ATTACHMENT 1
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
1 HUM-199 Culverts 0
686
96
0
756
3,116
0
0
0
1
0
0
0
655
52
78
814
2,393
3,992
0
05/01/19
04/01/20
05/01/20
10/01/20
02/01/23
In Del Norte County, at various locations from south of Myrtle Creek Bridge to south of the Oregon State line. Culvert rehabilitation and fish passage.
Baseline
1 4,654
0
655
814
2,393
78
52
3,992
DN199
1055
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
2 Hunter/Panther Creek Bridge Replacement
3,726
2,722
162
2,226
3,849
17,690
09/16/19
06/03/19
05/10/19
07/05/18
0
19
3,726
924
2,226
0
3,729
3,720
373
5,589
3,842
17,690
34,943
001/07/19
07/05/18
05/10/19
06/26/19
10/23/19
12/01/22
Near Klamath, at Panther Creek Bridge No. 01-0025 and at Hunter Creek Bridge No. 01-0003. Seismic retrofit.
Baseline
6,895 30,375
3,729
3,720
3,842
17,690
5,589
373
34,943
DN101
1072
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
3 Dominie Creek Fish Passage
1,392
1,046
111
33
1,866
4,993
07/22/20
01/17/20
01/03/20
01/15/19
0
4
1,392
19
13
0
2,000
1,141
118
151
1,643
5,852
10,905
0
01/15/19
01/03/20
01/17/20
05/20/20
01/02/23
Near the Smith River community, at Dominie Creek. Replace box culvert with new bridge and remediate fish passage barrier.
Baseline
1,428 9,441
2,000
1,141
1,643
5,852
151
118
10,905
DN101
1113
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
4 INSIDE PARK CULVERTS
306
412
69
47
386
2,532
0
0
0
0
0
0
300
480
30
88
407
2,605
3,910
0
01/14/20
01/08/21
01/21/21
05/06/21
12/01/21
Near Crescent City, at various locations from north of Elk Valley Cross Road to south of Walker Road. Culvert rehabilitation and fish passage.
Baseline
0 3,752
300
480
407
2,605
88
30
3,910
DN199
1130
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
5 Dr. Fine Bridge Replacement
14,126
3,782
611
2,725
11,954
50,902
12/10/21
04/19/21
03/19/21
12/01/19
0
122
13,158
0
37
0
13,655
4,200
650
3,900
12,250
50,448
85,103
0
03/01/20
03/19/21
04/19/21
12/10/21
12/02/25
Near Crescent City from 0.2 mile north of the Smith River Overflow Bridge. Replace bridge.
Baseline
13,317 84,100
13,655
4,200
12,250
50,448
3,900
650
85,103
DN101
0100V01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
6 Avenue Culvert Rehab
1,386
1,177
167
43
426
1,105
07/01/19
12/01/18
12/01/18
09/29/17
0
123
1,386
918
32
0
1,511
1,038
211
305
432
1,105
4,602
0
09/29/17
12/21/18
01/15/19
08/01/19
01/01/21
Near Miranda, from 2.3 miles south of Miranda Post Office to 0.9 mile south of Bear Creek Bridge. Upgrade drainage systems.
Baseline
2,459 4,304
1,511
1,038
432
1,105
305
211
4,602
HUM254
2270
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
7 Three HUM Bridges 1,522
1,354
165
138
1,681
4,063
09/01/20
02/15/20
02/01/20
02/01/19
0
0
1,342
0
0
0
2,366
0
171
1,089
1,948
6,171
11,745
0
04/19/19
02/01/20
02/15/20
09/01/20
12/07/24
In Humboldt County, on Routes 96 and 101 at various locations. Seismic retrofit three bridges.
Baseline
1,342 8,923
2,366
0
1,948
6,171
1,089
171
11,745
HUM96
2302
01
Page 1 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
8 Eureka CAPM 218
383
312
16
715
3,200
10/03/19
03/15/19
03/01/19
05/01/18
0
11
218
77
0
0
232
384
314
21
725
3,135
4,811
0
06/14/18
06/01/19
06/15/19
10/03/19
12/01/20
In Eureka, on 4th Street from Broadway to Eureka Slough Bridge; also on 5th street from O Street to Eureka Slough Bridge. Pavement rehabilitation.
Baseline
306 4,844
232
384
725
3,135
21
314
4,811
HUM101
2380
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
9 HUM-101 Strengthen 3 Bridges
618
1,283
66
45
2,219
9,630
11/14/19
06/01/19
06/01/19
09/01/18
0
7
618
745
13
0
1,010
1,355
65
1,359
2,102
10,109
16,000
0
09/18/18
05/20/19
06/03/19
10/21/19
10/04/21
In Humboldt County, at South Fork Eel River Bridge and Separation No. 04-0065, South Fork Eel River Bridge No. 04-0076 (PM 35.5), and Arcata Overhead No. 04-0079R. Strengthen three bridge structures.
Baseline
1,383 13,861
1,010
1,355
2,102
10,109
1,359
65
16,000
HUM101
2400
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
10 Redcrest CAPM 336
649
38
5
1,485
14,983
08/01/19
02/01/19
02/01/19
06/14/18
0
3
336
354
3
0
579
680
85
6
1,518
14,515
17,383
011/08/18
06/14/18
01/31/19
03/25/19
08/01/19
12/01/20
Near Redcrest, from Englewood Park Undercrossing to Eel River Bridge and Overhead. Pavement rehabilitation.
Baseline
696 17,496
579
680
1,518
14,515
6
85
17,383
HUM101
2422
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
11 5 BRIDGES DECK PRESERVATION
262
663
35
3
616
1,340
04/11/22
09/08/21
07/20/21
05/15/20
0
0
62
0
0
0
268
757
42
3
772
1,480
3,322
0
05/15/20
07/20/21
09/08/21
04/11/22
12/29/23
Near Bridgeville, at Van Duzen River Bridge No. 04-0284 (PM 17.94) and Van Duzen River Bridge No. 04-0293 (PM R23.91); also on Route 211 near Ferndale at Salt River Bridge No. 04-131 (PM R75.15), in Lake County on Route 29 near Lakeport at Hill Road East Apply polyester concrete overlay or methacrylate treatment to bridge decks.
Baseline
62 2,919
268
757
772
1,480
3
42
3,322
HUM36
2429
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
12 200/299 SEPARATION
577
799
24
27
1,075
4,022
08/04/20
03/03/20
02/04/20
08/01/19
0
0
222
0
0
0
564
857
26
31
1,124
4,028
6,630
0
10/01/19
03/02/20
03/16/20
07/22/20
12/01/21
Near Arcata, from 1.5 miles east to 2.0 miles east of Route 101 at the Route 200/299 Separation No. 04-0184. Establish standard vertical clearance.
Baseline
222 6,524
564
857
1,124
4,028
31
26
6,630
HUM299
2430
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
13 HUM-299 Culverts 1,056
1,048
66
920
1,609
4,974
02/01/22
08/01/21
08/01/21
05/01/20
0
0
400
0
0
0
904
958
77
920
1,615
4,268
8,742
0
11/01/20
11/01/21
11/01/21
05/01/22
11/01/22
Near Blue Lake and Willow Creek, from 0.1 mile east of Route 200 to 0.5 mile east of Boise Creek Campground. Rehabilitate drainage culverts.
Baseline
400 9,673
904
958
1,615
4,268
920
77
8,742
HUM299
2433
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
14 TRINIDAD CAPM 339
549
75
11
3,974
40,574
06/01/21
11/15/20
11/01/20
08/01/19
0
0
124
0
0
0
332
561
84
12
4,287
45,355
50,631
0
08/01/19
11/01/20
11/15/20
06/01/21
12/01/22
Near Trinidad, from 1.3 miles south of School Road to 0.4 mile north of Big Lagoon Bridge. Pavement rehabilitation.
Baseline
124 45,522
332
561
4,287
45,355
12
84
50,631
HUM101
2439
01
Page 2 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
15 TRINIDAD CAPM 339
549
75
11
3,974
40,574
06/01/21
11/15/20
11/01/20
08/01/19
0
0
124
0
0
0
332
561
84
12
4,287
45,355
50,631
0
08/01/19
11/01/20
11/15/20
06/01/21
12/01/22
Near Trinidad, from 1.3 miles south of School Road to 0.4 mile north of Big Lagoon Bridge. Pavement rehabilitation.
Baseline
124 45,522
332
561
4,287
45,355
12
84
50,631
HUM101
2439
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
16 TRINIDAD CAPM 339
549
75
11
3,974
40,574
06/01/21
11/15/20
11/01/20
08/01/19
0
0
124
0
0
0
332
561
84
12
4,287
45,355
50,631
0
08/01/19
11/01/20
11/15/20
06/01/21
12/01/22
Near Trinidad, from 1.3 miles south of School Road to 0.4 mile north of Big Lagoon Bridge. Pavement rehabilitation.
Baseline
124 45,522
332
561
4,287
45,355
12
84
50,631
HUM101
2439
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
17 Little Lost Man Fish Passage
1,219
949
103
115
2,068
4,909
10/15/19
03/15/19
03/01/19
03/01/18
0
19
1,219
504
8
0
1,505
644
193
1,523
1,933
4,919
10,717
0
06/01/18
03/01/19
05/05/19
08/28/19
12/01/21
Near Orick, at 0.2 mile south of Lost Man Creek Bridge. Remove fish passage barrier.
Baseline
1,750 9,363
1,505
644
1,933
4,919
1,523
193
10,717
HUM101
2447
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
18 HUM96-169 5 BRIDGES Rail Upgrade
1,044
1,545
93
278
1,770
8,385
12/01/22
12/15/21
10/05/21
04/01/20
0
0
109
0
0
0
1,050
2,127
110
278
2,242
10,486
16,293
0
06/01/20
09/01/21
11/02/21
03/23/22
12/02/24
Near Weitchpec and Orleans, at Aikens Creek Bridge No. 04-0059 (PM 28.07), Bluff Creek Bridge No. 04-0063 (PM 28.27), Bluff Creek Bridge No. 04-0225 (PM R28.91), and Slate Creek Bridge No. 04-0061 (PM 29.92); also on Route 169 at Rube Creek Bridge No. 04- Upgrade bridge rails at five locations and also strengthen for truck permit load capacity at
Baseline
109 13,115
1,050
2,127
2,242
10,486
278
110
16,293
HUM96
2449
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
19 HUM-101/MEN-271 Culverts
852
785
259
696
909
1,671
08/01/21
03/01/21
03/01/21
03/01/20
0
0
318
0
0
0
878
866
309
403
909
2,806
6,171
0
03/01/20
03/01/21
03/01/21
08/01/21
12/01/22
Near Garberville, from north of Redwood Drive to 1.3 miles south of Myers Flat; also in Mendocino County, on Route 271 near Piercy, from 0.5 mile north of Confusion Hill to 0.5 mile north of Route 101 Separation (PM 16.1 to 20.0). Rehabilitate or replace drainage culverts.
Baseline
318 5,172
878
866
909
2,806
403
309
6,171
HUM101
7002
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
20 Lak 20/29/53 Culvert Rehab
900
938
421
114
1,091
3,947
48
399
900
938
114
139
970
1,573
500
438
1,135
3,947
8,563
3,947
12/01/16
02/08/18
03/21/18
10/08/18
01/01/22
In Lake County, on Routes 20 and 29 at various locations. Upgrade drainage systems.
Baseline
2,538 7,411
970
1,573
1,135
3,947
438
500
8,563
LAK3047B
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
21 EAST LAKE CO TMS 495
761
161
38
1,045
1,801
12/17/20
08/01/20
06/25/20
07/01/19
0
0
160
0
0
0
618
844
186
39
1,073
2,123
4,883
0
10/01/19
09/21/20
10/09/20
02/03/21
12/01/22
In Lake County, on Routes 20, 29, 53, and 175 at various locations. Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring and data transmission.
Baseline
160 4,301
618
844
1,073
2,123
39
186
4,883
LAK53
3104
01
Page 3 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
22 Bachelor Creek Bridge
534
654
14
15
588
3,806
0
0
534
49
7
0
577
708
14
21
595
3,330
5,245
0Near Upper Lake, at Bachelor Creek Bridge No. 14-0001. Replace multi-plate steel culvert bridge with precast concrete box culverts and wingwalls.
Baseline
590 5,611
577
708
595
3,330
21
14
5,245
LAK20
3107
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
23 MT KONOCTI TMS 514
744
113
30
1,008
1,770
12/17/20
08/01/20
06/25/20
07/01/19
0
0
163
0
3
0
587
852
50
30
1,021
2,087
4,627
0
10/01/19
09/21/20
10/09/20
02/03/21
12/01/22
In Lake and Mendocino Counties, on Routes 20, 29, 101, 175, and 281 at various locations. Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring and data transmission.
Baseline
166 4,179
587
852
1,021
2,087
30
50
4,627
LAK29
7017
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
24 Flynn Creek CAPM & Tapered Edge
438
691
11
5
1,647
10,191
53
3
438
691
0
2
807
1,093
21
6
1,887
10,191
14,005
10,190
12/29/17
03/06/18
04/16/18
10/09/18
10/15/20
Near Navarro, from Route 1 to 0.5 mile east of Indian Creek Bridge. Pavement rehabilitation.
Baseline
1,187 12,983
807
1,093
1,887
10,191
6
21
14,005
MEN128
4598
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
25 McCoy Creek Bridge Replacement
1,246
890
81
108
2,054
5,125
452
12
1,246
890
108
2,222
1,588
973
162
464
1,829
5,125
10,141
5,124
04/27/17
03/22/18
05/01/18
10/09/18
12/01/20
Near Piercy, from 0.7 mile north of Routes 271/101 to0.4 mile south of Sidehill Viaduct. Replace bridge.
Baseline
4,930 9,504
1,588
973
1,829
5,125
464
162
10,141
MEN271
4545
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
26 Hopland CAPM 224
790
4
0
1,700
14,422
10/01/19
05/15/19
05/01/19
09/01/18
0
0
224
532
0
0
362
635
4
1
1,724
13,289
16,015
0
09/24/18
03/21/19
05/15/19
10/17/19
12/01/21
Near Hopland, from 0.7 mile south of Geysers Road to Hopland Overhead. Pavement rehabilitation.
Baseline
756 17,140
362
635
1,724
13,289
1
4
16,015
MEN101
4442
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
27 POINT ARENA CAPM
361
697
68
5
2,359
12,544
03/15/20
10/01/19
09/17/19
12/01/18
0
1
361
44
0
0
623
704
85
15
2,590
12,585
16,602
011/06/18
12/28/18
11/08/19
11/22/19
03/19/20
10/15/20
In and near Point Arena, from Sonoma County line to 0.1 mile south of Mill Street. Pavement rehabilitation.
Baseline
406 16,034
623
704
2,590
12,585
15
85
16,602
MEN1
4626
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
28 South Fork Eel River Bridge Seismic
683
869
201
18
1,012
2,935
06/01/22
01/15/22
01/01/22
10/01/20
0
0
129
0
0
0
739
1,028
248
26
1,278
3,605
6,924
0
10/01/20
01/01/22
01/15/22
06/01/22
02/01/24
Near Piercy, at South Fork Eel River Bridge No. 10-0218 (PM R106.57); also in Humboldt County (PM T0.0 to T0.1). Seismic bridge retrofit, bridge rail upgrade, restripe for wider shoulders and bicycle access, and upgrade deck drainage.
Baseline
129 5,718
739
1,028
1,278
3,605
26
248
6,924
MEN101
4627
01
Page 4 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
29 RUSSIAN GULCH BRIDGE
2,359
2,301
328
7,128
9,736
29,516
10/14/22
03/18/22
03/04/22
08/14/20
0
0
164
0
0
0
2,637
2,808
396
7,128
13,142
34,109
60,220
0
02/05/21
02/25/25
11/21/22
10/19/23
10/21/26
Near the Mendocino community, at Russian Gulch Bridge No. 10-0151 (PM 52.64). Replace or upgrade bridge to address bridge rail standards, functionality, structural integrity, and provide access for pedestrians and bicycles.
Baseline
164 51,368
2,637
2,808
13,142
34,109
7,128
396
60,220
MEN1
4636
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
30 South Eel River Bridge Seismic
1,191
1,356
181
152
2,100
5,371
06/01/22
01/15/22
12/30/21
10/01/20
0
0
280
0
0
0
737
1,295
127
618
4,179
6,383
13,339
0
10/01/20
12/30/21
01/15/22
06/01/22
12/01/24
Near Longvale, from 8.2 miles to 8.3 miles east of Route 101 at Eel River Bridge No. 10-0236. Bridge seismic retrofit.
Baseline
280 10,351
737
1,295
4,179
6,383
618
127
13,339
MEN162
4692
01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
31 Pudding Creek CAPM
323
639
35
0
901
13,549
10/01/19
05/15/19
05/01/19
09/01/18
0
1
323
310
0
0
336
501
36
1
657
13,582
15,113
0
11/28/18
05/01/19
05/15/19
10/01/19
10/16/20
In and near Fort Bragg, from Pudding Creek Bridge to 0.6 mile north of Wages Creek Bridge. Pavement rehabilitation.
Baseline
634 15,447
336
501
657
13,582
1
36
15,113
MEN1
0154T01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
32 Pudding Creek CAPM
323
639
35
0
901
13,549
10/01/19
05/15/19
05/01/19
09/01/18
0
1
323
310
0
0
336
501
36
1
657
13,582
15,113
0
11/28/18
05/01/19
05/15/19
10/01/19
10/16/20
In and near Fort Bragg, from Pudding Creek Bridge to 0.6 mile north of Wages Creek Bridge. Pavement rehabilitation.
Baseline
634 15,447
336
501
657
13,582
1
36
15,113
MEN1
0154T01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
33 Hare Creek Bridge 1,801
2,361
153
474
2,727
10,137
12/01/22
05/01/22
04/01/22
10/01/20
0
0
147
0
0
0
2,770
2,979
183
474
3,498
12,452
22,356
0
01/15/21
03/07/22
03/15/22
07/20/22
10/03/25
Near Fort Bragg, at Hare Creek Bridge No. 10-0175. Upgrade bridge rails and widen to make standard.
Baseline
147 17,653
2,770
2,979
3,498
12,452
474
183
22,356
MEN1
4588B01
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
34 Butte 70 Drainage 1,057
744
396
114
754
2,525
02/13/20
10/11/19
09/04/19
09/01/18
0
167
1,057
31
4
0
1,175
880
600
290
850
2,525
6,320
0
08/31/18
01/10/20
01/17/20
05/21/20
12/29/20
Near Pulga, from 3.0 miles west of Coal Canyon Road to Plumas County line at various locations. Drainage system restoration.
Baseline
1,259 5,590
1,175
880
850
2,525
290
600
6,320
BUT70
3588
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
35 Bieber to Adin Pavement
1,682
1,102
277
811
1,583
18,200
08/25/20
02/21/20
01/17/20
01/17/19
0
13
1,682
38
6
0
1,790
1,330
325
811
2,150
19,050
25,456
0
01/18/19
01/17/20
02/21/20
09/05/20
12/01/22
Near Adin, from west of Boyd Hill Lookout Road to Butte Creek Bridge; also in Modoc County from Ash Creek Bridge to east of County Road 87 (PM 0.0/0.5 and PM 1.0/1.8);also in Modoc County on Route 139 (PM 0.116/R0.231). Roadway rehabilitation.
Baseline
1,739 23,655
1,790
1,330
2,150
19,050
811
325
25,456
LAS299
3467
02
Page 5 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
36 Good Fred 4,442
3,016
428
5,011
3,313
29,436
11/13/19
08/14/19
08/01/19
05/25/18
0
214
4,442
1,582
126
0
1,887
2,950
400
0
0
0
5,237
012/03/18
05/25/18
10/01/19
10/14/19
03/15/20
04/15/22
In Lassen County near Westwood from 1.3 miles west of Goodrich Creek Bridge to 1.0 mile west of Willard Creek Road.. Rehabilitate Roadway and Replace Bridge Rehabilitate Roadway and Replace Bridge
Baseline
6,364 45,646
1,887
2,950
0
0
0
400
5,237
LAS36
3468
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
37 Caldwell Bridgeway 1,377
1,384
259
395
2,693
17,717
1,014
134
1,377
1,384
286
10,438
0
1,309
320
0
3,280
17,717
22,626
17,717
07/29/16
10/16/17
11/21/17
06/14/18
03/20/20
In Modoc County about 6 miles west of Alturas from 0.3 mile west of Caldwell Creek Bridge to 1.7 mile west of County Road 75.. Bridge Replacement and Roadway Rehabilitation Bridge Replacement and Roadway Rehabilitation
Baseline
14,633 23,825
0
1,309
3,280
17,717
0
320
22,626
MOD299
3522
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
38 Butte & Ash Creek Bridge Replacement
1,504
970
280
99
1,731
7,833
148
158
1,504
970
56
136
1,820
1,150
526
131
1,950
7,833
13,410
7,833
03/02/17
05/15/18
06/22/18
01/25/19
07/15/21
Near Adin, at Butte Creek Bridge No. 03-001 (PM 0.51) and at Ash Creek Bridge No. 03-002 (PM 1.02). Replace bridges.
Baseline
2,972 12,417
1,820
1,150
1,950
7,833
131
526
13,410
MOD299
3484
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
39 Modoc 139 Drainage 722
358
242
70
594
1,800
0
0
93
0
0
0
890
360
250
71
700
1,800
4,071
0
05/15/21
05/22/22
06/01/22
09/20/22
03/10/24
Near Canby, from 0.3 mile north of Howards Gulch Bridge to 0.1 mile north of Clear Lake Road, at various locations. Improve drainage facilities by repairing or replacing culverts.
Baseline
93 3,786
890
360
700
1,800
71
250
4,071
MOD139
3589
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
40 Plumas 70 Drainage 885
704
349
89
733
2,525
02/13/20
07/11/19
06/04/19
09/01/18
0
18
885
30
4
0
1,200
840
600
290
920
2,525
6,375
0
08/31/18
01/10/20
01/17/20
05/21/20
12/29/20
In Plumas County, from Butte County line to east of Moach Road at various locations. Drainage rehabilitation.
Baseline
937 5,285
1,200
840
920
2,525
290
600
6,375
PLU70
3587
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
41 Chilcoot 2R 989
709
167
13
1,417
20,310
08/27/19
03/28/19
02/25/19
01/16/18
0
104
989
655
13
0
1,200
900
170
51
1,693
19,314
23,328
008/07/18
01/16/18
11/16/18
12/07/18
05/06/19
12/24/20
In Plumas and Lassen Counties, near Chilcoot, from 1.8 miles west of Route 49 to Route 395 (Plumas PM 90.3/95.964, Lassen PM 0.0/3.889). Roadway rehabilitation.
Baseline
1,761 23,605
1,200
900
1,693
19,314
51
170
23,328
PLU70
3599
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
42 Cromberg Rehab 3,054
2,023
681
1,209
4,451
88,050
09/27/22
03/28/22
02/25/22
11/05/20
0
0
802
0
0
0
3,490
2,620
1,120
514
0
0
7,744
0
11/05/20
02/25/22
03/28/22
09/27/22
12/02/25
In and near Cromberg and Portola, from 0.2 mile east of Gill Ranch Road to 0.2 mile west of Big Grizzly Creek Bridge. Rehabilitate roadway, repair or replace culverts, upgrade guardrail, upgrade bridge railing at Humbug Creek Bridge No. 09-0022, and make pedestrian facilities American with Disabilities Act (ADA) compliant.
Baseline
802 99,468
3,490
2,620
0
0
514
1,120
7,744
PLU70
3619
02
Page 6 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
43 Redding to Anderson Six Lane - Phase 1 & 2
334
8,166
481
0
15,511
132,859
09/25/18
10/02/21
05/04/18
05/01/18
03/29/13
912
481
334
8,166
456
382
333
6,140
280
1,262
17,800
132,860
158,675
132,85903/21/19
05/01/18
05/04/18
11/30/18
10/02/21
In Shasta County in and near Anderson from Route 5/273 separation to 0.4 mile south of Churn Creek Road Overcrossing.. Widening to 6 lanes, bridge replacement and widening and roadway rehabilitation Widening to 6 lanes, bridge replacement and widening and roadway rehabilitation
Baseline
10,731 157,351
0
0
17,800
113,223
0
0
131,023
SHA5
3445A02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
44 Sidehill & Dog Creek Seismic Retrofit
2,239
3,031
108
73
8,498
33,669
6,447
94
2,239
3,031
39
26,263
671
3,100
104
82
5,770
37,298
47,025
28,129
06/02/14
05/19/15
06/18/15
02/17/16
11/15/19
Near OBrien, at Sidehill Viaduct No. 06-0042L; alsonear Lakehead at Dog Creek Bridge No. 06-0027 (PMR45.0/R45.8). Seismic retrofit bridges. (Additional contribution: $12,000,000 from Office ofTraffic Safety (OTS))
Baseline
38,113 47,618
671
3,100
5,770
22,054
82
104
31,781
SHA5
3346
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
45 Dri Whiskey 2,144
458
55
0
1,455
16,699
47
39
2,144
458
0
1
2,480
840
90
15
1,480
16,699
21,604
16,698
09/26/17
02/12/18
03/20/18
09/12/18
12/31/20
In and near the town of Shasta, from west of Crystal Creek Road to Trinity Alley. Rehabilitate pavement.
Baseline
2,689 20,811
2,480
840
1,480
16,699
15
90
21,604
SHA299
3456
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
46 Route 273 Gaps 832
1,053
424
46
986
11,183
253
201
832
1,053
46
838
880
1,100
500
233
990
11,183
14,886
11,182
12/12/16
02/16/18
03/16/18
08/06/18
11/30/20
In and near Anderson, on Route 273 at PM 3.8/7.1, PM 10.9/11.2, and PM 11.7/12.9; also near Redding, on Route 5 at PM R3.3/R3.8. Rehabilitate pavement.
Baseline
3,223 14,524
880
1,100
990
11,183
233
500
14,886
SHA273
3544
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
47 Pit River Deck Improvements
568
873
31
26
1,760
7,644
509
13
568
873
2
2,882
596
1,100
70
345
1,950
7,644
11,705
7,643
12/16/16
10/20/17
12/11/17
05/31/18
07/15/20
Near the city of Shasta Lake, from 0.2 mile south to 0.9 mile north of Pitt River Bridge Overhead No. 06-0021. Replace bridge deck overlay and rehabilitate bridge catwalk.
Baseline
4,847 10,902
596
1,100
1,950
7,644
345
70
11,705
SHA5
3548
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
48 Hat Creek Bridge replacement
1,090
1,017
238
423
1,654
6,276
104
208
1,090
1,017
52
91
1,176
1,330
410
484
1,670
6,575
11,645
6,276
07/29/16
02/20/18
03/26/18
11/30/18
11/30/20
Near Old Station, from 0.1 mile west to 0.3 mile east of Sugar Loaf Drive at Hat Creek Bridge No.06-0084. Replace Bridge.
Baseline
2,562 10,698
1,176
1,330
1,670
6,575
484
410
11,645
SHA44
3483
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
49 Burney CAPM 1,275
1,083
861
436
1,627
11,165
08/30/22
04/04/22
03/04/22
09/08/20
0
0
57
0
0
0
1,430
1,300
1,020
436
2,430
11,165
17,781
0
09/08/20
03/04/22
04/04/22
08/30/22
07/15/24
Near Burney, from 2.6 miles east of Carberry Flat Road to 0.3 mile east of Burney Mountain Power Road. Rehabilitate pavement, upgrade guardrail, and make curbs Americans with Disabilities Act (ADA) compliant.
Baseline
57 16,447
1,430
1,300
2,430
11,165
436
1,020
17,781
SHA299
3618
02
Page 7 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
50 O Brien Deck and Rail Rehab
203
510
23
0
466
2,610
02/16/21
10/26/20
09/25/20
11/05/19
0
2
203
158
0
0
250
600
40
7
580
2,215
3,692
0
01/31/19
06/07/19
06/13/19
12/24/19
12/07/20
Near Lakehead, at O?Brien Undercrossing No. 06-0148L. Rehabilitate bridge deck with concrete overlay, upgrade bridge rails, and construct approach slabs.
Baseline
363 3,812
250
600
580
2,215
7
40
3,692
SHA5
3630
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
51 263 Klamath River Bridge
2,447
1,247
256
546
3,179
19,950
238
178
2,447
1,247
331
22
2,700
1,600
280
440
3,100
19,950
28,070
19,949
11/21/16
05/02/18
05/31/18
12/21/18
11/15/21
About 8 miles north of Yreka, from 0.3 mile north of Shasta River Bridge to Route 96 (PM 56.8/57.194); also on Route 96, from 0.5 mile west to 0.2 mile east of Route 263 (PM 103.1/103.6). Replace bridge.
Baseline
4,463 27,625
2,700
1,600
3,100
19,950
440
280
28,070
SIS263
3424
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
52 Black Butte OH Br replacement
470
987
73
34
2,169
9,438
175
45
470
987
4
0
500
1,420
190
68
2,170
9,438
13,786
9,438
12/04/15
11/01/17
02/20/18
08/15/18
01/14/22
Near Weed, from south of Deetz Road Undercrossing No. 02-0161 to north of Black Butte Overhead No. 02-0004. Bridge replacement.
Baseline
1,681 13,171
500
1,420
2,170
9,438
68
190
13,786
SIS5
3509
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
53 96 Culverts 1,243
709
117
92
725
1,974
11
98
1,243
654
53
0
1,385
710
155
200
720
3,271
6,441
0
05/04/17
03/18/19
04/02/19
06/28/19
12/27/20
In and near Happy Camp, from 0.1 mile east of Swillup Creek Bridge to 2.1 miles east of Thompson Creek Bridge at various locations. Drainage system restoration.
Baseline
2,059 4,860
1,385
710
720
3,271
200
155
6,441
SIS96
3314
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
54 Ukonom 3 Drainage 802
678
317
127
987
2,070
09/01/20
03/02/20
02/17/20
03/29/19
0
24
802
4
0
0
1,450
730
350
200
1,060
2,070
5,860
0
03/28/19
02/17/20
03/02/20
09/14/20
11/15/22
Near Happy Camp, from 0.3 miles west of Swillup Creek Bridge to Route 263. Drainage system restoration.
Baseline
830 4,981
1,450
730
1,060
2,070
200
350
5,860
SIS96
3601
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
55 Sac River BOH 1,500
1,956
150
269
2,399
14,350
09/20/22
01/21/22
12/15/21
04/15/20
0
0
449
0
0
0
1,440
2,660
450
269
3,480
14,350
22,649
0
04/15/20
12/21/21
01/21/22
07/25/22
12/31/25
In Dunsmuir, from Central Dunsmuir Undercrossing to 0.1 mile north of Siskiyou Avenue at Sacramento River Bridge and Overhead No. 02-0002. Replace southbound bridge deck.
Baseline
449 20,624
1,440
2,660
3,480
14,350
269
450
22,649
SIS5
3614
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
56 Portuguese and Cade Creek
1,537
1,999
116
48
1,874
6,760
07/02/24
01/29/24
12/29/23
09/07/21
0
0
200
0
0
0
1,720
0
0
0
0
0
1,720
0
09/07/21
12/29/23
01/29/24
07/02/24
12/31/27
Near Happy Camp, from 0.9 mile west to 0.4 mile west of Gordons Ferry Road at Cade Creek (PM 43.4 to 43.8); also, near Seiad Valley at Portuguese Creek (PM 57.0). Replace deteriorated large-diameter culverts with natural-bottom structures, reduce fish passage barriers, and adjust new approaches.
Baseline
200 12,334
1,720
0
0
0
0
0
1,720
SIS96
3620
02
Page 8 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
57 Stanshaw Creek and Sandy Bar
1,494
1,899
116
37
2,692
13,700
08/27/24
02/20/24
01/19/24
10/01/21
0
0
143
0
0
0
1,910
0
0
0
0
0
1,910
0
10/01/21
01/19/24
02/20/24
08/05/24
12/31/27
Near Somes Bar, from 0.6 mile east to 1.3 miles east of Irving Creek Bridge at Stanshaw Creek (PM R8.2); also, from 1.6 miles east of Irving Creek Bridge to 1.6 miles west of Ti Creek Bridge at Sandy Bar Creek (PM 9.1). Replace deteriorated large-diameter culverts with natural-bottom structures, reduce fish passage barriers, and adjust new approaches.
Baseline
143 19,938
1,910
0
0
0
0
0
1,910
SIS96
3622
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
58 Horse Creek Bridge Replacement
2,248
2,129
615
993
2,734
14,000
04/27/24
10/01/23
03/01/23
09/01/21
0
0
165
0
0
0
2,640
0
0
0
0
0
2,640
0
09/01/21
03/01/23
10/02/23
04/26/24
11/15/27
Near Horse Creek, at Horse Creek Bridge No. 02-0117, from 0.4 mile west of Klamath River Bridge to 2.0 miles west of Kohl Creek. Replace bridge on new alignment to correct scour critical conditions, improve safety, and reduce operational deficiencies. (Long Lead Project)
Baseline
165 22,719
2,640
0
0
0
0
0
2,640
SIS96
3629
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
59 Azalea Deck and Rail Rehab
320
634
34
0
545
1,851
04/10/21
10/26/20
09/25/20
10/07/19
0
0
192
0
0
0
320
750
40
7
710
1,851
3,678
0
10/07/19
09/25/20
10/26/20
04/10/21
07/15/22
Near Mt. Shasta, at Azalea Road Overcrossing No. 02-0126. Rehabilitate bridge.
Baseline
192 3,384
320
750
710
1,851
7
40
3,678
SIS5
3631
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
60 Yreka Rehab 1,793
1,944
5,533
1,293
8,385
52,950
09/27/22
03/21/22
03/04/22
11/04/19
0
0
748
0
1
0
1,830
2,200
5,880
1,482
9,650
52,950
73,992
0
05/01/20
03/07/22
03/21/22
07/21/22
11/17/25
In Yreka, from 0.4 mile north of Laura Lane to Juniper Drive; also on Route 263 from Route 3 to 1.0 mile south of Long Gulch Road (PM 49.07 to 49.41). Reconstruct pavement structural section, replace sidewalk, driveways, curb ramps and pedestrian signals to meet current Americans with Disabilities Act (ADA) Standards, designate bikeways with new
Baseline
749 71,898
1,830
2,200
9,650
52,950
1,482
5,880
73,992
SIS3
3643
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
61 Dunsmuir GAP 1,652
4,989
63
135
11,705
116,040
09/27/22
03/10/22
10/04/21
10/02/20
0
0
1,059
0
0
0
1,620
5,090
80
135
0
0
6,925
0
10/02/20
10/04/21
03/10/22
09/27/22
11/16/26
In and near Dunsmuir and Mt. Shasta, from Sacramento River Bridge Overhead to Black Butte Overhead. Roadway rehabilitation.(G13 Contingency)
Baseline
1,059 134,584
1,620
5,090
0
0
135
80
6,925
SIS5
3685
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
62 I 5 Big and Tall 1,189
1,752
45
21
3,462
19,200
12/22/20
07/21/20
06/19/20
03/01/19
0
0
1,189
0
0
0
2,790
0
0
0
0
0
2,790
0
03/01/19
06/19/25
07/21/25
12/22/25
12/31/29
In and near Yreka at Louie Road Overcrossing (OC) No. 02-0137 (PM R31.2), Moonlit Oaks Avenue Undercrossing (UC) No. 02-0159R&L (PM R45.6), Miner Street UC No. 02-0158R&L (PM R47.6), and North Yreka Separation No. 02-0150R&L (PM R48.2); also in Redding, S Establish standard vertical clearance and improve to standard truck
Baseline
1,189 25,669
2,790
0
0
0
0
0
2,790
SIS5
3696
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
63 East Red Bluff CAPM 414
1,078
580
150
1,495
6,213
1,273
551
414
1,078
187
6,025
260
1,104
650
127
1,600
6,144
9,885
5,593
12/07/15
03/10/17
05/05/17
01/04/18
11/20/18
In and near Red Bluff, from East Sand Slough Bridge to 0.6 mile east of Stice Road. Rehabilitate pavement.
