator

prediction

Route Advice

evaluated for

onboard decision

making

Route Advice

service: new

route and/or

speed

VHF

Voice/

AIS

SESAME Straits – Work Packages

WP No Description Responsible

1 Monitoring and control strategy, metrics Norwegian Coastal

Administration

2 Analysis of decision making - HCD Vestfold University

3 System design – S100/200 Kongsberg Norcontrol IT

4 Data collection and preparation Marintek

5 Simulation collaboration - SimPlus Kongsberg Norcontrol IT

6 Cooperative Decision Support Tools Kongsberg Norcontrol IT

7 Ship-shore data communication Kongsberg Maritime

8 Upgraded Planning station Kongsberg Maritime/NAVTOR

9 Demonstration and dissemination Kongsberg Norcontrol IT

10 Management Kongsberg Norcontrol IT

– Vi tar ansvar for sjøvegen

The current status of the SESAME

Straits Project • Work Package 1 – Monitoring and Control Strategy

This work package is concluded.

• Work Package 2 – Analysis of Decision-Making Process

Focus on the simulator testing that will be conducted in Q4 2016 and Q1 2017. This simulator testing will focus on how the availability of an optimized route affects decision making, as well as safety of navigation.

• Work Package 3 – System Design

System Design is concluded.

• Work Package 4 – Data Collection and Preparation

This work package is concluded.

– Vi tar ansvar for sjøvegen

Status….

• Work Package 5 – Simulator Development

KNC, Marintek, and SimPlus continue bi-weekly teleconferences to finalize integration testing.

Currently, the ECDIS, Straits Traffic Management System (STM), and Ship Traffic Simulator (STS) can share information with each other.

The STM system can receive a route from the ECDIS and send the route to the STS. Once the STS has performed its calculations and optimized the route, the result can be displayed on the STM system, which can then forward the optimized route to the ECDIS.

Integration testing is in progress

– Vi tar ansvar for sjøvegen

Status…..

• Work Package 6 – Cooperative Decision Support

Work is ongoing to not only visualize hot spots but also provide suggested actions to reduce risk to navigation, ie. reduce speed to x knots.

• Work Package 7 – Ship Shore Communication

The first prototype VDES transponder is scheduled to be ready by October.

• Work Package 8 – Upgraded Planning Station

Work is ongoing with finalizing communications.

• Work Package 9 – Demonstration and Dissemination

The SESAME Straits project presented two papers at the 2016 e-Navigation Underway International conference, as well as the Innovation e-nav.no conference.

WP 1 - Metrics

20172016

SESAME Straits - Schedule

2014 2015

WP 2 - Analysis of decision making-HCD

WP 3 – System design

WP 4 - Data collection , preparation, analysis

WP 5 - Simulation

WP 6 - Cooperative decision support tools

WP 7 - Ship-shore data communication

WP 8 - Upgraded Planning station

WP 9 - Demo

WP 10 - Management

1. The Project is in progress according to the time schedule

2. The Project will be finalized in April 2017 (SMW)

3. A possible SESAME 2 Project is about to be discussed,

with focus on e-Navigation

solution 2: Standardized and

automatic ship reporting

Summary

e-Navigation is

“three sides of a

coin” and money

makes the

shipping industry

spin!

Recommended