Renovations, Repairs, Reconfigurations: Steel Buildings

Louis Gilmore: Miller Buildings Inc. LouisGilmore@MillerBldgs.com1408 Bethlehem PikeFlourtown, PA 19031www.MillerBldgs.com

Louis Gilmore's Presentation – Miller Buildings

Renovations: Steel Buildings

Renovations: -Façade improvement: pre-cast panels, climate controlled walls and roofing.

-Roofing upgrade: Coatings, re-roofing, roof replacement.

-Interior upgrades: Add diamond plate corners and kick-plates, touch-up paint, Burglar-bars, HVAC rooms, lockers, cart storage…

-Curb appeal: Mansards, awnings, canopies, dormers

PrePre--cast wall panels cast wall panels (Fiber Cement panels)(Fiber Cement panels)

Pre cast wall panels by: Nichiha, Hardie Plank, CertainTeed, others…

$ 5.50/sf to $15./sf installed

PrePre--cast wall panelscast wall panels

Roof coatings and applications

Rusting roof: Bad image, corrosion has started, leaking screws will cause damage to stored goods. Roof conditions may require a retro-fit roof or a roof replacement (engineer required).

Roof coatings will revive appearance, extend roof life up to 15 years, costs about $1.50/sf to $3./sf installed. 30% less cost than roof replacement, Includes Manufacturer's Warranty, Reduces Energy Costs: 90% UV reflective, Repairs Roof Leaks, Minimal Disruption, Long Term Solution, Cost Efficient Maintenance. Weather Barrier is a leading brand, for metal roofing.

Roof coatings: Steel BuildingsRoof coatings: Steel BuildingsElastomeric Coatings:Elastomeric Coatings: Liquid EPDM (Ethylene Propylene Diene Liquid EPDM (Ethylene Propylene Diene

Monomer): Monomer): ““Liquid rubber for roof repairLiquid rubber for roof repair””..Apply above 55 degrees. PowerApply above 55 degrees. Power--wash dirt and grease, apply one wash dirt and grease, apply one

coat rustcoat rust--inhibiting bonding primer, 2 coats elastomeric coating. inhibiting bonding primer, 2 coats elastomeric coating. Applications of 20,000sf to 30,000sf/weekApplications of 20,000sf to 30,000sf/week……estimated at $1.50/sf estimated at $1.50/sf installed.installed.

Repairs: Steel Buildings: Painting walls and doors

Before After

Case Study: Renovation: Mr. Storage

Retrofit roof replacement (Over Existing roof)

New purlins, called Roof Huggers, are installed over the existing roof, centered over the existing purlins, about 5’

apart.

Retrofit roof replacement (Over Existing roof)

A condensation barrier (R=3) is applied over the purlins. A galvalume standing seam roof is attached to the new purlins with clips, eliminating roof penetrations.

Retro-fit wall replacement

Openings are cut in, and framed out for new windows. New Girts,

insulationand wall panels are installed with trim. With the roof in place, the interior fit-

out for the mezzanine and conversion can take place.

Steel plank floor system.Steel drop ceiling, insulated.

Ramp to 2nd

floor$ 23,000.

Case Study: Renovation: Re-roof

Retro-fit re-roofing: Low profile screw-down roof…1979

Leaking at the ridge…

Leaking at the eave

Miller Buildings, Inc. Est. 1976

New purlins installed right over

existing screw down roof. N

ew

eave and rake trims added.

Special trim covers existing roof.

Condensation barrier added

New standing seam roof

Standing seam panels, attached with clips.

Conversion: Existing building

$20./sf: Miller Buildings

Renovations: Interior upgrades

Diamond plate corner guards and kick-plates.

Repairs

• Jamb replacement• Corner repairs• Trim damage• Roof damage• Graffiti removal• Snow/Ice damage, plow damage• Rust and corrosion repair

Steel Building Repairs: Piers Steel Building Repairs: Piers ““Old SchoolOld School””

Steel pier: Circa 1977, rusted from salting for 33 winters.

Steel Building Repairs: Piers Steel Building Repairs: Piers ““Old SchoolOld School””

Rusted structural steel has been removed and replaced, bolted into place, primer has been applied, ready for field paint. Cost $ 75. to $ 125./ pier replacement.

Steel Building Repairs: Piers “Old School”

“Multi-Rib”

header/jamb system, cheap to build, a challenge to repair…

Steel Building Repairs: Jambs: Modern design

Snow plow damage

Steel Building Repairs: JambsGalvanized structural jambs, pre-painted jamb cover. Simple to replace, no painting, no welding…$30./jamb cover

Before installing jamb covers…

Jamb covers installed.

Converting existing outdoor portable storage to climate controlled space…

•New Insulated roof

•New insulated walls

•New entrance doors

•HVAC System

•Lighting, electric, alarms…

•Increased revenue

•Engineering?

New retrofit roofing structure allows for a continuous 70’single slope roof, enclosing the existing structures, and thespace between the buildings.

70’

standing seam roof sheets cover all (6) buildings

New insulated wall system will allow for a perimeterhallway to access the existing units.

Steel Building Repairs: Corner damage

Steel building components are simple to repair.Miller Buildings, Inc. Est. 1976

Steel Building Repairs: Trim damage

1 Downspout: $30.

20’

Rake Trim: $56.

Graffiti

NEW: Roof, walls, insulation, framed openings

Graffiti

Vandalism

Lou

65’x130’x21’

$ 65,000. or $7.70/sf

Reconfigurations: Adjusting the mix…

Miller Buildings, Inc. Est. 1976

ReconfigurationsReconfigurationsConvert outside access units into indoor climate controlled units.

Recessed entry area

ReconfigurationsReconfigurationsConvert indoor access LARGE units into small units. Increase revenue

Reconfigurations: Adding small units (outside)Reconfigurations: Adding small units (outside)

ReconfigurationsReconfigurations

Upgrades and preventative measures…

Upgrades: Mansards, Canopies, Parapet walls.

Preventative measures: Clean gutters, heat tape, snow-guards, Bollards, smoke detectors, heat detectors, fire extinguishers.

Damage: Fire, Flood, Mud, Wind, Snow,

Directional signs, one-way striping, reflective bollard covers.

Miller Buildings, Inc. Est. 1976

Mansard structures

Canopy structures

Parapet walls

Vertical mansard

Gutters must to be cleaned!

…wrong length screws trap leaves.

Prevent ice dams with snow Guards and heat cables.

$4./lf to $6./lf

?

Wood wedged between purlin and insulation , causing roof damage!

Roof failure: Blizzard

Endwall failure: Hurricane

TornadoMudslide

Natural disasters

Fire damage

Fire damageFire damage

Wind Damage

Poor wall design: Allowed for up-lift

Poor roof design: (18 years later) Failure and complete loss, damage to stored goods.

Fire Restoration: Roof replacement, Door and filler replacement, trim replacement, new insulation, new partitions.

Solar…Easy ?

Solar equipment may add 3#/sf to 7#/sf•

Most buildings, are designed to allow an additional 3#/sf collateral load. Many buildings are NOT designed for additional loads.

Solar equipment set on an angle, will effect the wind load, possible uplift issues may arise.

Any equipment attached to a roof panel will void the warranty•

Standing seam Roof panels have a 20 to 30 year life. Solar panels are forecast to last 30 years.

Unbalanced snow drifting can be dangerous. Hire an engineer.