SCHEDULE OF REINFORCEMENT FOR PIER 2 BORED PILE

Preview:

Citation preview

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

PIER 2 BORED PILE DETAILS

P2SB-40

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=23m, Ø2000mm)

a b c d e

SCHEDULE OF REINFORCEMENT FOR PIER 2 BORED PILE

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

SCHEDULE OF REINFORCEMENT FOR PIER 6 BORED PILE

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

PIER 6 BORED PILE DETAILS

P2SB-49

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=33m, Ø2200mm)

a b c d e

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

C O N S U L T A N T S SUBMITTED BY

PROJECT MANAGER - UICI

DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

ALBERTO C. CAÑETE, P.P., F. ASEP

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

P2SB-50

PIER 7 COLUMN PLAN AND ELEVATION

COLUMN SECTION

SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES

b

a

c

A

e

a

c

b d

f

B

b

c

a

C

D

a a

b

E

a

F

D

a = PixDx3pcs

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALEDRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO.

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALEDRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO.

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

PILE CAP DETAIL

PEDESTAL DETAIL

PIER 7

SCHEDULE OF REINFORCEMENTS FOR PILE CAP - PIER 7

P2SB-51

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

PIER 7 BORED PILE DETAILS

P2SB-52

SCHEDULE OF REINFORCEMENT FOR PIER 7 BORED PILE

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=31m, Ø2000mm)

a b c d e

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

PIER 8 BORED PILE DETAILS

P2SB-55

SCHEDULE OF REINFORCEMENT FOR PIER 8 BORED PILE

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=31m, Ø1800mm)

a b c d e

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

C O N S U L T A N T S SUBMITTED BY

PROJECT MANAGER - UICI

DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

ALBERTO C. CAÑETE, P.P., F. ASEP

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

P2SB-56

PIER 9 COLUMN PLAN AND ELEVATION

COLUMN SECTION

SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES

b

a

c

A

e

a

c

b d

f

B

b

c

a

C

D

a a

b

E

a

F

D

a = PixDx3pcs

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

PILE CAP DETAIL

PEDESTAL DETAIL

PIER 9

SCHEDULE OF REINFORCEMENTS FOR PILE CAP - PIER 9

P2SB-57

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

PIER 9 BORED PILE DETAILS

P2SB-58

SCHEDULE OF REINFORCEMENT FOR PIER 9 BORED PILE

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=30m, Ø2000mm)

a b c d e

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

C O N S U L T A N T S SUBMITTED BY

PROJECT MANAGER - UICI

DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

ALBERTO C. CAÑETE, P.P., F. ASEP

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

P2SB-59

PIER 10 COLUMN PLAN AND ELEVATION

COLUMN SECTION

SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES

a

b

b

A

e

a

c

b d

f

B

b

c

a

C

D

a a

b

E

a

F

D

a = PixDx3pcs

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

PILE CAP DETAIL

PEDESTAL DETAIL

PIER 10

SCHEDULE OF REINFORCEMENTS FOR PILE CAP - PIER 10

P2SB-60

SCHEDULE OF REINFORCEMENT FOR PIER 10 BORED PILE

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

PIER 10 BORED PILE DETAILS

P2SB-61

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=36m, Ø2200mm)

a b c d e

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

PIER 14 BORED PILE DETAILS

P2SB-69

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=25m, Ø2000mm)

a b c d e

SCHEDULE OF REINFORCEMENT FOR PIER 14 BORED PILE

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

PIER 15 BORED PILE DETAILS

P2SB-71

SCHEDULE OF REINFORCEMENT FOR PIER 15 BORED PILE

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=24m, Ø2000mm)

a b c d e

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

PIER 16 BORED PILE DETAILS

P2SB-73

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

OIC - PMD

JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

PRESIDENT - UICI

DATE:

EFREN L. DAVID

- -

CHECKED BY

DATE:-

-

PROJECT MANAGER

RYAN PAUL S. GALURA

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE, P.P., F.ASEP

SCHEDULE OF REINFORCEMENT FOR PIER 16 BORED PILE

BAR BENDING

DIAGRAM

SIZE

(mm)

SPACING

(mm)

QTY

BAR

SHAPE

BAR DIMENSION

ALL DIMENSIONS ARE OUT TO OUT OF BARS

LOCATION

BAR

LENGTH

(m)

TOTAL

LENGTH

(m)

UNIT

WEIGHT

(kg./m.)

TOTAL

WEIGHT

(kg.)