Baseline
9,528 9,930
260
1,035
1,545
5,557
97
590
9,084
TEH36
3453
02
Page 9 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
64 Sacramento River Bridge Seismic
2,228
1,678
154
152
3,582
16,269
06/24/20
12/25/19
11/24/19
07/17/18
0
52
2,228
644
19
0
2,290
1,659
280
152
3,962
16,300
24,643
0
05/21/18
02/12/20
03/04/20
09/14/20
07/30/23
In Red Bluff, at Sacramento River Bridge No. 08-0095L/R. Retrofit bridges.
Baseline
2,943 24,063
2,290
1,659
3,962
16,300
152
280
24,643
TEH5
3515
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
65 District Wide Scour Counter-Measures
716
687
185
517
583
2,400
08/26/20
03/30/20
02/28/20
02/18/19
0
24
716
17
0
0
920
720
59
147
600
1,400
3,846
0
03/27/19
02/28/20
03/30/20
09/14/20
12/30/22
In Tehama County, on Routes 5, 32, and 36 at various locations; also in Shasta County on Routes 5 and 44; also in Lassen County on Route 299 at various locations. Bridge scour prevention at nine bridges.
Baseline
757 5,088
920
720
600
1,400
147
59
3,846
TEH3549
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
66 Red Bluff Drainage 678
540
388
79
1,223
2,525
02/13/20
10/10/19
09/03/19
07/23/18
0
10
678
58
34
0
850
660
620
351
1,310
2,525
6,316
0
07/18/18
09/03/19
10/10/19
02/13/20
12/29/20
Near Red Bluff, from Shasta County line to Route 32 at various locations. Drainage system restoration.
Baseline
780 5,433
850
660
1,310
2,525
351
620
6,316
TEH36
3550
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
67 Champlin Slough 821
999
65
91
694
4,054
04/19/22
11/24/21
10/22/21
05/05/20
0
0
274
0
1
0
850
1,170
90
90
990
4,370
7,560
0
05/05/20
10/22/21
11/24/21
04/19/22
01/02/24
Near Los Molinos, from 0.2 mile south to 0.2 mile north of Champlin Slough Bridge No. 08-0006. Replace bridge to correct scour critical conditions.
Baseline
275 6,724
850
1,170
990
4,370
90
90
7,560
TEH99
3642
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
68 Swift Creek Bridge Replacement
1,510
1,212
287
751
2,057
11,490
12/01/20
05/21/20
04/16/20
01/17/19
0
43
1,510
31
5
0
1,530
1,680
119
820
2,090
8,627
14,866
0
12/13/18
04/16/20
05/21/20
12/01/20
12/29/22
Near Trinity Center, from north of Preacher Meadows Road to north of El Dorado Way. Replace Swift Creek Bridge No. 05-0059.
Baseline
1,589 17,307
1,530
1,680
2,090
8,627
820
119
14,866
TRI3
3485
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
69 Sis Tri Deck Rehab 536
1,178
142
23
1,808
6,595
02/14/20
09/13/19
09/06/19
09/28/18
0
2
536
195
3
0
1,030
1,400
150
40
1,910
6,800
11,330
0
09/24/18
09/06/19
10/15/19
04/05/20
10/11/22
In Trinity County on Routes 299 and 36 and in Siskiyou County on Route 96 at various locations. Bridge preventative maintenance at 9 bridges.
Baseline
736 10,282
1,030
1,400
1,910
6,800
40
150
11,330
TRI299
3516
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
70 Trinity 3 Drainage 972
492
480
79
1,295
3,443
02/13/20
10/10/19
09/03/19
09/01/18
0
23
972
51
1
0
1,550
975
550
365
1,580
3,443
8,463
0
11/01/18
02/28/20
03/20/20
08/21/20
12/29/20
Near Trinity Center, from 0.9 miles south of Trinity River Bridge to Siskiyou County line at various locations. Drainage system restoration.
Baseline
1,047 6,761
1,550
975
1,580
3,443
365
550
8,463
TRI3
3586
02
Page 10 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
71 Trinity Four Bridges 847
801
278
206
1,402
6,295
08/09/22
02/22/22
01/21/22
07/02/20
0
0
314
0
0
0
900
1,030
230
206
2,060
6,300
10,726
0
07/02/20
01/21/22
02/22/22
08/09/22
12/31/25
In Trinity County, at Dobbins Gulch Bridge No. 05-0042 (PM 0.6), Stuart Fork Bridge No. 05-0055 (PM 43.9) and Mule Creek Bridge No. 05-0056 (PM 48.5); also on Route 299, at Grass Valley Creek Bridge No. 05-0013 (PM 65.5). Repair unsound concrete, replace bearings and joint seals, repair bridge decks, and install barrier and approach slabs.
Baseline
314 9,829
900
1,030
2,060
6,300
206
230
10,726
TRI3
3633
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
72 Trinity Culverts 841
780
312
56
699
3,000
12/14/21
08/19/21
07/19/21
06/03/20
0
0
375
0
1
0
930
980
330
311
990
5,390
8,931
0
07/01/20
07/19/21
08/19/21
12/14/21
01/02/24
Near Salyer, at various locations from 0.1 mile west of White House Gulch Road to 0.4 mile west of Slattery Pond Road. Rehabilitate culverts.
Baseline
376 5,688
930
980
990
5,390
311
330
8,931
TRI299
3668
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
73 Sims Crag Combine 1,678
2,646
135
16
3,568
17,875
08/27/19
03/26/19
02/22/19
02/01/18
0
14
1,678
1,832
4
0
0
2,880
260
36
4,799
16,860
24,835
008/08/18
02/01/18
02/22/19
03/22/19
08/27/19
12/31/21
In Shasta and Siskiyou Counties about 7 miles north of Pollard Flat from 0.8 mile south to 0.7 mile north of Sims Road Undercrossing and from 0.6 mile south of Castle Crags Drive Undercrossing to 0.2 mile south of South Dunsmuir Undercrossing.. Replace B Replace Bridges
Baseline
3,528 25,918
0
2,880
4,799
16,860
36
260
24,835
VAR5
3543
02
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
74 Cottonwood Creek Bridge Replacement
1,099
1,829
151
934
2,029
9,624
05/15/20
10/15/19
10/01/19
05/01/18
0
18
1,099
1,094
21
0
1,190
1,500
270
590
2,200
6,814
12,564
0
03/08/18
04/13/20
06/01/20
08/13/20
11/01/21
Near Richvale, at Cottonwood Creek Bridge No. 12-0120, from 0.3 mile south to 0.5 mile north of Nelson Avenue. Replace and realign scour-critical bridge.
Baseline
2,232 15,666
1,190
1,500
2,200
6,814
590
270
12,564
BUT99
2425
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
75 But 99 Bridge Rail Replacement
969
1,527
74
1,246
1,228
4,329
04/01/20
08/15/19
08/15/19
02/01/18
0
6
969
725
21
0
1,080
1,400
160
363
1,425
5,235
9,663
0
02/15/18
08/15/19
08/15/19
04/01/20
11/01/21
In and near Chico, from north of Route 162 to north of Broyles Road. Bridge rail upgrade at six locations.
Baseline
1,721 9,373
1,080
1,400
1,425
5,235
363
160
9,663
BUT99
2433
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
76 Chico ITS 588
1,046
33
32
1,266
7,430
01/02/21
08/01/20
07/02/20
07/02/19
0
0
372
0
0
0
561
1,177
41
35
1,352
8,470
11,636
0
08/01/19
08/03/20
09/02/20
02/05/21
11/01/22
In and near Chico, from Estates Drive to Garner Lane. Install Intelligent Transportation System (ITS) elements.
Baseline
372 10,395
561
1,177
1,352
8,470
35
41
11,636
BUT99
2437
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
77 Colusa Rehab 1,409
955
1,041
407
1,421
14,829
22
938
1,409
955
439
2
1,410
1,190
1,025
346
1,500
14,829
20,300
14,828
09/30/16
02/15/18
03/26/18
11/08/18
01/02/21
In Colusa, between Market Street and Butte Vista Way. Rehabilitate roadway.
Baseline
3,765 20,062
1,410
1,190
1,500
14,829
324
1,025
20,278
COL20
2950
03
Page 11 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
78 Sidehill Viaduct Bridge (Echo Summit)
1,626
1,611
37
60
1,725
8,905
178
26
1,626
1,611
2
0
2,000
1,630
38
60
1,750
8,905
14,383
8,904
12/29/16
03/15/18
05/07/18
12/10/18
12/01/20
Near South Lake Tahoe, at Echo Summit Sidehill Viaduct Bridge No. 25-0044. Rehabilitate or Replace bridge.
Baseline
3,443 13,964
2,000
1,630
1,750
8,905
60
38
14,383
ED50
3304
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
79 ED 50 Culverts 765
555
530
171
903
3,000
08/01/22
02/01/22
02/01/22
02/01/20
0
0
386
0
0
0
725
570
540
180
940
3,900
6,855
0
01/18/20
12/28/21
01/11/22
05/23/22
12/01/24
Near Cameron Park and Shingle Springs, from east of Silva Valley Parkway to west of El Dorado Road. Rehabilitate culverts.
Baseline
386 5,924
725
570
940
3,900
180
540
6,855
ED50
3315
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
80 ED 50 Culvert Rehab 235
557
120
930
959
3,000
12/15/21
08/15/21
08/01/21
05/01/20
0
0
133
0
0
0
200
600
120
620
960
3,000
5,500
0
05/01/20
08/01/21
08/15/21
12/15/21
10/01/23
In and near Placerville, from west of El Dorado Road to west ofSchnell School Road. Rehabilitate deteriorated culverts.
Baseline
133 5,801
200
600
960
3,000
620
120
5,500
ED50
3317
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
81 Culvert Rehab and Wildlife Crossing
120
289
59
15
480
2,600
0
0
120
0
0
0
183
290
60
310
480
1,500
2,823
0
03/12/19
04/20/19
07/03/19
10/15/19
12/01/22
In and near Placerville, from west of Schnell School Road to east of Braeburn Lane. Rehabilitate deteriorated culverts and provide access for wildlife crossing the route.
Baseline
120 3,563
183
290
480
1,500
310
60
2,823
ED50
3335
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
82 Nev-49 Culvert Rehab (North)
274
460
301
5
515
1,538
10/30/19
04/30/19
04/15/19
08/31/17
0
194
274
460
5
0
500
650
350
80
590
2,018
4,188
1,537
08/31/17
09/14/18
09/28/18
03/21/19
12/01/19
In and near Grass Valley, from 0.2 mile north of Lime Kiln Road to Route 20 (PM R14.475). Rehabilitate culverts.
Baseline
933 3,093
500
650
590
2,018
80
350
4,188
NEV49
4123
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
83 Nev-49 Culvert Rehab (South)
550
657
395
170
472
2,030
04/15/22
10/15/21
10/01/21
01/02/20
0
0
317
0
0
0
513
743
547
325
607
3,257
5,992
0
05/31/19
09/15/20
10/01/20
04/15/21
12/01/21
Near Higgins Corner, from the Placer County line to 0.3 mile north of Lime Kiln Road; also in Placer County, at PM R8.42 and PM R10.23. Rehabilitate drainage systems.
Baseline
317 4,274
513
743
607
3,257
325
547
5,992
NEV49
4124
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
84 COUNT STATION REPAIR & INSTALL
348
1,042
158
0
1,610
9,200
04/15/20
10/01/19
09/01/19
01/01/18
0
16
348
585
0
0
1,000
1,190
210
30
1,800
9,200
13,430
0
03/27/18
09/01/19
10/01/19
02/10/20
10/01/22
In various counties on various routes at various locations. Repair and install vehicle census count stations.
Baseline
949 12,358
1,000
1,190
1,800
9,200
30
210
13,430
NEV49
4125
03
Page 12 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
85 Pla-49 Rehab Project 2,394
2,365
1,557
555
3,214
27,686
165
1,529
2,394
2,365
600
0
2,400
2,400
1,575
555
4,300
30,717
41,947
27,685
03/01/17
06/29/18
06/29/18
03/21/19
08/06/21
In and near Auburn, from 0.1 mile south of Routes 49/80 Separation to 0.1 mile north of Dry Creek Road. Rehabilitate pavement.
Baseline
7,053 37,771
2,400
2,400
4,300
30,467
555
1,575
41,697
PLA49
4781
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
86 UPGRADE EMS SIGNS
215
415
36
35
437
1,710
04/01/20
08/01/19
07/01/19
01/01/18
0
16
215
280
0
0
290
410
30
35
500
1,600
2,865
0
03/19/18
07/15/19
08/01/19
12/30/19
12/30/21
In various counties on various routes at various locations. Upgrade Extinguishable Message Signs (EMS) to LED.
Baseline
511 2,848
290
410
500
1,600
35
30
2,865
PLA80
4291
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
87 PLA 80 Bridge Rehab 2,672
5,727
522
145
5,148
32,872
08/27/20
05/07/20
04/20/20
04/17/18
0
34
2,672
1,298
6
0
3,000
6,350
485
200
6,430
32,200
48,665
008/07/18
04/17/18
04/20/20
05/07/20
08/27/20
12/01/25
In Placer County, at various locations. Replace bridges at four locations.
Baseline
4,010 47,086
3,000
6,350
6,430
32,200
200
485
48,665
PLA80
5097
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
88 Culvert Rehab 191
507
127
1
548
2,094
02/15/19
10/11/18
10/01/18
10/02/17
0
40
191
438
1
0
220
430
140
70
610
1,946
3,416
0
10/27/17
10/19/18
11/29/18
04/25/19
12/01/19
Near Weimar, from 0.2 mile west of Crother Road to 0.1mile west of Weimar Road at various locations. Drainage system rehabilitation.
Baseline
670 3,468
220
430
610
1,946
70
140
3,416
PLA80
5105
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
89 Secret Town Culvert Rehabilitation
451
527
164
34
633
2,692
12/05/21
04/20/21
04/10/21
12/15/19
0
0
234
0
1
0
429
667
195
220
806
3,069
5,386
0
08/01/19
11/24/20
12/01/20
07/02/21
10/01/23
Near Magra, from Secret Town Overcrossing to the Gold Run Safety Roadside Rest Area (SRRA). Rehabilitate drainage systems.
Baseline
235 4,501
429
667
806
3,069
220
195
5,386
PLA80
5114
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
90 Rehabilitate Connection Ramp Pavement at var. locations
1,189
1,130
109
0
1,441
8,425
07/15/19
01/11/19
12/11/18
10/03/17
0
21
1,189
1,130
0
0
1,190
1,220
105
25
2,000
10,061
14,601
8,424
03/30/18
09/06/18
09/28/18
03/04/19
03/23/20
In and near the city of Sacramento, from 0.2 mile west of West El Camino Avenue to 0.2 mile east of Route 244. Pavement rehabilitation.
Baseline
2,340 12,294
1,190
1,220
2,000
10,061
25
105
14,601
SAC80
6711
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
91 Sac 50 Fiber Optics 361
1,075
132
13
1,030
6,377
181
85
361
1,075
13
486
400
1,080
400
800
1,200
6,377
10,257
6,376
06/30/16
01/08/18
03/30/18
12/12/18
12/16/19
In Sacramento, from Yolo County line to Watt Avenue Overcrossing; also, in Yolo County, from 0.1 mile west of Jefferson Boulevard to Sacramento County line (PM 2.4 to PM 3.2). Install fiber optic cable.
Baseline
2,201 8,988
400
1,080
1,200
6,377
800
400
10,257
SAC50
6239
03
Page 13 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
92 I-5 West End Viaduct 5,560
5,157
331
1,860
16,198
125,600
03/06/24
09/01/23
07/14/23
04/02/20
0
0
1,225
0
2
0
5,700
0
0
0
0
0
5,700
0
04/02/20
04/11/23
07/01/23
10/24/23
01/31/26
In the city of Sacramento, at the West End Viaduct No. 24-0069L/R. Improve to standard truck capacity. (Long Lead Project)
Baseline
1,227 154,706
5,700
0
0
0
0
0
5,700
SAC5
5863
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
93 I-5 Permit Load Mobility Improvement
16,241
4,095
1,218
3,107
21,952
51,643
04/15/22
11/15/21
11/01/21
12/01/19
0
0
1,927
0
0
0
16,780
0
0
0
0
0
16,780
0
12/01/19
11/01/21
11/15/21
04/15/22
11/01/26
In the city of Sacramento, from 0.5 mile south of Route 50 to Route 80 at South Connector Undercrossing No. 24-0267 (PM 22.42) and at American River Viaduct No. 24-0068L/R (PM 24.82). Improve to standard truck capacity.ACCELERATED BRIDGE (PA&ED Only)
Baseline
1,927 98,256
16,780
0
0
0
0
0
16,780
SAC5
5868
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
94 Rio Vista Bridge Operation Overhaul
735
2,154
9
98
2,072
12,804
02/01/22
07/01/21
06/01/21
07/01/19
0
0
105
0
0
0
760
2,460
20
100
3,120
16,400
22,860
0
08/19/19
03/10/21
03/25/21
07/21/21
07/21/22
In and near Rio Vista, at the Sacramento River Bridge No. 23-0024; also in Solano County from PM 26.3 to PM 26.4. Rehabilitate movable bridge electrical and mechanical systems and upgrade Americans with Disabilities Act (ADA) facilities.
Baseline
105 17,872
760
2,460
3,120
16,400
100
20
22,860
SAC12
5960
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
95 Sac 50 - Rehab Pavement
3,829
1,452
275
117
0
260,400
08/01/20
02/14/20
02/03/20
12/01/18
0
36
3,829
14
33
0
7,800
1,400
1,800
200
0
0
11,200
0
08/16/18
02/03/20
02/14/20
08/15/20
12/01/24
In the city of Sacramento, from Route 5 to Watt Avenue. Roadway rehabilitation.
Baseline
3,912 266,073
7,800
1,400
0
0
200
1,800
11,200
SAC50
6177
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
96 Sac 50 Paint 247
880
7
174
2,188
17,248
09/01/21
02/01/21
02/01/21
07/01/19
0
0
161
0
0
0
350
940
10
20
3,010
16,700
21,030
0
07/01/19
02/01/21
02/01/21
09/01/21
12/01/23
In the city of Sacramento, from the Sacramento River Viaduct (Pioneer Bridge) to 4th Street; also on Route 5 from 0.2 mile south of Broadway to S Street (PM 22.15 to 22.91). Clean and paint steel bridge girders within Route 5/50 Interchange.
Baseline
161 20,744
350
940
3,010
16,700
20
10
21,030
SAC50
6247
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
97 Sac/ED Fiber Optics 379
909
100
5
839
4,740
11/01/20
07/01/20
06/15/20
11/01/18
0
0
287
0
0
0
400
950
110
21
1,050
4,650
7,181
0
05/01/19
09/15/20
10/12/20
02/05/21
03/01/22
In and near Rancho Cordova and Folsom, from Sunrise Boulevard to the county line; also in El Dorado County near El Dorado Hills, from the county line to Silva Valley Parkway (PM 0.0/1.7). Install fiber optic cable.
Baseline
287 6,972
400
950
1,050
4,650
21
110
7,181
SAC50
6248
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
98 US 50 ICM Infrastructure
990
2,515
130
125
2,987
32,500
04/01/21
10/01/20
09/15/20
03/01/19
0
0
424
0
0
0
940
2,700
520
200
3,900
38,400
46,660
0
05/01/19
09/16/20
10/02/20
04/05/21
12/01/23
In and near the cities of Sacramento, Rancho Cordova, and Folsom, from Yolo County line to Folsom Boulevard; also in Yolo County in West Sacramento, from Route 80 to Sacramento County line (PM 0.0 to 3.156), and on Route 80 from Enterprise Boulevard to Ro Install Transportation Management System (TMS) field elements.
Baseline
424 39,247
940
2,700
3,900
38,400
200
520
46,660
SAC50
6250
03
Page 14 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
99 Sac 50 Design-Build 0
0
4,502
0
26,252
0
0
0
0
0
0
0
0
0
0
0
35,800
0
35,800
0
12/02/19
12/04/23
In Sacramento County on Route 50 from I-5 Junction to Watt Ave.. Add high occupancy vehicle lane and pavement rehab. Add high occupancy vehicle lane and pavement rehab.
Baseline
0 30,754
0
0
35,800
0
0
0
35,800
SAC50
6254
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
100 SAC Connector Ramp Meters
484
569
18
19
667
2,850
01/01/21
08/01/20
07/01/20
08/01/19
0
0
158
0
0
0
552
660
20
20
1,020
3,000
5,272
0
08/19/19
03/10/21
03/25/21
07/21/21
10/29/21
In the city of Sacramento, at various locations and routes at the Route 5/99 Interchange Connector ramps and the eastbound Route 51/160 Interchange Connector ramp. Install connector ramp meters.
Baseline
158 4,607
552
660
1,020
3,000
20
20
5,272
SAC5
6411
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
101 SAC 51/80 1,277
3,348
415
6
3,949
15,138
05/15/22
01/15/22
01/03/22
10/01/19
0
0
626
0
0
0
1,300
3,000
500
6
4,300
20,104
29,210
0
05/02/19
08/03/21
08/15/21
12/15/21
08/01/24
In and near the city of Sacramento, from west of Rio Linda Boulevard Undercrossing (UC) No. 24-0203 to east of Winters Street UC No. 24-0205; also on Route 51 from south of Route 51/244, 80 Separation No. 24-0291L to north of Route 51/244, 80 Connector No Upgrade bridge rails at four structures and widen for standard shoulders.
Baseline
626 24,133
1,300
3,000
4,300
20,104
6
500
29,210
SAC80
6412
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
102 Seismic Retrofit 242
850
17
6
616
1,753
06/01/20
12/15/19
11/01/19
04/01/18
0
3
242
446
0
0
330
800
18
0
691
1,900
3,739
0
03/30/18
06/26/19
07/15/19
10/21/19
09/27/21
In the city of Sacramento, at Southbound Route 99/5 Connector Overcrossing No. 24-0241F; also, on Route 80 at Longview Ramp Overcrossing No. 24-0281K (PM M9.15). Seismic retrofit two structures.
Baseline
691 3,484
330
800
691
1,900
0
18
3,739
SAC99
6707
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
103 SAC/PLACER 80 FIBER OPTICS
390
1,370
224
39
1,716
13,253
05/15/20
11/15/19
11/01/19
03/01/18
0
3
390
471
15
0
1,200
1,425
300
50
1,800
12,200
16,975
0
06/15/18
10/19/19
10/24/19
02/06/20
11/15/20
In and near the cities of Sacramento and Citrus Heights, from east of the Yolo County line to the Placer County line; also in Placer County, in the city of Roseville from the Sacramento County line to east of the Sacramento County line (PM 0.0/0.7). Install fiber optic communication line.
Baseline
879 16,992
1,200
1,425
1,800
12,200
50
300
16,975
SAC80
6713
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
104 SAC 80 R&R RHMA 35
1,642
73
95
1,552
14,385
04/01/22
10/15/21
09/20/21
08/01/19
0
1
35
696
0
0
50
1,500
80
100
2,500
14,000
18,230
0
07/13/18
10/07/20
10/22/20
02/04/21
04/15/22
Near the city of Sacramento, from 0.2 mile east of Longview Drive to 0.4 mile east of Madison Avenue. Pavement rehabilitation.
Baseline
732 17,782
50
1,500
2,500
14,000
100
80
18,230
SAC80
6714
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
105 Repair Loop Detectors
67
168
20
0
0
971
05/05/19
10/01/18
09/15/18
04/01/18
0
9
67
70
0
0
94
211
22
15
365
922
1,629
0
08/03/18
12/07/18
01/17/19
In various counties, on various routes. Repair or replace damaged inductive loop vehicle detection elements.
Baseline
146 1,226
94
211
365
922
15
22
1,629
SAC80
6717
03
Page 15 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
106 Sac 99 Fiber Optics 454
964
39
22
1,300
14,422
05/01/22
10/01/21
09/01/21
10/01/20
0
0
289
0
0
0
700
1,000
50
100
1,300
9,000
12,150
0
04/16/19
03/10/21
03/25/21
07/19/21
07/19/22
In and near the cities of Elk Grove and Sacramento, from Grant Line Road to Route 50; also on Route 51, from Route 50 to 0.1 mile south of the Fort Sutter Viaduct (PM 0.0 to 0.1). Install fiber optic cable.
Baseline
289 17,201
700
1,000
1,300
9,000
100
50
12,150
SAC99
6925
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
107 Repair Field Elements
40
142
7
0
0
1,460
05/05/19
10/01/18
09/15/18
04/01/18
0
7
40
85
0
0
148
260
22
15
507
1,403
2,355
0
08/03/18
12/07/18
01/17/19
In Placer, Sacramento, and Yolo Counties, on routes 5, 80, 99, and 113. Replace obsolete Microwave Vehicle Detection System (MVDS) elements.
Baseline
132 1,649
148
260
507
1,403
15
22
2,355
SAC5
8920
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
108 Sac 5 Corridor Enhancement Project
5,594
18,486
2,571
0
29,193
302,341
0
1,287
5,594
18,487
711
0
0
0
2,129
0
31,570
303,190
336,889
0
05/27/19
12/15/22
In Sacramento, from 1.1 miles south of Elk Grove Blvd Overcrossing to Route 50 at American River Br (Br#24-68).. Roadway rehabilitation, construct HOV lanes, and install fiber optic cable Roadway rehabilitation, construct HOV lanes, and install fiber optic cable
Baseline
26,079 358,185
0
0
31,570
276,190
0
2,129
309,889
SAC5
5854A03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
109 Sutter Bypass Widening & Rehab
1,967
2,359
1,351
1,150
2,771
23,911
0
969
1,967
2,301
484
0
2,000
2,400
1,323
1,248
2,990
27,800
37,761
0
12/01/16
01/13/19
01/28/19
06/06/19
10/01/22
Near Yuba City, from east end of Sutter Bypass to Lytle Road. Rehabilitate roadway, widen shoulders, and replace Wadsworth Canal Bridge No. 18-0003.
Baseline
5,721 33,509
2,000
2,400
2,990
27,800
1,248
1,323
37,761
SUT20
8132
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
110 Live Oak Rehab 12
475
41
0
1,408
16,380
02/28/20
09/01/19
09/01/19
08/01/17
0
10
12
321
0
0
20
380
50
0
1,500
18,100
20,050
008/06/18
08/01/17
09/01/19
09/01/19
02/28/20
10/01/21
In Live Oak, from 0.1 mile north of Coleman Avenue to 0.2 mile north of Ramsdell Drive. Roadway rehabilitation.
Baseline
343 18,316
20
380
1,500
18,100
0
50
20,050
SUT99
8378
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
111 Yol-275 Tower Br Fender Replc
565
1,153
147
160
2,323
12,449
107
88
565
1,153
98
1
700
1,200
147
41
2,380
12,449
16,917
12,449
01/08/16
09/29/17
03/16/18
12/17/18
02/01/21
In West Sacramento, at the Tower Bridge (Sacramento River Bridge No. 22-0021). Replace fender system.
Baseline
2,012 16,797
700
1,200
2,380
12,449
41
147
16,917
YOL275
9427
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
112 Install Ramp Meters 733
2,075
92
0
1,855
4,581
582
33
733
2,075
0
1,297
734
2,100
220
0
2,200
4,581
9,835
4,581
06/16/16
05/26/17
02/28/18
10/08/18
12/13/19
In Yolo, Placer and Sacramento Counties, on Routes 65, 80 and 99 at various locations. Install ramp meters.
Baseline
4,720 9,336
734
2,100
2,200
4,581
0
220
9,835
YOL80
6701
03
Page 16 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
113 I-5 Vertical Clearance (Colusa & Yolo)
1,697
1,673
344
5
2,628
19,080
09/15/20
04/15/20
04/01/20
02/01/19
0
0
646
0
0
0
1,700
0
0
0
0
0
1,700
0
06/03/19
06/02/20
06/17/20
10/14/20
11/01/22
Near Woodland, at County Road 96 Overcrossing (OC) No. 22-0155 (PM R14.27), County Road 95 OC No. 22-0156 (PM R15.85), and Zamora OC No. 22-0157 (PM R17.62); also in Colusa County, in and near Williams at E Street OC No. 15-0067 (PM R17.98) and Lurline Av Establish standard vertical clearance.
Baseline
646 25,427
1,700
0
0
0
0
0
1,700
YOL5
5869
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
114 I-5 Vertical Clearance (Yolo)
907
1,078
102
5
1,348
13,117
10/01/21
04/01/21
03/01/21
10/01/19
0
0
634
0
1
0
744
0
0
0
0
0
744
0
06/03/19
07/23/20
08/07/20
12/09/20
11/01/22
Near Woodland, at Wye Line Road Overcrossing (OC) No. 22-0158 (PM 4.49), County Road 6 OC No. 22-0138 (PM R25.57), County Line Road OC No. 22-0139 (R28.92). Establish standard vertical clearance.ACCELERATED BRIDGE (PA&ED Only)
Baseline
635 16,557
744
0
0
0
0
0
744
YOL5
8563
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
115 AVC REPAIR & INSTALL
704
1,171
162
1
2,242
11,107
03/01/19
10/01/18
09/01/18
01/01/18
0
79
704
1,108
1
0
1,000
1,300
190
80
1,900
9,400
13,870
0
04/02/18
02/13/19
02/27/19
07/25/19
02/09/20
In various counties, on various routes at various locations. Repair and install permanent Automatic Vehicle Classification (AVC) truck data collection stations.
Baseline
1,892 15,387
1,000
1,300
1,900
9,400
80
190
13,870
YOL5
8571
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
116 4F650 Yolo Pavement Rehab
9,482
11,299
536
940
17,794
171,898
11/01/24
02/01/24
12/01/23
01/01/22
0
0
1,002
0
0
0
10,337
0
0
0
0
0
10,337
0
01/01/22
12/01/23
02/01/24
11/01/24
10/01/27
In and near West Sacramento, from east of Mace Boulevard to Sacramento River Bridge; also on Route 50, from Route 80 to Jefferson Boulevard Overcrossing (PM 0.0/2.5). Rehabilitate pavement by placing Continuous Reinforced Concrete and asphalt pavement, rehabilitate bridge decks, median widening at three locations, and upgrade bridge railings.
Baseline
1,002 211,949
10,337
0
0
0
0
0
10,337
YOL80
8784
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
117 Sac River BOH (Bryte Bend) 0F250 [03*75]
1,787
1,568
63
40
3,498
29,204
07/23/20
04/09/20
03/25/20
09/28/18
0
0
1,787
305
6
0
1,900
1,550
75
482
3,640
32,760
40,407
010/10/18
09/28/18
03/25/20
04/09/20
07/23/20
11/01/22
In West Sacramento, at the Sacramento River Bridge and Overhead No. 22-0026L/R. Rehabilitate bridge.
Baseline
2,098 36,160
1,900
1,550
3,640
32,760
482
75
40,407
YOL80
8901
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
118 Putah Creek 1,083
1,798
123
636
2,227
11,537
07/15/22
03/15/22
03/01/22
02/01/20
0
0
343
0
0
0
941
1,755
371
215
2,662
13,960
19,904
0
02/01/20
03/01/22
03/15/22
07/15/22
12/01/24
Near Winters, at Putah Creek Bridge No. 22-0072L/R, from Solano County line to 0.4 mile south of Route 128; also in Solano County, from 0.3 mile south to the Yolo County line (PM R10.3 to R10.6). Seismic retrofit of two parallel bridges.
Baseline
343 17,404
941
1,755
2,662
13,960
215
371
19,904
YOL505
9504
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
119 Loma Rica Rd./Spring Valley Road Widening & Rehab
1,098
2,119
1,241
1,266
1,688
9,050
01/02/19
03/15/18
03/01/18
06/13/16
87
1,146
1,098
2,119
781
106
1,160
2,180
1,245
1,400
1,800
9,050
16,835
9,049
06/13/16
05/29/18
06/14/18
12/10/18
11/15/21
Near Marysville, from 0.1 mile east of Loma Rica Road to 0.2 mile west of Spring Valley Road. Rehabilitate roadway.
Baseline
5,337 16,462
1,160
2,180
1,800
9,050
1,400
1,245
16,835
YUB20
9587
03
Page 17 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
120 Feather River Scour 2,205
1,518
167
855
3,213
26,105
07/01/21
04/01/21
03/01/21
02/01/19
0
0
2,205
1
55
0
2,290
2,700
200
1,887
4,100
26,441
37,618
0
01/25/19
08/15/20
09/01/20
12/20/20
11/01/23
In Marysville, at the Feather River Bridge No. 18-009. Scour mitigation and retrofit piers.
Baseline
2,261 34,063
2,290
2,700
4,100
26,441
1,887
200
37,618
YUB20
8140
03
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
121 Ala-880 CAPM, Fremont OC to High UC
0
6,505
120
4
9,579
57,063
3,968
101
0
6,505
4
24,221
654
6,220
176
50
7,000
57,487
71,587
57,063
08/19/15
05/01/17
05/30/17
03/20/18
11/06/20
In and near Fremont, Union City, Hayward, SanLeandro, and Oakland from 0.4 mile north of FremontBoulevard Overcrossing to High Street Separation andOverhead. Rehabilitate pavement.
Baseline
34,799 73,271
654
5,920
6,600
55,207
40
166
68,587
ALA880
0483W04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
122 Rte. 580 Rehab- Grind & Pave Roadway; Guard Rail; ADA Curbs @ Ramps
1,400
2,617
68
4
4,991
38,047
64
39
1,400
2,617
3
0
1,400
2,655
120
57
5,400
38,046
47,678
38,046
10/14/16
05/10/18
06/15/18
01/30/19
05/21/21
In San Leandro and Oakland, from Routes 580/238 Separation to Fruitvale Avenue. Rehabilitate pavement.
