ELECTRICAL WORKS PROGRESS REPORT Approximate Only

ROW UPDATES as of Oct !!" !#$% Pro&ress Up'ate

A Ro(&)in& Ins *Pipin& " +an)ole" concrete encase' pipes ,

1) UNDERGROUND DUCT SYSTEM1.1 Medium Voltage ongoing - 15 %

1. !o" Voltage ongoing - #5 %

) E$tenal

#) Gound &loo ongoing- '(%

) &i*t &loo ongoing - +(%

5) Roo,de ongoing - +5%  

- Ca.lin&

1) Undegound Dut S0*tem1.1 Medium Voltage (%

1. !o" Voltage (%

) Gound &loo on going - 5%

#) &i*t &loo on going - (%

) Roo,de (%

Installation of 'e/ices *s0itc)es an' o(tlets,

1) E$tenal (%

) Gound &loo (%#) &i*t &loo (%

) Roo,de (%

Installation of Li&)tin& 1ixt(res

1) E$tenal (%

) Gound &loo (%

#) &i*t &loo (%

) Roo,de (%

7/24/2019 ROW Progress Report

http://slidepdf.com/reader/full/row-progress-report 2/4

 

C Installations of Panels2 Disconnectin& S0itc)

1) E$tenal Eletial Room (%

) Gound &loo Eletial Room (%

#) &i*t &loo Eletial Room (%

) Roo, De (%

D Installation of Gro(n'in& System (%

E Installation of Li&)tnin& Protection System (%

1 Installation of Transformers (%

Eletial Ro

G Installation of Generator (%

3 Testin& an' Commissionin& (%

7/24/2019 ROW Progress Report

http://slidepdf.com/reader/full/row-progress-report 3/4

V Man/ole

MV DUCT

7/24/2019 ROW Progress Report

http://slidepdf.com/reader/full/row-progress-report 4/4

!V Dut

  m Cale Ta0 &i*t &loo