View
232
Download
0
Category
Preview:
Citation preview
7/24/2019 Rabigh Requirement
1/33
TECHNICAL
DATA SHEET
AKON INTERNATIONAL
PROJECT
NPB, RABIGH
SUBJECT:
SPARE PARTS LIST
7/24/2019 Rabigh Requirement
2/33
Rll F Taing C.Limited Liabiliy
101086326
Date: 2/6/2014
Cusomer: AkonProject Name I No: NPB, RyadhMobile: 054652051
Work Order
04 _) o_,1
'.'\/" W
Work Order No.: RF/0000038/R2014
Head Ofce Location: Riyadh
Email: amjad.a@akonineational.com
Customer Infrmation
Contact Person:
Name: Eng Aiad Ali
Mobie: 054652051Emai: amjada@akonineational.com
Attachments
cpy f f qutt D N f ps ( 2 ) cpy f ppv/ctct /P D N f ps ( 9 )
From: Receiver:
Name: Al bandary AL Otaibi Name:ignature
\
Signaure:Dae: 2/6/014 Dae:
1_-0lT\Vo'L+. ii titi\\:4ii YltVttt . 1
iAYAO WI Y iA0 I tti . \ii itM Ar mO J/ . Facto: Te: +9661 214 744 ax +9661 41699 P.O Box 63975 Riyadh 11526 Kngdom of Saud Araba
Industa Lcense No 130 0/s CC No.133335 - CR101018636 -Admn Sales Tel. +9661 41688 ax: +9661 4164 699 Jedda Tel 966 2 63980 35 ax wocne E-ma nfo@olcne
7/24/2019 Rabigh Requirement
3/33
o_9 o_
94Rolle For Trading Co. Ltd.
A Attention: Eng. Amjad AliMb 0546532051Ema amjad.a@aknnana.m
Project: NPB, RabighSubject Quotation for Loading Dock Equipments
Dear Sir
Ref: RF-AM-465A-1/Date: 19 May 2014
fc yu quy h bv m Subjc/Pjc, w hv hpsu pv yu wh u bs ff s fws:
Descriptin U/Price T/Price
- Suppl & Instalato of Hydalc Dock Leveer Model HC 6630Size/ 6 ' wde x 6' og (omina) Capacity:30,000 lb
Sadard Fearesthe Pental leatre hat best descbes ths 12Eqipmen is podct buletin"Hydalc Loading Dock eveer (D030)
- Deck to accommodate canted vehicles up o 4" Pentaogc hydralc mad (excusive) Hydrauic l sa Back ad yelow saty stipng ad warning decals Maeace sad Safety checker plae deck and ipToe Gads Fu ange oe guardsLip Legth: 20 (508mm) (Nomna)Instalaon Sye Pi Model (Standad Pental pt sze)Fish Peali grayPowe Un Se Coaed 11/2 HP 230/ 3 I 60Optioa Hyd O: OIL22 standad dock evelerControls: Wal Moed Psh Bton Control (NEMA 12)Cub Age 70 x 70 x 5mm
Wth weathe sea.
Bmpes Lamnated dock bumpes 32
Total Amount
pecial Discount
Net Price
wwwllne
H' y L - :i vL + vv ;; u: u O
7/24/2019 Rabigh Requirement
4/33
f
o
ll
e
lg
09.fo ,L
4Rolle For Trading Co. Ltd.
Nt v wrk ar cu h prc.
Ts & Cndns
ValidityPayment
DeiveryWarray
: Two Weeks. 50% With Order Confirmation 40% Before Delivery of Material to Job Site 10% Upon Completion and Handing Over: 2 - 3 Months from the date of receiving down payment One Year warranty including spare parts against mafunction in workmanship
We hope the above meet your approval and we are ooking forward to hear from you.
est Regards
Abdul Muneer
Mobile 89
.
\Y" AYATO:U- \Y"T' ATO::i - \\ t\"t"'':- +'""\\ t\"t"VV/A A:Cli
7/24/2019 Rabigh Requirement
5/33
AD AABA BA Y
CONSTRUCION CO.
