SWGEC 2021 June 22, 2021

Recent Central Texas MSE Wall Failures: Strategies and Solutions for RepairRyan Eaves, P.E.TxDOT Bridge DivisionGeotechnical Branch

SWGEC 2021

June 22, 2021

SWGEC 2021 June 22, 2021

PROJECT DESCRIPTION

2

I-35

SH 45

SWGEC 2021 June 22, 2021

PROJECT DESCRIPTION

3

456’

21’

SWGEC 2021 June 22, 2021

PROJECT DESCRIPTION

4

SWGEC 2021 June 22, 2021

Pavement Distress (Feb. 2016)

Lorem ipsum dolor sit amet, consectetur

5

SWGEC 2021 June 22, 2021

Pavement Distress (Feb. 2016)

6

SWGEC 2021 June 22, 2021

Drainage Pipe Inspection

7

SWGEC 2021 June 22, 2021

Soil Boring/Monitoring

8

Piezometer

Piezometer

Inclinometer

SWGEC 2021 June 22, 2021

Soil Boring/Monitoring

9

SWGEC 2021 June 22, 2021

Piezometer Monitoring

10

SWGEC 2021 June 22, 2021

Inclinometer Monitoring

11

SWGEC 2021 June 22, 2021

Temporary Stabilization (Block Surface)

12

SWGEC 2021 June 22, 2021

Temporary Stabilization (Block Surface)

13

SWGEC 2021 June 22, 2021

Temporary Stabilization (Sep. 2016)

14

Shift traffic

Lanes on MSEW closed

CTB for temp. stabilization

Seal pavement crack

Monitor local slope stability and pavement distress

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Final Design

15

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Final Design

16

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Final Design

17

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Final Design

18

42in DS @ 6’ spacing Precast Panel Facing RW Underdrain and Horizontal drain

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Final Design

19

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Construction (Dec. 2016)

20

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Construction

21

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Construction

22

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Construction

23

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Construction

24

SWGEC 2021 June 22, 2021

Drilled Shaft RW – Construction

25

SWGEC 2021 June 22, 2021

Drilled Shaft RW (June 2017)

26

SWGEC 2021 June 22, 2021

IH-35 SB Mainlanes in West, TX

27

SWGEC 2021 June 22, 2021

Retaining Wall Layout

32’ Maximum Height

1303’ Length

280’ Failure Width

28

SWGEC 2021 June 22, 2021

May 14 – Initial Failure Symptoms

2’ – 3’ feet of settlement at the rail

29

SWGEC 2021 June 22, 2021

May 14 – Initial Failure Symptoms

4” Joint opening

Circular Failure Cracking

30

SWGEC 2021 June 22, 2021

May 14 – Initial Failure Symptoms

Cracking behind the rail near back of reinforced zone

Improper Drainage

31

SWGEC 2021 June 22, 2021

May 17 – Progression and Placement of Temporary Buttress

Additional Settlement and Movement at Wall Face

Placement of Low Profile Barrier

32

SWGEC 2021 June 22, 2021

May 17 – Progression and Placement of Temporary Buttress

6’ – 10’ Settlement at the Rail

33

SWGEC 2021 June 22, 2021

Repair Options

34

Remove and Replace

Tieback Anchors

Stabilization Berm

Drilled Shaft Wall

SWGEC 2021 June 22, 2021

Design Considerations

35

Sliding Check Controlled Design

Deflection Limit Controlled Drilled Shaft Size and Spacing

SWGEC 2021 June 22, 2021

June 4th – 100% Plans Complete

2

36

50’ Drilled Shaft Length

30’ Long – 0.5” Thick Casing

48” Drilled Shaft at 5’ Spacing

SWGEC 2021 June 22, 2021

Wall Layout

37

SWGEC 2021 June 22, 2021

Hitting a Moving Target

38

Layout June 4th – 17’ Offset from wall face

Layout June 17th – 17’ to 22’ Offset from wall face

SWGEC 2021 June 22, 2021

Construction

39

SWGEC 2021 June 22, 2021

Construction

40

SWGEC 2021 June 22, 2021

Lessons Learned

Ensure proper drainage above and below wall

Drilled shaft installation slowed down the failure significantly

Shaft installation was wet, indicating that water was conveyed through the failure surface

41

SWGEC 2021 June 22, 2021

US-290 Frontage Road – Austin, TX

42

SWGEC 2021 June 22, 2021

Retaining Wall Geometry

Excavation in front of wall results in loss of backfill material

Failure Centralized around Panel Columns 16-18

43

SWGEC 2021 June 22, 2021

Failure Investigation

44

SWGEC 2021 June 22, 2021

Failure Investigation

45

SWGEC 2021 June 22, 2021

Behind the wall Face

46

Void Extends 16’ behind wall face

Reinforcement Length is 22’

SWGEC 2021 June 22, 2021

Failure Progression

47

SWGEC 2021 June 22, 2021

Repair Options

48

~20’ deep excavation 6’ in front of the wall

Need to address Failed Foundation material.

– Extends minimum 10’ behind the face of the wall

Need to remove trench box and recompact material in front of wall

SWGEC 2021 June 22, 2021

Temporary Shoring Considerations

Need to avoid conflict with existing reinforcement to remain

Need to encompass the full failed zone

49

SWGEC 2021 June 22, 2021

Isometric View

50

SWGEC 2021 June 22, 2021

Foundation Improvement

51

SWGEC 2021 June 22, 2021

Design Considerations

Additional Drilled shafts to shore cut in front of the wall

Provide additional stability for intermediate construction stages

Permanent Casing to provide additional stiffness

52

SWGEC 2021 June 22, 2021

Stability Analysis

53

SWGEC 2021 June 22, 2021

Failure Progression

54

SWGEC 2021 June 22, 2021

Failure Progression

55

SWGEC 2021 June 22, 2021

Construction

56

TSS – Soldier Pile Lagging with closely spaced piles

Drill through the existing cement stabilized backfill ground improvement

SWGEC 2021 June 22, 2021

Lessons Learned So Far

57

Many unknowns, field adjustments may be necessary

– Limits of failed foundation material

– Limits of the void

– Condition of existing reinforcements

SWGEC 2021 June 22, 2021 58

QUESTIONS:

Ryan Eaves, P.E.TxDOT Bridge Division – Geotechnical Branch

Ryan.Eaves@txdot.gov

SWGEC 2021 June 22, 2021

Copyright 2021 • Texas Department of Transportation • All Rights Reserved Entities or individuals that copy and present state agency information must identify the source of the content, including the date the content was copied. Entities or individuals that copy and present state agency information on their websites must accompany that information with a statement that neither the entity or individual nor the information, as it is presented on its

website, is endorsed by the State of Texas or any state agency. To protect the intellectual property of state agencies, copied information must reflect the copyright, trademark, service mark, or

other intellectual property rights of the state agency whose protected information is being used by the entity or individual. Entities or individuals may not copy, reproduce, distribute, publish, or transmit, in any way this content for commercial purposes. This presentation is distributed

without profit and is being made available solely for educational purposes. The use of any copyrighted material included in this presentation is intended to be a “fair use” of such

material as provided for in Title 17 U.S.C. Section 107 of the US Copyright Law.

59

Recommended