Baseline
4,123 47,127
1,400
2,655
5,400
38,046
57
120
47,678
ALA580
0135A04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
123 Ala-680 Ramp Metering (Phase 2B)
0
2,503
22
677
4,463
13,233
01/28/19
06/29/18
06/25/18
11/16/16
81
13
0
2,503
0
399
0
5,800
100
800
4,500
13,233
24,433
13,23307/05/18
11/16/16
06/25/18
06/29/18
12/27/18
12/01/20
In and near Fremont, Pleasanton, and Dublin, from 0.3 mile south of Scott Creek Road to 0.3 mile north of Alcosta Boulevard. Install ramp meters, ramp High Occupancy Vehicle (HOV) bypass lanes, and Traffic Operations Systems (TOS).
Baseline
2,996 20,898
0
5,600
4,500
13,233
800
100
24,233
ALA680
1463D04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
124 FPI-Ramp Metering on I880(Auto Mall-Mowry) & SR84(Thornton-Newark Blvd
2,309
2,132
25
40
3,438
12,982
8
1
2,309
2,132
4
0
0
1,500
100
50
3,180
12,981
17,811
12,981
06/05/14
06/25/18
06/29/18
03/04/19
05/01/20
In Fremont, from Auto Mall Parkway to Mowry Avenue (PM 4.6 to 7.4) at various locations; also in Newark on Route 84 from Thornton Avenue to Newark Boulevard (PM R3.8 to R4.9) at various locations. Widen ramps and install ramp metering.
Baseline
4,454 20,926
0
0
3,180
12,981
0
0
16,161
ALA880
0012B04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
125 CRANDALL CREEK SEISMIC RETROFIT BRIDGE #33-0273
1,041
2,223
85
80
3,116
4,736
38
84
1,041
2,223
73
1
1,130
2,261
90
20
1,700
4,736
9,937
4,736
06/30/16
06/21/18
06/29/18
01/18/19
12/08/20
In Fremont, at Crandall Creek Bridge No. 33-0273. Seismic retrofit.
Baseline
3,460 11,281
1,130
2,261
1,700
4,736
20
90
9,937
ALA880
0086Q04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
126 BRIDGE PRESERVATION 2 BRIDGE LOCATIONS 238 and 580
578
1,017
21
5
2,233
3,374
39
2
578
1,017
0
0
864
995
72
20
2,091
3,374
7,416
3,374
01/11/17
06/21/18
06/25/18
12/28/18
12/06/19
Between Livermore and Hayward, at East Connector Separation Bridge No. 33-0524F, N238/S880 Connector Bridge No. 33-0540G and I-580 Arroyo Seco Bridge No. 33-0066. Bridge maintenance.
Baseline
1,636 7,228
864
995
2,091
3,374
20
72
7,416
ALA238
0448E04
Page 18 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
127 Ala 880 Roadway Rehabilitation Project
0
1,649
1
0
1,935
9,497
0
1
0
1,621
0
0
10
2,000
100
100
2,100
14,248
18,558
0
02/15/11
06/29/18
06/29/18
04/15/19
11/06/20
In Oakland, from 0.2 mile south of 29th Street to 0.3 mile north of 23rd Street. Rehabilitate roadway.
Baseline
1,622 13,082
10
2,000
2,100
14,248
100
100
18,558
ALA880
0044Q04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
128 Lake Merritt Railroad Bridge Replacement
1,029
2,641
711
7,643
1,793
3,000
0
436
1,029
1,955
212
0
500
2,628
657
7,500
1,700
3,000
15,985
0
05/11/15
06/03/19
06/10/19
12/04/19
10/01/21
In Oakland, near Lake Merrit Channel Bridge No. 33-0027 and 5th Avenue. Replace Hanlon Lead Railroad bridge. Mitigation for EA 1706U.
Baseline
3,632 16,817
500
2,628
1,700
3,000
7,500
657
15,985
ALA880
0050N04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
129 GREENVILLE OH REHAB
574
1,064
105
334
1,157
5,979
02/03/20
10/01/19
09/02/19
01/15/18
0
0
574
543
0
0
600
900
120
140
1,000
5,979
8,739
0
12/29/17
04/01/20
04/30/20
11/02/20
05/02/22
Near Livermore, near Greenville Road at Greenville Overhead Bridge No. 33-0121R. Rehabilitate westbound structure.
Baseline
1,117 9,213
600
900
1,000
5,979
140
120
8,739
ALA580
0480J04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
130 Bridge Railings Replacement
1,121
1,905
250
10
2,273
10,300
09/26/22
01/21/22
12/17/21
03/16/20
0
0
68
0
0
0
918
1,500
250
25
2,200
10,300
15,193
0
03/16/20
12/17/21
01/21/22
09/26/22
12/08/23
In Hayward, San Leandro, and Oakland, at Tennyson Road Overcrossing (OC) No. 33-0236 (PM 15.65), Washington Avenue OC No. 33-0166 (PM 20.82), and Damon Slough Southboud onramp No. 33-0142K (PM 26.53); also on Route 77 in Oakland, at San Leandro OC No. 33- Upgrade bridge rails, replace joint seals.
Baseline
68 15,859
918
1,500
2,200
10,300
25
250
15,193
ALA880
1450C04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
131 ALA-61 CAPM 1,301
1,297
48
440
1,463
4,874
11/01/21
05/01/21
03/01/21
02/01/20
0
0
546
0
0
0
1,220
1,200
22
5
1,500
4,874
8,821
0
02/01/20
03/01/21
05/01/21
11/01/21
05/01/23
In the city of Alameda, from Broadway/Encinal Avenue to Sherman Street. Pavement rehabilitation, upgrade Americans with Disabilities Act (ADA) curb ramps, and improve crosswalks.
Baseline
546 9,423
1,220
1,200
1,500
4,874
5
22
8,821
ALA61
1452J04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
132 CAPM ALA-84-6.9/10.8
1,867
1,929
738
173
1,903
12,874
09/01/22
02/01/22
12/01/21
04/01/20
0
0
57
0
0
0
2,080
2,340
780
173
2,080
12,874
20,327
0
11/02/20
01/02/22
02/01/22
09/01/22
09/01/23
In Fremont, from Route 880 (PM 6.922) to Route 238. Rehabilitate pavement and upgrade curb ramps to make Americans with Disabilities Act (ADA) compliant.
Baseline
57 19,484
2,080
2,340
2,080
12,874
173
780
20,327
ALA84
1454C04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
133 CAPM ALA-880-0.0/12.0
2,790
5,009
497
0
5,384
57,166
06/04/22
11/01/21
09/01/21
03/02/20
0
0
201
0
0
0
3,000
5,000
620
50
5,400
57,166
71,236
0
03/02/20
09/01/21
11/01/21
06/04/22
12/31/23
In Fremont, from Santa Clara County line to north of Fremont Boulevard Overcrossing. Cold plane pavement, overlay with Rubberized Hot Mix Asphalt (RHMA-G) and Open Graded Friction Course (OGFC), upgrade Americans with Disabilities Act (ADA) curb ramps, upgrade metal beam guardrail, and replace loop detectors.
Baseline
201 70,846
3,000
5,000
5,400
57,166
50
620
71,236
ALA880
1454G04
Page 19 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
134 TMC Hardware Replacement
96
394
10
0
260
2,570
11/01/20
12/01/19
09/01/19
10/01/18
0
0
96
74
0
0
110
392
10
10
262
2,570
3,354
0
10/01/18
09/01/19
12/01/19
11/01/20
08/29/22
In Oakland, at the District 4 Transportation Management Center (TMC). Upgrade or replace legacy TMC hardware components and related software by service contract to improve reliability and functionality.
Baseline
170 3,330
110
392
262
2,570
10
10
3,354
ALA980
1464L04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
135 2018 SHOPP TMS Service Contract Project
477
1,323
26
0
2,947
15,990
08/01/20
12/30/19
08/15/19
04/15/19
0
0
170
0
0
0
450
1,340
10
10
3,000
15,990
20,800
0
04/15/19
08/15/19
12/30/19
08/01/20
07/29/22
In various counties, on various routes at various locations. Restore non-operational Transportation Management System (TMS) field elements by use of on-call Task Order service contracts.
Baseline
170 20,763
450
1,340
3,000
15,990
10
10
20,800
ALA1464M
04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
136 East Crk Slough Scour Mitigation
1,226
933
159
100
1,225
2,307
08/15/22
01/15/22
12/15/21
06/15/20
0
0
707
0
0
0
1,000
850
160
100
1,170
2,307
5,587
0
10/01/19
04/01/21
05/01/21
12/01/21
12/01/22
In Oakland, at East Creek Slough Bridge No. 33-0143. Mitigate eroded channel side-slope tidal scour and replace bridge approach slabs.
Baseline
707 5,950
1,000
850
1,170
2,307
100
160
5,587
ALA880
1483D04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
137 TMS Replace & Upgrade at Maze
543
1,020
127
10
1,170
5,135
12/24/20
05/01/20
04/01/20
03/01/19
0
5
543
182
0
0
760
850
260
12
1,044
5,135
8,061
0
10/24/18
03/03/20
03/31/20
12/24/20
12/24/21
In Emeryville and Oakland, from San Francisco-Oakland Bay Bridge Toll Plaza to north of Powell Street; also in Oakland, on Routes 580 and 880, at various locations. Upgrade/replace Transportation Management System (TMS) elements.
Baseline
730 8,005
760
850
1,044
5,135
12
260
8,061
ALA80
1483H04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
138 TMS on ALA-580 1,001
608
11
20
321
17,970
12/31/20
06/15/20
04/16/20
06/19/18
0
0
1,001
35
0
0
2,700
2,700
50
10
3,600
17,970
27,030
008/09/18
06/19/18
04/16/20
06/15/20
12/31/20
11/15/21
In and near Oakland and San Leandro, from Route 238 to Route 80. Install and upgrade Transportation Management System (TMS) elements.
Baseline
1,036 19,931
2,700
2,700
3,600
17,970
10
50
27,030
ALA580
1487A04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
139 Detection Restoration Service Contract
56
300
6
0
863
4,559
0
0
56
297
0
0
64
393
10
10
901
4,549
5,927
0
11/30/17
03/15/18
05/01/18
12/14/19
12/14/21
In Alameda County, on Routes 24, 80, 84, 92, 238, 580, 680, 880, and 980 at various locations. Repair and replace existing Transportation Management System elements.
Baseline
353 5,784
64
393
901
4,549
10
10
5,927
ALA1488T
04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
140 ALA 185 CAPM 1,311
2,353
253
40
2,243
14,928
02/23/22
08/02/21
07/01/21
12/01/19
0
0
62
0
0
0
1,417
2,093
375
40
2,405
14,928
21,258
0
03/02/20
07/01/21
10/08/21
05/04/22
05/03/24
In and near Hayward and San Leandro, from A Street to Davis Street. Rehabilitate pavement and upgrade curb ramps to Americans with Disabilities Act (ADA) Standards.
Baseline
62 21,128
1,417
2,093
2,405
14,928
40
375
21,258
ALA185
1494C04
Page 20 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
141 Bridge Rehab 0
332
22
0
356
360
08/31/20
01/31/20
12/31/19
05/27/17
0
0
0
196
0
0
0
398
21
0
212
360
991
0
05/27/17
04/12/19
04/15/19
11/01/19
10/01/20
In Oakland, at Foothill Boulevard Undercrossing No. 33-0334K. Bridge deck rehabilitation.
Baseline
196 1,070
0
398
212
360
0
21
991
ALA580
1494K04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
142 ATMS and PCDC Upgrade Project
83
551
11
5
426
3,687
11/01/20
12/01/19
09/01/19
10/01/18
0
0
83
57
0
0
111
553
12
0
431
3,687
4,794
0
10/01/18
09/01/19
12/01/19
11/01/20
08/29/25
In Oakland, at the District 4 Transportation Management Center (TMC). Upgrade or replace legacy TMC software applications and interface components, and related system devices by service contract.
Baseline
140 4,763
111
553
431
3,687
0
12
4,794
ALA980
1499J04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
143 I-680/SR 4 Interchange - Widen Route 4 (Phase 3)
5,000
10,089
1,000
11,952
0
108,117
09/19/18
10/30/20
06/25/18
04/19/18
02/19/09
0
894
5,000
10,089
5,343
10,511
5,000
9,900
1,000
10,703
0
101,695
128,298
108,11703/14/19
02/19/09
04/19/18
05/30/18
10/17/18
11/30/21
IN CONTRA COSTA COUNTY ON ROUTE 4 BETWEEN MORELLO AVENUE AND 0.7 MILE EAST OF SR-242 ON SR-4. WIDEN SR 4 IN THE MEDIAN TO PROVIDE THIRD LANE IN EACH DIRECTION WIDEN SR 4 IN THE MEDIAN TO PROVIDE THIRD LANE IN EACH DIRECTION
Baseline
31,837 136,158
0
0
0
59,995
0
0
59,995
CC4
0298E04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
144 CC-4 CAPM 2,820
6,245
241
93
5,148
55,281
12/01/22
06/01/22
03/01/22
06/01/20
0
0
148
0
0
0
2,720
6,400
780
93
8,320
55,281
73,594
0
07/15/20
05/02/22
06/01/22
12/01/22
12/02/24
In and near Concord and Pittsburg, from Route 242 to Loveridge Road. Rehabilitate pavement, upgrade curb ramps to make Americans with Disabilities Act (ADA) compliant and upgrade guardrail to make standard.
Baseline
148 69,828
2,720
6,400
8,320
55,281
93
780
73,594
CC4
1462R04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
145 CC-580 Stege Drain super-structure
947
1,090
117
5
2,007
5,828
10/12/20
04/20/20
08/01/19
11/30/18
0
0
947
66
0
0
970
1,042
117
5
876
5,828
8,838
0
03/22/19
05/01/20
05/08/20
10/12/20
06/14/22
In Richmond, at Stege Drain Bridge No. 28-0091. Bridge rehabilitation.
Baseline
1,013 9,994
970
1,042
876
5,828
5
117
8,838
CC580
1482Q04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
146 Roadway Rehab 2R 2,979
4,702
267
28
7,693
61,317
11/15/22
02/01/22
12/01/21
04/01/20
0
0
806
0
0
0
3,083
4,624
206
28
0
0
7,941
0
04/15/20
12/01/21
02/01/22
11/15/22
12/31/24
In and near Hercules, Rodeo, and Crocket, from Route 4 to the Carquinez Bridge. Roadway rehabilitation.(G13 Contingency)
Baseline
806 76,986
3,083
4,624
0
0
28
206
7,941
CC80
1487E04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
147 Detection Restoration Service Contract
40
258
11
0
689
3,644
0
1
40
247
0
0
50
314
10
10
722
3,644
4,750
0
11/30/17
03/15/18
05/01/18
12/14/19
12/14/21
In Contra Costa County, on Routes 4, 24, 80, 242, 580, and 680 at various locations. Repair and replace existing Transportation Management System elements.
Baseline
288 4,642
50
314
722
3,644
10
10
4,750
CC1488V
04
Page 21 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
148 Seismic Restoration 925
1,091
175
37
376
2,067
12/22/22
02/21/22
01/04/22
04/13/20
0
0
467
0
0
0
925
1,175
175
38
375
2,067
4,755
0
04/13/20
01/04/22
02/21/22
12/12/22
12/12/24
In Orinda, at St. Stephens Drive Overcrossing No. 28-0111. Seismic retrofit.
Baseline
467 4,671
925
1,175
375
2,067
38
175
4,755
CC24
1493A04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
149 Ramp Metering 0
1,392
93
9
1,720
6,902
01/16/19
06/01/18
05/01/18
05/07/14
107
6
0
1,392
13
18
0
1,697
50
110
1,900
6,902
10,659
6,901
05/07/14
06/22/18
06/29/18
01/09/19
06/30/20
In and near Sausalito, Corte Madera, and Larkspur, from north of Golden Gate Bridge to 0.3 mile north of Sir Francis Drake Boulevard. Install ramp metering and Traffic Operations System (TOS) elements.
Baseline
1,536 10,116
0
1,500
1,900
6,902
110
50
10,462
MRN101
0334J04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
150 OLEMA CREEK 200
3,670
145
21
1,122
3,211
902
102
200
3,670
13
2,742
400
3,720
100
90
833
3,211
8,354
3,211
07/05/11
12/11/17
12/14/17
06/30/18
12/31/19
Near Olema, 1.8 miles south of Sir Francis Drake Boulevard. Replace culvert with a bridge.
Baseline
7,629 8,369
400
3,720
833
3,211
90
100
8,354
MRN1
0315D04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
151 Bridge replacement San Rafael harbor creek
1,016
2,099
304
1,279
2,476
9,926
2
206
1,016
1,982
106
0
1,190
2,100
300
570
2,700
9,785
16,645
0
07/07/17
06/29/18
06/29/18
01/14/20
04/17/21
In San Rafael, from Route 101 northbound off-ramp to 2nd Street at San Rafael Harbor Bridge No. 27-0033. Replace bridge.
Baseline
3,312 17,100
1,190
2,100
2,700
9,785
570
300
16,645
MRN101
0350H04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
152 Millerton Gulch Br Scour Mitigation
1,134
725
125
150
876
1,000
02/04/20
06/21/19
06/07/19
12/01/17
0
17
1,134
192
0
0
1,620
1,080
180
150
830
836
4,696
0
12/26/17
10/22/18
12/05/18
06/28/19
07/31/23
Near Point Reyes Station, at Millerton Gulch Bridge No. 27-0114. Environmental mitigation for emergency project EA 4K500.
Baseline
1,343 4,010
1,620
1,080
830
836
150
180
4,696
MRN1
0480C04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
153 Lagunitas Creek Bridge
4,132
3,572
774
4,059
2,582
11,552
02/08/21
08/25/20
08/20/20
06/29/18
0
59
4,132
823
3
0
4,517
2,850
750
6,500
2,500
11,552
28,669
009/19/18
06/29/18
08/20/20
08/25/20
02/08/21
12/30/22
Near Point Reyes Station, at Lagunitas Creek Bridge No. 27-0023. Replace bridge.
Baseline
5,017 26,671
4,517
2,850
2,500
11,552
6,500
750
28,669
MRN1
0756K04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
154 Irwn Cr Br Rehab Culvert
1,333
1,119
408
126
993
1,923
09/15/22
06/01/22
05/01/22
08/01/20
0
0
359
0
0
0
1,100
880
215
944
610
1,903
5,652
0
12/02/19
09/01/21
10/01/21
03/16/22
08/01/23
In San Rafael, at Irwin Creek Bridge No. 27-0097. Rehabilitate corrugated metal arch culvert bridge and adjoining deteriorated culvert structures.
Baseline
359 5,902
1,100
880
610
1,903
944
215
5,652
MRN101
1493K04
Page 22 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
155 Capell Creek Bridge Replacement
1,501
2,552
397
230
4,692
14,539
65
283
1,501
2,552
44
1
1,560
2,510
437
239
4,670
14,538
23,954
14,538
06/16/16
06/28/18
06/29/18
03/13/19
12/31/21
Near Napa, at Capell Creek Bridge No. 21-0078. Rehabilitate bridge.
Baseline
4,446 23,911
1,560
2,510
4,670
14,538
239
437
23,954
NAP128
0830B04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
156 SR 121 Repair Bridge Girders.
507
564
139
0
1,346
1,446
64
4
507
564
0
0
538
625
208
262
512
1,446
3,591
1,446
10/19/16
03/27/18
04/12/18
10/22/18
12/31/19
In Napa, at Tulucay Creek Bridge No. 21-0003. Repair bridge girders.
Baseline
1,139 4,002
538
625
512
1,446
262
208
3,591
NAP121
0086U04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
157 SR 128 CONN CREEK BRIDGE REPLACEMENT
1,190
2,628
702
961
2,833
7,165
8
625
1,190
2,565
163
1
1,190
2,620
950
3,800
2,850
8,448
19,858
0
10/05/15
06/20/18
06/29/18
05/03/19
12/31/20
Near Rutherford, at Conn Creek Bridge No. 21-0021. Replace bridge.
Baseline
4,552 15,479
1,190
2,620
2,850
8,448
3,800
950
19,858
NAP128
0587H04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
158 Hopper Slough Br. 2,082
2,413
163
1,514
2,661
7,864
12/01/22
05/02/22
04/04/22
10/01/20
0
0
414
0
0
0
2,074
1,988
206
1,514
2,014
7,864
15,660
0
10/01/20
04/01/22
05/01/22
01/10/23
12/01/24
Near Rutherford, at Hopper Slough Bridge No. 20-0019. Replace bridge.
Baseline
414 16,697
2,074
1,988
2,014
7,864
1,514
206
15,660
NAP128
1451C04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
159 SHEEHY CRK CULVERT REHAB
1,353
790
310
294
845
3,336
01/11/23
06/30/22
05/02/22
11/02/20
0
0
659
0
0
0
1,086
786
350
294
706
3,336
6,558
0
11/04/19
07/01/21
08/02/21
01/11/22
09/01/22
In American Canyon, at Rio Del Mar; also near American Canyon at 0.3 mile south of North Kelly Road (PM 5.1). Rehabilitate culverts.
Baseline
659 6,928
1,086
786
706
3,336
294
350
6,558
NAP29
1453K04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
160 Bridge Rail Replacement
1,045
1,484
421
747
1,147
1,000
10/02/23
04/03/23
01/03/23
03/01/21
0
0
127
0
0
0
1,040
0
0
0
0
0
1,040
0
03/01/21
04/01/23
04/03/23
10/01/23
12/01/25
In St. Helena, at Sulphur Creek Bridge No. 21-0016 and York Creek Bridge No. 21-0017. Upgrade bridge rails.(Long Lead Project)
Baseline
127 5,844
1,040
0
0
0
0
0
1,040
NAP29
1462K04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
161 Capell Br. Replacement
729
840
109
225
699
2,440
10/30/20
04/15/20
03/01/20
09/01/18
0
24
729
108
0
0
750
870
100
225
735
2,440
5,120
0
09/20/18
03/01/20
04/15/20
10/30/20
12/01/21
Near Napa, at Capell Creek Bridge No. 21-0064. Bridge rehabilitation.
Baseline
861 5,042
750
870
735
2,440
225
100
5,120
NAP121
1489K04
Page 23 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
162 York to Junction 128 CAPM
940
1,116
100
20
1,092
9,647
06/30/21
11/02/20
10/01/20
10/01/19
0
0
476
0
0
0
900
1,100
44
20
1,100
9,647
12,811
0
10/01/19
11/02/20
11/02/20
06/30/21
11/01/22
In and near St. Helena and Calistoga, from York Creek Bridge to Route 128. Pavement rehabilitation.
Baseline
476 12,915
900
1,100
1,100
9,647
20
44
12,811
NAP29
1490D04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
163 Bridge Rail Replacement
2,606
1,199
286
1,361
1,449
7,111
12/15/22
04/15/22
01/31/22
06/30/20
0
0
703
0
0
0
2,600
1,200
350
295
1,500
7,111
13,056
0
06/01/20
01/28/22
04/28/22
12/29/22
12/30/24
In and near the cities of Napa and Yountville, at Craig Creek Bridge No. 21-0048 (PM 14.11), Dry Creek Bridge No. 21-0014 (PM 16.48), Perfume Creek Bridge No. 21-0051 (PM 17.81), and California Drive Undercrossing No. 21-0047 (PM 19.04). Upgrade bridge rails and widen shoulders to make standard.
Baseline
703 14,012
2,600
1,200
1,500
7,111
295
350
13,056
NAP29
1494E04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
164 CAPM only in City of Santa Clara
387
882
7
0
662
8,844
71
3
387
882
0
2
469
870
20
20
400
8,844
10,623
8,843
08/04/17
05/16/18
06/08/18
12/21/18
06/30/20
In the city of Santa Clara, on El Camino Real from Portola Avenue to Lawrence Expressway. Pavement rehabilitation.
Baseline
1,345 10,782
469
870
400
8,844
20
20
10,623
SCL82
1490C04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
165 SCL-SM-280 CAPM 1,488
2,882
30
50
5,814
48,088
11/01/19
05/01/19
04/15/19
12/01/17
0
18
1,488
2,060
0
0
1,853
3,284
48
50
6,661
47,574
59,470
008/08/18
12/01/17
04/15/19
05/01/19
11/01/19
11/01/21
In and near Los Altos, Los Altos Hills, and Palo Alto, from Foothill Boulevard to north of Sand Hill Road (also in San Mateo County (PM R0.0/R2.1). Pavement rehabilitation.
Baseline
3,566 58,352
1,853
3,284
6,661
47,574
50
48
59,470
SCL280
0449A04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
166 SCL 101 Br. Rail Replacement/Upgrade
1,418
2,214
30
70
2,698
13,800
12/21/20
06/15/20
03/16/20
09/14/18
0
0
1,418
0
0
0
1,800
2,250
30
30
2,700
10,711
17,521
0
10/05/18
05/01/20
05/15/20
12/21/20
12/15/21
In various cities, on Routes 101 and 237 at various locations. Bridge rail upgrade at eight locations.
Baseline
1,418 20,230
1,800
2,250
2,700
10,711
30
30
17,521
SCL101
0481H04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
167 SCL-152 CAPM 607
1,514
86
64
1,674
14,165
06/14/19
12/14/18
12/03/18
04/05/18
0
64
607
1,299
54
0
1,400
1,900
68
125
2,100
16,287
21,880
008/08/18
04/05/18
12/27/18
12/31/18
06/28/19
12/01/20
In Gilroy, from 0.3 miles west of Santa Teresa Boulevard to Route 101. Rehabilitate pavement.
Baseline
2,024 18,110
1,400
1,900
2,100
16,287
125
68
21,880
SCL152
1452D04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
168 SCL 17 CAPM 1,920
2,646
192
53
2,453
30,141
07/15/20
01/27/20
01/17/20
07/02/18
0
35
1,920
205
0
0
2,400
2,750
175
20
3,150
30,141
38,636
0
10/10/18
05/29/20
06/15/20
12/22/20
09/19/22
In and near Los Gatos, Campbell and San Jose, from Hebard Way to Route 280. Pavement rehabilitation.
Baseline
2,160 37,405
2,400
2,750
3,150
30,141
20
175
38,636
SCL17
1480B04
Page 24 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
169 SCL, 280, Seismic Restoration, Arasteradero RD, UC and Bird Ave. OC
598
939
31
0
564
2,391
10/28/19
03/15/19
03/01/19
02/27/18
0
4
598
745
0
0
1,144
1,034
66
90
600
2,635
5,569
0
02/27/18
02/12/19
03/13/19
10/28/19
07/10/20
In San Jose, at Bird Avenue Overcrossing Bridge No. 37-0267 (PM R2.78); also in Los Altos Hills at Arastradero Road Undercrossing Bridge No. 37-0251 L/R (PM 17.8). Bridge seismic restoration.
Baseline
1,347 4,523
1,144
1,034
600
2,635
90
66
5,569
SCL280
1483K04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
170 Detection Restoration Service Contract
54
345
10
0
918
4,801
0
1
54
305
0
0
68
415
10
10
951
4,801
6,255
0
11/30/17
03/15/18
05/01/18
12/14/19
12/14/21
In Santa Clara County, on Routes 17, 85, 87, 101, 152, 237, 280, and 680 at various locations. Repair and replace existing Transportation Management System elements.
Baseline
360 6,128
68
415
951
4,801
10
10
6,255
SCL1488W
04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
171 PSSR - SCL-87 Pavement 2R
2,831
4,292
50
304
6,288
55,263
02/01/23
06/30/22
04/01/22
10/01/20
0
0
540
0
0
0
2,767
4,425
50
304
6,581
55,263
69,390
0
10/01/20
04/01/22
04/30/22
02/01/23
03/03/25
In San Jose, from Route 85 to West Julian Street. Roadway rehabilitation.
Baseline
540 69,028
2,767
4,425
6,581
55,263
304
50
69,390
SCL87
1492C04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
172 CAPM 883
1,976
83
360
1,965
22,885
11/30/21
08/11/21
07/06/21
03/03/20
0
0
145
0
0
0
888
1,974
99
360
1,974
22,885
28,180
0
05/01/20
11/17/21
12/01/21
05/27/22
12/14/23
In Mountain View, Los Altos, and Palo Alto, from 0.05 mile north of Route 237 to Sand Hill Road. Pavement rehabilitation.
Baseline
145 28,152
888
1,974
1,974
22,885
360
99
28,180
SCL82
1498F04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
173 04-4K110_SF 001 19th AVE. CAPM AND INTERCONNECT SIGNALS
611
2,241
61
290
2,261
16,638
0
46
611
2,241
35
0
201
0
0
0
2,434
17,186
19,821
14,900
11/17/17
06/28/18
06/29/18
04/10/19
02/26/21
ON STATE ROUTE 1, IN THE CITY & COUNTY OF SAN FRANCISCO FROM SM/SF COUNTY LINE TO HOLLOWAY AVE AND FROM LINCOLN WAY TO RUCKMAN AVE.. REHABILITATE ROADWAY AND UPGRADE AND INTERCONNECT SIGNALS. REHABILITATE ROADWAY AND UPGRADE AND INTERCONNECT SIGNALS.
Baseline
2,933 22,102
201
0
2,434
17,186
0
0
19,821
SF1
0481V04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
174 04-4C130_SF 001 19th AVE. CAPM REHABILITATE ROADWAY
0
1,035
42
0
1,345
12,718
0
0
0
0
0
0
800
1,319
35
180
0
0
2,334
0
05/18/16
06/28/18
06/29/18
04/10/19
02/26/21
In the City and County of San Francisco, from San Mateo County line to Holloway Avenue (PM R0.0/0.94) and from Lincoln Way to Ruckman Avenue (PM 4.05/6.9). Rehabilitate roadway.
Baseline
0 15,140
800
1,319
0
0
180
35
2,334
SF1
0585E04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
175 Alemany Circle UC Deck Replacement
3,875
3,983
21
4
3,169
32,400
12/02/19
06/03/19
05/15/19
01/12/18
0
6
3,875
2,209
0
0
4,000
3,540
20
20
3,250
32,400
43,230
008/08/18
01/12/18
05/15/19
06/03/19
12/02/19
06/30/21
Near San Francisco, at Alemany Circle Undercrossing No. 34-0033. Rehabilitate bridge.
Baseline
6,090 43,452
4,000
3,540
3,250
32,400
20
20
43,230
SF101
0587D04
Page 25 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
176 SF-101 & SM-1 Baluster Rails
755
1,705
162
0
1,947
5,461
10/01/21
03/01/21
01/01/21
10/01/19
0
0
49
0
0
0
657
1,751
164
10
1,805
5,461
9,848
0
05/01/20
01/01/21
03/01/21
10/01/21
10/01/22
In the City and County of San Francisco, at Alemany Circle Undercrossing (UC) No. 34-0064K, Alemany Circle UC No. 34-0063S and Bayshore Boulevard UC No. 34-0047S; also in San Mateo County in Pacifica, at Paloma Avenue Overcrossing No. 35-0187 (PM R44.21). Upgrade bridge rails.
Baseline
49 10,030
657
1,751
1,805
5,461
10
164
9,848
SF101
1450E04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
177 04-2J800_SF 101 Bridge Painting PID
1,856
7,835
225
229
12,690
100,793
12/15/20
04/01/20
03/01/20
12/01/18
0
4
1,856
69
0
0
2,500
9,200
300
62
0
0
12,062
010/31/18
12/21/18
06/26/20
06/26/20
12/15/20
06/01/25
In the City and County of San Francisco, at the Central Viaduct No. 34-0077 from south of 17th Street to S. Van Ness Avenue; also on Route 80, at the Bayshore Viaduct No. 34-0088 from Route 101 to 4th Street (PM 3.9/4.8). Paint superstructure steel members.(G13 Contingency)
Baseline
1,929 123,628
2,500
9,200
0
0
62
300
12,062
SF101
1483S04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
178 SM-1 CAPM 795
1,195
37
5
1,186
11,671
01/15/20
09/01/19
06/01/19
07/02/18
0
0
795
10
0
0
1,703
1,081
46
10
1,081
11,671
15,592
0
11/28/18
10/31/19
11/29/19
04/15/20
04/15/21
Near Pescadero, from Santa Cruz County line to south of Bean Hollow Road. Pavement rehabilitation.
Baseline
805 14,889
1,703
1,081
1,081
11,671
10
46
15,592
SM1
0622B04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
179 SM 280 Culvert Rehab
1,892
2,223
265
13
3,104
16,404
05/01/22
11/01/21
10/01/21
02/01/20
0
0
114
0
0
0
1,800
2,000
260
13
3,000
16,404
23,477
0
02/01/20
10/01/21
11/01/21
05/01/22
05/01/24
Near Redwood City, San Carlos and Belmont, from Edgewood Road to Route 92 and near Hillsborough at PM R12.7; also in Santa Clara County in and near Mountain View and Palo Alto, at various spot locations (PM 11.6, 12.8, 12.9, 18.8). Replace failing culverts and restore damaged slopes, pavement, and bridge approaches at six locations.
Baseline
114 23,901
1,800
2,000
3,000
16,404
13
260
23,477
SM280
0732J04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
180 SM-1 TOS 586
916
34
36
554
2,408
01/15/22
09/01/21
08/01/21
04/01/20
0
0
47
0
0
0
503
444
30
36
444
2,408
3,865
0
09/01/20
08/01/21
09/01/21
01/15/22
01/15/23
In and near the cities of Half Moon Bay, Pacifica and Daly City, from south of Miramontes Point Road to Clarinada Avenue Undercrossing, at various locations. Install Bluetooth Detection Systems and Variable Message Signs (VMS), enable two existing Changeable Message Signs (CMS), modify Advanced Transportation Management System (ATMS), and construct
Baseline
47 4,534
503
444
444
2,408
36
30
3,865
SM1
1452A04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
181 SM 101 Cordilleras Crk Br Replacement
2,883
3,800
989
4,285
6,520
26,570
01/11/23
06/30/22
06/30/22
10/02/20
0
0
26
0
0
0
4,500
4,500
1,125
4,285
7,500
26,570
48,480
0
07/01/20
11/01/21
12/01/21
07/01/22
06/01/24
In Redwood City, at Cordilleras Creek Bridge No. 35-0019. Replace bridge to restore structural integrity.
Baseline
26 45,047
4,500
4,500
7,500
26,570
4,285
1,125
48,480
SM101
1483C04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
182 Sub-Rehab+Scour 1,154
1,034
260
342
1,297
1,609
11/01/22
04/01/22
02/01/22
10/01/20
0
0
87
0
0
0
1,250
1,040
260
343
1,300
1,936
6,129
0
10/01/20
03/31/22
04/01/22
11/01/22
11/01/24
In Half Moon Bay, at the Pilarcitos Creek Bridge No. 35-0139L/R; also on Route 84 at San Gregorio Creek Bridge No. 35-0166 (PM 7.55). Retrofit scour critical bridges to preserve the structural integrity of the bridges by reinforcing with Rock Slope Protection (RSP).
Baseline
87 5,696
1,250
1,040
1,300
1,936
343
260
6,129
SM1
1483M04
Page 26 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
183 Bridge Rail Replacement
1,122
1,697
124
64
1,408
7,748
09/01/22
03/01/22
02/01/21
03/01/20
0
0
46
0
0
0
1,326
1,586
130
64
1,456
7,748
12,310
0
01/01/20
05/01/21
10/01/21
04/01/22
04/01/23
In East Palo Alto, Redwood City, Belmont, Burlingame, Millbrae, South San Francisco, and Brisbane, from University Avenue Overcrossing to Sierra Point offramp separation. Upgrade bridge rails at eight structures.