RABIGH I Non-Process BuildngsMai Adress: PO BOX 30980 Al Khobar 31952 KS.A
Sfl1 /iBIAUHEAD OFICEPne (+966) 03 - 893 0 79Tefax 966) 03 893 0 48BAYTUR We wbaytur.c
DIRETD TO
Gdece Ye
FAX NOFaks No
AENTIO TO
Aacak Oa
FROM
deen
SUBJCT
TEECOPIER MESSAG
Roll For Tading Co. td
+966 1 41 4699
A
lOI B I E M
L
IF YOU DO NOT RECV GBL OPIS O AL AS, PAS IORM S IDAY.
MSSAG
De M. Abdu
DAT 26.052014
Ta
AGES9
Say fa Aded
REFRr
Ref
cc
We Saud Aaban Baytu Constucton Co ( een afte caled SAB ere wth ssue ou fomal ode to you fo
te Hydraulc Dock Level n accodace wt te folowng condtios Ro Fo Tadng co td accepts tat a
te materals wl be as pe SABaytu Rabg PB Project standards Please kndy be fomed tat SA
Baytu Costucto Co s the owne of SO 90 ISO 141 and OHSAS 1801 certfcates due to that the
Labeg, Tasotaton, andng Ove and Asseby ( f equed ) of the goods shall catch the equements
o te beow mentoned standads
1Scope of Wok
and/or
Cotents)
o chase Orde :
abg Non Pocess Budngs ef# : R2P d 9
7/24/2019 Rabigh Requirement
6/33
Materal Descrpton Qty Unt Prce Total ie
Supply & Installaton of Hydralc Dock Levee Mode:C 6630 Size/ 6' wde x 6 log (nomal) Capacty30,000 lb
Stadard Feaus:
The Pea eae a bes descbes sEqpmen s podct bule "ydaulc oadng Docevele (030)-Dec o accomodae caed vecles up o 4"Pealogc ydac manod (excusve)Hyda fa saeBac and yelow saey stpg and wang decals
12Maeance sandSaey cee pae dec and pToe Gards F age oe guadsLip Leng 0 (508m), (Nomina)Insallaon Sye P Model ( Sandad Pealf ptsze)ns eat Gayowe Un Se Conaned 1/2 HP 230/3/0Optona yd i: IL sandad doc leveleCools Wal Monted Ps ton Coto (NEMA1)Cb Angle 70x70x5mm t weate seal.
mpe Lanated doc bupes 3
Toal Amount
Specia Dicou
Ne Pri
2. ayment
Tems:
00% o Prchase orde amont w be paid by bank tanse mentioned blow
21 o case Ode amount w be pai in avance by bak anser against
Commecial nvoice sgned by SAB athorized representatves
Sge an Stampd O
22 40 o rchase Oer amount wil be pai by bank tansfe beore the eivey
against
Comecia Invoice (sgne by SB athoze repesentatives)
Sige d Stamped .O
R bi h I N P B l Re# 2 29
7/24/2019 Rabigh Requirement
7/33
2.3 0 % of Puchase Orde amount w be paid y ank transe after te competio and
handng ove of te materials to site against
Commercial Invoce (signed y SAB authozed epresentatves)
Se Delvery Notce (signed y SAB authoed epresentatves)
3 Delverylocation& Dae:
Saudi Araban Baytu Constucton Co RabghI on Pocess Buidings Projec Ste Ragh / K.SA
The latest date for the delivery is 26.082014
4 Invoicig Pocedure
41 Address of nvoice
Invoce sall be addessed o:Saudi Araian Baytur Constucton o
PO Box 30980
Al Khoar
3952 - KSA
Atention M Rasim Uz
Tel 03 893 079
ax 03 83 3018
42 Further Inormation R quir d on Invoice fo Paym nt:
Specal care soud e taken that each nvoce clealy ncudes at east the folowig infomation SAB
eserves the rgt to dsegard invoices smitted wth nsffcient nfomatio .
