SECIN S.A.
1
1. Client Chevron Texaco Job 3052 - Las Bases Field Surface Facilities
Construction Year 2001 Turn Key Dew Point Plant.
Scope of supply
• Basic Engineering, Construction, Commissioning and Start-Up.
The plant consisted of a Dew-Point Control Plant, with mechanical Propane Refrigeration Unit and Etylenglicol Injection System, a Regenerator System for the Etylenglicol and a Propane Stabilization System. Capacity: 780000 Std.m3/d @ 78 barg.
5. Client TOTAL AUSTRAL 6. Job 3062 - Plant Debottlenecking, Aguada Pichana
Construction Year 2001 Process Simulation, Engineering, Construction and Precomissionning of Vessels, Piping and Control.
Scope of supply
• Skid with HEAT EXCHANGER & CHILLER Package.
Quantity: 1
Gas-Gas Design - Type: Nat Gas – Nat Gas Exchanger, NEM horizontal TEMA type. 2 Shell
connected in Series. - Heat Duty: 7304 kW. - Size: OD 1156 mm, Length 18000 mm, Thickness 44.5 mm. - Tubes: 1504 plain tubes, OD 15.9 mm. - Design: Shell Side: 87 barg., Temperature: -45.5 ºC in, 65 ºC out.
Tube Side: 87 barg., Temperature: 65 ºC in, -45.5 ºC out. Chiller Design
- Type: Propane – Nat Gas Exchanger, BKM horizontal TEMA type. - Heat Duty: 1779 kW. - Size: OD 1614 mm, Length 11000 mm, Thickness 19 mm. - Tubes: 941 plain tubes, OD 19 mm. - Design: Shell Side: 25.4 bara., Temperature: -45 ºC in, 38 ºC out.
Tube Side: 87 bara., Temperature: 65 ºC in, -45 ºC out.
- Total Weight: 180000 Kg.
• Skid with LOW TEMPERATURE SEPARATOR Package. Quantity: 1
Design
- Inlet: Gas 5522000 Std.m3/d, Liquid 500 m3/d. - Design Pressure: 87 barg. - Design Temperature: -45 / 65 ºC. - Vessel: Horizontal, OD 1475 mm, Length (TL-TL) 7100 mm, Thickness 50.8
mm. - Additional Equipments: Refrigerant Reclaimer and Condensate-Refrigerant
Exchangers. - Skid Weight: 25000 Kg
SECIN S.A.
1
1. Client Chevron Texaco Job 3121 - Campo Bremen Project
Construction Year 2002 Engineering, Construction and Precomissionning of Vessels, Piping and Control.
Scope of supply
• GASOLINE STABILIZER Package.
Quantity: 1
- Includes Stabilization Tower, Stabilizer Reboiler, Heater, Liquids and Flash Separator.
- Production: 150 m3/d Gasoline PVR < 11 PSIA a - PVR 7.0 PSIA.
SECIN S.A.
1
1. Client Repsol YPFRepsol YPF Job 3167 – Loma de La Lata Plant
Construction Year 2002 / 2003 Turn Key gasolina estabilization plant
Scope of supply
• Basic Engineering, construction, commissioning and Start-up. • Gasolina estabilitation instalation with stabilization tower, reboiler, gasolina cooler, recicle compresor, piping, instrumentation and control.
Design - 1000 m3/day gasolina - PVR 7.0 PSIA.
SECIN S.A.
1
12. MERICHEMMERICHEM
Job 3245 – UN MODULO PARA TRATAMIENTOS DE NAFTAS
Construction Year 2004
11. Client TOTAL AUSTRALTOTAL AUSTRAL Job 3248 – CARINA ARIES MEG UNIT
Construction Year 2004 TWO MEG UNITS
Scope of supply
• Basic Engineering, construction, commissioning and Start-up. • MEG UNITS with reboiler, contactor column, pumps, filters, aircooler and control
Design: Flow: 9,4 m3/hr Initial concentration: 60% Final Concentration: 90%
Salto de página
12.
SECIN S.A.
1
Client PROFERTIL Job 3223
Construction Year 2004 Reparing one CARBAMATE Stripper
Scope of supply
Man power Material Engineering
Design
- Weight: 150.000 Kg.
Material: Carbon steel lined with 25/22/2 (Cr/Ni/Mo) Tubes: Stainless Steel 25/22/2 (Cr/Ni/Mo) inner lined with zirconium