VOLUME

CONCRETE

(cu.m.)

FOR ONE (1) BORED PILE (L=23m, Ø2000mm)

a b c d e

a

b

a

a

b

c

e

d

b

a

A

B

C

D

E

BAR

MARK

PIT

CH

b

a

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

C O N S U L T A N T S SUBMITTED BY DESIGNED BY

DATE:

APPROVED BY

REVISIONS DATE PROJECT TITLE

SHEET CONTENT

SCALE DRAWING STATUS

A

B

C

D

E

F

DATE APPROVED DATE REVISED REV.

DRAWING NO. SIZEPROJECT CODE

DATE:DATE:

PROJECT MANAGER OIC - PMD

RYAN PAUL S. GALURA JOVITO M. SUNGA

AS SHOWN DRAFT DRAWING

A1

- -

-

DETAILED ENGINEERING DESIGN OF THE

PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,

MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD

DATE:- -

CHECKED BY

DATE:-

-

AIRPORT TO NCC (KM.0+000 - KM.1+500) - SACOBIA

PRESIDENT - UICI

EFREN L. DAVID

PROJECT MANAGER - UICI

ALBERTO C. CAÑETE P.P.,F. ASEP

ABUTMENT BORED PILE

SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES

P2SB-78

Location REF: SHEET NO. BORED PILE DIAMETER CORRECTED BP DIAMETER

P2SB ‐ 50 2200MMØ 2000MMØ

P2SB ‐ 51 & P2SB ‐52 2000MMØ 2000MMØ

P2SB ‐ 56 2200MMØ 2000MMØ

P2SB ‐ 57 & P2SB ‐58 2000MMØ 2000MMØ

P2SB ‐ 60 2200MMØ 2200MMØ

P2SB ‐ 59 & P2SB ‐61 2000MMØ 2200MMØ

Pier 7

Pier 9

Pier 10

Bored Pile 

LocationQty. of Vertical Reinforcement (PCS)

Pier 2 P2SB ‐ 40

Sheet No.

Pier 6 P2SB ‐ 49

Pier 7 P2SB ‐ 52

Pier 8 P2SB ‐ 55

Pier 9 P2SB ‐ 58

Pier 10 P2SB ‐ 61

Pier 14 P2SB ‐ 69

Pier 15 P2SB ‐ 71

Pier 16

Abutment

P2SB ‐ 73

P2SB ‐ 78Detailed Dwg.

Sched. Of Reinforcement BP1 ‐ 45

Detailed Dwg.

Sched. Of Reinforcement

Detailed Dwg.

Sched. Of Reinforcement

Detailed Dwg.

Sched. Of Reinforcement

Reference

Detailed Dwg.

Sched. Of Reinforcement

Detailed Dwg.

Sched. Of Reinforcement

Detailed Dwg.

Sched. Of Reinforcement

Detailed Dwg.

Sched. Of Reinforcement

BP1 ‐ 64; BP1' ‐ 32; BP1" ‐ 64

Detailed Dwg.

Sched. Of Reinforcement

Detailed Dwg.

Sched. Of Reinforcement

BP1 ‐ 26; BP1' ‐ 26; BP1" ‐ 26

BP1 ‐ 44

BP1 ‐ 32

BP1 ‐ 68; BP1' ‐ 48; BP1" ‐ 40

BP1 ‐ 64; BP1' ‐ 32; BP1" ‐ 64

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 60

BP1 ‐ 64; BP1' ‐ 32; BP1" ‐ 64

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 64; BP1' ‐ 32; BP1" ‐ 64

BP1 ‐ 80; BP1' ‐ 64; BP1" ‐ 40

BP1 ‐ 64; BP1' ‐ 32; BP1" ‐ 64

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 64; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 64; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 36; BP1" ‐ 36

BP1 ‐ 80; BP1' ‐ 64; BP1" ‐ 40

Qty. of Vertical Reinforcement (PCS) 

Corrected

BP1 ‐ 44

BP1 ‐ 44

BP1 ‐ 68; BP1' ‐ 48; BP1" ‐ 40

BP1 ‐ 68; BP1' ‐ 48; BP1" ‐ 40

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 26; BP1' ‐ 26; BP1" ‐ 26

BP1 ‐ 26; BP1' ‐ 26; BP1" ‐ 26

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 60

BP1 ‐ 60

BP1 ‐ 80; BP1' ‐ 64; BP1" ‐ 40

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

BP1 ‐ 32; BP1' ‐ 32; BP1" ‐ 32

Recommended