Purcase Order numer
Proec nae
Jo code
Name of ank
, Ba anch name
Bank ful address
. Account number
Bank telephone nume
Bank fax umer
5 Liuidated Damaes
iquidated damages sha e appicale @% per week up to a maxmum of % of te PO vaueThe delvery date metioned in artcle3 s ased on te condition tat Ro or Tradng co Ltd ndustes
sal submit the Pucase Oder Approva n day from receivig PO and SAB sha approve he same inday In case thee s a delay in approva of the Puchase Orde, the delivey date n the PO shal e adusted
accordingy
6. Warates
Waany applicable uder ths PO shall e 2 onths incuding spare parts from the date of deivey
Rabigh Non Process Budings Ref# : R2P order 299
7/24/2019 Rabigh Requirement
8/33
7. Sare Parts
In case of te request of SAB fo any spae pas Ro Fo Tadng co Ld as o suppy any spae pas
eaed o the mateals supple as per hs contrac by caging to SAB after the en of warany peod
8.SecalPrchase Condtons
8.1Assgnmet
The foowng sal e added to cause 5 of SAB's Genera Pucase Conditons:
The Purcase ay assign to the Owner, f so requesed y te Owne, owne, all is gs unde the orer,
the oer o any par hereof with a pio wen noificaton o te Venor."
82 Owne's Efocement
e Vendo and te Pucase unersand at te Puchase s conacng wth te Venor for te
Purchase of the Maerals unde he Oe fo uimate ansfe to and use y he Owne Therefoe, he
Veno agrees that in any event al gts of e Pcase for ay falue o meet specficaons or f any
oter reach of waany povied fo shal run o the benefi of and be fu y enforceabe y te Owne
9 Documet Sbsso
Documens sha e submtted on tme as equred n e Requsion, n the manne specied in the
Documen aning Pocedure uness othewse insructed an ageed n e Pucase Orer or n te
Applicae Documents specifed hs Purchase Orer
10. pcable ocments:
is Purcase Order shall consst of the fo owng douens whc n the event of any nconsstency sala n porty n he same oder n whc they appea elow uness oerwse sae heen
101 e ex of this purchase orde
102 Requison No
No condons or quaficaons ncluded n Venors quoaon o n te subsequet corespondence sha
constute part of s Pucase Oe or the Applcabe ocuments un ess an save o e exten expessy
sed above
11 Revson of Requston and ts cabe ocments:
SAB wll not ssue aendens o s Purchase Order (Cange Ore) jus for ssuance of evsed
Requson o any part of te Applcale Docuens SAB wl sen te evse Requsiion o pa of te
Appcable Docuens uner cover of SA ransmtal form
12 Bsess Etics
A. e Vendo shal not gve o ofer or agree o give to any peson n he sevces of SAB any person in te
sevces of SAB any gft o consdeaton of any knd whc s, o coul reasoaby be costrued as beng,
an nucemen o ewa for dong o posng to o any act n elaon o the obtang o execuion
of is Puchase Ode wt SAB o fo showng o pomsing o sow favo o dsfavor to any peson n
eation to te Pucase Orde wt SAB
Ragh I on Pocess Bungs ef# : RP orde 299
7/24/2019 Rabigh Requirement
9/33
B. Witot prejdce to any oter rigts tat SAB may ave, SAB may temiate ts Prchase oder
mmedatey upon notce i wtng shoud te vendo voate te povso of tis Atcle
13 General Terms and Conditions:
131 Defnitions:
As used n tese Genera Purcase Conditons,
Ode" means te pucase oder togete wt al ts attacments and exbt and any othe
documents, tat are expressy specfied as docments to form the Orde n te purchae orde
Mateals means coectvey any mateas, maciney equpment, artces, pas, items, o
sevices povded fo n te Order
Vendo means te person, fm or corporaton to whom te Oder s ssed
Prcase means SAB
. Prce means te conideraton specfied in te Ode to be pad by te Pucaser to te Vendo for
te coplete deivery of te Materias and peformance of al oblgatons of te Vendo unde theOder
Owner means te peson, fm, coporaton o company ownng and/o purcaing te pant o
factes or wc te ateria are purcased unde ts Orde
Documents means a docments and data eatng to te ateras, includng specfcations,
drawings, desgns and repots o fabcaton, devey and/or ispection mi certicates
ntrctons fo andng and/or asemy opeation ador mantenance anas and te ie o
be spplied by te Vendor to the Puchase unde te Order, and yea, 'mont' o day and any
ote refeences to tme sa be constred by refeece to te calenda
13 2
Complete Agreement:
Te Ode consttutes the sole and ente ageement beween te Pucaser and the Vedor. Te tems of
te Vendo popoal ae ncorporated nto and made a pat of te Orde only to te extent o specfyg
te natue and descripton of te aterias ordered and ten only to te extent tat suc terms ae
content wt te oter tems of the Orde No oter tems o conditions of te Vendos propoal sal e
bndng upo te Purcaser unless expresly accepted by the Purcase wtng.
