RSRDC
UNIT-II JODHPUR
ORGANISATION CHART OF RSRDC UNIT-II
JODHPUR SH SURESH
SHARMARE
SH. ASHOK KUMAR
MATHUR ARE
SH. RAKESH CHANDRA MATHUR
ARE
SH. NIRMAL KUMAR
MATHUR ARE
SH JASPAL SINGH
ACCOUNTANT
SH. AJIT JAIN ARE
SH. SHANTI CHAND
ARE
SH. MAHENDERA SINGH
DEORA ARE (E)
SH. SANJAY NARAIN
MATHUR JEN
Financial Work Load in UnitS. No.
Name of Work Client Deptt.
A& F Sanction Expenditure till date Balance Work
ARE – I SHRI ASHOK KUMAR MATHUR
1 Strengthening & DEV. PAL ROAD MDM CIRCLE -BORANADA
UIT/JDA JODHPUR
UDD/01/07/Dt 24-07-07 OF RS. 51.60 CRORE
29.00 CRORE 22.60 Crores
2 INDOOR STADIUM
UIT/JDA JODHPUR
LT. NO. 1848-56 LACS DT. 23.03.07 RS. 172.40 LACS
108.71 lacs 63.69 lacs
ARE – II Sh.Rakesh Chandra Mathur
1 Constt. Of USQ & LSQ at PTS Jodhpur
Police Deptt. (Govt of Raj)
898.05 LACS 776.95 LACS 121.10 LACS
2 Constt. Of LSQ& USQ at RAC Ist Ballalion (Mandore Campus ) Jodhpur
Police Deptt. (Govt of Raj)
3 Constt. Of LSQ & USQ at RPTC Jodhpur
Police Deptt. (Govt of Raj)
Rs. 4985.71 Lacs
Financial Work Load in Unit
S. No.
Name of Work Client Deptt. A& F Sanction Expenditure till date Balance Work
ARE – III Sh.Shanti Chand Mathur
1 Construction of OIL HOUSE at Jodhpur
OIL India Ltd 850.04 lacs 254.14 lacs 595.90 lacs
ARE – IV Sh.Nirmal Mathur
1 Construction of ROB in lieu of LC No. C-27 at Pali.
State Govt.(PWD)
1200.00 lacs 26.36 lacs 1173.64 lacs
2 Residencial Boys School Kenpura Pali.
REIS 223.76 lacs 204.17 lacs Work Completed & handed over to client in the month of June 09.
ARE – V Sh.Ajit Jain
1 Construction of ROB in lieu of LC No. 134-B at Abu Road.
State Govt.(PWD)
1000.00 lacs 159.52 lacs 840.48 lacs
ARE – VI Sh.Mahendra Singh Deora
1 Elect work of all work of unit II Jodhpur
ARE – VII Sh. Sanjay Narain Mathur
1 Residencial Boys School Mandore Jodhpur
REIS 250.69 lacs 197.06 lacs Work Completed & handed over to client in the month of June 09.
Rs. In Lacs
Important Works Completed during last 5 years
Civil and architectural work in superstructure of main power house building at GLTPP BARMER
DATE OF START 18-2-05DATE OF COMP 17-5-06WORK IS COMPLETEDCOST OF WORK 449.61 LACS
Important Works Completed during last 5 yearsAREA DEVELOPMENT WORK SUCH AS WATERSUPPLY,SEVERAGE,ROAD AND
DRAINAGE WORK IN VARIOUS RESIDENTIAL COLONIES &DEVELOPMENT OF LAND FILL
SITES AT JODHPUR PACKAGE JOD-ST-O5DATE OF START 3-2-03DARE OF COMP 3-9-06
COST 454.88 LACS
Residential Boys School Mandore Jodhpur
Total Cost : Rs. 250.69 LacsLocation : Residential Boys School Mandore
JodhpurDate of Start : 27.06.08Stipulated Date of Completion: 26.02.09Expenditure till Date : Rs. 197.06 lacsLikely Completion date : Work Completed.Bottlenecks if any :
ROB Rashala Road Jodhpur
Completion Cost – Rs. 10.14 Crs.
Important Works Completed during last 5 years
Residential Boys School Kenpura Pali.
Total Cost : Rs. 223.76 CroresLocation : Construction of ROB in lieu of LC No.
