Project Scope of performance Value Client
Franklinstraße Berlin
Berlin,
Germany
All trades and works (excluding FF&E) for the new
office complex (3 buildings, about 40.000 m² NGF).
Site installation
Surveillance
Masonry works
Core drilling
Locksmith works
Screed
Heating
Ventilation
Sanitary installations
Electrical installations
Plastering works
Fire Protaction
Tiling works
Painting works
Doors
Building automation
Sunscreen
Outdoor facilities
Flooring works
Earthworks
Scaffolding work
Insulation
~ 43,0 Mio. € Patron Mawson S.á r.l.
6, Avenue Pasteur
2310 Luxembourg
Rüthlingstraße Munich
Munich,
Germany
Energetic renovation and modernization of a
residential building (42-party tenement) with
underground parking.
Surveillance
Demolition works
Carcass work
Carpenter / Roffer
Outdoor facilities
Screed
Tiling works
Flooring works
Locksmith works
Heating
Ventilation
Sanitary installations
Electrical installations
Plastering works
Painting works
~ 3,0 Mio. € Habermann GbR
Widderstraße 20
81679 Munich
Germany
Motel One Berlin Ku´damm
Berlin,
Germany
Renovation of 248 guestrooms and public areas. All
finishing works incl. FF&E.
tiling
painting works
flooring
carpentery
loose furniture
textile decoration
lamps
~ 2,5 Mio. € Motel One Betriebs GmbH
Tegernseer Landstraße 165
81539 Munich
Germany
25hours Hotel Munich The Royal
Bavarian
Munich,
Germany
Conversion and renovation of the listed building
(carcass works, building services, as well as overall
finishing and completion) from a former telegraph
office to a hotel.
Site installation
Dry construction
Cavity floors and double floors
Laying of screed
Industrial floor coatings
Waterproofing of buildings
Plastering works
Artificial stone works
Laying of tiles
Metalwork
Glass and mirror works
Painting and wallpapering works
Flooring works
Joinery works
Construction of doors / fire doors
Air-conditioning systems (rooms)
Sanitary systems (rooms)
Sanitary installations
~ 20 Mio. € Fieldcustom S.à.r.l.
1, Allée Scheffer
2520 LUXEMBOURG
LUXEMBURG
Lots
2018 Page 2 of 17
References
Project Scope of performance Value ClientLots
Adina Apartment Hotel Leipzig
Leipzig,
Germany
Renovation and conversion of an office building into a
hotel with 166 rooms (planning, carcass and finishing
works, incl. building services).
Planning
Preservation of evidence
Measuring
Pollution control
Sound insulation
Statics
Fire protection
Construction signs
Security service / Construction
site surveillance
Demolition works
Carcass work
Core drilling
Masonry works
Waterproofing of roofs
Concrete components
External wall insulation system
Façade metal
Façade decorative element
Window/façade
Civil engineering works
Laying of screed
Screed coating
Steel works
Plastering works
Dry construction works
Laundry chute
WC partition walls
Mobile partition walls
Double floor
Tiling works
Natural stone works
Flooring works
Parquet works
Locksmith works
Wooden doors
Metal doors
Glass doors/glass door elements
Joinery works
Gastronomy kitchen
Locking system
Electrical installations
Heating/air-conditioning/
ventilation/sanitary
ICA (instrumentation, control and
automation)
Heating and cooling ceilings
Fire protection
Elevator systems
Inclined elevator
Pool/Pool technics
Sauna
Industrial cleaning
Loose furniture
Lighting
Outdoor facilities
Advertising structures
Signage
~ 18,5 Mio. € Leipziger Stadtbau AG
Reichsstraße 1-9
04109 Leipzig
Deutschland
Kimpton De Witt Amsterdam
Amsterdam,
Niederlande
Renovation of 274 rooms including public areas with
all trades including TGA. The Kimpton Amsterdam is
considered the first hotel of this brand outside
America.
Screed, dry construction
Concrete works
Tiling works
Painting works
Flooring works
Doors, Joinery works
~ 14,6 Mio. € YC Amsterdam BV
Nieuwezijds
Voorburgwal 5
1012 RC AMSTERDAM
Niederlande
2018 Page 3 of 17
References
Project Scope of performance Value ClientLots
NH Hotel Hamburg Mitte
Hamburg,
Germany
Conversion and renovation of 127 rooms(finishing
and completion package including technical facility
equipment - HVAC).
