Rolls-Royce Business Managers Program November 2002Washington, DC
Operations Strategy and
Performance Measurement
Doug Blocher Doug Blocher
Operations and DecisionOperations and Decision
Technologies DepartmentTechnologies Department
8/2/2019 RRBM Strat Nov02 Lesli
2/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 2
Strategy is NOT about doing thingsright,
It is aboutdoing the right things.
What is Strategy?What is Strategy?
Bob Collins, IMD
8/2/2019 RRBM Strat Nov02 Lesli
3/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 3
What are the right things?
Must have a debate which involves alldisciplines, about how products win orders inthe Market Place, AND, what qualifies us to
be there.Debate must be Specific
Debate is Time Sensitive
Functional area Strategies should supportmarket characteristics.
8/2/2019 RRBM Strat Nov02 Lesli
4/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 4
Order Winner:Order Winner:
What the customer truly values.The essence of the product orservice. Why the customer wouldchoose you over the competition.
Order Qualifier:Order Qualifier: Some minimumacceptable level of this measure isrequired to even be considered for thebusiness.
Order Winners and Order Qualifiers are discussed in depth in Manufacturing Strategy , Terry Hill, London Business School
8/2/2019 RRBM Strat Nov02 Lesli
5/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 5
Finding the Order Winner:Finding the Order Winner: FocusFocus
on the Customer on the Customer How are we viewed by our customers?
Customer service reps dont know strategy; top managersdont know customers.*
What do our customers really want or need? Heard? Questioned? Observed? Experienced?
What should we try to deliver? Needed? Possible? Afford? Add Value?
StayFocused
*Staple Yourself to an Order, Harvard Business Review Jul/Aug 92
8/2/2019 RRBM Strat Nov02 Lesli
6/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 6
Op erations StrategyOp erations Strategy
Market StrategyMarket Strategy
Performance MeasuresPerformance Measures
O rder WinnersO rder Winners
Links between StrategicLinks between Strategic
elements and processeselements and processes
Cor porate or Cor porate or SBU StrategySBU Strategy
Op eration ProcessesOp eration Processesand Tacticsand Tactics
8/2/2019 RRBM Strat Nov02 Lesli
7/25
8/2/2019 RRBM Strat Nov02 Lesli
8/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 8
Functional Strategies?Functional Strategies?
A Market Strategy is notMarketings Strategy. It is the Firms Strategy to compete in a
specific market.
An Operations Strategy is notOperations Strategy It is the firms strategy to competitively
support the market position
8/2/2019 RRBM Strat Nov02 Lesli
9/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 9
T radeoffs are necessary!T radeoffs are necessary!
Can't be all things to all peopleDifferent (competitive) positions require: different product configurations, different equipment, different employee behavior, different skills, and different management systems.
Many tradeoffs reflectinflexibilities in machinery,
people, or systems.
Porter, What is Strategy Harvard Business Review Nov/Dec 96,and another good read is Porter, Comp etitive Strategy, 80
Cost
Flexibility
8/2/2019 RRBM Strat Nov02 Lesli
10/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 10
T radeoffs are necessaryT radeoffs are necessaryBut not all are on the efficient frontierBut not all are on the efficient frontier
Cost
Flexibility
High
Low
High Low
8/2/2019 RRBM Strat Nov02 Lesli
11/25
8/2/2019 RRBM Strat Nov02 Lesli
12/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 12
What are the right things?Competitive Priorities for Operations
Operations Levers Be the Low Cost Provider Have the Quickest Delivery Speed Deliver when promised Customization / Variety Able to produce new
products and variations Conformance Quality Quality in terms of Long Term Reliability
8/2/2019 RRBM Strat Nov02 Lesli
13/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 13
Components of Operations StrategyPorter: H ow will we be different ?
Plant and Equipment Job shop vs Flow shop Special vs General purpose
equipment
Supply Chain Efficient vs Responsive
Labor Custom skills vs Repetitive
tasks
Engineering Support Process engineering vs Product
engineering
Organizational Style Decentralized vs Centralized
Capacity Limits Labor vs Machine Average vs Peak
8/2/2019 RRBM Strat Nov02 Lesli
14/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 14
StrategyStrategy
A Good strategy should provide focus for everyone be simple enough for everyone to understand always provide a guide for decisions
One must ensure that the strategy isexplicit (as well as correct) beforereal improvement is possible
this often means that it has been interpretedand translated into goals and metrics thus it must be measurable
8/2/2019 RRBM Strat Nov02 Lesli
15/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 15
Performance Measurement shouldProvide Direction
By looking at a firms keymeasures, one should be able to
determine the firms direction,determine their strategy.
