6 August 2015
Ref: E24192Klet
Jason Gao
Managing Director
Ausbao Pty Ltd
Level 4, 507 Kent St Sydney 2000
DEVELOPMENT APPLICATION SUPPORTING LETTER
PROPOSED RESIDENTIAL DEVELOPMENT
1, 1A, 3 & 5 AVON ROAD AND 4 & 8 BEECHWORTH ROAD, PYMBLE, NSW
Ausbao Pty Ltd (‘the client’) commissioned Environmental Investigation Services (EIS)1 to undertake
an additional Environmental Site Assessment (ESA) and prepare a Remedial Action Plan (RAP) for the
proposed residential development at 1, 1A, 3 & 5 Avon Road and 4 & 8 Beechworth Road, Pymble.
This letter forms part of the Land and Environment Court of NSW (L&E Court) Proceedings No.10834
of 2013. The proceedings relate to the refusal by the Planning Assessment Commission (PAC), as
delegate of the Minister for Planning (Minister), of the Major Project Application (MP 10_0219) for a
multi-unit residential development at 1, 1A & 5 Avon Road and 4 & 8 Beechworth Road, Pymble
(Site).
On 5 December 2014, the Land and Environment Court ordered that a Concept Plan approval be
issued in respect of the development of the Site, and the PAC issued the Concept Plan Approval on
19 December 2014. The proceedings No.10834 of 2013 relating to the Major Project Application
were stood over following the Court's order regarding the Concept Plan and the PAC's subsequent
issue of the Concept Plan Approval.
EIS have previously undertaken a Stage 1 ESA (Ref: E24192KrptRev1.2 dated December 2012) and a
Preliminary Stage 2 ESA (Ref: E24192Krpt2 dated 22 May 2015) and these should be read in
conjunction to this letter.
The EIS 2015 stage 2 ESA concluded that the site can be made suitable for the proposed
development provided that the following recommendations are implemented to address the data
gaps and to minimise/better manage/characterise the risks:
1. Address the data gaps identified as part of an additional ESA;
2. Prepare a Remediation Action Plan (RAP) to outline remedial measures for the site;
1 Environmental consulting division of Jeffery & Katauskas Pty Ltd (J&K)
3. Prepare a Validation Assessment (VA) report on completion of remediation.
The additional ESA investigation EIS are currently undertaking aims to address the data gaps
identified in the EIS 2015 report. Fieldwork for the additional ESA has commenced and based on the
findings an RAP will be prepared for the proposed development. Following the RAP implementation
and subsequent successful Validation Assessment (VA) the site can be deemed suitable for the
proposed development.
LIMITATIONS
This letter has been prepared for the particular project described and no responsibility is accepted
for the use of any part of this letter in any other context or for any other purpose. Copyright in this
letter is the property of EIS.
EIS has used a degree of care, skill and diligence normally exercised by consulting
engineers/scientists in similar circumstances and locality. No other warranty expressed or implied is
made or intended. Subject to payment of all fees, the client alone shall have a licence to use this
letter.
If you have any questions concerning the contents of this letter please do not hesitate to contact us.
Kind Regards
Geoff Fletcher
Environmental Scientist
Adrian Kingswell
Principal
SAMPLE LOCATION PLAN
1, 1A, 3 & 5 AVON ROAD AND4 & 8 BEECHWORTH ROAD,PYMBLE, NSW
2
E24192K
NOTES:Figure has been recreated from the suppliedsurvey plan
The borehole locations presented on this plan have beenestablished from site measurements only and should notbe construed as survey points. The fill depths include thepavement thickness where pavement was encountered.
Reference should be made to the report text for a fullunderstanding of this plan.
ENVIRONMENTALINVESTIGATIONSERVICES
Title:
Address:Figure:
Project Number:Approximate Scale (m):
0 10 20 30 40 50
BH1 (0.45)
BH2 (0.45)
BH3 (0.2)
BH4 (0.05)
BH5 (>0.3)
BH8 (0.4)
BH9/MW9 (2.0)
BH13 (0.4)
BH14 (0.2)
BH18 (>0.7)
BH19 (0.3)
BH20 (0.9)
BH21 (0.2)
BH22 (>1.0)
BH23 (>1.0)
BH24 (0.5)
BH25 (0.25)
BH26 (>0.5)
BH27 (0.4)
BH28 (0.3)
BH31/MW31 (0.4)
BH32 (0.3)
BH33 (0.6) BH34 (0.2)
BH35 (0.45)
BH36 (0.4)
SP1
SP2
SP3
CREEK
S1
LEGEND:
Approximate site boundary
Borehole location, number and depthof fill (m)
Groundwater monitoring well location
Approximate location of stockpile
Material sample location and number
Creek sample location
BH1 (0.2)
BE
EC
HW
OR
TH
RO
AD
AVON ROAD
Proposed Additional Locations July 2015
Recommended