Demolition works
Laying of screed
Dry construction works
Tiling works
Painting works
Flooring works
Doors
Textile decoration
Electrical installation
Lighting
Loose lighting
Industrial cleaning works
~ 7,8 Mio. € NH Hotels Deutschland GmbH
Friedrichstraße 96
10117 Berlin
Deutschland
Zur Krone Niedersonthofen
Niedersonthofen,
Germany
Furniture production for 20 modern guest rooms carpentery ~ 75 T € R&S Mayer GmbH
Laubener Straße 18
87439 Kempten:Hirschdorf
Germany
Huus Gstaad Hotel
Saanen-Gstaad,
Switzerland
Renovation of the public areas. All finishing works
incl. FF&E.
tiling
painting works
flooring
carpentery
loose furniture
textile decoration
lamps
~ 1,6 Mio. € Huus Gstaad AG
Schönriedstr. 74
3792 Gstaad-Saanen
Switzerland
2018 Page 4 of 17
References
Project Scope of performance Value ClientLots
The Ritz Carlton Berlin
Berlin,
Germany
Conversion and renovation of 1st floor (finishing and
completion package).
building site equipment
demolition
dry walling
painting works
flooring
carpentery
loose furniture
textile decoration
~ 1,2 Mio. € The Ritz-Carlton Hotel Company GmbH
Postdamer Platz 3
10785 Berlin
Germany
Land & Golf Hotel Stromberg
Stromberg,
Germany
Renovation of 109 rooms and suites in the main
building of the private hotel. One of the challenges for
us was the very short execution period of only 4
weeks.
demolition
dry walling
painting works
flooring
carpentery
loose furniture
textile decoration
electrical installation
lighting
lamps
~ 1,5 Mio. € BUL Verwaltungs- und Beteiligungsgesellschaft
mbH
am See 27,
76646 Bruchsal
Germany
2018 Page 5 of 17
References
Project Scope of performance Value ClientLots
Hotel Palace Berlin
Berlin,
Germany
Renovation of 76 rooms during ongoing hotel
operation including all finishing trades.
demolition
windows, outer door
dry walling
painting works
flooring
carpentery
loose furniture
furnishing
textile decoration
electrical installation
lamps
sanitary installations
~ 1,8 Mio. € Hotel im Europa Center Verwaltungsgesellschaft
mbH & Co.KG
Budapester Straße 45
10787 Berlin
Germany
Capri by Fraser Frankfurt
Frankfurt,
Germany
Construction of an apartment building of the brand
Fraser Place with 153 rooms (joinery works room +
kitchen incl. kitchen appliances, safe, vanity and
mirror).
carpentery loose furniture ~ 1,2 Mio. € GBI AG Gesellschaft für Beteiligungen und
Immobilienentwicklungen
PBMG Projekt- und Baumanagementgesellschaft
mbH
Königstor 35,
34117 Kassel
Germany
The Hague Marriott Hotel
Den Haag,
The Netherlands
Interior fittings for 306 Rooms and Suites plus Public
Areas. The Hotel has two Bars, Brasserie The Great
Room and restaurant The Gallery.
scaffolding work
demolition
shell works
dry walling
tiling
painting works
flooring
metal works
doors and carpentery
roller shutter
lighting
sanitary installations
building cleaning
~ 6,8 Mio. € Westmont UK,
Projektsteuerung über
ChandlerKBS
Königsallee 11
40212 Düsseldorf
Germany
2018 Page 6 of 17
References
Project Scope of performance Value ClientLots
RIU Plaza Berlin
Berlin,
Germany
Interior fittings for 357 Rooms and Suites plus Public
Areas, including technical facility equipment - HVAC
demolition
screed
cavity works
plaster and stucco works
dry walling
natural and artificial stone works
tiling works
painting works
flooring works
metal works
doors and carpentery
furnishing
shutter and sun-protection works
HVAC
~ 30 Mio. € Codes Capital Partners S.L.