A firm lacking good, consistentmeasures will tend to be going in alldirections.
8/2/2019 RRBM Strat Nov02 Lesli
16/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 16
PerformancePerformance
MeasurementMeasurement
That which gets measured on a regular basis
(and as a part of the performance appraisal process) , gets attention.
Beware of Gaps
A ppr oximate Measures are better than wrongconvenient measures.
Beware of False Alarms
8/2/2019 RRBM Strat Nov02 Lesli
17/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 17
MeasurementMeasurementMistakes to AvoidMistakes to Avoid
G ap s exist where there are no measures for areasdeemed strategically important.
Examples: Customer satisfaction, employee involvement,
False Alarms occur where there are detailedmeasures for areas which are not strategicallyimportant.
Examples: many efficiency measures
Incorrect Em phasis (see following graph)
Vollmann and Schmenner, I nternati onal J ournal o f O perati ons & Pr od ucti on Manage ment , 1994
8/2/2019 RRBM Strat Nov02 Lesli
18/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 18
P erformance vs Im portance:P erformance vs Im portance:Is the Emphasis in the right place?Is the Emphasis in the right place?
Chase and Hayes
Performance
Importance
Trouble
False senseof security
8/2/2019 RRBM Strat Nov02 Lesli
19/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 19
A Balanced ScorecardA Balanced Scorecard
Customer Perspective How do customers see us?
Internal Perspective What must we excel at?Innovation and Learning Perspective Can we continue to improve and create value?
Financial Perspective How do we look to our stakeholders?
Kaplan and Norton, The Balanced Scorecard, 1996
8/2/2019 RRBM Strat Nov02 Lesli
20/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 20
Some NonSome Non--financial Measuresfinancial Measures
L ead time for customer order deliveryNumber of CorrectionsAmount of T ime needed to answer a phoneNumber of Com p laintsConformance QualityT ime to Res pond to Change Request
T rained users of ER P p rocess X
8/2/2019 RRBM Strat Nov02 Lesli
21/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 21
D ifferent L evels Need D ifferentD ifferent L evels Need D ifferentMeasuresMeasures
Measure ments sh oul d be hierarchical
Upper Management
Middle Management
Operational Departments
Will need 2-4 measures
Will need 2-4 per area --
not all the sameWill need 3-5 per dept or
process
8/2/2019 RRBM Strat Nov02 Lesli
22/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 22
The Heisenberg Uncertainty PrincipleThe Heisenberg Uncertainty Principle of Productivity of Productivity
Y ou cant have measures that aresimultaneously broad and dee p.
The broader the measure of productivity, the less meaningfuland the more arbitrary it is for operations at lower levels inthe organization. The more specific the measure, the moreincomplete and partial it is for the company as a whole.
T he D ilemma: How to choose real-time proxies that helplead action to the overall productivity goal.
8/2/2019 RRBM Strat Nov02 Lesli
23/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 23
Th e Need for Umbrellas
Dixon, Nanni, and Vollmann,T he New Perf or mance C hallenge
Financial measures for the upper levels of management; properly interpreted physicalmeasures for lower levels.
Progressive managers provide"umbrellas" for those under them so that the "rain" of
financial measures dont drownthem.
8/2/2019 RRBM Strat Nov02 Lesli
24/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 24
Using The Control BucketUsing The Control Bucket
ou cant kee p measuring everything f orever ...
If a measure is not meeting goal or not showing
the right improvement, then it must be monitoredregularly.If a measure indicates satisfactory performanceover some period of time, it should be placed inthe control bucket and monitored once-in-awhile.If a control measure falls from grace, it should be brought back on the table for regular review.
8/2/2019 RRBM Strat Nov02 Lesli
25/25
S t r a
t e g y
S t r a
t e g y
S t r a
t e g y
07 November 2002 25
Measurement Reminders
1. Link between strategy & action.2. Consistent, simple, visual for all, and attuned
to the customer.
3. Should not necessarily be identical acrosslocations, units, or levels. Comparability is afalse issue its too easy.
4. Should be significantly non-financial in
character 5. Should be well defined and agreed upon
Dixon, Nanni, Vollmann, The New Performance Challenge:Measuring Operations for World-Class Competition, 1990
Recommended