133 Pce
Pice te consideration specfed in te Oder to be pad by te Prcaser to te Vendo te
complete deivey of te Mateas and perfomance of a obigatons of te Vendo under te Ode ad,
subect to any adustment cage or escaaton in espect of costs of te Mateias or any other factowatoever ems of payment of te Price shal be a specfied i Cause 2 of te Ode
134 Change
he rcaser eserves te ght, at any time, to mae canges qatty dawngs and speciications,
metod of sipmet and packagng, schedues and te pace of delve n espect of any of te Mateials
under the Order. In uc event, an equitabe adtent n prce and/o tme of performance mtuay
atfactory to te Pucase and te Vendo may be negotated, but ony f any caim by te Vendo for
uch adutment be made in wtng wthn ten (10) day after receipt o te notice of any sc cange Any
adutment in pce and/o time of perfomance wi be made ony if ageed to n wtng by te Purcase,
Rabig II Non Process Bdngs ef# : R2P orde 99
7/24/2019 Rabigh Requirement
10/33
and no agreement or understatng modfyng t conditons or terms of te Odr sa ngg pon te
Prcasr uness made in wring and sgned by t Purcasrs athorzed representative
3.S Assgnm nt and Sub ttng:
Te Vendor sa not assign t Ordr or any part erof or any amounts d ereunder or suet th Orderor any part tereof wtout te prior written consnt of t Prcasr
13 6
D liv Tme(s) and D lays
e deivry tme(s stpuatd n te Ordr s of critica importace for te avoidance of sustanta loss to
te Prcaser and te Owner Howver te Vndor sal not a for delays n dlivey due to ay
event of force majeure ("orce Majeur wc is unforeseae and eyond its reasonal contro suc as
acts of God acts of governmenta autorities, firs floods arquaks explosions rots or war provided
te Vdor sa ave notfed te Purchasr in writng of t event te Vendor eieves constituts orce
ajeur wthn tree(3) days of its occurrce and th Prcaser accepts the same n writng n this cas,
te tme(s of divery of te Materias sa xtndd for te period ual to te tm actually lost yreason of t deay d to Forc Maeure but n no event Vndor sha e entted to any addtiona fnanca
compensation.
3.7 Patents and Prorieta Rights
Te Vendo warrants tat nor of te Materas furnished prsuant to th Order nor t use thereof y te
Pucaser or t Owner, w nfrng any patent or otr proprietay rigts of any tird party and th
Vendor agrees at its so cost and expens to indemnify dfnd and save armess te Purcaser and th
Oner from and aganst al osses costs, expenses or damags arsig or ncurred as a result of any sch
nfrngment or aegd frngment n t us or sae of te Materias except suc of te aterias as are
manfactured to t Purcasers own specfc desgn unless suc design orginated from or was proposed or
advsed y te Vendor
13.8Insp cton
e Purchaser and the Owner sal ave te rgt to inspect and test e ateras at any time durig
manufacture and rior to shpment treof and to carry out a fnal nspecton wtn a reasonae timeafter arrva of te Matas at t utimate destination Th Vendor at ts own cost and expense sa
prompty rectfy any dfects in te aterias discovered during such inspectons and tests and sa comply
with a otr requests o te Purcaser in reation terto Materas sa not demed to e
accepted by the Purcaser or te Owne unti dtermned satsfacto after t said fina inspecton e
making or faiure to make any inspecton of or paymnt for or acceptance of the atrias sal n no way
mpair the Purcass rgt to reject te Matrials as eing nsatsfactoy wtn any warranty perodstpulatd n Artcle 10 elow or to avai itself of any otr rmedes to whc te Prcaser may e entted
rnder or undr applcae law
139Exp ditn
Wnevr any actua or potenta cause deays o tratns to delay te performance of any of t work
under te Order t Vndor sa immdiately so notfy te urcaser in writng givng f detals tereof
and sa take suc measres at ts own cost as t Purcaser may approve or instrct to minimize or
eimnate the delay. T Purcaser shal ave te rigt to take watvr aton t ls ncssary, ncding
aranging te work to e carried out at th Vndor's or any of ts su supplrs' pants or esewhr y ayoter party at t Vndor's expense Purcasr or its representatve sa be alowed reasonale access
to t Vendor's pant ad tose of ts su sppiers for suc expedtng purposes Te Vendor sha suppy
Raigh I Non-rocss Bidngs Ref# : R2Porde 299
7/24/2019 Rabigh Requirement
11/33
scedues o ogress reots for the Purcases se exedtng as required by the Pchase an sall
reder all othe assstance deemed necessay by the Purchaser.