Niederlassung Berlin
Hardenbergstraße 4-5
10623 Berlin
Germany
Mövenpick Hotel Münster
Münster,
Germany
Partial soft refurbishment of the hotel in the areas:
guest rooms and corridors in the section "Altbau" (old
building).
building site equipment
painting works
flooring
carpentery
loose furniture
equipment
textile decoration
electrical installations
lighting
lamps
building cleaning service
≈ 1 Mio. € Mövenpick Hotels Deutschland GmbH
Am Hauptbahnhof 2
45127 Essen
Germany
JW Marriott Venice
Resort & SPA
Venice,
Italy
On behalf of the Aareal Bank AG, hagenauer GmbH
was carrying out the complete interior construction of
266 guest rooms, suites and public areas on Sacca
Sessola, an island in the Venetian Lagoon.
carpenetry
textiles decoration
lighting
loose furniture
dry walling
screed
paint works
natural stone
tiling
metal works
parquet
carpets
~ 13 Mio. € La Sessola S.r.L.
Via Mercadante 12/14
00198 Rom
Italy
Contact:
Wilhelm Wüst
+49 611 348 2791
2018 Page 7 of 17
References
Project Scope of performance Value ClientLots
Hotel Meliá Vienna
Vienna,
Austria
Complete FF&E furnishings for 242 Standard Rooms,
six Honeymoon Suites, four Suites, one Presidential
Suite plus the entire Public Areas - two restaurants,
three bars, Conference Rooms, three kitchens - as
well as for the total of the Back of House area
carpentry
textiles decoration
lighting
loose furniture
OS&E
kitchen installations
~ 5,3 Mio. € VIENNA DC Tower 1
Liegenschaftsbesitz GmbH
Donau-City-Straße 1
1220 Vienna
Austria
Contact
Dipl.-Ing. Thomas Jakoubek
Lindner Congress
Hotel Düsseldorf
Düsseldorf,
Germany
Interior fittings for 90 guestrooms including corridors demolition
dry walling
tiling
paintworks
flooring
carpentry
electrical installations
sanitary installations
lighting
~ 3,0 Mio. € Lindner Rheinstern GmbH & Co KG
Emanuel-Leutze-Straße 17
40547 Düsseldorf
Germany
Contact
Dirk Dietrich
T +49 211 5997 1389
Siegfried Wenzelmann
T +49 211 5997-337
25hours Hotel Bikini Berlin
Berlin,
Germany
Complete fittings and interior fittings for 127
guestrooms and 22 suites, public areas (check-in,
conference areas, wellness area including sauna,
restaurant, kitchen and bar) and back-of-house area
(office, staff rooms, etc.)
Refurbishment of approx. 6.000 m² industrial surface,
transformation into a lifestyle hotel, implementation of
a design concept
dry walling
ventilation spaces and double
floors
screed
industrial floor finishing
sealing works
plasterworks
artificial stone works
tiling
metal works
mirrors / glass
paintworks
paperhanging
flooring
carpentry
doors
fire protection doors
ventilation / air conditioning
sanitary installations
sanitary objects
~ 6,0 Mio. € Bayerische Hausbau GmbH & Co. KG
Niederlassung Berlin
Hardenbergplatz 2
10623 Berlin
Germany
2018 Page 8 of 17
References
Project Scope of performance Value ClientLots
INNSIDE by Melia
Düsseldorf
Düsseldorf,
Germany
Transformation of an office building (Colorium) into a
4* design hotel.
Interior fittings for guestrooms and public areas
(check-in, bar, breakfast room and kitchen).
screed
dry walling
concrete works
tiling
paintworks
flooring
doors
carpentry
locking system
~ 2,1 Mio. € Ibing Immobilien GmbH & Co. KG
Am Töllershof 31
40489 Düsseldorf
Germany
Contact
Kai 18 Projekte GmbH
Oliver Ziehe
René Lück
T +49 211 - 540 750 0
Büropark Mollstraße 1
Berlin,
Germany
Core reconstruction of an office building including
facade works and building equipment (HVACR).