C-27 at Pali. Date of Start : 27.06.08Stipulated Date of Completion: 26.02.09Expenditure till Date : Rs.204.17 lacsLikely Completion date : Work is Completed.
Indoor Stadium Jodhpur
Total Cost : Rs. 172.40 CroresLocation : JodhpurDate of Start : 04.07.07Stipulated Date of Completion: 03.01.08Expenditure till Date : Rs. 108.71 lacsLikely Completion date : On the availability of fundBottlenecks if any : Funds are not made available by JDA
Strengthening & Dev. Pal Road MDM Circle to Boranada Jodhpur
Total Cost : Rs. 51.60 CroresLocation : JodhpurDate of Start : 01.02.09Stipulated Date of Completion:Expenditure till Date : Rs. 2900.00 lacsLikely Completion date : On the available of fund Bottlenecks if any : Funds are not made available by JDA
Construction of LSQ&USQ at PTS Jodhpur
Total Cost : Rs. 4.366 CroresLocation : RPTC Campus JodhpurDate of Start : 01.04.08Stipulated Date of Completion : 28.02.09Expenditure till Date : Rs. 332.03 lacsLikely Completion date : 31.12.09Bottlenecks if any :
Construction of LSQ&USQ at RPTC Jodhpur
Total Cost : Rs. 2.35 CroresLocation : RPTC Campus JodhpurDate of Start : 01.04.08Stipulated Date of Completion : 28.02.09Expenditure till Date : Rs. 244.56 lacsLikely Completion date : 31.12.09Bottlenecks if any :
Construction of LSQ&USQ at RAC Ist Battalion Jodhpur
Total Cost :Rs. 2.27 CroresLocation : RPTC Campus & RAC Campus
JodhpurDate of Start : 25.02.08Stipulated Date of Completion : 24.01.09Expenditure till Date : Rs. 200.36 lacsLikely Completion date : 31.12.09Bottlenecks if any :
Construction of “OIL HOUSE” at Jodhpur
Total Cost : Rs. 8.50 CroresLocation : Construction of “OIL HOUSE” at
JodhpurDate of Start : 22.07.08Stipulated Date of Completion : 21.01.10Expenditure till Date : Rs. 254.14 lacsLikely Completion date : 30.04.10Bottlenecks if any :1. Some decisions about RCC designs and finishing work are pending from OIL
India Ltd.2. Approval for subletting of some works like Aluminum and fire fighting is
pending 3. Tenders for Electrical and AC works are not finalised.
Construction of ROB in lieu of LC No. C-27 at Pali.
Total Cost : Rs. 12.00 CroresLocation : Construction of ROB in lieu of LC No.
C-27 at Pali. Date of Start : 19.10.08Stipulated Date of Completion: 18.10.09Expenditure till Date : Rs. 26.36 lacsLikely Completion date : Work is temporarily suspended.Bottlenecks if any : Revised A&F is required
Construction of ROB in lieu of LC No. 134-B at Abu Road.
Total Cost : Rs. 10.00 CroresLocation : Construction of ROB in lieu of LC No.
134-B at Abu Road. Date of Start : 12.09.08Stipulated Date of Completion: 11.09.09Expenditure till Date : Rs. 159.52 lacsLikely Completion date : 30.06.10Bottlenecks if any : GAD was revised by RAILWAY delayed
the work by 2 month .
Some qty Steel supplied didn’t confirm to specifications and had to be replaced by
supplier three times so work delayed by 3months..
DEC 09 JAN 10 FEB 10 MAR 10 APRIL 10 MAY 10 JUNE 10
ABUTMENT A2
ABU ROAD SIDE
APPROACH ABU ROAD SIDE
ABATMENT A1 (AMBAJI SIDE)
APPROACH AMBAJI SIDE
SERVICE ROAD AMBAJI SIDE
SERVICE ROAD ABU ROAD SIDE
DRAIN ABU ROAD SIDE
DRAIN AMBAJI SIDE
WMM, BT ABUROAD SIDE
WMM BT AMBAJI SIDE
P,A1 SPAN SUPPER STRACTURE
P5,A2 SPAN SUPPER STRACTURE
ROAD FURNITURE
BAR CHART FOR Construction of ROB in lieu of LC No. 134-B at Abu Road.
Proposed New Works
S. No.
Name of Work Client Deptt. Mode Estimated Cost
1 ROB Barmer LC-325 State Govt. (PWD)
Actual plus GAD under approval