View
0
Download
0
Category
Preview:
Citation preview
Monte Vista Elementary School Modular Bathroom Project Update
Board of Education MeetingInformation Report No. 7
Date: April 16, 2019
Presented by: Hagop Kassabian, Administrator: Planning, Development & Facilities
Stephen Dickinson, Chief Business & Financial Office
Revised 04/16/2019
Modular Bathroom Project Update
• Requests have been made to improve restroom access to Monte Vista Elementary School o Current status of site is in compliance, but additional need has
been established
• Planning & Development staff met with site staff and District Administrators o Staff walked the site and discussed possible locations for a portable
restroom building near the current bungalows
2
Improvements at Monte Vista Elementary
• Beautification project at the bungalow area o Painting of the bungalows o Awning installation at classrooms 8110-8111 o Tree planting in courtyard – completed o Installation of benches in courtyard o Removal of grates from the windows of the bungalows – completed
• Moving classrooms so that grade alike rooms are in close proximity
• Installation of modular restroom building o Project has not been finalized or approved by the Board
3
Installation of Modular Restroom
• A primary location was identified and is recommendedo Two alternate locations are available
• Project is anticipated to take 6 to 12 months to be completed from the time of Board approval
• 12’ x 40’ building will fit in the recommended location o Two toilets, two urinals, and two sinks in boys sectiono Three toilets and two sinks in girls section o One gender-neutral staff restroom
• Cost is estimated to be approximately $205,000 to $255,000o To be funded by Developer Fees funds
4
Installation of Modular Restroom (cont.)
5
Boys BoysGirls GirlsStaff
Installation of Modular Restroom (cont.)
6
Option 1: Recommended location
Option 2
Option 3
Three Options for Location of Building
Option 1 – Southeast corner • Pros
o Shorter delivery and installation lead time
o Larger number of fixtureso Staff restroom o Pre-plan check approved
buildingo Close proximity to existing
bungalows• Cons
o Site access for installation
7
Options 2 and 3• Pros
o Close proximity to existing bungalows
• Conso Longer delivery and
installation lead time o Loss of open play areao Need for DSA plan check
approval o Limited number of fixtures
Next Steps
• Staff is seeking direction from the Board to proceed with the project
• Staff is prepared to bring an item to the Board for approval at the May 7 Board meeting
8
Slide Number 1Modular Bathroom Project Update Improvements at Monte Vista ElementaryInstallation of Modular Restroom Installation of Modular Restroom (cont.)Installation of Modular Restroom (cont.)Three Options for Location of Building Next Steps
Recommended