10.000 m² useable surface, excluding basement,
consisting of a 10 storey high rise building and a 3-
storey low rise building.
demolition
shell works
sealing works (roofs)
facade works
windows
exterior doors
outdoor facilities
screed
plaster and stucco works
dry walling
fire protection facilities
tiling
concrete works
paintworks
flooring
fitting works
electrical installations
telecommunication circuit facilities
sanitary installations
ventilation and air conditioning
facilities and appliances
lifts
~ 13,5 Mio. € Mollstraße 1, Objektgesellschaft mbH
c/o Suprema Immobilienverwaltung GmbH
Rosenthaler Straße 13
10119 Berlin
Germany
Contact
Suprema Immobilienverwaltung GmbH Dipl.-Ök.
Janet Greulich
T +49 30 612 86 662
Generator Hostel
Berlin Mitte
Berlin,
Germany
Core reconstruction and transformation of an office
building into a design hostel.
Fitting and furnishing for guestrooms and public areas
(reception, bar, lobby, café, breakfast room and
kitchen).
demolition
sealing works (basement)
statics
structural works
masonry works
exterior windows
screed
dry walling
sealing works
tiling
electrical installations
heating / ventilation
sanitary installations
flooring
paintworks
doors
carpentry
loose furniture
lighting
lift facilities
facade works
outdoor installations
advertising structures
signage
~ 8,0 Mio. € Patron Mitte Properties GmbH
Generator Hostels
Storkowerstraße 160
10407 Berlin
Germany
Contact
Generator Hostels LTD
Tarna Schmidt
T +49 30 417 24044
2018 Page 9 of 17
References
Project Scope of performance Value ClientLots
Doubletree by Hilton
Luxembourg
Luxemburg
Refurbishment of guestrooms and 6 suites and public
areas (lobby, reception, business centre, restaurant,
bar, meeting areas).
in an operational hotel
demolition
paintworks
natural stone
tiling
flooring
carpentry
loose furniture
textile decoration
sanitary installations
electric installations
~ 6,0 Mio. € Westmont Hospitality Group Europe
SW19 4DT London
United Kingdom
Contact
Westmont Hospitality Group Europe
Mitchell Binks
T +44 208 944 6666
Steigenberger Hotel
Bad Neuenahr,
Germany
Interior fittings for 63 guestrooms including bathrooms
(7 suites, 56 rooms), conference rooms an corridors,
public areas, hotel hall including lobby, check-in and
bar.
demolition
masonry
windows
screed
dry walling
natural stone
tiling
paintworks
flooring
doors
carpentry
loose furniture
textile decoration
decorative lighting
glass plates
sanitary installations
~ 2,6 Mio. € Steigenberger Hotels AG
Lyonerstrasse 40
60528 Frankfurt / Main
Germany
Contact
Steigenberger Hotels AG
Dr. Michael Schicker
T +49 69 665 646 39
Hilton Munich Park Hotel
Munich,
Germany
Refurbishment of guestrooms and suites, public
areas, lobby, restaurants, bar, executive lounge, ball
room and kitchen.
demolition
screed
dry walling
tiling
paintworks
flooring
doors
carpentry
loose furniture
textile decoration
electrical installations
lighting
sanitary installations
~ 8,0 Mio. € Hilton München Park
Zweigniederlassung der Hilton International Co.
Am Tucherpark 7
80538 München
Germany
Contact
Hilton München Park
Zweigniederlassung der Hilton International Co.
Christoph Glaser
T +49 89 384 523 00
2018 Page 10 of 17
References
Project Scope of performance Value ClientLots
Panoramahotel
Oberjoch;
Germany
Interior fittings for 113 guestrooms and suites plus
public areas.
carpentry
furniture
textile decoration
lighting
sanitary objects
sanitary accessories
~ 1,5 Mio. € Wellnesshotel Oberjoch GmbH
Salzstraße 10
87435 Kempten
Germany
Contact
BreFa Bauunternehmung GmbH
Gerhard Breher
T +49 170 61 38 07 5
Hotel Giardino Mountain
St. Moritz,
Switzerland
Refurbishment of 78 guestrooms and suites including
bathrooms.
screed
dry walling
natural stone
tiling
plasterworks
glass elements
paintworks
flooring
doors
carpentry
furniture
lighting
textile decoration
accessories
sanitary items
sanitary accessories
~ 4,5 Mio. € Centaurium Immobilien AG
Schulstrasse 27
2572 Möringen
Switzerland
Contact
Hotel Giardino Mountain
Philippe Frutiger
T +41 91 785 88 88
Hotel Austria Trend
Park Royal Palace
Vienna,
Austria
Interior fittings for 232 guestrooms and suites
including bathrooms and public areas.