Baseline
46 12,163
1,326
1,586
1,456
7,748
64
130
12,310
SM101
1485K04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
184 SM-101 Pavement Preservation
769
1,568
14
20
1,577
17,465
05/15/20
11/01/19
10/15/19
12/28/18
0
1
769
63
0
0
1,056
1,342
132
100
1,628
16,500
20,758
001/02/19
12/28/18
05/01/20
05/20/20
03/01/21
08/01/22
In the cities of Burlingame, Millbrae, San Bruno and South San Francisco, from Broadway to Oyster Point Boulevard. Pavement rehabilitation.
Baseline
833 21,413
1,056
1,342
1,628
16,500
100
132
20,758
SM101
1487J04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
185 Detection Restoration Service Contract
26
199
3
0
507
2,747
0
1
26
188
0
0
37
236
10
10
545
2,747
3,585
0
11/30/17
03/15/18
05/01/18
12/14/19
12/14/21
In San Mateo and San Francisco Counties, on Routes 80, 92, 101, and 280 at various locations. Repair and replace existing Transportation Management System elements.
Baseline
215 3,482
37
236
545
2,747
10
10
3,585
SM1488X
04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
186 SM-1 Pescadero Crk. Br. rails
1,234
1,579
7
260
1,225
4,434
12/15/22
05/01/22
04/01/22
11/01/20
0
0
43
0
0
0
1,200
1,000
8
260
1,200
4,434
8,102
0
11/01/20
04/01/22
05/01/22
12/15/22
12/15/23
Near Pescadero, at Pescadero Creek Bridge No. 35-0028. Upgrade bridge rails and repair approach slabs.
Baseline
43 8,739
1,200
1,000
1,200
4,434
260
8
8,102
SM1
1494G04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
187 CAPM SR-84 1,203
2,515
27
44
1,670
18,225
11/01/22
04/01/22
03/01/22
06/01/20
0
0
15
0
0
0
2,340
2,860
39
566
3,120
18,225
27,150
0
02/03/20
06/01/21
08/01/21
03/01/22
04/01/23
In and near Woodside and Redwood City, from Route 280 to Route 101. Rehabilitate pavement, make curb ramps and sidewalks Americans with Disabilities Act (ADA) compliant, and upgrade guardrails to make standard.
Baseline
15 23,684
2,340
2,860
3,120
18,225
566
39
27,150
SM84
1497A04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
188 SM-280 Seismic at 6 Br.s
935
1,989
87
262
1,307
7,470
10/01/22
04/01/22
05/01/22
10/01/20
0
0
227
0
0
0
600
1,000
100
262
1,000
7,470
10,432
0
03/18/20
03/01/22
04/01/22
07/01/22
06/01/23
In and near Menlo Park and San Bruno, from Alpine Road to Route 380 at Alpine Road Undercrossing No. 35-0009L/R (PM R0.05), Sand Hill Road Overcrossing (OC) (South) No. 35-0007 (PM R1.56), Sand Hill Road OC (North) No. 35-0008 (PM R1.62), and Route 280/38 Structure seismic retrofit.
Baseline
227 12,050
600
1,000
1,000
7,470
262
100
10,432
SM280
1498G04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
189 Dan Wilson Creek Br.
1,443
965
17
154
751
2,095
57
17
1,443
965
9
1
1,520
1,011
100
145
714
3,325
6,815
3,325
02/22/17
01/05/18
02/01/18
06/28/19
01/07/20
Near Fairfield, at Dan Wilson Creek Bridge No. 23-0006. Rehabilitate bridge.
Baseline
2,492 5,425
1,520
1,011
714
3,325
145
100
6,815
SOL80
8315N04
Page 27 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
190 Miner Slough 3,366
2,661
673
3,009
4,026
24,500
12/20/20
05/30/20
04/30/20
09/29/17
0
36
3,366
598
9
0
3,550
4,100
1,098
2,884
3,500
24,500
39,632
008/10/18
09/29/17
04/30/20
05/30/20
12/20/20
04/30/23
Near Rio Vista, at Miner Slough Bridge No. 23-0035. Replace bridge.
Baseline
4,009 38,235
3,550
4,100
3,500
24,500
2,884
1,098
39,632
SOL84
0886
04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
191 Real McCoy Ramp 1,945
2,061
250
350
2,100
12,630
12/01/22
06/01/22
05/01/22
10/01/20
0
0
11
0
0
0
2,080
2,080
260
350
2,080
12,630
19,480
0
10/01/20
05/01/22
06/01/22
12/19/22
11/20/23
Near Rio Vista, at the Cache Slough Ferry Crossing. Upgrade the existing fender systems, concrete ramps, and swing gate systems, modify the ferry boat deck surface, and install traffic counter and Vehicle Detection Systems (VDS).
Baseline
11 19,336
2,080
2,080
2,080
12,630
350
260
19,480
SOL84
0480D04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
192 Br Rehab+Scour 859
1,003
277
715
742
3,686
11/02/20
05/31/20
02/28/20
08/31/18
0
0
859
4
2
0
990
880
79
423
880
1,379
4,631
0
03/22/19
09/21/20
09/25/20
04/14/21
07/31/23
In and near Vallejo, Dixon and Vacaville, at Route 80/29 Separation Bridge No. 23-0087, McCune Creek Bridge No. 23-0084L/R and Horse Creek Bridge No. 23-0077L. Bridge preventative maintenance.
Baseline
865 7,282
990
880
880
1,379
423
79
4,631
SOL80
0480N04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
193 sol 80 raise oc 2,056
2,401
38
250
1,728
15,951
01/15/20
06/14/19
06/01/19
07/23/18
0
0
2,056
1,308
10
0
2,100
2,154
154
10
1,859
15,951
22,228
008/08/18
07/23/18
05/30/19
06/10/19
01/15/20
01/15/22
In Vallejo, from Magazine Street Overcrossing No. 23-0066 to Redwood Street Overcrossing No. 23-0114. Increase vertical clearance at six overcrossing structures.ACCELERATED BRIDGE
Baseline
3,374 22,424
2,100
2,154
1,859
15,951
10
154
22,228
SOL80
0481R04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
194 Sol-80/29 Separation 2,179
3,053
31
15
2,560
15,800
01/15/21
06/08/20
05/04/20
12/03/18
0
9
2,052
521
0
0
2,057
2,624
22
15
2,600
12,300
19,618
0
06/21/18
05/17/19
06/24/19
01/15/20
01/30/21
In Vallejo, at Route 80/29 Separation Bridge No. 23-0087. Replace bridge.ACCELERATED BRIDGE
Baseline
2,582 23,638
2,057
2,624
2,600
12,300
15
22
19,618
SOL80
1452F04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
195 CAPM 12 897
1,426
27
10
1,312
5,665
07/30/20
02/01/20
01/02/20
04/01/18
0
2
897
227
0
0
1,308
1,030
62
5
856
6,843
10,104
0
04/03/18
01/02/20
02/01/20
07/30/20
06/01/21
In and near Sonoma, from Vallejo Avenue to east of Leveroni Road/Napa Road. Pavement rehabilitation.
Baseline
1,126 9,337
1,308
1,030
856
6,843
5
62
10,104
SON12
0488K04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
196 Replace Bridge Rails 1,040
1,403
111
120
982
4,343
03/01/21
09/01/21
08/01/21
10/01/19
0
0
190
0
0
0
650
780
130
116
988
4,343
7,007
0
10/01/19
08/02/21
09/01/21
03/01/22
03/01/23
In and near Santa Rosa, at Todd Road Overcrossing (OC) No. 20-0172 (PM 16.54) and Baker Avenue OC No. 20-0173 (PM 19.00); also in Marin County near Navato, at Miller Creek Road OC No. 27-0082 (PM 15.57). Upgrade bridge rails.
Baseline
190 7,999
650
780
988
4,343
116
130
7,007
SON101
1451A04
Page 28 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
197 Son 1 Culverts Rehab
1,761
1,000
354
101
253
4,256
01/01/23
06/01/22
06/15/22
10/15/20
0
0
404
0
0
0
744
1,369
429
321
1,385
4,256
8,504
0
12/29/19
05/15/22
06/01/22
01/01/23
05/15/24
Near Jenner, from south of Fort Ross Road to north of Moon Rock Campground at various locations. Rehabilitate drainage culverts.
Baseline
404 7,725
744
1,369
1,385
4,256
321
429
8,504
SON1
1453J04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
198 BIG PAVE SEGMENT 2
3,677
6,243
249
890
7,628
68,200
12/01/19
06/03/19
06/03/19
04/19/18
0
199
3,677
1,746
84
0
5,149
6,799
320
890
7,600
68,200
88,958
012/04/18
04/19/18
06/03/19
06/05/19
12/01/19
12/30/21
In and near Windsor, Healdsburg, and Cloverdale, from Old Redwood Highway to 2.0 miles south of Mendocino County line. Roadway rehabilitation.
Baseline
5,706 86,887
5,149
6,799
7,600
68,200
890
320
88,958
SON101
1482F04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
199 San Antonio Crk 1,066
688
25
161
433
996
06/01/22
12/01/21
12/01/21
10/01/20
0
0
172
0
0
0
982
416
24
160
468
997
3,047
0
10/01/20
12/01/21
12/01/21
06/01/22
02/01/23
Near Petaluma, at San Antonio Creek Bridges No. 20-0019L/R. Abutment scour mitigation and channel sediment cleaning to address flooding.
Baseline
172 3,369
982
416
468
997
160
24
3,047
SON101
1487D04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
200 Detection Restoration Service Contract
83
584
10
0
1,298
6,929
0
1
83
573
0
0
101
600
10
10
1,371
6,929
9,021
0
11/30/17
03/15/18
05/01/18
12/14/19
12/14/21
In Sonoma, Marin, Napa, and Solano Counties, on Routes 12, 29, 37, 80, 101, 580, 680, and 780 at various locations. Repair and replace existing Transportation Management System elements.
Baseline
657 8,904
101
600
1,371
6,929
10
10
9,021
SON1488Y
04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
201 SON 12 CAPM 1,651
1,116
29
60
1,025
27,681
05/02/22
12/01/21
11/01/21
04/01/20
0
0
293
0
0
0
2,084
2,900
66
280
3,350
27,681
36,361
0
05/01/20
05/01/21
12/01/21
06/15/22
03/20/24
In and near Santa Rosa, from Llano Road to Farmers Lane. Rehabilitate pavement, upgrade guardrail to make standard and upgrade curb ramps to make Americans with Disabilities Act (ADA) compliant.
Baseline
293 31,562
2,084
2,900
3,350
27,681
280
66
36,361
SON12
1493M04
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
202 King City Combined Projects
2,237
7,464
175
3,020
15,641
77,788
164
175
2,237
7,464
62
3
0
0
0
0
16,851
88,898
105,749
77,787
06/25/18
02/11/19
06/01/23
In Monterey County, in and near King City from 0.2 miles South of Wild Horse Road (PM R36.9) to Teague Avenue (PM47.7). Pavement Rehabilitation, Seismic Retrofit with widening and median barrier Pavement Rehabilitation, Seismic Retrofit with widening and median barrier
Baseline
10,105 106,325
0
0
16,851
88,898
0
0
105,749
MON101
2548
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
203 Salinas Rehab 805
2,436
130
17
5,704
41,249
115
22
805
2,436
17
0
806
2,466
180
80
6,189
41,249
50,970
41,248
12/01/15
11/20/17
06/26/18
01/07/19
12/23/20
In Salinas, from East Market Street to 0.3 mile south of Russell/Espinosa Road. Rehabilitate pavement.
Baseline
3,395 50,341
806
2,466
6,189
41,249
80
180
50,970
MON101
2474
05
Page 29 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
204 Paris Valley 2R Rehab
0
1,445
44
16
3,840
31,523
06/21/19
12/07/18
07/18/18
07/01/14
0
13
0
943
7
0
11
1,820
42
14
3,749
27,482
33,118
27,48208/06/18
07/01/14
07/18/18
10/11/18
06/21/19
12/23/20
Near King City, from 0.1 mile south of Paris Valley Road Overcrossing to Rancho Undercrossing. Roadway rehabilitation.
Baseline
963 36,868
11
1,820
3,749
27,482
14
42
33,118
MON101
2546
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
205 SALSIPUEDES CREEK BRIDGE SCOUR MITIGATION
2,115
2,730
99
41
2,571
6,131
172
57
2,115
2,730
40
579
2,445
2,819
139
195
2,360
6,131
14,089
6,130
11/02/15
12/13/17
04/02/18
01/09/19
10/03/20
ON ROUTE 1 IN SANTA BARBARA COUNTY NEAR LOMPOC AT THE SALSIPUEDES CREEK BRIDGE (NO. 51-0095). Bridge Replacement Route 101 - native oak planting
Baseline
5,693 13,687
2,445
2,819
2,360
6,131
195
139
14,089
MON1
1501
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
206 Replace 7 Culverts on Mon-1
348
990
331
320
930
3,448
53
201
348
990
311
97
400
1,324
344
300
885
3,448
6,701
3,447
06/30/16
03/26/18
04/09/18
10/25/18
04/12/22
South of Carmel, at seven (7) locations from north of the San Luis Obispo County line to south of Malpaso Creek Bridge. Rehabilitate and/or replace culverts.
Baseline
2,000 6,367
400
1,324
885
3,448
300
344
6,701
MON1
2478
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
207 REPLACE CULVERT NEAR LIMEKILN CREEK
582
1,275
107
26
558
1,355
06/01/20
02/03/20
10/28/19
10/01/18
0
2
582
10
2
0
936
1,300
115
23
575
1,527
4,476
0
11/14/18
10/28/19
03/16/20
07/13/20
10/13/21
Near Lucia, at 0.6 mile south of Limekiln Creek Bridge. Replace culvert.
Baseline
596 3,903
936
1,300
575
1,527
23
115
4,476
MON1
2230
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
208 Big Sur CAPM 913
1,423
37
56
2,989
24,335
01/02/20
06/11/19
05/28/19
05/31/18
0
10
913
623
2
0
988
1,427
41
56
2,828
24,335
29,675
0
06/05/18
05/28/19
06/17/19
12/23/19
04/05/21
In and near Big Sur and Carmel, from Torre Canyon Bridge to San Luis Avenue. Pavement rehabilitation.
Baseline
1,548 29,753
988
1,427
2,828
24,335
56
41
29,675
MON1
2534
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
209 Salinas CAPM 0
2,296
95
8
2,036
26,676
05/08/19
10/29/18
03/29/18
06/30/16
0
15
0
2,042
8
0
0
6,000
1,200
70
2,300
26,676
36,246
012/04/18
06/30/16
03/29/18
10/29/18
05/08/19
07/01/20
In and near Salinas, from 0.5 mile north of North Gonzales Overcrossing to East Market Street. Pavement rehabilitation.
Baseline
2,065 31,111
0
6,000
2,300
26,676
70
1,200
36,246
MON101
2540
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
210 San Antonio River bridge-seismic retrofit
946
1,789
17
73
1,862
9,938
12/30/20
04/29/20
02/11/20
09/07/18
0
4
946
122
9
0
1,529
1,859
17
841
2,236
7,734
14,216
0
09/07/18
03/30/20
04/29/20
12/30/20
06/13/23
Near Paso Robles, at San Antonio River Bridge No 44-0141L/R. Bridge seismic restoration.
Baseline
1,081 14,625
1,529
1,859
2,236
7,734
841
17
14,216
MON101
2565
05
Page 30 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
211 Pacific Grove CAPM 311
1,381
240
98
1,112
8,682
07/15/21
12/11/20
10/26/20
02/26/19
0
0
311
0
0
0
482
1,638
312
70
1,675
7,996
12,173
0
03/11/19
10/26/20
12/11/20
07/15/21
12/09/21
In and near Pacific Grove, from Forest Avenue to Route 1. Upgrade Americans with Disabilities Act (ADA) curb ramps, cold plane pavement and place Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
311 11,824
482
1,638
1,675
7,996
70
312
12,173
MON68
2631
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
212 Garrapata Creek Bridge Rehab
526
1,440
86
0
1,818
7,400
07/12/21
01/08/21
09/15/20
04/18/19
0
0
429
0
0
0
700
1,500
90
0
2,100
7,400
11,790
0
04/18/19
09/15/20
01/08/21
07/12/21
09/13/22
Near Carmel-By-The Sea, at Garrapata Creek No. 44-0018. Rehabilitate bridge to extend the service life and mitigate corrosion by applying Electrochemical Chloride Extraction (ECE) process and waterproofing to the structure.
Baseline
429 11,270
700
1,500
2,100
7,400
0
90
11,790
MON1
2654
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
213 Castro Cyn Bridge Rail Upgrade
739
1,305
131
7
660
1,605
12/01/21
04/01/21
12/01/20
10/01/19
0
0
262
0
0
0
608
1,345
141
41
762
1,605
4,502
0
10/01/19
12/01/20
04/05/21
10/28/21
06/01/22
Near Big Sur, at the Castro Canon Bridge No. 44-0035. Upgrade bridge railing and approach railings to meet current standards.
Baseline
262 4,447
608
1,345
762
1,605
41
141
4,502
MON1
2656
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
214 Prunedale Rehab 4,396
5,883
1,210
393
10,828
104,000
02/25/22
08/03/21
05/12/21
09/03/19
0
0
2,684
0
0
0
4,500
6,300
1,300
393
0
0
12,493
0
09/03/19
07/01/21
08/03/21
02/25/22
01/26/24
Near Salinas, from 0.4 mile south of Espinosa Road Undercrossing to San Benito County line. Reconstruct embankment, widen shoulders, improve drainage systems, upgrade barrier railing, cold plane pavement, place Rubberized Hot Mix Asphalt (RHMA) pavement and place Hot Mix Asphalt (HMA) to rehabilitate roadway.
Baseline
2,684 126,710
4,500
6,300
0
0
393
1,300
12,493
MON101
2679
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
215 Garrapata Creek Bridge Rail Replacement
1,606
1,638
86
5
1,012
3,000
02/14/23
10/21/22
04/02/21
0
0
53
0
0
0
1,600
0
0
0
0
0
1,600
0
04/02/21
10/21/22
02/14/23
09/08/23
09/11/24
Near Carmel-by-the-Sea, at the Garrapata Creek Bridge No. 44-0018. Replace bridge railing to meet current traffic safety standards.(Long Lead Project)
Baseline
53 7,347
1,600
0
0
0
0
0
1,600
MON1
2696
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
216 TMS Detection Repair
301
999
31
0
393
3,175
11/06/20
04/01/20
01/03/20
09/05/18
0
1
301
0
0
0
585
1,160
20
21
465
3,200
5,451
0
10/15/18
03/13/20
06/08/20
02/01/21
06/22/21
In various counties, on various routes and at various locations. Replace and upgrade existing detection field elements for the Traffic Management System (TMS).
Baseline
302 4,899
585
1,160
465
3,200
21
20
5,451
MON2735
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
217 Mon 101 TMS 137
632
36
0
387
1,371
09/16/19
04/15/19
01/11/19
07/16/18
0
7
137
310
0
0
260
1,000
45
9
420
1,500
3,234
0
07/19/18
01/07/19
04/15/19
09/16/19
07/01/20
In and near Salinas, from 0.4 mile north of Airport Boulevard Overcrossing to 0.3 mile south of San Miguel Canyon Road Overcrossing. Install vehicle detection systems, Changeable Message Signs (CMS), cameras, and a vehicle pullout.
Baseline
454 2,563
260
1,000
420
1,500
9
45
3,234
MON101
4020
05
Page 31 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
218 Las Cruces CAPM 0
614
33
6
1,748
16,852
1,284
15
0
614
6
15,503
0
950
87
6
1,716
16,852
19,611
16,851
06/26/14
07/20/17
09/29/17
04/25/18
04/19/19
In and near Lompoc, from Las Cruces Separation to Route 246. Pavement rehabilitation.
Baseline
17,422 19,253
0
950
1,716
16,852
6
87
19,611
SB1
2542
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
219 Cold Spring Bridge Maintenance Inspection Access
383
1,025
22
8
3,638
19,000
08/03/20
01/15/20
08/15/19
11/09/18
0
2
383
53
0
0
1,110
1,740
75
50
1,500
19,000
23,475
011/09/18
11/09/18
02/15/20
08/01/20
02/01/21
07/15/25
Near Lake Cachuma, at Cold Spring Canyon Bridge No. 51-0037. Install inspection access system below bridge and paint structure.
Baseline
438 24,076
1,110
1,740
1,500
19,000
50
75
23,475
SB154
2392
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
220 SB 101 Rehab - Carpinteria (Segment 4A)
2,304
1,361
231
4,241
8,837
41,430
0
7
2,304
384
65
0
0
1,380
220
4,880
10,040
41,430
57,950
0
06/04/18
01/15/20
01/31/20
08/14/20
02/21/24
In Carpinteria, from Casitas Pass Overcrossing to 0.5 mile south of South Padaro Lane. Rehabilitate roadway.
Baseline
2,760 58,404
0
1,380
10,040
41,430
4,880
220
57,950
SB101
2426
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
221 Nojoqui Creek Bridge (51-0018) Railing Upgrade
912
1,738
183
38
1,858
5,298
07/15/20
01/29/20
11/01/19
08/29/18
0
19
912
177
3
0
1,266
1,789
211
99
1,218
5,304
9,887
0
08/17/18
02/19/20
03/19/20
09/02/20
11/01/22
Near Buellton, at Nojoqui Creek Bridge No. 51-0018L/R. Bridge rail replacement and widening.
Baseline
1,111 10,027
1,266
1,789
1,218
5,304
99
211
9,887
SB101
2561
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
222 San Antonio Cr Seismic Retrofit
502
1,307
22
50
608
1,897
09/17/20
03/09/20
09/01/19
07/02/18
0
1
502
81
3
0
784
1,365
23
132
640
1,978
4,922
0
08/28/18
09/01/19
03/09/20
09/17/20
10/01/21
Near Los Alamos, at San Antonio Creek Bridge No. 51-0006. Bridge seismic restoration.
Baseline
587 4,386
784
1,365
640
1,978
132
23
4,922
SB135
2567
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
223 Solomon Canyon CAPM
770
948
93
799
889
9,583
05/21/20
11/01/19
08/01/19
07/02/18
0
11
770
309
27
0
1,110
916
104
795
905
9,583
13,413
0
06/25/18
09/25/19
01/02/20
07/16/20
04/21/21
Near Santa Maria, from Solomon Road to Route 166. Pavement rehabilitation.
Baseline
1,117 13,082
1,110
916
905
9,583
795
104
13,413
SB1
2586
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
224 Santa Maria CAPM 0
1,761
1,568
377
1,838
12,565
05/24/21
11/19/20
09/30/20
06/16/17
0
143
0
737
0
0
0
1,869
1,832
378
2,396
14,372
20,847
008/09/18
06/16/17
10/01/20
11/19/20
05/24/21
08/19/22
In and near Santa Maria, from Lakeview Road to Route 101. Upgrade Americans with Disabilities Act (ADA) curb ramps, cold plane pavement, and place Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
880 18,109
0
1,869
2,396
14,372
378
1,832
20,847
SB135
2629
05
Page 32 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
225 Lompoc CAPM 0
3,371
1,772
760
1,503
6,900
07/27/22
12/15/21
12/10/21
04/24/17
0
28
0
839
0
0
0
3,630
2,460
350
1,750
6,900
15,090
0
04/24/17
10/25/21
12/15/21
07/27/22
07/21/23
In Lompoc, at combined segment of Route 246 and Route 1, on Route 246, from 0.3 mile west of V Street to H Street; also on Route 1, from H Street to 12th Street. Upgrade Americans with Disabilities Act (ADA) curb ramps, cold plane pavement and place Hot Mix Asphalt (HMA) pavement.
Baseline
867 14,306
0
3,630
1,750
6,900
350
2,460
15,090
SB246
2632
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
226 San Jose Ck Bridge replacement
1,485
2,168
32
34
2,480
9,240
06/15/22
10/01/21
07/01/21
04/20/20
0
0
589
0
0
0
1,400
2,730
70
40
3,480
9,240
16,960
0
04/15/20
06/28/21
09/28/21
06/10/22
12/06/24
In Goleta, at San Jose Creek Bridge No. 51-0163L/R. Replace bridges to maintain standards of safety and reliability.
Baseline
589 15,439
1,400
2,730
3,480
9,240
40
70
16,960
SB101
2649
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
227 Rehab Primavera & La Colina Bridges
799
1,725
41
3
1,592
8,437
01/05/22
07/30/21
04/15/21
12/20/19
0
0
193
0
0
0
928
2,135
52
3
2,186
6,416
11,720
0
04/15/19
07/01/20
11/09/20
07/12/21
12/07/22
In the city of Santa Barabara, at La Colina Road Undercrossing (UC) No. 51-0256 (PM R31.82) and at Primavera Road UC No. 51-0257 (PM R32.07). Upgrade bridge railing and reconstruct abutment for bridge rehabilitation.
Baseline
193 12,597
928
2,135
2,186
6,416
3
52
11,720
SB154
2651
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
228 Gaviota-Nojoqui Rehab
2,240
2,213
59
20
3,627
59,218
05/02/22
09/22/21
05/21/21
12/02/19
0
0
913
0
0
0
2,160
2,648
74
21
0
0
4,903
0
12/02/19
05/21/21
09/22/21
05/02/22
04/27/23
Near Gaviota, from 1.0 mile south of Gaviota Gorge Tunnel to 0.1 mile north of Nojoqui Creek Bridge. Upgrade guard railing, widen shoulders, place High Friction Surface Treatment (HSFT), construct retaining walls, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
913 67,377
2,160
2,648
0
0
21
74
4,903
SB101
2700
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
229 SB 101 Rehab - Padaro (Segment 4B)
3,341
4,761
153
410
9,252
60,650
0
1
3,341
124
66
0
0
4,370
290
410
12,490
60,650
78,210
0
06/04/18
10/30/20
12/31/20
07/15/21
10/02/25
In and near Summerland, from 0.9 mile south of South Padaro Lane Undercrossing to 0.6 mile north of Padaro Lane Overcrossing. Rehabilitate roadway.
Baseline
3,532 78,567
0
4,370
12,490
60,650
410
290
78,210
SB101
2426A05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
230 SB 101 Rehab - Summerland (Segment 4C)
1,884
327
0
0
6,137
31,890
0
0
1,884
11
0
0
0
3,285
90
270
6,380
31,890
41,915
0
06/04/18
10/30/20
12/31/20
07/15/21
08/29/25
In and near Summerland, from 0.2 mile north of Padaro Lane Overcrossing to 0.2 mile north of Sheffield Avenue. Rehabilitate roadway.
Baseline
1,895 40,238
0
330
6,380
31,890
270
90
38,960
SB101
2426C05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
231 Santa Cruz 1 CAPM and Bridge Rails
517
2,803
61
0
2,248
25,177
17
61
517
2,803
11
0
0
0
0
0
2,329
25,177
27,506
25,176
08/22/16
08/24/18
10/08/18
02/28/19
07/07/20
In and near Santa Cruz from North Aptos UP to Jct. Route 9. Pavement Rehabilitation, ADA Curb Ramps, Guardrail/Barrier rail/Bridge Rail Upgrades Pavement Rehabilitation, ADA Curb Ramps, Guardrail/Barrier rail/Bridge Rail Upgrades
Baseline
3,409 30,806
0
0
2,329
25,177
0
0
27,506
SCR1
2804
05
Page 33 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
232 N Route 17 CAPM 0
1,691
71
15
1,609
15,750
71
46
0
1,691
15
0
0
1,932
64
16
1,660
15,750
19,422
15,749
12/16/14
05/23/18
06/14/18
12/19/18
11/25/20
In and near Scotts Valley, from 0.6 mile north of Granite Creek Road to the Santa Clara County line (PM 12.553). Pavement rehabilitation.
Baseline
1,823 19,136
0
1,932
1,660
15,750
16
64
19,422
SCR17
2538
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
233 DAVENPORT CULVERT REPLACEMENT
1,325
1,512
269
172
879
8,205
12/27/21
07/19/21
07/09/21
01/30/20
0
5
782
33
0
0
964
1,940
344
84
1,365
3,570
8,267
0
10/28/19
04/12/21
04/12/21
09/17/21
09/22/23
Near Davenport, from 1.4 miles north of Swanton Road to 0.6 mile south of Waddell Creek. Replace and upgrade existing Corrugated Metal Pipe (CMP) culverts with Reinforced Concrete Pipe (RCP) culverts.
Baseline
820 12,362
964
1,940
1,365
3,570
84
344
8,267
SCR1
1967
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
234 San Lorenzo River Bridge and Kings Creek Bridge Replacement
2,505
2,570
814
622
3,477
11,928
03/04/22
10/29/21
09/03/21
04/10/20
0
0
863
0
0
0
2,692
2,884
888
660
4,158
11,928
23,210
0
08/24/20
01/24/22
01/24/22
07/01/22
03/27/26
Near Boulder Creek, at San Lorenzo River Bridge No. 36-0052 (PM 13.61) and Kings Creek Bridge No. 36-0054 (PM 15.49). Replace bridges to maintain standards of safety and reliability.
Baseline
863 21,916
2,692
2,884
4,158
11,928
660
888
23,210
SCR9
2655
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
235 Cayucos CAPM 0
1,154
27
10
1,781
11,175
110
1
0
1,154
10
1
0
1,369
30
10
2,157
11,175
14,741
11,174
06/23/15
11/17/17
04/02/18
10/22/18
07/01/20
In and near Cayucos, from Old Creek Bridge to 0.3 mile north of Harmony Valley Road. Rehabilitate pavement and construct shoulders on ramps.
Baseline
1,276 14,147
0
1,369
2,157
11,175
10
30
14,741
SLO1
2587
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
236 Pismo Creek Scour Repair Project
763
1,573
81
21
1,011
2,701
69
15
763
1,573
10
11
930
1,741
185
275
993
2,701
6,825
2,701
09/14/16
01/24/18
06/21/18
12/19/18
12/01/20
In Pismo Beach, at Pismo Creek Bridge No. 49-0015K. Scour prevention.
Baseline
2,441 6,150
930
1,741
993
2,701
275
185
6,825
SLO101
2387
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
237 Toro Creek Bridge replacement
1,697
2,334
178
952
2,412
5,200
02/04/21
06/29/20
04/17/20
06/18/18
0
13
1,697
635
55
0
1,895
2,300
275
906
2,400
5,200
12,976
0
06/26/18
05/14/20
06/12/20
01/20/21
12/27/23
In Morro Bay, at Toro Creek Bridge. Replace bridge. Baseline
2,400 12,773
1,895
2,300
2,400
5,200
906
275
12,976
SLO1
0072
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
238 Pismo Beach CAPM 822
1,615
1,427
309
1,353
8,734
08/23/22
04/06/22
04/06/22
02/01/19
0
0
822
43
0
0
1,156
1,751
1,670
303
1,568
8,618
15,066
0
12/03/18
04/06/22
04/06/22
08/23/22
07/03/23
In and near Pismo Beach, from Gracia Way to North Pismo (Route 101/Route 1) Separation. Upgrade Americans with Disabilities Act (ADA) curb ramps, cold plane pavement and place Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
865 14,260
1,156
1,751
1,568
8,618
303
1,670
15,066
SLO1
2630
05
Page 34 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
239 SLO 101 N Cnty TMS 388
956
73
6
612
3,621
04/01/22
12/01/20
08/03/20
02/01/19
0
3
388
8
0
0
450
1,095
78
5
702
2,865
5,195
0
01/11/19
08/03/20
12/01/20
08/02/21
01/03/22
In San Luis Obispo County, from 0.3 mile north of Reservoir Canyon Road to 0.3 mile north of North Paso Robles Overhead at various locations. Install vehicle detection systems, Changeable Message Signs (CMS), cameras, and loop detectors.
Baseline
399 5,656
450
1,095
702
2,865
5
78
5,195
SLO101
4022
05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
240 Old Creek Bridge replacement
1,775
2,625
133
447
2,593
4,200
11/13/20
04/28/20
01/02/20
11/02/17
0
14
1,775
675
17
0
1,739
1,900
200
450
1,900
4,200
10,389
0
05/15/18
02/25/20
06/16/20
12/21/20
11/01/23
Near Morro Bay, at Old Creek Bridge No. 05-49-0070R. Replace bridge.
Baseline
2,481 11,773
1,739
1,900
1,900
4,200
450
200
10,389
SLO1
0072A05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
241 Trout Creek Bridge replacement
1,281
2,306
191
313
2,269
4,750
08/12/20
01/08/20
12/02/19
11/01/17
0
24
1,281
1,040
16
0
1,719
2,500
210
308
2,900
5,987
13,624
0
10/31/17
12/13/19
01/08/20
08/12/20
04/25/23
Near Santa Margarita, at Trout Creek Bridge No. 05-49-0091. Replace bridge.
Baseline
2,361 11,110
1,719
2,500
2,900
5,987
308
210
13,624
SLO58
0072B05
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
242 Shaver to Huntington CAPM & Culvert Rehab
2,247
1,807
2
1,484
2,407
17,060
453
2
2,247
1,807
77
1,399
0
0
0
0
2,495
17,060
19,555
17,059
06/28/17
11/30/17
12/11/17
09/20/18
10/02/20
In Fresno County near Shaver Lake from 0.5 mi west of Prather Pond Rd to end of route at Huntington Lake. Pavement Preservation (CAPM) and Culvert Rehabilitation Pavement Preservation (CAPM) and Culvert Rehabilitation
Baseline
5,985 25,007
0
0
2,495
17,060
0
0
19,555
FRE168
6754A06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
243 Derrick CAPM 366
695
0
0
1,383
14,086
76
0
366
695
0
28
390
700
11
20
1,200
14,086
16,407
14,085
12/11/17
02/06/18
04/05/18
10/22/18
01/31/20
Near Mendota, from Tuolumne Avenue Overcrossing to north of Route 33. Pavement rehabilitation.
Baseline
1,165 16,530
390
700
1,200
14,086
20
11
16,407
FRE5
6753
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
244 Tumey Gulch III 1,323
1,649
3
14
2,531
12,443
07/03/20
02/03/20
01/03/20
07/31/18
0
0
1,323
65
2
0
1,395
1,900
4
79
2,800
10,898
17,076
0
10/12/18
01/03/20
02/03/20
07/03/20
07/03/23
Near Mendota, at Tumey Gulch Bridge No. 42-0246L/R. Replace bridge.
Baseline
1,390 17,963
1,395
1,900
2,800
10,898
79
4
17,076
FRE5
6725
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
245 Kings Canyon Bridge Rail
457
1,193
9
0
845
2,990
09/02/19
02/25/19
01/21/19
01/15/18
0
3
457
948
0
0
480
1,173
10
4
814
3,153
5,634
0
01/26/18
01/18/19
03/29/19
10/17/19
11/10/20
Near Squaw Valley, at Mill Creek Bridge No. 42-0080; also near Cedar Grove, at South Fork Kings River Bridge No. 42-0024 (PM 130.1). Bridge rail upgrade.
