SAVIM TECHNOLOGIES:PRODUCTIVITY AS A SERVICE

WHY? We engage and enable remarkable increase

in productivity every year in clients

through advanced productivity

improvement systems.

What are the key

elements?

Survey ,study and recommendations by Consultants

Clocks

Public Address Systems

Software solutions

Wired and wireless Andon Boards

Network integration

IOT based solution

(

Case Study 1

Location : Bidadi ,Bangalore

Business type: Auto manufacturer

Focus: Timings and production shortfall

CHALLENGE

CHALLENGE BEFORE IMPLEMENTATION :

There is a situation where the workmen and

members were not aligned to the work timings.

There were instances of chatting and

gossip,loitering and not starting the production

on time .

IMPACT

IMPACT AFTER IMPLEMENTATION

Productivity improvement solution is

implemented.The network PA and digital

network clocks were aligned with the time and

attendance system and commissioned.

The impact after the implementation is as

follows:

On the dot timings of the work.

More discipline among the members.

Controlled break timings

Considerable improvement in output

Case Study 2

Location : HOSKOTE,Bangalore

Business type: E Commerce

Focus: Packing delay

CHALLENGE

CHALLENGE BEFORE IMPLEMENTATION:

The team had lot of difficulty in ensuring

smooth packing and validation.

There were various challenges like returns

,maintanence,packaging concerns which

hindering the productivity during a concern

A lot of time was spent in clarifying and

resolving the concern.

IMPACT

IMPACT AFTER IMPLEMENTATION:

We installed a wireless andon system which

facilitataed easy communication through audio

,alerts and visual methods.

This considerably improved the productivity of

the line of packing and validations.

The throughput improvement was appreciated

by the top management.

We are talking to them for a pan India

deployment on all the lines of manifestation.

ACHIEVEMENTS

• Successfully implemented productivity improvementsolutions to more than 15 Toyota companies.

• Configured and commissioned solutions at Myntra

warehouses.

• Completed several solutions for garment factories andwarehouses all over India.

PRODUCTION CONTROL SYSTEM SOFTWARE

Linestop delay mapping screenshot

PLANT STATUS ANDON

WIRELESS CALL ANDON WITH DELAY TIMING

KITTING STATUS ENTRY WIRELESS SWITCH PANEL

NETWORK WOLRD CLOCK – LAN SYNCED

HOW?

Phase 1 – Survey to estimate gains & tie to commercials

and success fees.

Phase 2 - Order & Contract Phase 3 – Delivery, Installation, commissioning

and handholding .

HISTORY

Company founded in 1995.

Started business in telecom

Partnered with TATAFONE,Alcatel,NEC,Ericsson,Samsungand Siemens. Savim is a premium partner with Eaton.

Consistent performance was achieved and innovation was key to our success .

OUR STRENGHTS

• Professional Work Culture

• Hi Caliber Engineers

• 20 Year Old Company

• Loyal Customer Base.

• ISO 9001 :2015 Certified.

• Developing Knowledge Base Continuously.

• Continuous Improvement Concept In Operations.

AWARDS

• Outstanding business achiever for the year2010-2011,2011-2012,2012-13,2016-17,2017-18 for EatonPower Quality.

• Best sales achievement trophy from HCL.

• Best Tata Fone dealer.

PARTIAL CUTOMER LIST

THANK YOU!

Recommended