sealing works
natural stone
tiling
paintworks
paperhanging
flooring
doors
carpentry
loose furniture
textile decoration
~ 5,0 Mio. € Mariahilferstrasse 212
Verwertungs GmbH
Favoritenstrasse 7/2
1040 Wien
Austria
Contact
PD Projektmanagement GmbH
Karl Resch
T +43 67 655 55 99 0
2018 Page 11 of 17
References
Project Scope of performance Value ClientLots
Mövenpick Hotel Lausanne
Lausanne,
Switzerland
Refurbishment of 72 guestrooms including
bathrooms, corridors, staircases, meeting rooms an
public bathrooms.
dry walling
sealing works
paintworks
natural stone
tiling
flooring
doors
carpentry
loose furniture
textile decoration
lighting
~ 2,5 Mio. € CLAIR AG
MAS Immobilienmanagement
Seestrasse 1
6330 Cham
Switzerland
Contact
CLAIR AG
MAS Immobilienmanagement
Tobias Achermann
T +41 41 783 8052
Apart-Hotel
operated by Hilton Zürich
Zurich,
Switzerland
Refurbishment of 67 guestrooms including corridors. demolition
flooring
loose furniture
textile decoration
lighting
~ 0,38 Mio. € Westmont Hospitality Group - Europe
SW19 4DT London
United Kingdom
Contact
Westmont Hospitality Group - Europe
Mitchell Binks
T +44 208 944 6666
Marriott Renaissance Paris Le
Parc Trocadero Hôtel
Paris,
France
Refurbishment of 100 guestrooms and 20 suites
including corridors, lift-landings, staircases, public
areas, hotel hall, check-in, bar, concierge and office
accommodations.
demolition
structural works
sealing works
steel construction
dry walling
doors / fire protection doors
handicapped accessible
furnishings
stucco works
natural stone n
tiling
paintworks
flooring
fitting works
carpentry
mirrors / glass
furniture fittings
furniture
textile decoration
electrical installations
lighting
sanitary installations
fire protection
sprinkler system
alarm system
ventilation / air conditioning
~ 5,6 Mio. € Westmont Hospitality Group - Europe
SW19 4DT London
United Kingdom
Contact
Westmont Hospitality Group - Europe
Mitchell Binks
T +44 208 944 6666
2018 Page 12 of 17
References
Project Scope of performance Value ClientLots
Fairmont
Le Montreux Palace
Montreux,
Switzerland
Phase 3:
Refurbishment of 41 guestrooms and 8 suites
Phase 1+2:
Refurbishment of 80 guestrooms and 23 suites
including bathrooms and corridors
in an operational hotel
demolition
dry walling
stucco works
paintworks
fitting works
doors
flooring
mirrors / glass
furniture
electrical installations
lighting
textile decoration
~ 8,4 Mio. € Fairmont Le Montreux Palace
Grand Rue 100
1820 Montreux
Switzerland
Contact
Fairmont Le Montreux Palace
Michael Smithuis
T +41 219 621 000
Hilton Stockholm Slussen
Stockholm,
Sweden
Refurbishment of 178 guestrooms including corridors
plus executive lounge
in an operational hotel
demolition
paintworks
flooring
carpentry
mirrors / glass
loose furniture
textile decoration
electrical installations
lighting
~ 2,8 Mio. € Hilton Stockholm Slussen
Guldgränd 8 Box 15270
10465 Stockholm
Sweden
Contact
Hilton Stockholm Slussen
Mr Peter Eriksson
T +46 8517 353 00
Hilton Berlin Hotel
am Gendarmenmarkt
Berlin,
Germany
Refurbishment of public areas (lobby, restaurant,
executive lounge, meeting rooms) plus 597
guestrooms and suites including corridors.
in an operational hotel
demolition
structural works
screed
dry walling
natural stone
tiling
paintworks
flooring
fitting works
carpentry
mirrors / glass
furniture
textile decoration
electrical installations
lighting
ventilation / air conditioning
~ 13,1 Mio. € Domhotel GmbH
Mohrenstrasse 30
10117 Berlin
Germany
Contact
Hilton Berlin
Zweigniederlassung der Hilton International Co.