Baseline
1,408 5,494
480
1,173
814
3,153
4
10
5,634
FRE180
6766
06
Page 35 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
246 SOUTH FRESNO VIADUCT POLYESTER CONCRETE OVERLAY
281
633
16
0
799
7,050
02/15/19
09/01/18
07/01/18
09/29/17
0
5
281
478
0
0
307
750
20
291
880
5,946
8,194
0
09/29/17
10/08/18
12/03/18
06/03/19
02/03/20
In Fresno, at the South Fresno Viaduct No. 42-0226L/R. Replace failed joint seals and rehabilitate worn bridge decks with polyester concrete overlay.
Baseline
764 8,779
307
750
880
5,946
291
20
8,194
FRE41
6771
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
247 Selma to Fowler Rehab
1,088
2,403
24
37
9,994
86,000
08/25/20
04/14/20
03/03/20
12/18/18
0
5
1,088
206
2
0
1,130
2,360
24
56
0
0
3,570
012/19/18
12/18/18
04/01/20
04/14/20
08/25/20
10/25/22
In and near Selma and Fowler, from 0.1 south of Rose Avenue Undercrossing to Merced Street Undercrossing. Replace pavement with Continuous Reinforced Concrete Pavement (CRCP). Update curb ramps to meet current Americans with Disabilities Act (ADA) Standards.(G13 Contingency)
Baseline
1,301 99,546
1,130
2,360
0
0
56
24
3,570
FRE99
6800
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
248 Fre-198/Ker-119 Culverts
0
1,370
405
31
426
1,206
10/14/19
04/01/19
03/01/19
05/22/17
0
42
0
802
14
0
0
1,247
484
165
454
1,206
3,556
0
05/22/17
04/05/19
04/15/19
11/01/19
08/03/20
In Fresno County, at various locations; also in Kern County, on Route 119 at various locations. Replace damaged drainage systems.
Baseline
858 3,438
0
1,184
454
1,206
165
484
3,493
FRE198
6802
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
249 Morgan Canyon CAPM
390
1,093
1
0
1,095
5,000
09/18/20
03/26/20
03/13/20
02/15/19
0
0
390
72
0
0
750
1,230
1
5
1,140
5,000
8,126
0
10/29/18
01/15/20
02/03/20
09/15/20
10/29/21
Near Prather, from Sample Road to Oak Creek Road. Upgrade barrier railing, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
462 7,579
750
1,230
1,140
5,000
5
1
8,126
FRE168
6809
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
250 TMS Repair Service Contract
0
118
1
0
139
1,196
0
1
0
98
0
0
0
319
8
0
166
1,446
1,939
0
06/15/17
01/18/18
03/23/18
01/04/21
In Fresno County, on Routes 41, 99, 168 and 180; also in Kern County on Route 99 and Madera County on Route 41. Repair detection systems with wire theft prevention measures.
Baseline
99 1,454
0
319
166
1,446
0
8
1,939
FRE6880
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
251 Fre-41;99;168 & 180 Fiber Optic
161
1,662
138
62
1,354
16,010
09/07/21
03/08/21
02/08/21
12/10/18
0
0
161
1
0
0
619
1,809
165
30
1,791
16,010
20,424
012/26/18
12/10/18
02/08/21
03/08/21
09/07/21
02/01/23
In and near the city of Fresno, from 0.1 mile south of North Avenue to the Madera County line; also on Route 99 (PM 19.36 to PM 21.9), Route 168 (PM R0.2L/R to PM R9.7), and Route 180 (PM R58.55 to PM R59.85). Replace and upgrade existing communication elements for the Traffic Management System (TMS).
Baseline
162 19,387
619
1,809
1,791
16,010
30
165
20,424
FRE41
6881
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
252 TMS Element Upgrade/Repair
264
1,020
214
30
822
2,557
06/01/20
12/16/19
12/02/19
09/03/18
0
4
264
2
0
0
800
1,017
250
119
1,056
3,036
6,278
0
10/12/18
04/01/20
04/05/20
10/13/20
11/30/21
In Fresno County, on Routes 99, 41, 168, and 180 at various locations; also in Madera County, on Route 99 at various locations. Repair vehicle detection systems.
Baseline
270 4,907
800
1,017
1,056
3,036
119
250
6,278
FRE99
6883
06
Page 36 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
253 Fresno 198 Culvert Rehab
1,872
1,409
1,449
628
2,297
14,900
08/19/22
03/18/22
02/28/22
12/06/19
0
0
283
0
0
0
3,000
1,600
1,600
660
2,800
14,900
24,560
0
11/09/20
01/13/23
02/15/23
09/30/24
11/30/26
In Fresno County, on Route 198 at various locations. Improve drainage facilities by repairing or replacing culverts.
Baseline
283 22,555
3,000
1,600
2,800
14,900
660
1,600
24,560
FRE198
6921
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
254 TMS Detection Repair
306
866
6
0
572
4,000
0
0
69
0
0
0
400
900
10
0
800
4,000
6,110
0
09/02/19
12/01/20
01/15/21
07/06/21
10/01/22
In Fresno, Kern, Kings, Madera, and Tulare Counties, at various locations. Repair Transportation Management System (TMS)elements.
Baseline
69 5,750
400
900
800
4,000
0
10
6,110
FRE6923
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
255 McMullin Grade CAPM
749
843
18
40
1,956
8,200
06/28/21
01/22/21
12/22/20
03/20/20
0
0
196
0
0
0
820
860
30
40
2,100
8,200
12,050
0
04/01/20
12/22/20
01/22/21
06/28/21
06/28/23
Near Helm, from Kamm Avenue to Manning Avenue. Pavement rehabilitation.
Baseline
196 11,806
820
860
2,100
8,200
40
30
12,050
FRE145
6934
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
256 Panoche CAPM 1,756
1,143
8
405
4,340
35,900
07/01/22
12/01/21
08/02/21
01/15/21
0
0
44
0
0
0
2,000
1,300
10
300
5,200
35,900
44,710
0
01/15/21
08/02/21
12/01/21
07/01/22
09/06/24
Near Mendota, from north of Three Rocks Road to south of Panoche Road. Pavement rehabilitation, repair culverts and upgrade Transportation Management Systems (TMS) field elements.
Baseline
44 43,552
2,000
1,300
5,200
35,900
300
10
44,710
FRE5
6970
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
257 Bakersfield 99 Rehab 2,782
4,952
23
266
8,381
72,745
415
18
2,782
4,952
216
1,176
3,500
5,150
20
220
11,000
72,744
92,634
72,744
08/22/16
03/14/18
05/01/18
10/25/18
08/01/21
In Bakersfield, from Brundage Lane Overcrossing to Beardsley Canal Bridge. Rehabilitate roadway.
Baseline
9,559 89,149
3,500
5,150
11,000
72,744
220
20
92,634
KER99
6661
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
258 Northbound 2R/Fast Freight Corridor
2,131
1,552
10
0
4,814
64,642
81
10
2,131
1,552
8
18
0
0
0
0
6,700
64,642
71,342
64,641
09/22/17
08/15/18
08/27/18
02/07/19
11/15/20
Near Bakersfield from Rte 5/99 Separation to 0.3 mi north of US 99 Overcrossing. Rehabilitate Pavement/Vertical Clearance Correction Rehabilitate Pavement/Vertical Clearance Correction
Baseline
3,800 73,149
0
0
6,700
64,642
0
0
71,342
KER99
6737A06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
259 Gap Closure Rehab 0
2,409
15
0
4,046
24,967
229
6
0
2,409
0
319
0
2,500
35
30
4,055
24,967
31,587
24,967
09/30/13
12/03/15
10/27/17
05/29/18
09/01/21
In Bakersfield from Route 99 Separation to Cottonwood Road. Rehabilitate roadway.
Baseline
2,963 31,437
0
2,500
4,055
24,967
30
35
31,587
KER58
6678
06
Page 37 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
260 Cache Creek Bridge Replacement
318
2,446
60
60
2,627
7,742
93
46
318
2,446
19
5
328
2,500
60
60
2,768
8,178
13,894
7,547
07/28/15
11/14/17
10/19/18
03/21/19
11/01/20
Near Tehachapi, at Cache Creek Bridge No.50-346L/R. Replace Bridge.
Baseline
2,927 13,253
328
2,500
2,768
8,178
60
60
13,894
KER58
6674
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
261 Summit OH Bridge Rails
0
854
23
27
803
2,633
78
17
0
854
0
0
0
900
25
25
803
2,633
4,386
2,632
06/27/13
11/16/17
02/21/18
01/09/19
07/15/20
In Tehachapi, at the Summit Overhead Bridge No. 50-343L/R. Upgrade bridge rail
Baseline
949 4,340
0
900
803
2,633
25
25
4,386
KER58
6673
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
262 I-5 Freight Corridor California Aqueduct
884
146
5
2
795
2,137
12/14/18
08/01/18
07/02/18
04/02/18
61
0
884
146
6
6
1,910
430
10
10
725
2,137
5,222
2,136
04/04/18
07/02/18
08/01/18
01/15/19
12/13/19
Near Grapevine, at California Aqueduct Bridge No. 50-0321L/R. Improve to standard load capacity.
Baseline
1,103 3,969
1,910
430
725
2,137
10
10
5,222
KER5
6877
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
263 Union Ave to White Lane 2R Rehab
963
2,250
72
769
3,407
45,440
08/17/20
03/02/20
02/03/20
03/02/18
0
19
963
809
5
0
960
2,300
120
30
0
0
3,410
012/04/18
03/02/18
04/02/20
04/07/20
11/02/20
11/01/22
In and near Bakersfield, from 0.5 mile south of Old US 99 Overcrossing to 0.1 mile north of White Lane. Rehabilitate pavement. (G13 Contingency)
Baseline
1,796 52,901
960
2,300
0
0
30
120
3,410
KER99
6681
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
264 Grapevine Channel Repair
454
690
36
155
655
5,100
11/01/19
03/30/19
02/01/19
04/01/18
0
15
454
448
50
0
475
686
100
150
690
5,100
7,201
0
04/20/18
04/19/19
04/26/19
10/01/19
07/01/20
Near Lebec, from north Lebec Road to south of Grapevine Road. Rehabilitate drainage systems.
Baseline
967 7,090
475
686
690
5,100
150
100
7,201
KER5
6749
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
265 Enos Lane CAPM & ADA Curb Ramps
783
741
188
11
1,063
10,910
11/01/20
04/01/20
03/02/20
08/01/18
0
22
783
47
2
0
800
500
81
23
650
12,700
14,754
0
07/27/18
04/01/20
04/15/20
12/01/20
09/01/22
Near Bakersfield, from Route 119 to south of Noriega Road; also on Route 119, from Enos Lane to Route 5 (PM 18.1/19.8). Pavement rehabilitation.
Baseline
854 13,696
800
500
650
12,700
23
81
14,754
KER43
6755
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
266 West Rosedale CAPM
1,072
1,018
192
350
1,650
8,500
09/01/22
03/01/22
01/01/22
10/01/20
0
0
425
0
0
0
1,400
1,200
250
350
1,900
8,500
13,600
0
10/01/20
02/01/22
03/01/22
09/01/22
11/01/23
In and near Bakersfield, from Route 43 to 0.1 mile west of Allen Road. Pavement rehabilitation.
Baseline
425 12,782
1,400
1,200
1,900
8,500
350
250
13,600
KER58
6756
06
Page 38 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
267 Kern-Kings Pumping Plant Upgrades
424
1,888
550
33
1,674
4,494
05/11/20
11/20/19
11/08/19
07/13/18
0
32
424
453
1
0
650
2,190
610
122
2,150
5,080
10,802
0
06/19/18
10/01/19
10/11/19
07/02/20
10/31/21
In Kern and Kings Counties, on Route 99, 198 and 204 at various locations. Upgrade existing pumps and control systems at eleven pumping plants.
Baseline
910 9,063
650
2,190
2,150
5,080
122
610
10,802
KER6796
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
268 Morning Drive 3R Rehab
1,091
1,422
44
352
1,374
7,600
04/11/21
10/02/20
09/09/20
01/02/19
0
0
321
0
0
0
1,020
1,520
50
350
1,600
7,600
12,140
0
12/01/20
04/01/21
05/01/21
10/01/21
12/01/22
In and near Bakersfield, from 0.2 mile south of Edison Highway to Route 178. Upgrade Americans with Disabilities Act (ADA) curbs and barrier railing, widen shoulders, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement to rehabilitate roadway.
Baseline
321 11,883
1,020
1,520
1,600
7,600
350
50
12,140
KER184
6798
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
269 Weedpatch Hwy 3R Rehab
2,104
2,477
1,619
2,230
2,520
17,700
02/01/22
08/16/21
08/01/21
10/01/19
0
0
407
0
0
0
2,425
3,175
2,630
2,230
3,750
17,700
31,910
0
10/01/20
03/01/22
04/01/22
11/01/22
11/01/24
Near Bakersfield, from south of Hickory Lane to north of Brundage Lane. Upgrade Americans with Disabilities Act (ADA) curb ramps, install bike lanes, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
407 28,650
2,425
3,175
3,750
17,700
2,230
2,630
31,910
KER184
6803
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
270 Wasco Route 46 CAPM
508
1,006
379
43
725
3,856
10/29/20
05/01/20
04/03/20
07/19/18
0
44
508
171
2
0
710
950
415
90
900
4,600
7,665
0
04/26/18
02/03/20
03/02/20
09/15/20
09/30/21
In and near Wasco, from Magnolia Avenue to Route 43 South. Upgrade Americans with Disabilities Act (ADA) curb ramps, cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
725 6,517
710
950
900
4,600
90
415
7,665
KER46
6810
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
271 Lost Hills Rehab 368
1,235
23
0
1,819
21,500
04/12/20
10/04/19
09/06/19
08/03/18
0
2
368
68
0
0
440
1,200
25
65
1,900
21,500
25,130
0
01/24/19
04/01/20
04/02/20
08/17/20
10/01/21
Near Kettleman City, from 0.34 mile south of Twisselman Road Overcrossing to Kings County line. Cold plane pavement, repair concrete pavement panels, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement to rehabilitate roadway.
Baseline
438 24,945
440
1,200
1,900
21,500
65
25
25,130
KER5
6820
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
272 I-5 Fast Freight Corridor I-5/Rte 99 Separation
0
0
2
2
1,463
7,795
12/14/18
08/01/18
07/02/18
04/02/18
0
0
0
0
0
0
1,600
470
10
10
0
0
2,090
0
04/04/18
07/13/18
08/27/18
02/04/19
12/13/19
Near Wheeler Ridge, from 0.8 mile south to 0.6 mile north of Route 5/99 Separation; also on Route 5, at the Route 5/99 Separation No. 50-0240R (PM R15.82). Lower roadway profile to obtain standard vertical clearance.
Baseline
0 9,262
1,600
470
0
0
10
10
2,090
KER99
6876
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
273 Grapevine Culvert Repair
920
1,283
26
104
2,271
7,758
09/16/20
03/01/20
02/01/20
03/01/19
0
0
568
0
0
0
955
2,173
29
132
2,763
8,162
14,214
0
05/01/19
04/01/20
04/10/20
09/16/20
09/16/21
In Kern County, from 2.4 miles north of Fort Tejon Overcrossing to 1.2 miles south of Grapevine Undercrossing at four locations. Repair reinforced concrete box culverts.
Baseline
568 12,362
955
2,173
2,763
8,162
132
29
14,214
KER5
6884
06
Page 39 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
274 Golden Empire CAPM
323
767
46
170
587
3,290
06/15/20
12/10/19
11/15/19
08/13/18
0
0
323
174
0
0
450
740
65
10
550
3,290
5,105
0
09/24/18
11/15/19
12/10/19
07/01/20
12/15/21
In Bakersfield, from F Street to Route 99. Cold plane pavement, place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
497 5,183
450
740
550
3,290
10
65
5,105
KER204
6889
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
275 Kern Canyon Culvert Rehab
2,327
775
575
10
1,409
7,100
0
0
175
0
0
0
2,800
900
480
20
1,700
7,100
13,000
0
10/29/20
12/15/21
01/14/22
08/01/22
08/01/23
Near Bakersfield, from east of Miramonte Drive to Vista Grande Drive. Repair, replace, and/or clean culverts.
Baseline
175 12,196
2,800
900
1,700
7,100
20
480
13,000
KER178
6925
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
276 Reward CAPM 1,385
1,309
28
140
1,418
11,000
10/01/21
04/01/21
02/01/21
10/01/20
0
0
111
0
0
0
1,500
1,500
30
140
1,800
11,000
15,970
0
10/01/20
02/01/21
04/01/21
10/03/21
08/01/22
Near McKittrick, from San Luis Obispo County line to Route 33. Pavement rehabilitation, repair culverts, and upgrade Intelligent Transportation System (ITS) field elements.
Baseline
111 15,280
1,500
1,500
1,800
11,000
140
30
15,970
KER58
6957
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
277 Lost Hills Rubber Rehab
452
451
83
10
1,910
20,388
1,278
29
452
451
3
18,187
650
1,300
140
35
2,300
20,388
24,813
20,387
06/05/17
10/12/17
10/12/17
03/20/18
01/11/19
Near Lost Hills, from Kern/Kings County line to south of Utica Avenue. Roadway rehabilitation.
Baseline
20,400 23,294
650
1,300
2,300
20,388
35
140
24,813
KIN5
6729
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
278 STRATFORD KINGS RIVER BRIDGE REPLACEMENT
2,213
1,929
254
285
4,018
23,497
05/11/22
10/01/21
09/01/21
04/02/20
0
0
866
0
0
0
2,300
2,700
400
94
6,400
21,400
33,294
0
07/15/20
09/01/21
10/01/21
03/30/22
09/18/23
In and near Stratford, from 22nd Street to Laurel Avenue at the Kings River Bridge No. 45-0007. Replace 73 year old bridge due to extensive superstructure and substructure distress and susceptibility to liquefaction.
Baseline
866 32,196
2,300
2,700
6,400
21,400
94
400
33,294
KIN41
6873
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
279 Kings 43 CAPM 248
891
100
4
623
4,500
0
0
248
0
0
0
550
900
150
100
700
4,500
6,900
0
03/28/19
04/01/20
04/10/20
10/16/20
10/15/21
In and near Corcoran, from the Tulare County line to west of Santa Fe Avenue. Pavement rehabilitation.
Baseline
248 6,366
550
900
700
4,500
100
150
6,900
KIN43
6965
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
280 Madera 99 Widening 2,222
6,296
549
21
6,787
64,019
11/01/19
06/01/18
05/01/18
08/14/15
15
365
2,222
6,296
23
0
2,250
5,545
402
52
8,750
72,146
89,145
64,019
08/14/15
06/13/18
07/05/18
04/05/19
07/01/22
In and near Madera, from Avenue 12 Overcrossing to 0.9 mile north of Avenue 17 Overcrossing. Additional contribution for the construction of one new lane in each direction. Roadway rehabilitation.
Baseline
8,921 79,894
0
1,850
7,500
58,426
0
0
67,776
MAD99
5335A06
Page 40 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
281 Chowchilla 2R Rehab 502
1,512
40
12
2,274
15,618
03/01/19
03/23/18
02/01/18
03/01/17
5
36
502
1,512
8
0
499
1,535
50
30
2,507
17,319
21,940
15,617
03/01/17
02/01/18
03/23/18
03/22/19
11/18/20
In and near Chowchilla, from Route 152 to the Merced County line. Roadway rehabilitation.
Baseline
2,063 19,958
499
1,535
2,507
17,319
30
50
21,940
MAD99
6732
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
282 Oakhurst CAPM 548
967
77
0
538
4,037
343
77
548
967
2
3,769
600
1,032
192
37
698
4,037
6,596
4,036
08/17/16
01/18/18
02/01/18
06/28/18
12/18/18
In and near Oakhurst, from north of Road 426 to north of Allen Road. Rehabilitate pavement.
Baseline
5,706 6,167
600
1,032
698
4,037
37
192
6,596
MAD41
6716
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
283 Berenda CAPM 0
1,102
27
0
1,281
11,210
07/15/19
01/23/19
12/01/18
05/11/16
0
23
0
768
0
0
0
1,118
109
27
1,379
11,210
13,843
0
05/11/16
12/31/18
01/25/19
04/01/20
04/01/22
In and near Madera, from 0.3 mile north of Avenue 16 Overcrossing to 0.9 mile north of Avenue 20 Overcrossing. Rehabilitate pavement on mainline and ramps.
Baseline
791 13,620
0
1,118
1,379
11,210
27
109
13,843
MAD99
6789
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
284 COTTONWOOD CREEK BRIDGE REPLACEMENT (Br. No. 41-0065 L/R&S)
2,606
2,116
61
136
4,374
24,500
03/02/22
07/26/21
07/07/21
07/01/20
0
0
1,427
0
1
0
2,400
3,200
100
137
6,100
24,500
36,437
0
07/01/20
07/07/21
07/26/21
03/02/22
10/10/24
Near the city of Madera, at Cottonwood Creek Bridge No. 41-065R, No. 41-0065L and No. 41-0065S. Replace bridges to mitigate corrosion by chloride latent concrete.
Baseline
1,428 33,793
2,400
3,200
6,100
24,500
137
100
36,437
MAD99
6857
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
285 SOUTH GATEWAY DRIVE OC DECK REHAB
325
959
0
0
603
1,350
10/28/20
05/01/20
04/02/20
03/15/19
0
0
325
71
0
0
950
1,100
1
30
1,300
2,700
6,081
0
01/17/19
01/15/20
02/05/20
07/17/20
10/28/21
Near the city of Madera, at South Gateway Drive Overcrossing No. 41-0046K. Replace bridge railing, grind deck, and place reinforced Portland Cement Concrete (PCC) to rehabilitate bridge.
Baseline
396 3,237
950
1,100
1,300
2,700
30
1
6,081
MAD99
6887
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
286 Bridge Widening 1,822
4,786
691
247
2,877
12,339
01/21/19
06/22/17
06/21/17
04/20/15
528
606
1,822
4,786
201
465
1,268
5,140
692
450
2,800
12,339
22,689
12,338
04/20/15
06/21/17
06/22/17
12/18/18
07/19/21
Near Kingsburg, on Route 201 at Sand Creek Bridge No. 46-0137 and Friant-Kern Canal Bridge No. 46-0065; also on Route 216, at Kaweah River Bridge No.46-0091. Bridge rail replacement.
Baseline
8,408 22,762
1,268
5,140
2,800
12,339
450
692
22,689
TUL201
6521
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
287 Tipton Bridge Deck Rehab
552
1,742
241
343
1,355
10,500
08/03/20
03/02/20
02/03/20
02/01/18
0
113
552
638
12
0
698
1,730
204
343
1,354
7,521
11,850
0
02/01/18
02/03/20
03/02/20
08/03/20
10/01/21
In Tipton, at Avenue 152 Overcrossing (No. 46-0191). Replace bridge.
Baseline
1,315 14,733
698
1,730
1,354
7,521
343
204
11,850
TUL99
6679
06
Page 41 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
288 Woodlake Bridge Replacement
1,615
2,120
518
397
1,588
12,100
10/05/21
04/26/21
04/15/21
12/13/19
0
0
1,265
0
7
0
1,658
2,260
645
395
1,940
12,100
18,998
0
08/15/19
03/15/21
03/30/21
10/19/21
07/10/23
Near Woodlake, at Yokohl Creek Bridge No. 46-0011 (PM 1.39); also at Kaweah River Bridge No. 46-0073 (PM 4.19). Replace bridges to upgrade to current standards, facilitate bike lane shoulders, and upgrade guard railing.
Baseline
1,272 18,338
1,658
2,260
1,940
12,100
395
645
18,998
TUL245
6787
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
289 Pixley-Earlimart Bridge Rail
734
729
29
86
701
3,908
10/15/21
02/01/21
01/15/21
11/20/19
0
0
125
0
0
0
740
1,122
30
108
1,048
2,120
5,168
0
11/01/19
01/15/21
02/01/21
10/15/21
07/15/23
In and near Pixley, at Avenue 48 Overcrossing (OC) No. 46-0165 (PM 6.2), Davis Avenue OC No. 46-0172 (PM 12.6), and Avenue 100 OC No. 46-0173 (PM 12.8). Upgrade bridge railing to current standards and install approach railings.
Baseline
125 6,187
740
1,122
1,048
2,120
108
30
5,168
TUL99
6788
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
290 Tul-Fre-Mad Pumping Plant Upgrades
408
1,863
552
41
1,760
5,140
05/11/20
11/20/19
11/08/19
07/13/18
0
34
408
488
7
0
650
2,060
620
65
2,230
5,140
10,765
0
06/11/18
11/08/19
12/06/19
07/02/20
01/01/22
In Tulare, Fresno and Madera Counties, on Route 99 at various locations. Upgrade existing pumps and control systems at eleven pumping plants.
Baseline
937 9,764
650
2,060
2,230
5,140
65
620
10,765
TUL99
6795
06
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
291 PCH CAPM 73
6,733
91
168
4,393
33,050
133
25
73
6,733
14
0
74
7,522
126
168
4,361
33,050
45,301
33,050
04/21/16
11/17/17
05/25/18
12/12/18
07/01/21
In the cities of Santa Monica and Los Angeles, from Route 1 to Route 5/101 interchange; also on Route 1 from McClure Tunnel to Lincoln Boulevard. Rehabilitate pavement.
Baseline
6,978 44,508
74
7,522
4,361
33,050
168
126
45,301
LA10
4700
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
292 ITS Restoration Work in Hassan Manaa's area
0
2,964
133
405
3,025
14,476
6
52
0
2,964
72
0
0
3,347
200
750
3,150
14,476
21,923
14,475
06/27/18
06/28/18
02/05/19
12/30/20
In Los Angeles and Ventura Counties, on various routes and at various locations. Repair and Rehabilitate Ramp Metering Systems (RMS) and Vehicle Detection Systems (VDS).
Baseline
3,094 21,003
0
3,347
3,150
14,476
750
200
21,923
LA2
5245
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
293 Pavement Preservation and ADA Curb Ramps
94
1,056
45
100
1,563
5,402
890
23
94
1,056
0
4,652
45
1,600
50
100
1,735
5,402
8,932
4,729
10/21/15
07/06/17
08/31/17
04/12/18
07/31/19
In Palmdale, from 30th Street E. to E. Avenue S. Pavement rehabilitation.
Baseline
6,715 8,260
45
1,600
1,735
5,402
100
50
8,932
LA138
4769
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
294 Paint LA River Bridge 0
784
17
339
1,649
3,387
18
11
0
784
8
0
50
1,000
400
133
1,900
3,387
6,870
3,387
06/23/14
03/07/18
06/28/18
01/15/19
07/01/20
In the city of Los Angeles, at Los Angeles River Bridge (No. 53-0421R/L). Spot blast, clean, and paint steel bridge members.
Baseline
821 6,176
50
1,000
1,900
3,387
133
400
6,870
LA110
4730
07
Page 42 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
295 Pavement Rehab 1,170
10,266
479
165
19,402
135,000
0
394
1,170
10,026
46
0
1,173
9,990
481
165
30,000
134,511
176,320
0
08/31/15
05/29/18
01/14/19
06/21/19
01/14/25
In and near Monterey Park, Montebello, Rosemead, and South El Monte, from 0.5 miles west of Route 710 to Route 605; also on Route 710, from 0.5 miles south to 0.5 miles north of Route 60. Rehabilitate pavement.
Baseline
11,636 166,482
1,173
9,990
30,000
134,511
165
481
176,320
LA60
4699
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
296 Pavement Rehab 0
1,626
180
10
2,256
14,890
0
51
0
1,597
0
0
170
1,630
230
10
2,261
14,478
18,779
0
06/22/14
08/30/17
12/29/17
11/15/19
02/26/22
In Burbank, from Verdugo Avenue to Magnolia Boulevard. Rehabilitate pavement.
Baseline
1,648 18,962
170
1,630
2,261
14,478
10
230
18,779
LA5
4702
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
297 LANE REPLACEMENT
1,275
8,353
19
84
8,445
60,496
01/15/21
02/28/20
02/26/20
06/20/18
0
0
1,275
968
0
0
1,289
8,385
23
147
0
0
9,844
008/03/18
06/20/18
05/15/20
06/15/20
02/28/21
01/12/24
In Baldwin Park and West Covina, from Route 605 to Citrus Avenue. Rehabilitate roadway.(G13 Contingency)
Baseline
2,243 78,672
1,289
8,385
0
0
147
23
9,844
LA10
4712
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
298 REPLACE DRAINAGE INLETS
257
627
342
1,952
797
2,518
01/06/20
03/30/20
02/14/20
07/18/18
0
0
257
0
0
0
400
624
203
395
351
1,574
3,547
0
09/28/18
03/01/21
03/30/21
01/31/22
07/05/23
In Carson, at Dolores Yard Overhead No. 53-1168. Upgrade bridge drainage system.
Baseline
257 6,493
400
624
351
1,574
395
203
3,547
LA405
4721
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
299 Bridge Paint 347
1,104
683
3,322
2,402
5,883
05/04/20
03/24/20
02/14/20
07/11/18
0
0
347
0
0
0
490
1,237
203
245
826
3,883
6,884
0
12/31/18
03/16/21
03/30/21
12/15/21
07/05/23
In the city of Los Angeles, at Wilmington Overhead No. 53-0352. Paint and repair bridge deck.
Baseline
347 13,741
490
1,237
826
3,883
245
203
6,884
LA1
4729
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
300 Pavement Rehab and ADA curb ramps
904
2,198
551
1,386
1,602
9,995
08/20/20
03/19/20
12/19/19
03/26/18
0
39
904
481
0
0
1,074
2,224
649
25
1,607
9,995
15,574
0
03/29/18
02/19/20
03/19/20
10/01/20
10/21/21
In the cities of Los Angeles, Calabasas and Agoura Hills, from Route 170 to Kanan Road. Rehabilitate pavement, construct and upgrade Americans with Disabilities Act (ADA) curb ramps.
Baseline
1,424 16,636
1,074
2,224
1,607
9,995
25
649
15,574
LA101
4770
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
301 Pavement Preservation
751
8,282
410
487
14,934
120,000
02/25/20
05/31/19
04/30/19
09/29/17
0
5
751
4,911
0
0
750
8,200
500
490
16,500
120,000
146,440
008/03/18
09/29/17
04/30/19
06/21/19
02/25/20
01/05/23
In the city of Los Angeles, from Route 5 to North Wheatland Avenue. Rehabilitate roadway.
Baseline
5,667 144,864
750
8,200
16,500
120,000
490
500
146,440
LA210
4801
07
Page 43 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
302 Drainage Rehabilitation
102
497
15
20
886
1,817
03/25/19
09/10/18
07/31/18
06/01/17
0
9
102
391
0
0
300
700
20
20
970
1,817
3,827
0
06/01/17
08/21/18
10/01/18
07/29/19
03/30/20
Near Pyramid Lake, 4.4 miles north of Templin Highway. Remove and replace two sections of damaged reinforced concrete pipe.
Baseline
502 3,337
300
700
970
1,817
20
20
3,827
LA5
4847
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
303 Drainage Improvement
256
1,205
48
10
1,030
1,810
03/25/19
09/10/18
07/31/18
10/19/17
0
2
256
516
0
0
420
1,200
50
10
1,175
1,810
4,665
0
10/19/17
02/22/19
03/29/19
12/12/19
03/30/20
In Glendale, from east of Concord Street Overcrossing to west of Chevy Chase Drive Undercrossing at three locations. Restore culvert systems.
Baseline
774 4,359
420
1,200
1,175
1,810
10
50
4,665
LA134
4848
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
304 Drainage Improvement & Replace Culvert System
173
1,322
11
50
1,001
2,820
03/13/20
03/29/19
02/28/19
01/17/18
0
3
173
572
0
0
310
1,325
20
50
1,200
2,820
5,725
0
01/26/18
02/06/19
03/29/19
01/22/20
07/14/21
Near Gardena, south of Redondo Beach Boulevard. Replace culvert.
Baseline
748 5,377
310
1,325
1,200
2,820
50
20
5,725
LA110
4849
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
305 Reconstruct Pavement Structure and Ramps
1,487
7,402
241
208
17,400
126,660
02/24/21
11/06/20
09/02/20
04/11/19
0
0
565
0
0
0
3,000
21,200
280
210
25,800
126,660
177,150
0
07/31/19
02/08/21
03/15/21
01/10/22
08/23/23
In and near Palmdale and Lancaster, from Avenue P-8 to the Kern County line. Replace distressed lanes/shoulders, cold plane and overlay ramps, upgrade guardrail, dikes, sign panels, curb ramps and traffic loop detectors.
Baseline
565 153,398
3,000
21,200
25,800
126,660
210
280
177,150
LA14
4887
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
306 Upgrade Pumps 345
1,017
27
16
2,474
4,803
08/14/19
01/30/19
12/31/18
12/01/17
0
6
345
819
0
0
360
1,038
30
10
1,500
4,803
7,741
0
12/07/17
02/13/19
03/29/19
03/30/20
02/01/22
In the cities of Los Angeles, Hollywood, Long Beach and Signal Hill from Simons Underpass to Eastern Avenue; on Routes 101, 405 and 710 at various locations. Replace 9 pump plants.
Baseline
1,170 8,682
360
1,038
1,500
4,803
10
30
7,741
LA5
4910
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
307 Bridge Replacement 946
3,501
493
767
2,384
10,819
09/19/19
03/21/19
02/21/19
03/26/18
0
148
946
2,454
31
0
1,033
3,726
500
1,067
2,442
10,819
19,587
0
03/30/18
06/10/19
06/20/19
02/12/20
01/20/22
Near Encino, at Encino Pedestrian Overcrossing. Replace pedestrian overcrossing.
Baseline
3,579 18,910
1,033
3,726
2,442
10,819
1,067
500
19,587
LA101
4915
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
308 Strengthen Bridge 506
1,463
3
15
1,139
2,253
05/22/22
10/21/21
09/22/21
07/15/20
0
0
40
0
0
0
508
1,493
80
10
1,188
2,253
5,532
0
07/17/20
10/08/21
11/12/21
05/20/22
12/01/23
In the city of Los Angeles, at the Normandie Avenue Undercrossing Bridge No. 53-1565. Strengthen girders with epoxy and reinforcement steel.
