Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

1Seattle, Washington

Seattle Design CommissionAlley Vacation PetitionApril 3, 2008

Block 101

City Place IV, LLC505 5th Ave SSuite 900Seattle WA 98104(206) 342-2016Contact: Rachel Ben-Shmuel

Callison1420 5th Ave Suite 2400Seattle WA 98104(206) 623-4646Contact: Michael Medina

DPD Project #: 3008521

301 BOREN AVE. N.

PHASE 2 & 3

BLOCK 101

PHASE 1A

PHASE 4

PHASE 5BLOCK 100

PHASE 1B

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

2Seattle, Washington

9-BLOCK &TOPOGRAPHY

MAPS

9-Block Map

Block 102Phase 1A

Block 100Phase 5

Fred RogersBuilding

Bio-RadBuiding

Seattle TimesBuilding

Troy LaundryBuilding

Terr

y Av

e N

Bor

en A

ve N

Harrison St

Thomas St

9-Block TopographyCLASS 2 PEDESTRIAN STREET per Text Amendment Ordinance 122611

Van VorstBuilding

retail

offi ce/warehouse

offi ce

fl orist

offi ce

offi ce

offi ce/retail

offi ce/retail

proposedoffi ce

DavidSmith

Building

EL 52.0’

EL 96.0’

EL 128.0’

Block 101Phase 4

Westlake Terry

offi ce/retail

offi ce/retail

offi ce/retail

offi ce

offi ce

EL 64.0’

EL 60.0’

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

3Seattle, Washington

Bio-Rad

Harrison Street (Class 2 Pedestrian)

Bor

en A

venu

e N

orth

Terr

y Av

enue

Nor

th

South Lake UnionStreetcar

Stop

EXISTING SURFACECONDITIONS

Wes

tlake

Ter

ry

E. 52’

E. 96’

1-StoryTO BE

DEMOLISHED

1-StoryTO BE DEMOLISHED

Terry Ave BuildingTO REMAIN Retaining Wall

Site Constraints

1. BioRad Laboratories to remain

2. Desire to save the Terry Avenue Building

3. Signifi cant elevation change

E. 60’

E. 64’

Thomas Street (Class 2 Pedestrian)

2-StoryTO BE

DEMOLISHED

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

4Seattle, Washington

Terry Avenue Building from Terry Avenue

Terry Ave Bldg Roof from Boren Ave NAlley View

BLOCK 101EXISTING BUILDINGS

One Story ShedBio-Rad Laboratory

Aerial View from the West

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

5Seattle, Washington

Alley View to the South Alley View to the North

BLOCK 101 ALLEY VIEWS

INTERURBAN PROJECT(PHASE 1A)

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

6Seattle, Washington

No Vacation Option - Massing DiagramAerial View from West

With Vacation Option - Massing DiagramAerial View from West

MASSING DIAGRAMS

EXISTING TERRY AVENUE BUILDING

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

7Seattle, Washington

Massing Diagram - No VacationView from Terry Ave N looking East

Massing Diagram - With VacationView from Terry Ave N looking East

MASSING DIAGRAMS

EXISTING TERRY AVENUE BUILDING

TERRY AVENUE BUILDING

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

8Seattle, Washington

BLOCK 34PLANNING DIAGRAM

Harrison St.

Thomas St.

Bor

en A

venu

e

Terr

y Av

enue

North Building

South Building

Bio-Rad

Terry AveBuilding

Harrison St.

Thomas St.

Bor

en A

venu

e

Terr

y Av

enue

Bio-Rad

No Vacation Option Alley Vacation Option

710 cars

65 cars

Alle

y

Alley

Alle

y

EXISTING TERRY AVE BUILDING

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

9Seattle, Washington

SCHEMATICLOADING & GARAGE

ENTRY PLAN

Approx710 cars

Approx60 cars

Ramp Access from Thomas Street

to Bio-Rad Parking

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

10Seattle, Washington

SCHEMATICPLAZA AND LOBBY

ENTRY PLAN

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

11Seattle, Washington

OPEN SPACECONTEXT PLAN

Planned & ProposedThrough Block Connections

BLOCK 101

Planned & ProposedLandscape Plan

BLOCK 101

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

12Seattle, Washington

OVERALL VIEWSOF DEVELOPMENT

Looking East Along Terry Ave.

Looking West Along Boren Ave.

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

13Seattle, Washington

OVERALL VIEWSOF DEVELOPMENT

Looking Southwest

Looking Northwest

Looking Southeast

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

14Seattle, Washington

VIEWS OF COURTYARD

Landscaping at Boren Avenue Plaza View of Terry Avenue Building East Facade

View down Hillclimb from Boren Avenue PlazaView up Hillclimb from Terry Avenue North

Design Commission Meeting Block 101April 3, 2008

Callison Project #207193.00

Project: Amazon Phase IV

15Seattle, Washington

Bio-Rad Thomas St.

Harris

on S

t.

Terry Ave. N.

AERIAL VIEWOF HILLCLIMB

Recommended