Ronald van Weezel
T +49 30 20 23 40 00
2018 Page 13 of 17
References
Project Scope of performance Value ClientLots
Copenhagen Marriott Hotel
Copenhagen,
Denmark
Refurbishment of the reservation back office, check-
in, lobby, restaurant and bar including „front-cooking
area“.
demolition
dry walling
natural stone n
tiling
paintworks
paperhanging
flooring
doors
carpentry
furniture fittings
upholstered furniture
loose furniture
textile decoration
electrical installations
kitchen technology and
installations
technical and decorative lighting
fire protection
~ 1,2 Mio. Marriott Copenhagen Hotelinvest Kalvebod A/S /
Kalvebod Brygge 5
1560 Copenhagen
Denmark
Contact
Axios Hospitality Real Estate
Mr. Guy Greer
T +44 208 879 5140
Radisson Blu Ambassador Hotel
Paris
Paris,
France
Refurbishment of public areas (lobby, hotel hall, bar,
conference rooms, fitness studio, executive lounge
and board rooms)
in an operational hotel
demolition
dry walling
natural stone
tiling
paintworks
flooring
carpentry
mirrors / glass
furniture
textile decoration
electrical installations
lighting
sanitary installations
~ 1,5 Mio. € Westmont Hospitality Group
SW19 4DT London
United Kingdom
Contact
Westmont Hospitality Group
Mitchell Binks
T +44 208 944 6666
The Ritz Carlton, Vienna
Vienna,
Austria
Interior fittings for 177 guestrooms, 29 suites and 1
presidential suite including bathrooms and corridors.
dry walling
sealing works
natural stone
paintworks
flooring
fitting works
carpentry
mirrors / glass
furniture
textile decoration
electrical installations
lighting
sanitary installations
~ 11,0 Mio. € BAI Bauträger Austria Immobilien GmbH
1020 Wien
Austria
Contact
BAI Bauträger Austria Immobilien GmbH
DI Robert Hahn
T +43 1 33 146 45 20
2018 Page 14 of 17
References
Project Scope of performance Value ClientLots
Mövenpick Hotel Egerkingen
Egerkingen,
Switzerland
Refurbishment of 95 guestrooms and suites including
corridors plus board rooms and fitness centre
demolition
structural works
dry walling
natural stone
tiling
paintworks
flooring
fitting works
carpentry
mirrors / glass
furniture
textile decoration
electrical installation
lighting
ventilation / air conditioning
~ 1,82 Mio. € Mövenpick Hotel Egerkingen
Höhenstrasse 12
4622 Egerkingen
Switzerland
Contact
Chandler KBS
Baukonstruktion & Kostenmanagement
Dane Hutchinson
T +49 211 992 101
Hilton Munich Park Hotel
Munich,
Germany
Refurbishment of check-in area, ball room,
conference rooms and interior fittings for a new
fitness centre
in an operational hotel
demolition
dry walling
tiling
paintworks
fitting works
flooring
carpentry
textile decoration
fire protection doors
~ 1,03 Mio. € Hilton München Park
Zweigniederlassung der Hilton International Co.
Am Tucherpark 7
80538 München
Germany
Contact
Hilton Berlin
Zweigniederlassung der Hilton International Co.
Kurt Marosky
T +49 30 2023 1232
Starwood
Hotel Prince de
Galles
Paris,
France
Mock-up room screed
dry walling
stucco works
paintworksflooring
doors
carpentry
glass elements
mirrors
GLEEDS
7, rue d’Artois
Fra-75008 Paris
Contact:
GLEEDS
Herr David Grant
+33 40 38 64 24
2018 Page 15 of 17
References
Project Scope of performance Value ClientLots
Hilton Zürich Airport Hotel
Zurich,
Switzerland
3 phase refurbishment of 259 guestrooms including
bathrooms and corridors, executive lounge, meeting
rooms and restaurant
in an operational hotel
demolition
dry walling
natural stone
tiling
paintworks
flooring
carpentry
loose furniture
textile decoration
electric installation
lighting
sanitary installations
heating / air conditioning
~ 6,3 Mio. € Elba I Swiss GmbH
Hohenbühlstrasse 10
8152 Opfikon
Switzerland
Contact:
Chandler KBS
Baukonstruktion & Kostenmanagement Dane
Hutchinson
+49 211 992 101
Hotel Breidenbacher Hof
Düsseldorf, a Cappella Hotel
Düsseldorf,
Germany
Interior fittings for 79 guestrooms, 6 junior suites, 8
executive suites, 2 presidential suites and public
areas.