Baseline
40 5,379
508
1,493
1,188
2,253
10
80
5,532
LA10
4966
07
Page 44 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
309 Nickname Required 907
2,403
36
36
1,929
3,230
04/15/22
03/15/21
02/15/21
10/15/19
0
0
70
0
0
0
910
2,468
43
40
2,073
3,230
8,764
0
10/15/19
02/12/21
03/15/21
04/15/22
04/03/23
In Long Beach, at the eastbound Route 91 to northbound Route 710 Connector Bridge No. 53-2241G over connector from northbound Route 710 to eastbound Route 91. Lower profile of connector to achieve standard vertical clearance
Baseline
70 8,541
910
2,468
2,073
3,230
40
43
8,764
LA91
4967
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
310 Nickname Required 907
2,403
36
36
1,929
3,230
04/15/22
03/15/21
02/15/21
10/15/19
0
0
70
0
0
0
910
2,468
43
40
2,073
3,230
8,764
0
10/15/19
02/12/21
03/15/21
04/15/22
04/03/23
In Long Beach, at the eastbound Route 91 to northbound Route 710 Connector Bridge No. 53-2241G over connector from northbound Route 710 to eastbound Route 91. Lower profile of connector to achieve standard vertical clearance
Baseline
70 8,541
910
2,468
2,073
3,230
40
43
8,764
LA91
4967
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
311 Pavement Rehabiliation
1,603
7,026
293
10
13,693
46,000
11/15/22
02/15/22
10/15/21
02/15/19
0
0
634
0
0
0
1,960
8,100
150
25
0
0
10,235
0
04/30/19
07/30/21
08/30/21
05/20/22
12/30/24
In various cities, from Orange County line to Telegraph Road. Pavement rehabilitation consisting of full structural section replacement and damaged slab replacement. Cold plane and overlay Rubberized Hot Mix Asphalt (RHMA-G) on right shoulders and apply High Friction Surface Treatment (HFST) onramps and connectors.
Baseline
634 68,625
1,960
8,100
0
0
25
150
10,235
LA605
4979
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
312 PSSR Bridge 2,056
6,552
296
254
5,752
15,831
11/04/22
03/20/22
02/16/22
09/15/19
0
0
500
0
4
0
2,140
6,840
300
254
5,840
15,831
31,205
0
03/31/20
02/16/22
03/18/22
02/01/23
11/05/24
In Long Beach, at the San Gabriel River Bridge No. 53-1185 and SB LA-605 to NB I-405 connector Bridge No. 53-1737H; also in Orange County on I-405 at the SB 405 to NB 605 connector Bridge No. 55-0413F; 12-Ora-405-PM 24.1. Retrofit scour critical bridges to preserve the structural integrity of the bridges by enlarging and deepening pile cap, adding Cast in
Baseline
504 30,741
2,140
6,840
5,840
15,831
254
300
31,205
LA405
4984
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
313 Cold Plane and Overlay AC
2,092
4,672
879
1,554
7,621
38,220
11/06/22
03/30/22
02/26/22
12/15/18
0
0
621
0
0
0
2,048
4,886
920
1,554
7,684
38,220
55,312
0
07/31/20
02/25/22
03/30/22
10/12/22
07/17/24
In and near Redondo Beach, from Orange County line to south of Topaz Street. Upgrade Americans with Disabilities Act (ADA) curb ramps, upgrade metal beam guardrail, cold plane pavement, and place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement to rehabilitate pavement.
Baseline
621 55,038
2,048
4,886
7,684
38,220
1,554
920
55,312
LA1
4998
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
314 Bridge Rail Upgrade 698
1,627
30
10
1,555
3,520
04/01/21
08/26/20
07/15/20
02/21/19
0
0
73
0
0
0
712
1,673
30
30
1,632
3,520
7,597
0
09/30/19
01/08/21
02/19/21
10/15/21
02/24/23
In the city of Los Angeles, at the 5th Street Overcrossing No. 53-0685 and 6th Street Overcrossing No. 53-0746. Upgrade bridge railing.
Baseline
73 7,440
712
1,673
1,632
3,520
30
30
7,597
LA110
5002
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
315 Bridge Rail Upgrade 1,131
2,037
155
2,527
2,926
5,300
02/26/22
12/30/21
07/15/21
09/20/19
0
0
71
0
0
0
1,300
2,500
200
2,530
2,860
5,420
14,810
0
02/07/20
08/30/21
09/30/21
02/25/22
10/01/24
In Pasadena, at the Arroyo Seco Bridge No. 53-0166. Replace/upgrade bridge railing.
Baseline
71 14,076
1,300
2,500
2,860
5,420
2,530
200
14,810
LA134
5003
07
Page 45 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
316 Union Pacific OH Deck Rehabilitation
658
2,660
346
581
3,997
12,478
08/28/22
01/30/22
12/31/21
11/12/19
0
0
274
0
0
0
669
3,482
376
1,730
4,228
12,478
22,963
0
11/12/19
12/31/21
01/28/22
08/26/22
08/27/24
In the city of Los Angeles, at the Union Pacific Overhead No. 53-2626. Replace the bridge deck with composite reinforced concrete.
Baseline
274 20,720
669
3,482
4,228
12,478
1,730
376
22,963
LA103
5004
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
317 Overlay AC 1,413
3,893
448
499
4,861
30,550
07/01/22
10/21/21
09/21/21
03/28/20
0
0
160
0
0
0
1,593
4,405
576
499
5,540
30,550
43,163
0
03/27/20
09/21/21
10/21/21
07/01/22
01/05/24
In and near Canoga Park, from Pacific Coast Highway to Entrada Road; also near Woodland Crest Drive to near Devonshire Street (PM 10.11/18.62). Cold plane and overlay asphalt pavement, repair damaged structural and upgrade curb ramps to meet Americans with Disabilities Act (ADA) Standards.
Baseline
160 41,664
1,593
4,405
5,540
30,550
499
576
43,163
LA27
5007
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
318 I-5 Pavement Rehab 100
5,999
234
260
6,793
43,080
02/26/21
01/29/21
12/30/20
03/28/18
0
16
100
483
0
0
100
6,000
250
250
7,200
43,080
56,880
008/03/18
03/28/18
11/06/20
01/29/21
09/01/21
03/01/23
Near Castaic and Valencia, from 0.2 mile north of Lake Hughes Road Undercrossing to 0.7 mile south of Vista Del Lago Road Overcrossing. Cold plane pavement and place Rubberized Hot Mix Asphalt concrete (RHMA), repair drainage systems, and perform upgrades to overhead signs, drainage curbs and guardrail.
Baseline
599 56,466
100
6,000
7,200
43,080
250
250
56,880
LA5
5013
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
319 Cold Plane and AC Overlay
562
2,462
11
126
1,688
4,376
09/05/21
12/15/20
11/05/20
09/15/19
0
0
45
0
0
0
670
2,523
12
126
1,967
4,376
9,674
0
09/13/19
11/05/20
12/15/20
09/03/21
06/30/23
In Long Beach, from Route 1 to San Gabriel Undercrossing. Cold plane pavement and overlay with Rubberized Hot Mixed Asphalt - Type G (RHMA-G), upgrade curb ramps to current Americans with Disabilities Act (ADA) Standards, install guardrail and construct bus pads.
Baseline
45 9,225
670
2,523
1,967
4,376
126
12
9,674
LA22
5022
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
320 Repair/upgrade pump stations
244
870
32
0
999
5,946
11/30/21
02/28/21
01/01/21
12/01/19
0
0
21
0
0
0
254
1,075
73
14
1,110
5,946
8,472
0
12/02/19
12/31/20
02/26/21
11/30/21
09/30/22
In various cities, on Route 5 (PM 19.75/35.99), Route 10 (PM 22.32/23.88), Route 91 (PM R11.80), Route 605 (PM R14.07) and Route 710 (PM 18.7/21.01). Replace pumps with submersible pumps.
Baseline
21 8,091
254
1,075
1,110
5,946
14
73
8,472
LA5
5024
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
321 Hinge and Diaphragm Repairs
769
2,456
116
596
4,359
18,697
10/28/21
01/06/21
11/06/20
10/04/19
0
0
111
0
0
0
1,061
3,665
444
596
4,244
18,697
28,707
0
10/04/19
11/06/20
01/06/21
10/28/21
04/28/23
In Irwindale, on the San Gabriel River Bridge No. 53-1867. Reconstruct hinge diaphragms at hinge 4 and hinge 6, upgrade bridge railing and reinstall electroliers.
Baseline
111 26,993
1,061
3,665
4,244
18,697
596
444
28,707
LA210
5026
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
322 Slab Replacement and Shoulder Resurfacing
712
6,455
131
161
4,601
16,410
09/06/22
11/08/21
08/09/21
12/01/18
0
0
712
0
0
0
1,375
6,856
138
2,721
6,242
16,410
33,742
0
12/06/18
10/08/21
11/08/21
09/06/22
11/06/24
In the cities of Irwindale and Baldwin Park, from Route 10 Interchange to the end of the freeway at Route 210. Grind mainline pavement and replace damaged stabs with Jointed Plain Concrete Pavement (JPCP) rapid strength concrete and/or Individual Precast Slab Replacement (IPSR), cold plane and overlay median, shoulders, ramps with Hot Mix Asphalt
Baseline
712 28,470
1,375
6,856
6,242
16,410
2,721
138
33,742
LA605
5029
07
Page 46 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
323 Tejon Pass OC Bridge; Seismic Retrofit
600
1,409
345
50
1,379
1,800
01/05/22
07/15/21
06/15/21
10/01/19
0
0
45
0
0
0
700
1,500
400
50
1,500
1,800
5,950
0
10/01/19
06/15/21
07/15/21
01/05/22
12/15/22
Near Kern County line, at the Tejon Pass Overcrossing No. 53-1779. Seismic retrofit of bridge, widen bridge abutments, add steel casing to bent columns, retrofit bent foundation and install micro piles.
Baseline
45 5,583
700
1,500
1,500
1,800
50
400
5,950
LA5
5032
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
324 Cold Plane and Overlay AC
2,540
6,851
773
1,932
8,470
45,900
12/01/22
03/30/22
02/26/22
12/15/18
0
0
650
0
0
0
2,356
6,770
780
1,900
8,770
45,900
66,476
0
07/31/20
02/25/22
03/30/22
10/12/22
07/17/24
In and near Redondo Beach, from Topaz Street to Dewey Street. Upgrade Americans with Disabilities Act (ADA) curb ramps and metal beam guardrail, repair concrete pavement, replace asphalt concrete pavement with Portland Cement Concrete (PCC) at intersections, cold plane pavement, and place Hot Mix Asphalt (HMA) and R
Baseline
650 66,466
2,356
6,770
8,770
45,900
1,900
780
66,476
LA1
5034
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
325 39, 71, 138 Seismic Retrofit
1,351
3,066
142
102
4,762
19,329
06/10/22
10/03/21
08/07/21
08/01/19
0
0
356
0
0
0
1,372
4,549
488
101
5,686
19,329
31,525
0
11/22/19
10/04/21
11/03/21
06/10/22
05/10/24
In and near Palmdale, Azusa and Pomona, at the California Aqueduct Bridge No. 53-2174; also on Route 39, at the San Gabriel River Bridge No. 53-0113 (PM 17.81) and Route 71 at the Ridgeway Street Undercrossing Bridge No. 53-2052 (PM R0.92). Seismic retrofit, barrier replacement, paint San Gabriel River Bridge.
Baseline
356 28,752
1,372
4,549
5,686
19,329
101
488
31,525
LA138
5035
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
326 Upgrade Transportation Management System
135
1,027
13
147
1,253
6,674
05/22/21
10/21/20
08/21/20
06/15/18
0
0
135
0
0
0
233
1,028
45
153
1,450
6,674
9,583
0
12/31/18
10/10/20
10/21/20
08/19/21
09/18/25
In and near the city of Los Angeles, from EB Route 60/5 Separation to Route 605; also on Route 2 (PM R18.7), Route 5 (PM 6.8), Route 10 (PM 18.3), and Route 605 (PM 20.2). Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring, data transmission, and network connectivity including the Los
Baseline
135 9,249
233
1,028
1,450
6,674
153
45
9,583
LA60
5040
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
327 Upgrade TMS 108
3,144
35
327
3,280
17,264
05/13/21
10/15/20
08/22/20
12/15/18
0
0
108
0
0
0
539
3,159
43
327
3,284
17,264
24,616
0
12/31/18
08/21/20
10/21/20
05/21/21
05/16/23
In and near Santa Monica, from Lincoln Boulevard to McClure Tunnel; also on Route 10 (PM 2.1/18.3), Route 2 (PM R18.7), Route 101 (PM 11.8), and Route 105 (PM R1.95). Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring, data transmission, and network connectivity including the Los Angeles Regional Transportation
Baseline
108 24,158
539
3,159
3,284
17,264
327
43
24,616
LA1
5041
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
328 New Pump Station 1,198
1,912
172
1,647
3,713
22,593
10/01/21
03/30/21
01/15/21
12/31/19
0
0
139
0
0
0
1,198
2,586
420
1,646
3,954
22,593
32,397
0
12/20/19
01/15/21
02/16/21
02/28/22
03/22/24
In Long Beach, at Henry Ford Avenue offramp. Construct larger pump plant facility including replacing undersized pumps.
Baseline
139 31,235
1,198
2,586
3,954
22,593
1,646
420
32,397
LA103
5043
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
329 San Gabriel Br OH 805
3,912
915
1,262
3,895
8,140
09/25/22
02/01/22
01/03/22
10/01/19
0
0
156
0
0
0
813
3,927
915
1,262
3,526
8,140
18,583
0
01/07/20
01/03/22
02/01/22
11/23/22
10/31/24
In the city of El Monte, from Baldwin Avenue Overcrossing to Route 605 at Rio Hondo Bridge No. 53-657, East El Monte Overhead No. 53-0867 and San Gabriel River Bridge No. 53-109L/R. Replace overhang joints with reinforced concrete closure pours.
Baseline
156 18,929
813
3,927
3,526
8,140
1,262
915
18,583
LA10
5067
07
Page 47 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
330 105-replace joint seals
258
876
25
10
972
1,340
07/30/21
12/01/20
10/01/20
08/01/19
0
0
63
0
0
0
259
891
26
27
1,022
1,340
3,565
0
09/20/19
10/01/20
12/01/20
07/30/21
04/28/23
In the city of South Gate, at Paramount Boulevard Overcrossing No. 53-2425; also in the city of Downey, at Ardis Avenue Overcrossing No. 53-2572. Remove and install new joint assemblies, apply waterproof coating, replace joint seals and apply methacrylate to Ardis Avenue Overcrossing deck.
Baseline
63 3,481
259
891
1,022
1,340
27
26
3,565
LA105
5069
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
331 Bridge Painting 72
518
23
10
495
1,632
09/23/22
02/17/22
01/12/22
06/01/19
0
0
34
0
0
0
141
550
25
10
522
1,632
2,880
0
12/20/19
01/12/22
02/17/22
08/23/22
10/30/24
In El Monte, at Peck Road Undercrossing No. 53-0661. Paint steel portion of bridge for preventative maintenance to preserve and extend the life of bridge.
Baseline
34 2,750
141
550
522
1,632
10
25
2,880
LA10
5070
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
332 Route 2 Cold plane & Overlay
1,562
2,785
2
10
4,157
20,000
12/01/22
03/01/22
01/05/22
07/01/20
0
0
158
0
0
0
1,900
5,000
160
38
5,000
19,810
31,908
0
07/01/20
01/05/22
02/23/22
07/29/22
12/29/23
In and near the city of Los Angeles, from Centinela Avenue to Cotner Avenue, North La Brea Avenue to North Oxford Avenue and North Hollywood Boulevard to Allesandro Street. Cold plane and overlay pavement, upgrade curb ramps, reconstruct curb and gutter, construct bus pads and replace traffic signals at several locations.
Baseline
158 28,516
1,900
5,000
5,000
19,810
38
160
31,908
LA2
5184
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
333 Bluetooth Detection System
124
200
0
10
300
1,373
04/22/21
10/21/20
07/21/20
12/28/18
0
0
124
0
0
0
240
200
0
10
300
1,373
2,123
0
01/29/19
07/21/20
10/21/20
04/22/21
10/21/22
In the cities of Los Angeles, Wilmington, and Carson, from Gaffey Street to Route 405; also on Route 210 (PM R0.0/R35.8), Route 605 (PM 19.9/26.0), Route 710 (PM 5.0/9.4) and Route 2 (PM R18.7). Install wireless Bluetooth? detection system to monitor travel time.
Baseline
124 2,007
240
200
300
1,373
10
0
2,123
LA110
5188
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
334 Rte 14 Drainage Culvert
387
1,888
23
10
1,206
2,719
05/01/20
10/01/19
09/03/19
07/13/18
0
1
387
119
0
0
556
1,881
23
10
1,262
2,719
6,451
0
10/15/18
11/22/19
12/02/19
09/15/20
10/14/22
In the City of Santa Clarita, near southbound offramp to Sierra Highway. Replace damaged drainage system that includes seventeen culverts.
Baseline
507 6,233
556
1,881
1,262
2,719
10
23
6,451
LA14
5219
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
335 LA-101 Upgrade CCTV/CMS
233
2,964
149
218
1,773
9,718
08/01/22
01/03/22
09/03/21
07/15/18
0
0
233
0
0
0
438
3,008
162
13
1,863
9,718
15,202
0
02/28/19
09/03/21
01/03/22
08/01/22
07/01/24
In various ciites, from Routes 5/10 to Route 405, Route 2 at Route 134 (PM R18.7) and Route 10 at Route 5/10 (PM 18.3). Upgrade Transportation Management System (TMS) elements including Closed Circuit Television (CCTV) cameras, Ramp Metering Systems (RMS), Vehicle Detection Stations (VDS), Highway Advisory Radio (HAR), Changeable Message Signs
Baseline
233 15,055
438
3,008
1,863
9,718
13
162
15,202
LA101
5221
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
336 LA-134 Upgrade TMS
160
2,828
134
10
1,936
7,559
08/01/22
01/03/22
08/03/21
07/15/18
0
0
160
0
0
0
454
2,840
154
13
1,953
7,559
12,973
0
12/26/18
09/03/21
01/03/22
08/01/22
07/01/24
In the city of Los Angeles, from Route 170 to Routes 210/710; also on Route 2 at Route 134 (PM R18.7), on Route 10 at Routes 5/10 (PM 18.3), and on Route 101 near Pleasant Valley Road (PM 11.8). Upgrade Transportation Management System (TMS) elements including Closed Circuit Television (CCTV) cameras, Ramp Metering Systems (RMS), Vehicle
Baseline
160 12,627
454
2,840
1,953
7,559
13
154
12,973
LA134
5222
07
Page 48 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
337 Nickname Required 434
2,559
123
10
2,411
1,654
05/01/20
10/01/19
09/01/19
07/15/18
0
0
434
177
0
0
709
2,548
123
10
2,462
1,654
7,506
0
11/21/18
02/14/20
03/13/20
11/16/20
04/15/22
In the city of Los Angeles, on the northbound connector at the Route 5/110 Separation. Replace compromised 18 inch Reinforced Concrete Culvert (RCP).
Baseline
611 7,191
709
2,548
2,462
1,654
10
123
7,506
LA5
5223
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
338 Upgrade TMS 203
3,097
11
266
3,741
16,390
08/01/22
01/03/22
08/03/21
12/12/18
0
0
203
0
0
0
511
2,630
150
590
2,237
10,851
16,969
0
12/28/18
08/03/21
01/03/22
07/01/22
07/01/24
In and near Carson, from Route 110 to Orange County line; also on Route 2 (PM R18.7), Route 5 (PM 6.8), Route 405 (PM 21.1). Upgrade the existing Transportation Management System (TMS) elements to improve traffic monitoring, data transmission, and network connectivity including the various communication hubs on Route 2, Route 5, and Route 405.
Baseline
203 23,708
511
2,630
2,237
10,851
590
150
16,969
LA91
5226
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
339 ITS Restoration work in Shimelis area
0
676
17
10
2,753
15,515
207
3
0
676
0
65
0
2,295
18
54
3,645
16,999
23,011
0
12/14/17
03/19/18
07/29/18
12/30/20
In Los Angeles County, on various routes and at various locations. Repair and Rehabilitate Ramp Metering Systems (RMS) and Vehicle Detection Systems (VDS).
Baseline
951 18,971
0
2,295
3,645
16,999
54
18
23,011
LA10
5246
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
340 ITS Restoration 0
489
1
10
3,894
23,670
379
1
0
489
0
97
0
2,962
18
173
4,702
23,670
31,525
0
01/01/18
03/19/18
07/27/18
12/30/20
In Los Angeles County, on various routes and at various locations. Repair and Rehabilitate Ramp Metering Systems (RMS) and Vehicle Detection Systems (VDS).
Baseline
966 28,064
0
2,962
4,702
23,670
173
18
31,525
LA5
5247
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
341 Freight Corridor Improvements on LA-60
1,753
2,006
123
34
2,400
16,000
07/30/21
06/30/20
05/29/20
10/31/19
0
0
1,136
0
0
0
3,320
0
0
0
0
0
3,320
0
06/14/19
04/30/20
07/30/20
03/30/21
12/30/21
In the City of Industry at Hacienda Boulevard Undercrossing (UC) No. 53-1789 (PM 15.93), Stemson Avenue UC No. 53-1784 (PM 16.30), Azusa Avenue Overcrossing No. 53-1785 (PM 17.97) and Fullerton Road UC No. 53-1786 (PM 19.46). Improve freight corridor movement by modifying and replacing bridges to meet vertical clearance and load carrying capacity
Baseline
1,136 22,316
3,320
0
0
0
0
0
3,320
LA60
5297
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
342 LA-39/ N. Fork San Gabriel Bridge Replacement
0
1,704
19
10
4,468
11,742
08/01/19
04/01/19
03/01/19
09/20/17
0
6
0
735
0
0
0
1,930
20
10
4,476
11,742
18,178
008/02/18
09/20/17
02/26/19
04/15/19
08/01/19
12/01/21
Near Azusa, at the North Fork San Gabriel River Bridge No. 53-2245. Replace bridge.
Baseline
741 17,943
0
1,930
4,476
11,742
10
20
18,178
LA39
5298
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
343 Cold Plane. 46
1,088
16
0
1,936
13,888
403
1
46
1,088
0
4,784
80
1,600
25
20
2,000
13,888
17,613
13,887
07/20/15
10/24/17
12/20/17
07/10/18
12/13/19
In and near the city of Ventura, from Route 101 to 0.1 mile south of Park View Drive. Rehabilitate pavement.
Baseline
6,322 16,974
80
1,600
2,000
13,888
20
25
17,613
VEN33
4697
07
Page 49 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
344 SR 1 Cnty Ln Pavement Rehab
54
1,325
18
65
1,081
5,060
85
8
54
1,325
10
66
56
1,410
60
66
1,100
5,060
7,752
5,060
02/10/17
03/27/18
04/26/18
12/10/18
01/06/21
Near Oxnard, from Los Angeles County line to south of Sycamore Canyon Road. Rehabilitate pavement.
Baseline
1,548 7,603
56
1,410
1,100
5,060
66
60
7,752
VEN1
4696
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
345 Pavement Rehab 221
1,012
16
44
1,264
4,412
19
5
221
1,012
32
3
277
1,025
20
20
1,250
4,412
7,004
4,411
10/27/17
05/22/18
06/29/18
02/05/19
03/30/20
In Thousand Oaks, from Carlisle Road to Route 101. Rehabilitate pavement.
Baseline
1,292 6,969
277
1,025
1,250
4,412
20
20
7,004
VEN23
4698
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
346 Ven 101 Padre Juan Rehab
510
2,283
193
99
5,285
42,500
08/28/20
02/14/20
01/10/20
09/28/18
0
0
510
381
0
0
530
3,300
200
150
6,000
42,500
52,680
010/15/18
09/28/18
01/10/20
02/14/20
08/28/20
08/31/23
Near Sea Cliff, from 0.4 mile south of Padre Juan Canyon Road Overcrossing to 0.3 mile north of Punta Gorda Pedestrian Undercrossing. Rehabilitate roadway.
Baseline
891 50,870
530
3,300
6,000
42,500
150
200
52,680
VEN101
4687
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
347 VEN-23 REHAB 1,642
6,454
95
51
14,456
92,450
03/10/20
06/14/19
05/10/19
09/28/17
0
4
1,642
2,997
0
0
1,630
7,500
100
860
17,000
92,445
119,535
008/03/18
09/28/17
05/10/19
06/14/19
03/10/20
09/15/23
In and near cities of Thousand Oaks and Moorpark, from Route 101 to Route 118. Rehabilitate pavement.
Baseline
4,643 115,148
1,630
7,500
17,000
92,445
860
100
119,535
VEN23
4688
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
348 OH span replacement
1,209
2,407
472
971
1,618
3,565
08/15/22
12/15/21
11/15/21
12/14/18
0
0
725
0
0
0
1,200
2,500
540
983
1,650
3,565
10,438
0
04/30/19
11/15/21
12/15/21
08/15/22
09/15/23
Near the city of Ventura, at Ventura Overhead No. 52-0040. Replace corroded steel spans of bridge and upgrade bridge railing to current standards.
Baseline
725 10,242
1,200
2,500
1,650
3,565
983
540
10,438
VEN1
4972
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
349 Bridge Structure Painting
189
821
49
40
614
660
06/02/22
10/31/21
09/01/21
12/15/18
0
0
189
5
0
0
320
850
50
30
620
660
2,530
0
12/28/18
12/01/20
06/01/21
12/31/21
07/21/23
Near Ojai, at North Fork Matilija Creek No. 52-0173. Paint steel portion of bridge and replace missing rivets of bottom flanges for preventative maintenance to preserve and extend the life of bridge.
Baseline
194 2,373
320
850
620
660
30
50
2,530
VEN33
5008
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
350 CapM 594
1,437
192
222
1,642
5,588
04/08/21
10/05/20
08/05/20
09/03/19
0
0
123
0
0
0
600
1,500
250
221
1,700
5,588
9,859
0
01/03/20
12/03/21
01/04/22
05/02/22
12/01/23
In and near Ojai, Mira Monte and Meiners Oaks, from Burham Road to Gorham Road; also on Route 33 from 33/150 Junction to Meiners Road. Cold plane and overlay pavement, upgrade guardrail and signs.
Baseline
123 9,675
600
1,500
1,700
5,588
221
250
9,859
VEN150
5014
07
Page 50 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
351 PCH CAPM 627
1,469
58
15
2,473
10,200
08/05/22
12/15/21
11/01/21
07/15/20
0
0
58
0
0
0
625
1,850
60
14
3,350
10,200
16,099
0
07/15/20
11/01/21
12/15/21
08/05/22
12/13/24
In the city of Ventura, from North 101 Junction - Solimar Undercrossing to Hobson County Park Road. Cold plane and overlay pavement, upgrade guardrail/end treatment, install traffic signs and crosswalks.
Baseline
58 14,842
625
1,850
3,350
10,200
14
60
16,099
VEN1
5018
07
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
352 Riv 10/60/86 Install Changeable Message Signs
330
593
14
10
872
2,527
84
7
330
593
0
16
425
635
20
10
635
2,527
4,252
2,526
08/30/17
03/28/18
06/18/18
12/10/18
09/01/20
In Riverside County, on Routes 10, 60, and 86 at various locations. Install Changeable Message Signs.
Baseline
1,030 4,346
425
635
635
2,527
10
20
4,252
RIV10
3002T08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
353 RIV 10 METHACRYLATE DECKS (VARIOUS ROUTES)
313
762
28
40
726
919
04/30/19
08/03/18
06/20/18
10/31/17
0
18
313
642
7
0
350
760
50
30
660
875
2,725
580
11/02/17
07/18/18
11/27/18
07/01/19
10/24/19
In Riverside County, on Routes 10 and 91, at various locations; also in San Bernardino County, on Routes 10 and 15, at various locations. Repair bridge decks.
Baseline
980 2,788
350
760
660
875
30
50
2,725
RIV10
3002G08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
354 RIV-79 NEAR TEMECULA MILL & OVERLAY
699
862
13
10
805
9,585
02/14/20
05/10/19
04/12/19
05/15/18
0
12
699
671
0
0
1,133
780
17
10
800
8,742
11,482
0
06/27/18
04/03/19
05/01/19
12/04/19
10/30/20
Near Temecula, from San Diego County line to Temecula city limits. Pavement rehabilitation.
Baseline
1,382 11,974
1,133
780
800
8,742
10
17
11,482
RIV79
0066Q08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
355 RIV 74/79/371 UPGRADE TO STANDARD BRIDGE RAIL
1,049
2,485
53
415
1,646
5,520
03/02/20
08/01/19
06/03/19
04/02/18
0
8
1,049
494
1
0
1,031
2,700
80
550
2,800
6,245
13,406
0
06/17/19
04/01/20
05/01/20
01/04/21
01/03/22
In and near the cities of Lake Elsinore, Perris, Menifee and Hemet, at Leach Canyon Channel Bridge No. 56-0750 and Blue Ridge Wash Bridge No. 56-0257; also on Routes 79 and 371, at Arroyo Seco Bridge No. 56-0189, and Cahuilla Bridge No. 56-0490. Bridge rail replacement, replace one bridges, and extend one culvert.
Baseline
1,552 11,168
1,031
2,700
2,800
6,245
550
80
13,406
RIV74
3002C08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
356 RIV 10 REHAB SUBSTRUCTURE
1,140
1,854
207
895
2,776
14,290
01/21/20
06/18/19
06/03/19
05/02/18
0
71
1,140
777
132
0
1,218
1,916
138
895
2,300
12,399
18,866
0
06/18/18
05/20/19
06/03/19
02/21/20
11/15/21
Near Palm Springs, at Whitewater River Bridge No. 56-0004 L/R. Bridge rehabilitation and scour mitigation.
Baseline
2,120 21,162
1,218
1,916
2,300
12,399
895
138
18,866
RIV10
3002F08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
357 Temecula Lane Replacement
962
1,330
23
10
4,423
36,130
01/22/20
08/06/19
04/02/19
03/23/18
0
18
962
1,109
0
0
1,364
1,362
20
10
5,181
34,890
42,827
008/09/18
03/23/18
02/22/19
06/28/19
05/01/20
02/03/22
In and near Temecula, in Riverside County, from the San Diego county line to north of Temecula River Bridge; also in San Diego County from 0.1 mile south of the Riverside County line to the Riverside County line. Rehabilitate roadway.
Baseline
2,089 42,878
1,364
1,362
5,181
34,890
10
20
42,827
RIV15
3003K08
Page 51 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
358 RIV 015 Slab Replacement
763
889
15
10
3,666
22,000
01/15/20
03/04/19
02/01/19
11/08/17
0
12
763
809
0
0
1,108
926
20
10
3,347
20,762
26,173
008/07/18
11/08/17
12/17/18
03/04/19
11/15/19
11/15/21
In and near Terra Cotta, from Nichols Road to north of Glen Ivy. Concrete pavement slab replacement.
Baseline
1,584 27,343
1,108
926
3,347
20,762
10
20
26,173
RIV15
3003L08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
359 RIV 015 Bridge Maintenance
848
1,096
12
36
4,498
25,190
01/15/21
03/02/20
01/03/20
04/13/18
0
5
848
83
0
0
1,022
1,066
10
10
4,771
24,040
30,919
008/07/18
04/13/18
01/03/20
03/02/20
01/15/21
08/02/21
In and near Corona, from south of Ontario Avenue to Route 60. Concrete pavement slab replacement.
Baseline
936 31,680
1,022
1,066
4,771
24,040
10
10
30,919
RIV15
3003M08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
360 RIV 74 REPLACE BRIDGES/UPGRADE RAIL
1,708
1,534
43
653
1,171
9,502
11/30/22
03/30/22
02/28/22
02/22/21
0
0
436
0
0
0
1,690
1,295
150
653
2,390
6,824
13,002
0
03/01/21
03/01/22
04/01/22
12/01/22
12/02/24
Near Lake Elsinore, at Morrill Canyon Bridge No. 56-0169; also near Hemet, at Strawberry Creek Bridge No. 56-0180 (PM 53.4/54.7). Replace structures/upgrade rails.
Baseline
436 14,611
1,690
1,295
2,390
6,824
653
150
13,002
RIV74
3005Q08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
361 RIV/SBD REPAIR DETECTION SITES
126
825
86
10
1,212
4,458
06/14/19
10/15/18
09/14/18
02/15/18
0
15
126
560
0
0
346
1,000
90
10
1,401
5,000
7,847
0
02/13/18
08/27/18
10/01/18
05/30/19
05/28/20
In Riverside and San Bernardino Counties, on various routes and at various locations. Repair and replace vehicle detection equipment impacting the operations of the District Transportation Management Center (TMC).
Baseline
701 6,717
346
1,000
1,401
5,000
10
90
7,847
RIV3006W
08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
362 Riv 10 Blythe Pavement Rehab: mainline, shoulders, ramps
6,278
9,906
80
10
20,083
132,000
01/13/13
05/27/22
04/22/22
08/28/20
0
0
1,783
0
0
0
7,000
15,800
90
10
0
0
22,900
0
09/02/20
10/07/21
03/03/22
07/05/22
07/08/25
In and near Coachella, from 0.5 mile east of Coachella Canal to Hazy Gulch Bridge. Cold plane pavement and overlay with Portland Cement Concrete (PCC). Construct eastbound truck climbing lane. A one-lane temporary detour will be constructed in the median for traffic handling.(G13 Contingency)
Baseline
1,783 168,357
7,000
15,800
0
0
10
90
22,900
RIV10
3008A08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
363 RIV 10 REPLACE EXISTING ROCK SLOPE PROTECTION
611
977
158
140
1,854
0
12/12/22
03/16/22
02/16/22
09/23/20
0
0
4
0
0
0
825
1,282
217
140
2,336
7,356
12,156
0
10/01/20
02/16/22
03/16/22
12/12/22
10/11/23
Near Desert Center, from Coxcomb Ditch to Copa Ditch. Replace existing Rock Slope Protection (RSP) to prevent further scour damage and preserve the structural integrity of sixteen bridges.
Baseline
4 3,740
825
1,282
2,336
7,356
140
217
12,156
RIV10
3008M08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
364 RIV 10 REPLACE EXISTING ROCK SLOPE PROTECTION
611
977
158
140
1,854
0
12/12/22
03/16/22
02/16/22
09/23/20
0
0
4
0
0
0
825
1,282
217
140
2,336
7,356
12,156
0
10/01/20
02/16/22
03/16/22
12/12/22
10/11/23
Near Desert Center, from Coxcomb Ditch to Copa Ditch. Replace existing Rock Slope Protection (RSP) to prevent further scour damage and preserve the structural integrity of sixteen bridges.
Baseline
4 3,740
825
1,282
2,336
7,356
140
217
12,156
RIV10
3008M08
Page 52 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
365 RIV 10 REPLACE EXISTING ROCK SLOPE PROTECTION
1,202
1,150
165
190
3,509
10,440
11/04/22
03/16/22
02/16/22
09/23/20
0
0
564
0
0
0
967
1,232
259
190
3,648
10,440
16,736
0
09/23/20
02/16/22
03/16/22
11/04/22
12/20/23
Near Desert Center, from Krume Ditch to Wide Ditch. Replace existing Rock Slope Protection (RSP) to prevent further scour damage and preserve the integrity of twenty-four bridges.
