View
213
Download
0
Category
Tags:
Preview:
Citation preview
RESULTS Training
Woodlot Reporting to RESULTS
ESF Submission
March 2013
Mei-Ching Tsoi
mtsoi@shaw.ca
Modules
1. Legislative Context and Business Documentation
2. Online Data Entry Basics
3. Online Data Entry Demo
4. ESF Submission
5. RESULTS Canned Reports
http://www.for.gov.bc.ca/his/results/business.htm
Must have a bceid account and authorized to submit to RESULTS
RESULTS Accesshttp://www.for.gov.bc.ca/his/results/
RESULTS Pre-Conditions
• Cutblock must be status of “HB” or “LC”
ESF Submission requires mandatory spatial for:• Opening Definition
• Standards Units
• All Forest Cover Polygons within the opening
ESF Submission allows flexibility to create as many SU and Forest Cover polygons for the opening.
RESULT
ESF Submission components
ESF Submission requires software to build submissions.
Must understand RESULTS ESF Schema and WL’s submission requirements before attempting
Examples shown is using EziLink noting there are other softwares
Meta-data requirements
User id, Org Unit and Client are validated against Tenure to ensure authorized to submit.
RESULT ESFMeta-data
Opening Definition must contain• Opening (Tenure key)• Opening spatial• Mandatory data for opening
definition• Action Code (I-Insert)• Tenure• Standard Unit• NAR• BEC• Standard Regime ID (if SP Exempt
Ind N)
RESULT ESFOpening Definition
Opening Definition must contain• Opening (Tenure key)• Opening spatial• Mandatory data for opening definition• Action Code (I-Insert)• Tenure• Standard Unit• NAR• BEC• Standard Regime ID (if SP Exempt Ind N)
Note if Site Plan Exempt Ind is set to Y, this means that SU is provided but must provide full stocking standards for all required elements in the site plan.
RESULT ESFOpening Definition
Disturbance Reporting must be provided before or with Forest Cover.
Forest Cover submission is based on RISS-WL requirements. Forest Cover via ESF must include FC spatial.
NSR or MAT does not require layer or species components. But if layer information is provided, then species composition must also be provided.
IMM requires full forest cover with layer and species composition information.
RESULT ESFDisturbance & Forest Cover
Silviculture report requires mandatory.Planting report must also include number of trees planted with lot information.
Forest Cover submission is based on RISS-WL requirements. Forest Cover via ESF must include FC spatial.
Example of Full attribution Forest Cover submission
RESULT ESF ExamplesPlanting Example & Immature Forest Cover
Opening Creation at Harvest Completion1. Opening creation
2. Standards Unit (Site Plan content)
3. Disturbance Reporting
4. Forest Cover update reflecting post-harvest stand condition
Silviculture Activity (annually)Completed Silviculture Reporting
Planting report include lot and species information
RESULTS has planning feature that may be useful
At Free Growing Completion1. Forest Cover update reflecting free growing conditions
2. Free Growing Milestone
RESULTS ESF Pre-Conditions
FTA CP application with spatial by cutblock submitted
Cutblocks must be status of “HB” or “LC”
May create multi-cutblock opening
Action Code = “I” - Insert
• previous stand label, opening gross area
• tenure
• SU, Site Plan, Stocking Standard (regime) with Site Plan Map
• opening spatial
RESULTS ESF – Disturbance Reporting
Action Code = “I” – Insert
• disturbance reporting
• forest cover with spatial
RESULTS ESF – Silviculture Reporting (annual)
Action Code = “I” – Insert
• silviculture activites
• if planting, planting details
RESULTS ESF – At free growing
Action Code = “I” – Insert
• forest cover with spatial
• Free Growing declaration
RESULTS ESF – SU Modifications
Action Code:
“U” – Correction of data only applicable to silv prescriptions
“M” – Minor amendment for silviculture prescriptions
“A” – Amendment
- silv prescription – no SS ID, requires approval
- site plan – SS ID exists, no approval required
Depending on Action must be careful with set up of ESF submission
RESULTS provides ability to supply SU Modification actions online and via ESF.
Site Plan (no SS ID) Amendment Requires Approval
FPCBC (WLFMR) Site Plan (no SS ID)
Approval Required
No Approval Required
No Approval Required
Opening Status
“APP” – active opening, nothing pending“AMD” – active opening, draft amendment“SUB” – active opening, submitted amendment for approval requires District Inbox action
Note that pre-RESULTS, any SU Modification was paper-based, therefore changes not tracked on the system and must refer to opening files.
SU Modifications
FRPA (WLPPR) Site Plan (SS ID)
http://www.for.gov.bc.ca/his/results/webhelp/index.htm
Submissions
RESULTS Training Obligation Reporting (Submissions)
Submissions
RESULTS Training Obligation Reporting (Submissions)
https://apps18.for.gov.bc.ca/esf/submissionWelcome.do
RESULTS Training Obligation Reporting (Submissions)
Upload Submission performs coarse validation to ensure submission matches schema requirements
Submissions
RESULTS Training Obligation Reporting (Submissions)
Provide email for confirmation messages
Submissions
RESULTS Training Obligation Reporting (Submissions)
Submission ID assigned
Submissions
RESULTS Training Obligation Reporting (Submissions)
Submission will be sent to your email account
ESF will reviews XML and GML based on error and system’s business edit rule checks.
Successful or Rejected – if rejected error message # provided.
Submissions
RESULTS Training Obligation Reporting (Submissions)
May access history your ESF Submissions
Submissions
RESULTS – Technical Documentationhttp://www.for.gov.bc.ca/his/results/techDocs.htm
Provides processing rules, dependencies, optionality, context of what information and where it is located in RESULTS – clues to which tables to look for.
Online & ESF Submission Requirements – need to refer to both
RESULTS – Training Recordings & documentation http://www.for.gov.bc.ca/his/results/training/index.htm
Refer to Training website for powerpoints, documentation, recordings or any upcoming training opportunities.
More themes exists than what is shown on this slide.
References on RESULTS Website
Business Documentation
http://www.for.gov.bc.ca/his/results/business.htm
Business/Spatial Views http://www.for.gov.bc.ca/his/results/spatialviews.htm
Technical DocumentationApplication and ESF
http://www.for.gov.bc.ca/his/results/techDocs.htm
Training Resources http://www.for.gov.bc.ca/his/results/training/index.htm
RESULTS – Application Support http://www.for.gov.bc.ca/his/results/support.htm
Recommended