dry walling
stucco works
natural stone
paintworks
flooring
doors
carpentry
~ 6,5 Mio. € Chandler KBS
Baukonstruktion & Kostenmanagement
Königsallee 11
40212 Düsseldorf
Germany
Contact
Chandler KBS
Baukonstruktion & Kostenmanagement
Craig Maunder
T +49 211 992 101
The Dolder Grand Zürich
Zürich,
Switzerland
Interior fittings for 114 guestrooms and junior suites
including corridors.
dry walling
stucco works
natural stone
paintworks
flooring
carpentry
fire protection elements for
corridors
~ 10,5 Mio. € The Dolder Grand
Kurhausstrasse 65
8032 Zürich
Switzerland
Contact
Itten & Brechbühl AG
Kuno Zimmermann
T +41 796 890 892
2018 Page 16 of 17
References
Project Scope of performance Value ClientLots
Grand Hôtel de Bordeaux
Bordeaux,
France
Interior fittings for 150 guestrooms, public areas and
shopping arcade
dry walling
sealing works
stucco works
natural stone
paintworks
flooring
doors
carpentry
furniture
textile decoration
lighting
~ 13,5 Mio. € SNC Paris Le Havre
33000 Bordeaux
France
Contact
HF Architecture
Henrich Fitger
T +33 671 74 96 47
Hilton Dresden Hotel
Dresden,
Germany
Refurbishment of executive and business floors:
311 guestrooms including corridors, construction of
an executive lounge including business centre and of
a conference centre
in an operational hotel
demolition
dry walling
tiling
paintworks
flooring
doors
carpentry
textile decoration
lighting
~ 2,67 Mio. € Hilton Dresden
An der Frauenkirche 5
01067 Dresden
Germany
Contact
Chandler KBS
Baukonstruktion & Kostenmanagement
Dane Hutchinson
T +49 211 992 101
Crowne Plaza Heidelberg
Heidelberg,
Germany
Refurbishment of 232 guestrooms including corridors. demolition
dry walling
natural stone
tiling
paintworks
flooring
doors
carpentry
furniture
textile decoration
electric installations
lighting
~ 3,0 Mio. € Limnä Hotelbetriebs GmbH & Co. Verwaltungs KG
Kurfürstenanlage 1
69221 Heidelberg
Germany
Contact
Westmont Hospitality Group
Mitchell Binks
T +44 208 944 6666
2018 Page 17 of 17
References
Project Scope of performance Value ClientLots
Luxury Apartments
Divonne-les-Bains,
France
Turnkey construction of 3 residential buildings
comprising 19 luxury apartments
earthworks
building shell
carpentry / roofing
exterior windows
screed
dry walling
sealing works
natural stone, tiling
electrical installations
sanitary installations
heating / ventilation
metal works
flooring
paintworks
doors
wooden staircases
carpentry
fixtures
sanitary objects
elevators
facade works
garages
outdoor facilities
~ 7,8 Mio. € Chandler KBS
Baukonstruktion & Kostenmanagement
Königsallee 11
40212 Düsseldorf
Germany
Contact
Chandler KBS
Baukonstruktion & Kostenmanagement
Craig Maunder
T +49 211 992 101
Grand Elysée Hotel Hamburg
Hamburg,
Germany
Refurbishment of 230 guestrooms and suites
including public areas, ball room, wellness area.