Baseline
564 16,656
967
1,232
3,648
10,440
190
259
16,736
RIV10
3008N08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
366 RIV 10 REPLACE EXISTING ROCK SLOPE PROTECTION
934
1,022
232
131
1,996
0
11/16/22
03/16/22
02/16/22
09/23/20
0
0
4
0
0
0
938
1,442
281
131
2,732
8,832
14,356
0
10/01/20
03/01/22
04/01/22
12/01/22
12/01/23
Near Blythe, from Rubble Ditch to Palowalla Ditch. Replace existing Rock Slope Protection (RSP) to prevent further scour damage and preserve the structural integrity of eighteen bridges.
Baseline
4 4,315
938
1,442
2,732
8,832
131
281
14,356
RIV10
3008P08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
367 RIV 10 PAVEMENT REPLACEMENT
731
5,973
28
10
10,268
205,824
0
28
731
5,754
0
0
0
0
0
0
11,611
205,824
217,435
0
12/22/15
02/08/18
06/12/18
10/07/19
07/05/22
IN BEAUMONT & BANNING FROM JCT 10/60 SEP TO JCT 10/111 SEP. PAVEMENT REPLACEMENT LANES 3 & 4 & OUTSIDE SHOULDERS WITH JPCP, OVERLAY INSIDE SHOULDER, CONCRETE SLAB REPLACEMENT LANE 1 & 2 & UPGRADE CURB RAMPS PAVEMENT REPLACEMENT LANES 3 & 4 & OUTSIDE SHOULDERS WITH JPCP,
Baseline
6,513 222,834
0
0
11,611
205,824
0
0
217,435
RIV10
3008U08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
368 Riv 10 Blythe Pavement Rehab: mainline, shoulders, ramps
16,522
23,145
126
10
28,058
263,010
01/15/21
05/29/20
04/24/20
06/28/19
0
0
2,899
0
0
0
16,900
21,800
153
10
0
0
38,863
0
02/03/20
04/15/20
06/17/20
11/02/20
11/01/23
Near Blythe, from Rice Road/SR-177 to Teed Ditch Bridge. Cold plane mainline pavement and overlay with Portland Cement Concrete (PCC). The shoulders and ramps will be milled and overlaid with Hot Mix Asphalt (HMA-A). A two lane temporary detour will be constructed in the median for traffic handling.
Baseline
2,899 330,871
16,900
21,800
0
0
10
153
38,863
RIV10
3008Y08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
369 Riv 10 Blythe Pavement Rehab: mainline, shoulders, ramps
9,280
12,122
102
5,047
20,255
168,000
01/10/23
05/27/22
04/22/22
08/28/20
0
0
2,595
0
0
0
9,000
21,000
117
10
0
0
30,127
0
07/01/20
01/14/22
02/01/22
05/03/22
05/01/25
In and near Blythe, from Teed Ditch Bridge to Arizona State line. Cold plane mainline pavement and overlay with Portland Cement Concrete (PCC). The shoulders and ramps will be milled and overlaid with Hot Mix Asphalt (HMA-A). A two lane temporary detour will be constructed in the median for traffic handling.
Baseline
2,595 214,806
9,000
21,000
0
0
10
117
30,127
RIV10
3009K08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
370 SBD 10 Redlands Rehab
0
2,764
17
10
4,055
29,869
460
11
0
2,764
0
576
0
2,910
18
10
4,850
29,869
37,657
29,869
09/13/11
01/24/18
05/03/18
11/30/18
09/01/20
In Yucaipa, from 0.2 mile west of Live Oak Canyon Road to County Line Road. Rehabilitate roadway.
Baseline
3,811 36,715
0
2,910
4,850
29,869
10
18
37,657
SBD10
0163C08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
371 SBd 10 Santa Ana River Br Seismic Retrofit
824
2,635
103
1,133
2,909
15,675
53
79
824
2,635
215
0
1,025
3,300
160
1,133
2,910
15,675
24,203
15,674
12/01/15
06/27/18
06/29/18
03/04/19
07/02/20
In Colton, at Santa Ana River (Bridge No. 54-0292L/Rand 54-0292G). Seismic retrofit.
Baseline
3,806 23,279
1,025
3,300
2,910
15,675
1,133
160
24,203
SBD10
0133N08
Page 53 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
372 SBD 142 Chino Hills CAPM
398
795
282
30
1,424
6,195
86
277
398
795
0
0
416
827
283
20
1,500
6,195
9,241
6,194
08/12/16
04/19/18
06/01/18
12/10/18
03/02/20
In Chino Hills, from Orange County Line to Route 71. Pavement rehabilitation.
Baseline
1,556 9,124
416
827
1,500
6,195
20
283
9,241
SBD142
0241C08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
373 SBD 2 UPGRADE BR RAILING @ SHEEP CREEK
494
1,324
29
10
1,807
3,247
156
22
494
1,324
15
1
324
1,353
36
12
1,813
3,247
6,785
3,247
02/09/16
08/31/17
02/15/18
10/22/18
11/02/21
Near Wrightwood, at Sheep Creek Bridge No. 54-0360. Upgrade bridge railing.
Baseline
2,012 6,911
324
1,353
1,813
3,247
12
36
6,785
SBD2
0127J08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
374 SBD 330 CITY CREEK REPLACE BRIDGE RAIL
963
924
29
30
1,065
3,247
112
29
963
924
5
0
967
925
34
30
773
3,247
5,976
3,246
06/15/17
02/20/18
06/04/18
12/17/18
02/03/20
Near Highland, at City Creek Bridge No. 54-365, and at East Fork City Creek Bridge No. 54-345. Replace bridge rail and approach rail.
Baseline
2,033 6,258
967
925
773
3,247
30
34
5,976
SBD330
0256C08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
375 SBd 60 - REPLACE PIPELINE, MONTE VISTA AND BENSON BRIDGES
2,124
3,306
961
5,266
4,916
22,644
0
678
2,124
3,254
77
0
2,243
3,320
1,030
3,912
4,742
20,399
35,646
0
02/17/17
05/21/18
06/22/18
04/22/19
09/01/21
In Chino, at Pipeline Avenue Overcrossing (OC) No. 54-0744, Monte Vista Avenue OC No. 54-0746, and Benson Avenue OC No. 54-0748. Replace bridges.
Baseline
6,133 39,217
2,243
3,320
4,742
20,399
3,912
1,030
35,646
SBD60
0033E08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
376 SBD 18 CULVERTS 1,123
1,380
1,876
700
1,301
3,770
07/15/22
01/18/22
12/01/21
07/05/20
0
0
261
0
0
0
1,192
1,493
2,708
700
1,417
4,107
11,617
0
06/01/20
12/01/21
01/18/22
07/15/22
09/01/23
Near Big Bear and Lucerne Valley, at various locations, from Route 38 at Big Bear Lake Dam to Artic Canyon Wash. Reline or replace culverts.
Baseline
261 10,150
1,192
1,493
1,417
4,107
700
2,708
11,617
SBD18
0181J08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
377 SBD 18 RELINE OR REPLACE CULVERTS
948
1,005
914
385
1,045
3,671
01/17/23
05/02/22
02/15/22
05/01/20
0
0
485
0
0
0
742
1,090
1,240
385
1,059
7,185
11,701
0
05/01/20
02/15/22
05/02/22
01/17/23
10/03/23
In and near Arrowhead, from 48th Street to Route 138. Repair, reline and replace culverts.
Baseline
485 7,968
742
1,090
1,059
7,185
385
1,240
11,701
SBD18
0184C08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
378 SBd 38 Replace Culverts
802
1,694
2,523
1,632
958
3,285
09/15/20
03/16/20
03/02/20
10/17/18
0
393
802
374
12
0
860
1,730
2,822
868
1,029
3,580
10,889
0
10/30/18
06/03/20
06/10/20
01/11/21
06/12/23
Near Big Bear Lake, from Zaca Road to Route 18. Replace culverts.
Baseline
1,581 10,894
860
1,730
1,029
3,580
868
2,822
10,889
SBD38
0205C08
Page 54 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
379 SBD 95 Roadway Rehabilitation
459
612
70
20
1,683
9,466
10/26/20
02/21/20
01/07/20
05/04/18
0
5
459
306
2
0
672
640
85
100
1,500
9,567
12,564
0
05/18/18
10/01/19
01/03/20
07/31/20
11/23/21
Near Needles, from Route 62 to south of Havasu Lake Road. Rehabilitate pavement.
Baseline
772 12,310
672
640
1,500
9,567
100
85
12,564
SBD95
3002V08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
380 SBD 15 REHAB (G-13)
1,175
4,332
165
162
15,848
137,054
10/29/20
02/03/20
11/04/19
05/17/18
0
65
1,175
1,796
1
0
1,190
5,300
210
10
0
0
6,710
009/19/18
05/17/18
11/04/19
02/03/20
10/29/20
05/10/23
In Hesperia and Victorville, from Oak Hill Road to south of Bear Valley Road. Rehabilitate roadway.(G13 Contingency)
Baseline
3,037 158,736
1,190
5,300
0
0
10
210
6,710
SBD15
3003U08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
381 SBD 95 Roadway Rehabilitation
725
665
71
20
956
7,423
10/26/20
02/21/20
01/07/20
05/04/18
0
5
725
331
1
0
738
650
95
100
690
4,389
6,662
0
05/18/18
11/07/19
12/03/19
07/01/20
11/29/21
Near Needles, from Goffs Road to Nevada State line. Rehabilitate pavement.
Baseline
1,062 9,860
738
650
690
4,389
100
95
6,662
SBD95
3003Y08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
382 SBD 62 Roadway Rehabilitation
816
826
54
10
2,288
9,570
10/26/20
02/21/20
01/07/20
05/04/18
0
5
816
269
0
0
855
1,050
87
100
2,660
11,314
16,066
0
06/12/18
10/01/19
01/03/20
07/31/20
10/25/21
Near Vidal, from 3.8 miles west of Route 95 to Arizona State line. Rehabilitate pavement and upgrade guardrail.
Baseline
1,090 13,564
855
1,050
2,660
11,314
100
87
16,066
SBD62
3004A08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
383 SBD 18/10/215 BRIDGE REHAB
323
755
99
62
516
2,639
04/29/22
10/15/21
09/17/21
03/06/20
0
0
107
0
0
0
320
780
100
62
690
2,639
4,591
0
04/01/20
07/02/21
09/02/21
06/01/22
08/30/23
In Victorville, at Mojave River Bridge No. 54-0307; also on Route 10, at Colton Overhead No. 54-0464R (PM R22.36); and Route 215 North/Route 10 East Connector Overhead No. 54-0482G (PM 3.72). Various repairs to three bridges.
Baseline
107 4,394
320
780
690
2,639
62
100
4,591
SBD18
3006C08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
384 SBD 18 PAVEMENT PRESERVATION
709
1,169
61
65
1,821
13,657
10/15/21
02/16/21
11/16/20
07/15/19
0
0
258
0
0
0
564
1,588
77
65
2,366
16,442
21,102
0
11/01/19
12/01/20
01/04/21
09/01/21
09/01/22
In and near Adelanto, from Route 395 Junction to Los Angeles County line. Cold plane pavement and place Hot Mix Asphalt (HMA) and Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
258 17,482
564
1,588
2,366
16,442
65
77
21,102
SBD18
3007M08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
385 SBD 215/259 INSTALL TMS FIELD ELEMENTS
388
899
42
10
1,871
9,205
02/01/21
06/01/20
05/01/20
02/01/19
0
0
388
6
0
0
436
968
42
10
1,930
9,238
12,624
0
02/28/19
03/01/20
04/02/20
12/02/20
08/26/21
In and near the city of San Bernardino, from Route 215/10 Connector to Route 215/15 Junction; also on Route 259, from Route 259/215 Separation to Route 259/210 Junction. Install wireless Vehicle Detection Stations (VDS), Changeable Message Signs (CMS), Closed Circuit Television (CCTV)and Fiber Optic elements.
Baseline
394 12,415
436
968
1,930
9,238
10
42
12,624
SBD215
3007S08
Page 55 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
386 SBD 40 BRIDGE SCOUR MITIGATION
1,621
1,373
45
30
2,255
9,652
11/02/22
03/15/22
02/22/22
09/14/20
0
0
379
0
0
0
1,393
1,903
55
30
2,538
9,652
15,571
0
10/01/20
03/01/22
04/01/22
11/02/22
11/02/23
Near Needles, at the Halfway Hills Wash Bridge No. 54-0799L/R. Retrofit bridge footings, replace and expand Rock Slope Protection (RSP) limits.
Baseline
379 14,976
1,393
1,903
2,538
9,652
30
55
15,571
SBD40
3008K08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
387 SBD 10 INSTALL TMS ELEMENTS
234
994
38
60
1,511
9,714
11/01/19
06/03/19
05/01/19
06/01/18
0
21
234
437
0
0
300
1,000
33
10
1,600
7,654
10,597
0
06/18/18
02/19/19
06/20/19
02/02/20
06/01/21
In and near Redlands, from Route 210/10 Junction to the Riverside County line. Install wireless Vehicle Detection Stations (VDS) pole, Changeable Message Signs (CMS), Closed Circuit Television (CCTV), Data Node Cabinet and Fiber Optic elements.
Baseline
692 12,551
300
1,000
1,600
7,654
10
33
10,597
SBD10
3009A08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
388 SBD 71 INSTALL, CCTV, CMS, VDS & FIBER OPTIC COMM SYS
414
1,227
101
73
1,577
10,438
01/05/21
05/01/20
01/06/20
12/03/18
0
0
414
145
0
0
561
1,515
113
99
1,657
11,167
15,112
0
12/14/18
01/06/20
05/01/20
01/19/21
10/18/22
Near Chino Hills, from the Los Angeles County line to the Riverside County line; also in Riverside County, from San Bernardino County line to Route 91 (PM R0.0 to PM R3.0). Replace and upgrade existing communication elements and install Closed Circuit Television Cameras (CCTV) for the Traffic Management System (TMS).
Baseline
559 13,830
561
1,515
1,657
11,167
99
113
15,112
SBD71
3009N08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
389 I-10 Express Lanes-San Antonio Ave to Route 15 (Contract 1)
0
0
0
0
0
0
08/13/18
02/01/24
11/01/21
03/01/22
07/06/17
0
0
0
0
221
0
400
30,325
0
47,811
17,900
716,366
812,802
003/14/19
07/07/17
01/16/18
01/16/18
09/07/18
07/07/23
From LA/SBd Co Ln to I-10/I-15 Interchange & in LA County from 0. 4 Mi W/o White Ave OC to LA/SBd Co Ln; Implement two express lanes in each direction for a total of four general purpose and two express lanes in each direction with auxiliary lanes, widening undercrossings, and reconstruction of ramps and lane transition
Baseline
221 0
0
0
0
238,515
0
0
238,515
SBD10
3009P08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
390 SBD/RIV EXPAND MULTI-MODAL FREIGHT MOVEMENT
2,006
2,679
250
1,234
5,888
53,740
01/05/22
03/10/21
02/12/21
12/11/19
0
0
948
0
3
0
5,822
0
0
35
0
0
5,857
0
10/08/19
07/02/21
07/12/21
03/25/22
03/12/24
In San Bernardino County, at the Etiwanda San Sevain FCC Br. No. 54-0454L, Colton Overhead No. 54-0464R; also on Route 60, at Ramona Avenue Overcrossing No. 54-0745 (PM R1.37). In Riverside County, on Route 10 at Highland Springs Avenue Undercrossing No. Improve freight corridor movement by modifying and replacing bridges to meet vertical clearance
Baseline
951 65,797
5,822
0
0
0
35
0
5,857
SBD10
3009R08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
391 SBD 60 Replace Lanes and Slabs - (G-13)
2,438
5,511
54
48
10,928
147,398
0
31
2,438
5,282
0
0
0
6,037
70
48
11,441
145,717
163,313
0
02/18/16
03/01/18
06/20/18
05/20/19
07/06/21
IN ONTARIO FR EUCLID AVE IC TO RIV CO LN & NEAR RIVERSIDE FROM SBD CO LN TO COUNTRY VILLAGE RD & FROM 0.7 MILES W/O VALLEY WAY TO JCT 60/91/215 IC. REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS REPLACEMENT OF TWO OUTSIDE LANES AND CONCRETE SLABS
Baseline
7,751 166,377
0
6,037
11,441
145,717
48
70
163,313
VAR0224N
08
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
392 South Lone Pine CAPM
107
133
167
0
529
6,240
33
0
107
133
0
0
142
490
220
0
890
6,240
7,982
6,240
10/02/17
11/03/17
06/13/18
11/30/18
11/27/19
In and near Lone Pine, from 1.2 miles south of Route 136 to East Inyo Street; also on Route 136 at the Route 395 intersection (PM 0.0/0.1). Pavement rehabilitation.
Baseline
273 7,176
142
490
890
6,240
0
220
7,982
INY395
0657
09
Page 56 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
393 Rosamond-Mojave Rehab
174
1,458
97
22
2,383
40,515
06/24/20
01/23/20
01/03/20
06/20/18
0
1
174
508
0
0
370
1,460
250
22
0
0
2,102
010/22/18
06/20/18
01/03/20
01/23/20
11/18/20
02/26/21
In and near Rosamond and Mojave, from 1.4 miles south of Dawn Road Overcrossing (OC) to 0.5 mile north of Silver Queen Road OC. Rehabilitate lanes and ramps by replacing slabs and grinding lane 1, construct Continuous Reinforced Concrete Pavement (CRCP) Replace guardrail, construct rumble strip, replace signs using retroreflective sheeting, and
Baseline
683 44,649
370
1,460
0
0
22
250
2,102
KER14
2633
09
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
394 MOUNTAIN COUNTIES BRIDGE RAILS
1,160
1,540
116
313
1,799
6,676
09/08/20
04/17/20
02/10/20
07/02/18
0
0
1,160
0
2
0
1,410
1,737
115
313
1,484
5,451
10,510
0
01/15/19
05/01/20
05/15/20
12/01/20
08/29/23
Near Markleeville, on Routes 4, 88, and 89 at various locations. Bridge rail upgrade on four bridges.
Baseline
1,162 11,604
1,410
1,737
1,484
5,451
313
115
10,510
ALP88
3134
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
395 ALP/AMA/TUO CULVERT REHAB
955
1,286
293
550
1,128
2,390
09/01/20
01/15/20
12/01/19
07/02/18
0
24
955
265
3
0
1,310
1,043
317
269
1,180
4,290
8,409
0
08/30/18
05/20/20
05/22/20
12/21/20
09/01/22
In Alpine County on Routes 4, 88 and 207; also in Amador County on Routes 16 and 49; also in Tuolumne County on Route 108; at various locations. Rehabilitate culverts.
Baseline
1,247 6,602
1,310
1,043
1,180
4,290
269
317
8,409
ALP88
3138
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
396 ALPINE CULVERT REHAB
1,150
1,144
479
384
1,205
3,319
09/01/20
01/02/20
10/13/19
07/02/18
0
7
1,150
171
7
0
1,370
1,176
359
384
1,203
3,319
7,811
0
08/30/18
04/01/20
04/01/20
10/01/20
09/01/23
In Alpine County on Routes 4, 88, and 89 at various locations. Rehabilitate culverts.
Baseline
1,335 7,681
1,370
1,176
1,203
3,319
384
359
7,811
ALP4
3142
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
397 TUOLUMNE DRAINAGE RESTORATION
454
740
16
54
614
2,583
08/15/19
01/02/19
12/01/18
03/01/18
0
12
454
262
33
0
475
778
65
55
616
2,640
4,629
0
03/14/18
02/28/19
04/01/19
10/15/19
12/01/20
In Amador County, on Route 88 and in Tuolumne County on Routes 120,108 and 49, at various locations. Rehabilitate culverts.
Baseline
761 4,461
475
778
616
2,640
55
65
4,629
AMA88
3119
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
398 Mokelumne River Bridge Upgrade
1,566
1,828
115
185
1,710
3,166
12/27/22
05/02/22
04/28/22
06/30/20
0
0
159
0
0
0
1,590
2,010
135
185
2,055
3,914
9,889
0
07/02/20
04/28/22
05/02/22
12/27/22
03/30/24
Near Jackson, at Mokelumne River Bridge No. 26-0012. Upgrade bridge rails and widen shoulders.
Baseline
159 8,570
1,590
2,010
2,055
3,914
185
135
9,889
AMA49
3219
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
399 Upgrade bridge rails of three bridges
1,052
1,629
58
112
1,704
2,843
01/03/22
08/02/21
05/03/21
08/03/20
0
0
214
0
0
0
1,033
1,604
60
8
1,540
4,536
8,781
0
08/03/20
05/03/21
08/02/21
01/03/22
01/02/24
Near West Point, at South Fork Mokelumne River Bridge No. 30-0022 (PM 30.0), and at North Fork Mokelumne River Bridge No. 30-0049 (PM 38.3); also on Route 4 in Angels Camp, at Angels Creek Bridge No. 30-0008 (PM R21.4). Upgrade bridge railing at three structures, also seismic retrofit at one location.
Baseline
214 7,398
1,033
1,604
1,540
4,536
8
60
8,781
CAL26
3247
10
Page 57 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
400 Bridge Replacement 838
1,319
97
294
1,017
1,707
02/28/22
08/11/21
02/04/21
08/06/19
0
0
441
0
0
0
865
1,392
103
278
1,241
2,000
5,879
0
08/06/19
07/01/21
08/11/21
02/28/22
01/06/23
Near Angels Camp, at West Branch Cherokee Creek Bridge No. 30-0036. Replace bridge.
Baseline
441 5,272
865
1,392
1,241
2,000
278
103
5,879
CAL4
3255
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
401 DWR BRIDGE SEISMIC RETROFIT
1,392
1,321
12
4
2,497
2,377
177
10
1,392
1,321
3
0
1,224
3,928
50
34
2,650
2,762
10,648
2,377
11/02/15
04/30/18
06/06/18
11/30/18
12/30/20
In Merced and Stanislaus counties at various bridge locations. Bridge seismic retrofit.
Baseline
2,903 7,603
1,224
3,928
2,650
2,762
34
50
10,648
MER0338
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
402 SR99 MERCED REHAB
2,178
3,737
165
43
10,396
45,344
12/14/20
05/15/20
05/01/20
06/27/18
0
6
2,178
610
1
0
2,510
3,700
122
95
0
0
6,427
011/02/18
06/27/18
05/01/20
05/15/20
12/14/20
12/30/22
In and near the city of Merced, from south of Childs Avenue to south of Franklin Road. Roadway rehabilitation.(G13 Contingency)
Baseline
2,795 61,863
2,510
3,700
0
0
95
122
6,427
MER99
3089
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
403 D10 BRIDGE SUBSTRUCTURE REPAIRS
953
912
534
206
1,155
2,094
07/23/21
12/18/20
12/01/20
07/02/18
0
16
953
15
2
0
1,025
950
542
206
1,200
3,200
7,123
0
08/22/18
12/01/20
12/18/20
07/23/21
11/01/22
In Merced, San Joaquin, Mariposa and Stanislaus Counties, on various routes at various locations. Scour mitigation and preventative structural maintenance measures at thirteen bridges.
Baseline
986 5,854
1,025
950
1,200
3,200
206
542
7,123
MER5
3102
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
404 DRAINAGE RESTORATION
760
504
100
112
684
1,589
01/03/20
05/01/19
04/01/19
06/04/18
0
29
760
287
22
0
840
743
124
151
765
1,768
4,391
0
05/11/18
04/01/19
05/01/19
01/03/20
09/03/20
In Merced County on Routes 152, 59, and 99 and in San Joaquin County on Routes 5 and 12, at various locations. Rehabilitate culverts.
Baseline
1,098 3,749
840
743
765
1,768
151
124
4,391
MER152
3139
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
405 Midpines CAPM 166
591
2
0
303
2,853
252
0
166
591
0
2,754
208
611
2
13
375
2,853
4,062
2,852
03/15/16
10/05/17
12/05/17
06/07/18
10/24/18
Near Mariposa, from the north Junction of Route 140 and 49 to Whitlock Road. Rehabilitate pavement.
Baseline
3,763 3,915
208
611
375
2,853
13
2
4,062
MPA140
4736
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
406 Culvert Rehabilitation near Fish Camp in Mariposa County
639
843
56
12
951
1,893
07/01/19
12/04/18
12/03/18
10/27/17
0
8
639
644
32
0
650
929
84
80
905
1,949
4,597
0
10/27/17
12/14/18
01/17/19
05/30/19
07/01/20
Near Fish Camp, from south of Miami Mountain Road to south of Yosemite National Park boundary; also in Madera County (PM D0.639/D1.841). Rehabilitate culverts.
Baseline
1,323 4,394
650
929
905
1,949
80
84
4,597
MPA41
3158
10
Page 58 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
407 MPA Route 140 Pavement Preservation
1,093
2,179
34
163
2,507
21,554
04/15/22
10/01/21
09/01/21
05/01/20
0
0
241
0
0
0
982
1,900
30
162
2,330
23,765
29,169
0
06/01/20
10/01/21
11/01/21
05/16/22
05/15/24
Near the Mariposa community and El Portal, from East Whitlock Road to Yosemite National Park entrance. Pavement rehabilitation.
Baseline
241 27,530
982
1,900
2,330
23,765
162
30
29,169
MPA140
3167
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
408 Mariposa SR 49 CAPM
380
1,111
7
7
1,248
16,293
09/27/20
03/16/20
02/11/20
12/20/18
0
0
380
21
0
0
403
1,032
9
7
2,150
16,197
19,798
001/02/19
12/20/18
02/11/20
04/27/20
09/28/20
12/06/21
Near the community of Mariposa, from Madera County line to the south junction with Route 140. Pavement rehabilitation.
Baseline
401 19,046
403
1,032
2,150
16,197
7
9
19,798
MPA49
3233
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
409 SR140 MARIPOSA CAPM
1,035
1,066
406
1,718
1,551
18,850
12/01/22
06/01/22
05/01/22
02/01/20
0
0
329
0
0
0
1,025
1,095
416
1,989
1,689
17,363
23,577
0
04/01/20
05/01/22
06/01/22
12/01/22
06/01/24
In and near the Mariposa community, from 1.7 miles east of Catheys Valley Park to the north Route 49 Junction. Rehabilitate pavement and upgrade Americans with Disabilities Act (ADA) ramps.
Baseline
329 24,626
1,025
1,095
1,689
17,363
1,989
416
23,577
MPA140
3252
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
410 RIPON BRIDGE REHAB
1,713
2,443
117
436
2,552
9,062
194
92
1,713
2,443
117
28
2,574
3,031
180
480
3,500
9,062
18,827
9,062
09/06/16
06/05/18
06/15/18
12/17/18
12/01/20
In Ripon, at the Stanislaus River Bridge No. 29-0013L; also in Stanislaus County (PM R24.3/R24.750). Rehabilitate Bridge.
Baseline
4,587 16,323
2,574
3,031
3,500
9,062
480
180
18,827
SJ99
0321
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
411 CLEMENTS CAPM 175
764
8
4
610
7,177
384
1
175
764
2
4,821
100
891
10
10
488
7,177
8,676
7,177
09/28/16
09/27/17
03/09/18
09/20/18
07/10/19
Near Lockeford, from east of Disch Road to the Amador County line. Rehabilitate pavement.
Baseline
6,147 8,738
100
891
488
7,177
10
10
8,676
SJ88
0165
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
412 Mathews Road UC 302
341
2
10
900
1,661
379
1
302
341
0
475
0
300
5
10
700
1,661
2,676
1,661
01/09/18
03/15/18
04/23/18
11/08/18
10/31/19
Near Lathrop, at Mathews Road Undercrossing 29-0218L. Improve to standard truck capacity.
Baseline
1,498 3,216
0
300
700
1,661
10
5
2,676
SJ5
3235
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
413 Mathews Road UC 302
341
2
10
900
1,661
379
1
302
341
0
475
0
300
5
10
700
1,661
2,676
1,661
01/09/18
03/15/18
04/23/18
11/08/18
10/31/19
Near Lathrop, at Mathews Road Undercrossing 29-0218L. Improve to standard truck capacity.
Baseline
1,498 3,216
0
300
700
1,661
10
5
2,676
SJ5
3235
10
Page 59 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
414 SJ BRIDGE MAINTENANCE
661
1,440
142
322
1,321
5,579
10/21/20
05/04/20
04/03/20
08/15/18
0
15
661
161
2
0
748
1,414
65
2,000
1,319
4,079
9,625
0
08/22/18
04/03/20
05/04/20
10/21/20
04/21/22
Near Discovery Bay, at Old River Bridge No. 29-0045. Upgrade mechanical and electrical equipment on movable bridge.
Baseline
839 9,465
748
1,414
1,319
4,079
2,000
65
9,625
SJ4
3113
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
415 SJ CULVERTS 475
806
200
43
615
1,380
12/01/20
06/22/20
05/22/20
09/04/18
0
3
475
48
2
0
1,003
788
200
71
597
3,178
5,837
0
10/03/18
05/22/20
06/22/20
12/01/20
12/01/21
In San Joaquin County, on Routes 4, 5, and 99 at various locations. Rehabilitate culverts.
Baseline
528 3,519
1,003
788
597
3,178
71
200
5,837
SJ5
3140
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
416 SJ/ALP 88 DRAINAGE SYSTEM
685
1,001
257
1,304
859
3,160
07/21/21
12/20/20
12/05/20
12/03/18
0
1
685
3
2
0
795
900
290
335
875
3,756
6,951
0
12/14/18
12/24/20
01/09/21
07/21/21
03/07/22
Near Lockeford, from 0.1 mile nouth of East Jack Tone Road to 0.1 mile south of north Tully Road intersection; also near Kirkwood, in Alpine County (PM 0.2/2.6). Replace culverts.
Baseline
691 7,266
795
900
875
3,756
335
290
6,951
SJ88
3141
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
417 SR205 SMART CORRIDOR - PHASE 2
1,560
3,599
1,176
3,018
5,648
31,194
07/23/21
01/01/21
12/17/20
09/11/18
0
41
1,560
193
12
0
1,649
3,500
979
4,830
5,600
26,632
43,190
011/14/18
09/11/18
05/12/21
05/26/21
03/02/22
12/20/23
In Tracy, from Byron Road Undercrossing to Paradise Road Overcrossing. Install ramp meters and other Transportation Management System (TMS) elements.
Baseline
1,806 46,195
1,649
3,500
5,600
26,632
4,830
979
43,190
SJ205
3146
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
418 SJ SR 4 Pavement Resurfacing and Restoration
787
2,508
0
0
4,979
29,571
07/11/20
11/10/19
10/10/19
05/09/18
0
0
787
765
0
0
792
2,478
19
48
4,979
35,157
43,473
011/06/18
05/09/18
10/10/19
11/10/19
07/11/20
01/05/21
In Stockton, from 0.2 mile east of Fresno Avenue to Center Street; also on Route 5 from Taylor Street Overhead to Stockton Channel Viaduct (PM 25.8/26.5). Roadway rehabilitation.
Baseline
1,552 37,845
792
2,478
4,979
35,157
48
19
43,473
SJ4
3165
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
419 SJ Route 26 Increase Bridge Vertical Clearance
676
1,689
0
7
2,962
6,112
07/01/21
01/15/21
12/15/20
05/01/19
0
0
509
0
0
0
598
1,827
13
7
3,221
6,112
11,778
0
05/01/19
12/15/20
01/15/21
07/01/21
12/29/23
Near Stockton, at Route 26/99 Separation No. 29-0142 (PM 1.11). Establish standard vertical clearance.
Baseline
509 11,446
598
1,827
3,221
6,112
7
13
11,778
SJ26
3169
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
420 SJ SR 5 Bridge Deck Rehabilitation
224
848
7
0
1,556
3,039
07/13/20
01/03/20
09/20/19
07/13/18
0
0
224
88
0
0
335
1,030
10
5
1,950
4,766
8,096
0
06/21/18
01/07/20
02/06/20
09/12/20
06/12/21
In Stockton, at the Stockton Channel Viaduct No. 29-0176L/R. Bridge deck rehabilitation at spot locations.
Baseline
312 5,674
335
1,030
1,950
4,766
5
10
8,096
SJ5
3193
10
Page 60 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
421 SJ SR 4 Reconstruction of Hinge 32
300
894
23
115
770
2,542
11/29/19
03/15/19
03/01/19
11/15/17
0
4
300
525
1
0
648
848
37
115
631
3,428
5,707
0
12/27/17
05/20/19
06/20/19
01/20/20
01/20/21
In Stockton, at Crosstown Freeway Viaduct No. 29-0269. Reconstruct hinge 32 (left and right) and three ramp joint seals.
Baseline
830 4,644
648
848
631
3,428
115
37
5,707
SJ4
3198
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
422 SJ Route 99 Bridge Girder Replacement
72
813
7
2
493
1,170
11/22/18
07/05/18
06/05/18
07/13/17
0
1
72
463
2
0
172
817
7
4
493
1,731
3,224
0
11/16/17
06/01/18
01/15/19
07/02/19
06/20/20
Near Stockton, at Wilson Way Overcrossing No. 29-0118C. Remove existing damaged girder and build new overhang and barrier, resulting in reduced bridge width and increased vertical clearance.
Baseline
538 2,557
172
817
493
1,731
4
7
3,224
SJ99
3206
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
423 D 10 TMS Repair 523
1,180
97
0
1,062
2,065
07/06/21
01/05/21
11/05/20
04/26/19
0
0
312
0
0
0
632
1,191
107
33
1,243
2,065
5,271
0
04/26/19
11/05/20
01/05/21
07/06/21
07/06/22
In San Joaquin, Amador, Calaveras, Merced, Mariposa, Stanislaus, and Tuolumne Counties, on Routes 4, 5, 26, 33, 49, 59, 88, 99, 104, 108, 120, 132, 140, 152 and 205 at various locations. Repair or replace damaged and nonfunctioning Traffic Management System (TMS) elements.
Baseline
312 4,927
632
1,191
1,243
2,065
33
107
5,271
SJ120
3226
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
424 D 10 MVDS replacement and upgrade
929
1,586
428
9
1,994
6,862
09/15/20
03/16/20
02/14/20
04/01/19
0
0
672
0
0
0
1,202
1,719
465
7
1,310
6,862
11,565
0
04/01/19
02/14/20
03/16/20
09/15/20
03/14/22
In San Joaquin, Merced, and Stanislaus Counties, on Routes 5, 12, 59, 99, and 152 at various locations. Upgrade or replace inefficient and damaged Traffic Monitoring Station (TMS) elements.
Baseline
672 11,808
1,202
1,719
1,310
6,862
7
465
11,565
SJ99
3227
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
425 SJ DRAINAGE PUMP PLANT UPGRADE
480
1,402
60
260
1,109
4,634
07/05/22
01/13/22
12/13/21
09/09/19
0
0
148
0
0
0
439
1,530
59
260
1,289
5,169
8,746
0
11/22/19
02/14/22
03/04/22
07/05/22
11/06/23
In and near Stockton and Lodi, at various locations from Eastside Underpass to Acampo Road; also on Route 4 at the Route 4/5 Separation (PM R16.10) and on Route 120 in Lathrop at Mossdale Underpass (PM R0.5). Upgrade drainage pump plants.
Baseline
148 7,945
439
1,530
1,289
5,169
260
59
8,746
SJ99
3229
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
426 SR 120 TMC Upgrade
255
1,147
2
58
1,375
7,210
09/13/21
01/29/21
12/03/20
08/17/18
0
0
255
145
0
0
373
1,221
5
68
1,121
3,550
6,338
0
09/21/18
12/03/20
01/29/21
09/13/21
03/14/22
In and near Manteca and Lathrop, from Route 5 to Route 99; also on Route 5 at PM R13.34 and on Route 99 at PM 4.56. Install Intelligent Transportation System (ITS) field elements.
Baseline
400 10,047
373
1,221
1,121
3,550
68
5
6,338
SJ120
3230
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
427 SJ Changeable Message Signs
811
2,272
268
324
1,633
10,372
07/14/22
12/22/21
11/23/21
08/28/18
0
14
811
232
2
0
820
2,550
380
80
1,805
10,373
16,008
0
09/13/18
11/23/21
12/22/21
07/14/22
12/29/23
In and near Stockton, on Route 5 at various locations; also on Route 4 (PM 14.6/26.0) and Route 99 (PM 15.8/18.5) at various locations. Install Transportation Management System (TMS) elements.
Baseline
1,059 15,680
820
2,550
1,805
10,373
80
380
16,008
SJ5
3250
10
Page 61 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
428 Potato Slough Bridge Bearing Pads
659
833
2
925
1,126
2,927
12/15/21
05/20/21
02/17/21
07/20/20
0
0
244
0
0
0
553
905
2
925
1,232
3,028
6,645
0
07/20/20
02/17/21
05/20/21
12/15/21
12/30/22
Near Terminous, at Little Potato Slough Bridge No. 29-0101. Replace joint seals and bearing pads using temporary pile supports.
Baseline
244 6,472
553
905
1,232
3,028
925
2
6,645
SJ12
3273
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
429 SR-4 Ramp Metering System Installation
1,667
5,156
278
1,269
3,800
37,521
12/01/22
04/15/22
03/15/22
09/15/19
0
0
300
0
0
0
2,177
0
0
0
0
0
2,177
0
03/02/20
11/17/22
01/05/23
08/17/23
09/15/25
In Stockton, from Route 5 to Route 99. Install ramp meters, traffic monitoring systems, Closed Circuit Television (CCTV), and synchronize intersection signals with ramp metering.(Long Lead Project)
Baseline
300 49,691
2,177
0
0
0
0
0
2,177
SJ4
3274
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
430 DEUEL OVERHEAD UC
493
998
80
299
1,231
3,396
08/26/20
02/28/20
01/30/20
12/30/17
0
11
493
378
0
0
498
925
70
440
1,700
7,700
11,333
0
01/09/18
01/30/20
02/28/20
09/25/20
12/30/21
In and near Lathrop, at Deuel Overhead No. 29-0262R/L. Improve to standard truck capacity.
Baseline
882 6,497
498
925
1,700
7,700
440
70
11,333
SJ5
3235B10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
431 SR99 STANISLAUS CAPM RAMPS
754
1,621
37
8
4,419
21,081
138
2
754
1,621
0
3
1,224
2,350
50
3
4,546
24,291
32,464
21,081
11/17/16
03/28/18
05/08/18
12/21/18
07/01/20
Near Turlock and Modesto, from the Merced County line to the San Joaquin County line. Rehabilitate pavement.
Baseline
2,518 27,920
1,224
2,350
4,546
24,291
3
50
32,464
STA99
3088
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
432 STA SR 99 Replace Bridge Deck AC Overlay
263
761
10
0
1,173
6,097
239
1
263
761
0
491
310
845
10
30
1,230
6,096
8,521
6,096
06/26/17
01/08/18
05/04/18
10/22/18
05/25/20
In and near Modesto, from north of Hatch Road to south of Tuolumne Boulevard at Tuolumne River Bridge No. 38-0078L/R, South Modesto Undercrossing No. 38-0082L/R, and South Modesto Overhead No. 38-0076L/R. Replace bridge approach slabs and joint seals at six bridges, and repair bridge deck at one location.
Baseline
1,755 8,304
310
845
1,230
6,096
30
10
8,521
STA99
3192
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
433 Replace Drainage Pumps
325
1,075
93
13
1,754
6,440
03/26/21
09/09/20
08/10/20
06/29/19
0
0
77
0
0
0
330
1,142
93
13
1,991
6,440
10,009
0
06/26/19
08/10/20
09/09/20
03/26/21
02/09/22
In and near Ceres and Modesto, at various locations from Mitchell Road to Kansas Avenue; also in Merced County, on Route 59 near the city of Merced, at Childs Avenue (PM 14.0). Upgrade drainage pump plants.
Baseline
77 9,700
330
1,142
1,991
6,440
13
93
10,009
STA99
3251
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
434 TTI SYSTEM UPGRADE
203
371
4
0
341
1,411
08/17/20
04/07/20
01/28/20
07/01/19
0
0
107
0
0
0
163
377
4
6
401
1,619
2,570
0
12/30/19
12/15/20
02/15/21
09/10/21
12/16/22
In San Joaquin, Merced, Stanislaus, and Sacramento Counties, at various routes and locations. Upgrade Travel Time Information System.
Baseline
107 2,330
163
377
401
1,619
6
4
2,570
STA99
3286
10
Page 62 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
435 WEST LONG BARN CAPM
0
429
0
0
202
1,432
100
0
0
429
0
1,140
0
434
11
0
333
1,432
2,210
1,431
08/14/13
12/08/16
10/12/17
05/16/18
08/28/18
Near Long Barn, from Lyons Dam Road to 0.4 mile east of Long Barn Connection. Rehabilitate pavement.
Baseline
1,669 2,063
0
434
333
1,432
0
11
2,210
TUO108
0126
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
436 Long Barn CAPM 765
1,134
7
8
1,906
18,100
07/15/21
01/01/21
12/01/20
10/01/19
0
0
352
0
0
0
687
1,152
8
88
2,092
17,970
21,997
0
10/01/19
12/01/20
01/02/21
07/15/21
10/01/23
Near Long Barn, from 0.1 mile east of the east junction of Long Barn Road to 2.3 miles east of Cow Creek Road. Pavement rehabilitation.
Baseline
352 21,920
687
1,152
2,092
17,970
88
8
21,997
TUO108
0157
10
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
437 CULVERT REPLACEMENT
163
449
0
0
190
416
03/06/20
07/08/19
06/04/19
07/05/18
0
0
163
220
0
0
190
371
0
0
190
417
1,168
0
06/29/18
02/08/19
04/19/19
09/12/19
01/31/20
In Imperial County, from Mets Road to Blodgott Road. Culvert replacement.
Baseline
383 1,218
190
371
190
417
0
0
1,168
IMP115
0602
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
438 Intelligent Transportation System Technology (Advanced Technology Corridors at Border Ports of
466
4,006
1
0
4,826
26,683
08/14/20
02/15/20
01/31/20
11/16/18
0
0
466
286
0
0
1,635
5,759
62
375
5,938
27,945
41,714
007/05/18
10/15/18
05/17/20
05/30/20
11/02/20
09/07/22
In San Diego County and Imperial County on various routes at various locations. Install Intelligent Technology Statewide Border Wait Time, implement a fiber optic cable network to facilitate an advanced traveler information and border wait time system connecting the entire San Diego and Imperial border network.
Baseline
752 35,982
818
4,038
1,534
8,118
0
0
14,508
IMP1241
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
439 IMP BRIDGE STRUCTURE REHAB
239
902
0
0
2,031
0
0
0
16
0
0
0
200
800
0
0
1,700
12,300
15,000
0
03/03/20
08/13/21
11/30/21
03/17/22
10/19/23
In Imperial County, on Routes 8 and 78 at various locations. Rehabilitation of six bridges, including painting, deck and column work.
Baseline
16 3,172
200
800
1,700
12,300
0
0
15,000
IMP8
1329
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
440 11-IMP-008-BRIDGE PRESERVATION
193
506
0
0
479
4,163
0
0
3
0
0
0
193
506
0
0
479
4,163
5,341
0
07/05/19
12/28/20
02/26/21
06/22/21
12/14/21
Near Winterhaven, at Colorado River Viaduct Bridge No. 58-0312L/R. Patch spalls, polyester deck overlay, hinge bearing replacement, and joint replacement to preserve the structural integrity of two bridges.
Baseline
3 5,341
193
506
479
4,163
0
0
5,341
IMP8
1336
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
441 I-5 North Coast Corridor HOV Extension - Phase 1 - Encinitas HOV
0
0
0
0
36,571
256,038
10/31/18
06/30/18
06/30/18
08/30/14
1,141
0
0
0
0
24,486
0
0
0
0
44,670
256,059
300,729
256,03810/19/18
11/16/18
09/01/22
IN SAN DIEGO COUNTY IN ENCINITAS AND CARLSBAD FROM SAN ELIJO LAGOON BRIDGE TO 0.3 MILE NORTH OF PALOMAR AIRPORT ROAD OVERCROSSING. CONSTRUCT HOV LANES, ITS ELEMENTS, CULVERT REHABILITATION, SOUNDWALLS, AND NC BIKE TRAIL. In the cities of Encinitas and Carlsbad from Manchester Avenue
Baseline
25,627 292,609
0
0
37,670
191,981
0
0
229,651
SD5
0615F11
Page 63 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
442 I-805 SWEETWATER RIVER BRIDGE UPGRADE
41
1,844
0
15
4,712
20,186
01/24/19
06/29/18
02/28/18
08/31/17
163
0
41
1,844
0
0
42
2,028
15
0
5,023
20,186
27,294
20,18608/21/18
08/31/17
02/28/18
06/29/18
01/09/19
03/07/23
In and near Chula Vista, from 0.2 mile south of Sweetwater River Bridge No. 57-0638R/L to Route 54. Upgrade bridge rails, widen bridges to make standard, and repair approach slabs, joint seals, gore pavement, and shoulders.
Baseline
2,048 26,798
0
0
5,023
20,186
0
0
25,209
SD805
1280
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
443 52 PAVEMENT REHAB
0
1,480
0
0
2,075
13,311
281
0
0
1,480
0
287
0
1,558
0
0
2,086
13,311
16,955
13,311
06/19/15
05/16/18
06/20/18
11/08/18
05/29/20
In the city of San Diego, on Routes 52, 15, 163, and 805 at various locations. Pavement rehabilitation.
Baseline
2,048 16,866
0
1,558
2,086
13,311
0
0
16,955
SD52
1176
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
444 805 - PAVEMENT REHAB
0
1,316
0
0
1,472
6,564
394
0
0
1,316
0
110
0
1,357
0
90
1,510
6,564
9,521
6,563
06/19/15
03/06/18
03/29/18
08/31/18
04/30/20
In the city of San Diego, from Mira Mesa Boulevard Undercrossing to 0.4 mile north of Route 5/805 separation. Pavement rehabilitation.
Baseline
1,820 9,352
0
1,357
1,510
6,564
90
0
9,521
SD805
1175
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
445 DVMS PANELS 381
968
0
0
800
3,450
01/23/19
05/25/18
02/22/18
03/24/17
78
0
381
968
0
0
389
993
0
0
825
3,450
5,657
3,450
03/24/17
03/06/18
06/18/18
11/30/18
07/10/20
In San Diego County, on various routes at various locations. Replace Changeable Message Signs (CMS) panels with Advanced Variable Message Signs (AVMS) panels.
Baseline
1,427 5,599
389
993
825
3,450
0
0
5,657
SD1174
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
446 CULVERT REHABILITATION
811
967
403
80
507
2,646
10/18/19
06/03/19
05/22/19
07/20/18
0
148
811
34
12
0
856
988
418
483
718
2,646
6,109
0
11/15/18
11/08/19
11/15/19
06/04/20
11/04/20
Near Ballena, from 3.4 miles east of Route 67 to 4.3 miles west of Route 79. Culvert rehabilitation.
Baseline
1,005 5,414
856
988
718
2,646
483
418
6,109
SD78
1134
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
447 SR-78 PAVEMENT REHABILITATION
1,303
4,116
1,091
1,399
1,739
17,731
02/25/21
03/30/20
03/18/20
12/07/18
0
0
1,303
100
4
0
1,408
3,153
1,117
4
3,001
19,252
27,935
012/19/18
12/07/18
03/18/20
04/02/20
02/01/21
04/28/22
In and near Escondido, from west of North Broadway to Teepee Drive. Pavement rehabilitation.
Baseline
1,407 27,379
1,408
3,153
3,001
19,252
4
1,117
27,935
SD78
1162
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
448 TMS ELEMENT IN-HOUSE FIBER OPTIC
0
898
0
0
888
4,401
09/04/20
12/12/19
10/14/19
06/19/15
0
0
0
483
0
0
0
685
0
0
886
4,401
5,972
0
06/19/15
06/14/19
07/15/19
02/18/20
11/30/20
In San Diego County, on various routes at various locations. Replace Changeable Message Signs (CMS) panels with Advanced Variable Message Signs (AVMS) panels.
Baseline
483 6,187
0
685
886
4,401
0
0
5,972
SD1171
11
Page 64 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
449 SR-94 PAVEMENT REHAB
565
1,265
0
0
1,398
12,811
06/16/20
11/26/19
10/28/19
01/19/18
0
0
565
363
0
0
577
1,252
10
0
1,537
12,811
16,187
0
01/12/18
10/25/19
12/13/19
05/29/20
02/11/21
In the city of San Diego, from Spring Street to Route 54. Pavement rehabilitation.
Baseline
928 16,039
577
1,252
1,537
12,811
0
10
16,187
SD94
1177
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
450 SR 54 PAVEMENT PRESERVATION
644
1,911
21
297
1,993
21,330
05/05/22
10/20/21
08/27/21
02/03/20
0
0
74
0
0
0
709
2,260
24
297
2,513
21,329
27,132
0
02/07/20
08/31/21
10/22/21
05/20/22
12/04/23
In and near National City and Chula Vista, from Route 54/5 Separation to the Route 54/125 Junction. Rehabilitate flexible and rigid pavement on the traveled way, shoulders, ramps and connectors, upgrade guard rail and dike.
Baseline
74 26,196
709
2,260
2,513
21,329
297
24
27,132
SD54
1188
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
451 SD-008-L0.7/R23.0 - DRAINAGE SYSTEM RESTORATION
961
1,537
0
116
1,764
8,618
10/08/20
03/30/20
02/04/20
11/26/18
0
0
961
0
0
0
1,173
1,590
0
80
2,020
8,367
13,230
0
12/13/18
02/28/20
04/17/20
09/04/20
05/18/23
In San Diego County, at various locations, from 0.5 mile west of Midway Drive Undercrossing to 0.6 mile west of Flinn Springs Road Undercrossing. Repair, rehabilitate and replace culvert systems.
Baseline
961 12,996
1,173
1,590
2,020
8,367
80
0
13,230
SD8
1246
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
452 CULVERT REPLACEMENT
1,147
1,546
208
204
1,756
8,519
06/13/22
12/10/21
12/10/21
03/18/20
0
0
425
0
0
0
811
1,469
212
204
2,047
8,519
13,262
0
12/31/19
12/10/21
12/10/21
06/13/22
02/07/25
In San Diego County, at various locations from 0.1 mile east of Route 78/5 Separation to Route 15/78 Separation. Rehabilitate and replace culverts including invert paving, joint repair grouting, Cured-in-Place Pipeliner (CIPP) and drainage inlet lid repair.
Baseline
425 13,380
811
1,469
2,047
8,519
204
212
13,262
SD78
1247
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
453 I8 - PAVEMENT REHAB
998
3,549
0
0
4,854
43,769
03/14/22
11/03/21
09/21/21
12/04/19
0
0
832
0
0
0
936
3,276
0
0
5,479
43,768
53,459
0
04/22/19
01/08/21
02/12/21
07/22/21
12/13/22
Near Alpine, from Viejas Creek Bridge to Pine Valley Creek Bridge. Grind, remove and replace Jointed Plain Concrete Pavement (JPCP) lanes, remove and replace asphalt concrete outside shoulders and cold plane and overlay inside shoulders. Upgrade guardrail, replace approach/departure slabs and construct rumble strips.
Baseline
832 53,170
936
3,276
5,479
43,768
0
0
53,459
SD8
1255
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
454 E8-S163 CONNECTOR OC
373
815
0
0
720
1,867
03/11/21
11/06/20
10/26/20
07/02/19
0
0
31
0
0
0
374
969
0
0
848
1,867
4,058
0
11/08/19
01/29/21
03/26/21
08/27/21
04/19/23
In the city of San Diego, at the east Route 8 to south Route 163 Connector Overcrossing No. 57-0355G. Bridge rail replacement.
Baseline
31 3,775
374
969
848
1,867
0
0
4,058
SD8
1256
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
455 SR-125 CAPM 1,449
2,335
45
253
3,032
34,185
06/08/22
11/09/21
09/30/21
12/02/19
0
0
645
0
0
0
1,383
2,541
53
252
3,863
34,185
42,277
0
11/18/19
08/02/21
09/22/21
04/19/22
08/22/23
Near La Mesa and in Santee, from 0.2 mile south of Route 125/94 Separation to Mission Gorge Road. Rehabilitate pavement by grinding and replacing concrete slabs and cold plane and overlay shoulders with Rubberized Hot Mix Asphalt (RHMA-G).
Baseline
645 41,299
1,383
2,541
3,863
34,185
252
53
42,277
SD125
1257
11
Page 65 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
456 REPAIR EXISTING LOOP DETECTORS
936
1,499
0
0
2,251
11,535
05/15/20
12/13/19
11/15/19
08/22/18
0
0
936
154
0
0
911
2,160
0
0
2,264
11,535
16,870
0
01/29/19
12/26/19
01/08/20
05/01/20
02/09/22
In San Diego County, at various locations. Repair and install Vehicle Detection Station (VDS) elements including Microwave Vehicle Detection Systems (MVDS) and loop detectors.
Baseline
1,090 16,221
911
2,160
2,264
11,535
0
0
16,870
SD1262
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
457 INSTALL RADAR DETECTION SYSTEMS
150
978
0
0
576
3,325
12/13/19
05/08/19
03/08/19
04/18/18
0
0
150
504
0
0
372
865
0
0
654
3,324
5,215
0
08/06/18
03/07/19
05/08/19
12/13/19
02/03/21
In San Diego County, at various locations. Update Microwave Vehicle Detection System (MVDS) elements for traffic flow monitoring and data collections.
Baseline
654 5,029
372
865
654
3,324
0
0
5,215
SD15
1263
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
458 I-5NCC ITS ELEMENTS
0
1,323
0
0
0
0
10/02/18
06/29/18
05/21/18
10/23/13
0
0
0
1,323
0
0
0
1,497
122
3
0
0
1,622
012/27/18
10/23/13
06/06/18
06/29/18
11/16/18
12/03/21
In San Diego County, from 0.6 mile south of Route 5/8 Separation to 1.5 miles north of Route 5/76 Separation. Install Vehicle Detection Stations (VDS), Changeable Message Signs (CMS), Closed Circuit Television (CCTV), Ramp Metering, Traffic Signal and Fiber Optic Network elements.
Baseline
1,323 1,323
0
1,497
0
0
3
122
1,622
SD5
1281
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
459 SD-52 DIPS PAVEMENT REHAB
2,058
3,154
40
0
5,485
33,738
0
0
25
0
0
0
2,066
3,452
45
15
5,654
33,738
44,970
0
07/10/20
11/29/21
03/18/22
07/29/22
03/28/25
In San Diego, from 0.4 mile west of Convoy Street Overcrossing to Santo Road Overcrossing. Roadway rehabilitation to mitigate highway settlement, construct auxiliary lane, transportation management systems, lighting, and roadside safety improvements.
Baseline
25 44,475
2,066
3,452
5,654
33,738
15
45
44,970
SD52
1302
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
460 SD-125 (SD-54 TO SD-94)
2,920
4,789
383
0
7,003
37,300
0
0
158
0
0
0
3,071
5,557
317
120
9,027
54,357
72,449
0
07/10/20
11/29/21
02/18/22
07/18/22
07/09/25
In and near Lemon Grove, from 0.1 mile north of Jamacha Boulevard Overcrossing to Route 94. Pavement rehabilitation.
Baseline
158 52,395
3,071
5,557
9,027
54,357
120
317
72,449
SD125
1310
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
461 SD-008-R25.1/R40.1 - REHABILITATE CULVERTS.
262
1,057
180
25
1,082
5,200
0
0
262
210
10
0
262
1,100
200
25
1,200
5,200
7,987
0
06/29/18
05/17/19
06/21/19
12/02/19
05/31/21
In San Diego County, from 0.6 mile west of Harbison Canyon Undercrossing to 0.4 mile east of Horsethief Road Undercrossing. Rehabilitate culverts.
Baseline
482 7,806
262
1,100
1,200
5,200
25
200
7,987
SD8
1332
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
462 I-8 EL CAJON BRIDGE REHAB
518
1,828
0
0
3,500
20,735
0
0
16
0
0
0
390
1,974
0
0
4,031
20,735
27,130
0
10/31/19
04/20/21
08/03/21
11/18/21
06/26/23
In and near El Cajon, from Grossmont Boulevard to Mollison Avenue at various locations. Rehabilitate three bridge decks.
Baseline
16 26,581
390
1,974
4,031
20,735
0
0
27,130
SD8
1339
11
Page 66 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
463 11-SD-67 RHMA OVERLAY w/SAMI
808
2,689
83
0
5,110
26,891
0
0
0
0
0
0
807
2,690
85
0
5,110
26,891
35,583
0
12/13/19
05/05/20
06/30/21
10/02/21
09/24/22
Near Lakeside and Ramona, from 0.2 mile north of San Diego River Bridge to Route 78. Rehabilitate asphalt pavement, drainage system restoration, curb ramp upgrades, guardrail upgrades, and enhance crosswalk visibility.
Baseline
0 35,581
807
2,690
5,110
26,891
0
85
35,583
SD67
1344
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
464 I-15 CONCRETE LANE REPLACEMENT
2,508
4,969
176
0
8,676
55,419
0
0
198
0
0
0
2,749
5,497
200
0
10,994
55,420
74,860
0
07/26/19
01/08/21
04/26/21
03/18/22
01/03/25
In and near Escondido, from 0.2 mile south of Route 78 to 0.5 mile north of Deer Springs Road. Rehabilitate pavement by replacing sections of the existing pavement and the outside shoulder with Continuously reinforced Concrete Pavement (CRCP), pavement slab replacement, bridgeapproach slab replacement, bridge joint seal work, and sign
Baseline
198 71,748
2,749
5,497
10,994
55,420
0
200
74,860
SD15
1350
11
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
465 12-0H028 Rt 5 CCTV, fiber opt. upgrade
330
690
0
0
700
1,270
252
0
330
690
0
760
330
780
0
0
750
1,270
3,130
1,269
03/01/17
04/10/18
05/04/18
10/08/18
03/13/20
In Tustin and Irvine, from Route 133 to Route 55. Upgrade existing fiber optic communication system, closed circuit television and electronic equipment.
Baseline
2,032 2,990
330
780
750
1,270
0
0
3,130
ORA5
2753B12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
466 12-0Q690 detection system rehab.
0
1,677
0
24
1,766
6,530
01/01/21
05/01/20
02/01/20
06/22/17
0
0
0
803
0
0
0
2,060
0
24
1,800
6,530
10,414
0
06/22/17
02/01/20
05/01/20
12/15/20
07/01/22
At various locations, on various routes. Replace and upgrade existing field elements for the Traffic Management System (TMS).
Baseline
803 9,997
0
2,060
1,800
6,530
24
0
10,414
ORA1203
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
467 12-0Q930 Bridge Project on Route 5 and 133
1,106
2,491
155
53
3,720
2,753
05/02/22
10/01/21
08/02/21
01/07/20
0
0
246
0
0
0
1,215
2,500
155
58
3,720
14,549
22,197
0
03/01/20
08/01/21
10/01/21
05/02/22
11/01/23
In Orange County, on Routes 5, 133, and 241 at various locations. Rehabilitate 25 bridges.
Baseline
246 10,278
1,215
2,500
3,720
14,549
58
155
22,197
ORA1204
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
468 12-0H150 PCH Laguna Beach Rehabilitate Pavement & ADA upgrades
0
3,688
0
65
1,621
6,507
01/04/21
06/01/20
05/01/20
08/30/05
0
0
0
936
0
0
0
3,200
400
65
1,739
7,071
12,475
0
08/30/05
02/28/20
06/02/20
02/17/21
05/13/22
In Laguna Beach and Newport Beach, from 1,000 feet south of Vista Del Sol to Moss Street; also from Ledroit Street to Newport Coast Drive (PM 10.5/14.1). Remove and replace existing pavement with Rubberized Hot Mix Asphalt (RHMA).
Baseline
936 11,881
0
3,200
1,739
7,071
65
400
12,475
ORA1
2246
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
469 12-0P680 Upgrade Traffic Signal
1,424
4,655
1,018
745
2,175
12,925
01/30/22
05/30/21
05/15/21
01/05/19
0
0
1,424
8
10
0
1,891
4,299
1,244
191
3,537
12,925
24,087
011/13/18
02/01/19
05/15/21
05/30/21
01/30/22
04/30/23
In the cities of Newport Beach, Huntington Beach and Seal Beach, from Crystal Heights Drive to First Street. Replace traffic signals, upgrade non-standard curb ramps to meet Americans with Disabilities Act (ADA) Standards and modify drainage.
Baseline
1,442 22,942
1,891
4,299
3,537
12,925
191
1,244
24,087
ORA1
2330
12
Page 67 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
470 12-0R410 PCH at Newport Beach CAPM w ADA & FO
1,954
2,631
1,405
132
2,364
10,605
05/01/22
11/01/21
11/01/21
10/01/19
0
0
358
0
0
0
1,980
2,660
1,520
132
2,438
10,605
19,335
0
10/01/19
11/30/21
11/30/21
05/26/22
10/25/23
In Newport Beach, from Jamboree Road to Santa Ana River Bridge. Pavement rehabilitation.
Baseline
358 19,091
1,980
2,660
2,438
10,605
132
1,520
19,335
ORA1
2374
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
471 12-0P700 Rt 5, Drainage restoration Segunda Deshecha Channel
456
1,138
111
125
1,386
4,303
12/11/20
06/01/20
05/01/20
03/01/19
0
0
456
0
2
0
550
1,145
111
15
1,080
4,303
7,204
0
03/01/19
06/01/20
06/02/20
02/01/21
02/01/23
In San Clemente, adjacent to northbound Avenida Pico offramp. Restore hydraulic capacity of channel by repairing concrete panels in channel slope and bottom.
Baseline
458 7,519
550
1,145
1,080
4,303
15
111
7,204
ORA5
2563
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
472 12-0R560 VAR Connector Rehab 2018 SHOPP Reservation project.
2,998
5,398
0
0
5,396
26,447
0
0
0
0
0
0
3,000
5,400
0
0
5,500
26,500
40,400
0
08/01/20
04/01/22
05/02/22
11/03/22
09/01/25
In the cities of Santa Ana, Tustin, Irvine, Newport Beach, Costa Mesa, and Anaheim on various routes. Rehabilitate pavement by repairing broken concrete slabs and replacing asphalt concrete with Rubberized Hot Mix Asphalt (RHMA-G) at 17 connectors, one ramp and one overcrossing.
Baseline
0 40,239
3,000
5,400
5,500
26,500
0
0
40,400
ORA3959
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
473 12-0R340 State Route 73 Multi-Asset Project
455
1,272
0
0
739
3,050
03/02/22
08/02/21
07/01/21
04/02/20
0
0
0
0
0
0
494
1,294
0
5
1,007
3,094
5,894
0
04/02/20
07/02/21
08/02/21
06/01/22
03/01/23
In Laguna Hills, Laguna Niguel, Aliso Viejo, Laguna Beach, Irvine, Newport Beach, and Costa Mesa from Moulton Parkway to Bristol Street. Rehabilitate bridge decks, bridge joints and approach slabs to preserve service life on ten bridges.
Baseline
0 5,516
494
1,294
1,007
3,094
5
0
5,894
ORA73
4080
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
474 12-0P580 Cold plane pavement and place RHMA
461
1,256
129
0
2,269
8,208
09/01/20
01/30/20
12/03/19
11/01/18
0
0
461
48
0
0
478
1,249
153
0
2,269
8,208
12,357
0
10/30/18
12/03/19
01/30/20
09/01/20
09/30/22
In and near Brea, from Harbor Boulevard to Randolph Avenue. Cold plane pavement and place Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
509 12,323
478
1,249
2,269
8,208
0
153
12,357
ORA90
4337
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
475 12-0Q360 Drainage System Restoration
0
1,582
714
435
1,188
2,095
01/05/21
06/15/20
04/17/20
10/02/18
0
0
0
0
0
0
1,613
2,037
911
1,467
1,188
2,095
9,311
0
10/02/18
05/01/20
06/01/20
12/01/20
08/08/23
In Orange County, from 0.3 mile south of El Toro Road to 0.2 mile north of Route 73/133 Interchange. Construct detention basin, reconstruct channel, extend reinforced concrete box and regrade to prevent adverse flow.
Baseline
0 6,014
1,613
2,037
1,188
2,095
1,467
911
9,311
ORA133
4792
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
476 12-0H047 SR 241, Capital Preventive Maintenance Project
0
3,141
0
0
3,280
16,827
11/30/21
04/01/21
02/26/21
08/13/18
0
0
0
117
0
0
0
3,205
0
0
3,668
16,827
23,700
012/27/18
08/13/18
02/15/21
03/01/21
11/30/21
07/15/23
In and near the cities of Anaheim, Irvine, and Orange, from Portola Parkway to Route 91. Pavement rehabilitation.
Baseline
117 23,248
0
3,205
3,668
16,827
0
0
23,700
ORA241
5502
12
Page 68 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
No. Route
Approved Budget
($1,000s)
EAC ($1,000s)Phase MilestoneTitle
Approved Finish Date
Expended ($1,000s)
Current Finish Date
PPNO
State Highway Operation and Protection Program (SHOPP) Project List**January 1 - March 31, 2019
Award Amount ($1,000s)Location and Type of Work
SHOPP Budget
($1,000s)
Actual Finish Date
District
County
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
477 12-0P590 Resurface 14.9 lane miles
1,274
2,907
965
503
1,906
8,770
01/30/22
05/30/21
05/15/21
01/05/19
0
0
1,274
13
11
0
1,720
2,932
1,245
111
2,358
8,770
17,136
0
02/01/19
05/15/21
05/30/21
01/30/22
04/30/23
In Huntington Beach, from Warner Avenue to Los Angeles County line. Upgrade Americans with Disabilities Act (ADA) curb ramps, cold plane pavement, and place Rubberized Hot Mix Asphalt (RHMA) pavement.
Baseline
1,298 16,325
1,720
2,932
2,358
8,770
111
1,245
17,136
ORA1
2499A12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
478 12-0R200 Interstate 5 Pavement Rehabilitation Project
1,969
3,857
0
0
3,849
22,850
04/01/22
07/01/21
06/01/21
12/02/19
0
0
245
0
0
0
2,569
3,824
0
0
3,849
23,809
34,051
0
12/01/19
06/01/21
07/01/21
04/01/22
04/01/24
In San Clemente, from the San Diego County line to El Camino Real. Pavement rehabilitation and upgrade safety devices.
Baseline
245 32,525
2,569
3,824
3,849
23,809
0
0
34,051
ORA5
2530N12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
479 12-0P42U I-5, SR57, & SR 91 ICM123 Project combined with ICM 1,2, & 3
1,621
2,397
0
9
3,094
22,073
01/04/21
05/01/20
03/18/20
06/19/18
0
0
1,621
278
0
0
1,655
2,400
0
9
3,045
22,073
29,182
008/31/18
06/19/18
03/18/20
04/10/20
03/04/21
02/01/23
Install & modify ITS elements. Install & modify ITS elements Install & modify ITS elements
Baseline
1,899 29,194
1,655
2,400
3,045
22,073
9
0
29,182
ORA2859B
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
480 12-0P670 I-5, SR 57, & SR 91 ICM 4 Project - Install and modify ITS
2,287
3,613
121
15
3,554
13,673
02/01/21
05/01/20
04/15/20
11/01/18
0
0
2,287
194
0
0
2,380
4,343
320
0
3,650
13,673
24,366
011/14/18
11/19/18
04/15/20
05/01/20
04/01/21
02/01/23
In and near Anaheim, from south of Route 22 to south of Route 39; also on Route 57 (PM 10.7/16.6) and Route 91 (PM R2.6/R4.1 and (PM 0.0/7.2). Create interoperability of Transportation Management System (TMS) by upgrading Intelligent Transportation System (ITS) elements between Caltrans and local agencies.
Baseline
2,481 23,263
2,380
4,343
3,650
13,673
0
320
24,366
ORA5
2859C12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
481 12-0F970 SR-39 Drainage and ADA
71
871
151
438
859
2,226
07/15/20
11/15/19
11/01/19
06/26/17
0
26
71
626
11
0
0
870
153
414
906
2,226
4,569
0
06/26/17
11/01/19
11/15/19
07/15/20
09/30/21
In Buena Park, from Auto Center Drive to Craig Avenue. Rehabilitate drainage systems, install new inlets, Reinforced Concrete Pipes (RCP) and replace flood damaged sections of curb and gutters.
Baseline
734 4,616
0
870
906
2,226
414
153
4,569
ORA39
3230A12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
482 1217000003 - 12-0Q390 Bridge Seismic Restoration
954
2,234
0
0
5,346
15,456
09/09/21
02/02/21
01/15/21
09/25/19
0
0
256
0
0
0
1,048
2,279
11
0
5,381
15,456
24,175
0
04/15/20
01/04/21
05/28/21
12/30/21
10/02/23
In Costa Mesa, at the Route 55/73 Connector Overcrossing Bridge No. 55-538F (PM 4.74), Route 91 Carmenita Road Pedestrian Overcrossing Bridge No. 55-0473 (PM 0.02) and Route 405 Laguna Canyon Road Overcrossing Bridge No. 55-0247 (PM 2.20). Seismic restoration.
Baseline
256 23,990
1,048
2,279
5,381
15,456
0
11
24,175
ORA3450A
12
PAED
Total
RW CapCon Cap
Con SupRW SupPSE PAED
End ConstBegin Const
RW CertRTL
483 12-0Q660_ SB 55 to SB 405 connector, Replace Slab
282
715
0
0
710
2,692
0
0
282
516
0
0
90
880
0
0
600
2,830
4,400
0
12/28/17
03/12/19
07/15/19
12/10/19
11/02/20
In Costa Mesa and Santa Ana, at the southbound Route 55 connector to southbound Route 405. Correct vertical pavement profile, replace existing concrete pavement, build bridge structural departure slabs, and construct overhead sign structure.
Baseline
798 4,399
90
880
600
2,830
0
0
4,400
ORA55
3458A12
Page 69 of 69EAC = Estimate at CompletionApproved = Last Commission action
** = Only includes projects with Road Maintenance and Rehabilitation Act (RMRA) funding.
Recommended