New construction of an annexe building plus
refurbishment of existing areas .
screed
dry walling
sealing works
stucco works
natural stone
tiling
paintworks
flooring
fitting works
doors / fire protection doors
carpentry
mobile partition walls
loose furniture
textile decoration
lighting
~ 11,7 Mio. € Atacasa Grundstücksver-waltungsgesellschaft
mbH & Co
55252 Wiesbaden
Germany
Contact
Anwaltskanzlei Costard
Dr. Andreas Costard
T +49 40 303 88 80
Pride of Hawaii
Cruise liner
Norwegian Cruise Line
Papenburg
Germany
Cruise liner fittings for the areas Italian Restaurant,
Cigar Lounge, Champagne Bar, Tepanyaki Bar, Beer
Bar.
dry walling
natural stone
tiling
fitting works
doors
carpentry
metal ceilings
fire-retarding sealing
~ 1,5 Mio. € Meyer Werft GmbH
Postfach 1555
26855 Papenburg
Germany
Contact
Meyer Werft GmbH
Hannes Wüstnienhaus
T +49 160 471 8541
2018 Page 18 of 17
References
Project Scope of performance Value ClientLots
Norwegian Jewel
Cruise liner
Norwegian Cruise Line
Papenburg
Germany
Cruise liner fittings for the areas French Restaurant,
Cigar Lounge, Champagne Bar, Martini Bar, Beer Bar
dry walling
natural stone
tiling
fitting works
doors
carpentry
metal ceilings
fire-retarding sealing
~ 1,4 Mio. € Meyer Werft GmbH
Postfach 1555
26855 Papenburg
Germany
Contact
Meyer Werft GmbH
Hannes Wüstnienhaus
+49 160 471 8541
Jewel of the Seas
Cruise liner
Royal Caribbean International
Papenburg,
Germany
Ship-Refurbishment for the area Sportsbar. dry walling
natural stone
tiling
fitting works
doors
carpentry
metal ceilings
fire-retarding sealing
~ 500 T€ Meyer Werft GmbH
Postfach 1555
26855 Papenburg
Germany
Contact:
Meyer Werft GmbH
Hannes Wüstnienhaus
+49 160 471 8541
Serenade of the Seas
Cruise liner
Royal Caribbean International
Papenburg,
Germany
Ship-Refurbishment for the area Sportsbar. dry walling
natural stone
tiling
fitting works
doors
carpentry
metal ceilings
fire-retarding sealing
~ 520 T€ Meyer Werft GmbH
Postfach 1555
26855 Papenburg
Germany
Contact:
Meyer Werft GmbH
Hannes Wüstnienhaus
+49 160 471 8541
2018 Page 19 of 17
References
Project Scope of performance Value ClientLots
Hilton München City Hotel
Munich,
Germany
Refurbishment in 3 phases of 493 guestrooms
including corridors, public areas (lobby, reception,
business centre) plus construction of an executive
lounge
in an operational hotel
demolition
dry walling
tiling
paintworks
flooring
doors
carpentry
lighting
technical facility equipment -
HVAC
~ 4,3 Mio. € Hilton International Germany GmbH
Zweigniederlassung München
Rosenheimer Str. 15
81667 München
Germany
Contact
Chandler KBS
Baukonstruktion & Kostenmanagement
Ulf Oebius
+49 211 992 101
Deutsche Lufthansa
First Class Terminal Frankfurt
Airport
Frankfurt,
Germany
Interior fittings for the customer area of the first class
lounge, approx. 1.800 m².
dry walling
sealing works
natural stone
tiling
paintworks
flooring
fitting works
doors / fire protection doors
carpentry
electrical installations
lighting
textile decoration
metal ceiling
technical equipment
~ 2,5 Mio. € Deutsche Lufthansa AG
50679 Köln
Germany
Contact
Architekten K2
Klaus Kampmann
T +49 241 989 033 11
Hilton Düsseldorf Hotel
Düsseldorf,
Germany
Refurbishment of 375 guestrooms and suites
including corridors, public areas (lobby, reception,
bar, restaurant, wellness area, ball room)
in an operational hotel
demolition
masonry
dry walling
natural stone
tiling
paintworks
flooring
doors / fire protection doors
carpentry
textile decoration
~ 8,02 Mio. € Hilton International Germany GmbH
Zweigniederlassung Düsseldorf
Georg-Glock-Str. 20
40474 Düsseldorf
Germany
Contact
Chandler KBS
Baukonstruktion & Kostenmanagement
Andreas Schulz
T +49 211 992 101
2018 Page 20 of 17