13.10 Waranties:
All the ateias fnished psant to the Oder ae guaranteed to be new used and of the best qualty
obtainabe ess otheise athorzed by the Purchase) to confom in al espects to the Ode to befree from falty design workmaship o materias to comy wth all apicable egal eqiements o othe
regulatons commoy accepted n the industy and to be of sufcent se and capacity so as to ffi i al
esects and opeating condtios specfie n the Oer. f any toble o efect n the esgn materias,
wormansh oerating chaacteistcs or performance of any at of the ateals arises o in danger of
asin at ay time up to one ) year fom the date whe sch aterias ae pace i commercia
operatio bt ot late tha twetyfou 24) moths fom the relevat tme of delivery thereof) and the
Vendor is otifed theeof the Veor shall at its ow cost ad exense ad as omty as ossble
theeate, mae all ateations, epairs ad eplacements as may be necessay to pemt the aterials to
functio in accodance with the oder ad to fufill the foegong warrantes Sho the Vedor fail to
corect or to commence ad digety poceed with taig approriate actions to coect the efective
aterals within a easonable time of beig caled uon to o so the Puchaser may, at its otion remove
and coect whethe by epai or repacement) such deectve ateials at the Vendos exense Te
Pchase may howeve at its otio elect to accept the defective Materias wt an ajstment i the
price theefore If usuat to the above waranties the Vendo a ters epais o repaces any defectve
mateias the provsios of this Atice sha then aly to sch altered reae o replaced Materials fo a
peiod of oe 1) yea fom the ate of ecommencement of commercial oeraton of such ateias.
Notwtstanding the above n case of an emegecy or any HSE elated issue, the Puchaser shal ave the
rght to emedy te defect by tsef or have it remedie by thid paty (ies) at the Vedo's expense. The
foregoing ovsons of this Atice icludig the warantes thee) sal also ue to the benefit of te
Owne
311Ind mity
:
he Vedor shall idemify an hold hamess the Pchase and/o the Owne from and against all
iabiites caims costs fo pesona injuy ncudig death) o operty or othe damage arisig ot of fact
o omissos of the Vendo o its employees, sppes, o agents o arisig out of any defect in the
Materas supped by the Venor pursuant to the Ode.
312 Canceato for Defaut
the event the Veno shal
a) Become insovent or
b) ecome baupt or go ito qiatio o
c) ake a genera aragement o assgnment fo the beneft of its cedtors, o
d) ave a eceiver o tstee aonte to manage its affas or
e) Be subject to the attachment exectio o othe udicia seiue of al or substatia y all of s assets o
f) Fa to corect ay defaut of the Vendo in comying with ay of the povisos o requiements of the
Order withi a reasonabe perio as may be etemned by the Puchaser ate bein notified in wtig
of sch defat by the Puchase ten an in each sch case the Pcase may fothwith by wtten
notice to the Venor and wthout prejudice to ay othe ights o emedies which the Puchase may
ave heender o at aw temnate furthe pefomance by the Veor of its wo unde the Orde
Uon receit of otice fom Pchaser Vendo sha iscotinue the wok and perom wateve is
eqied under a) to f) of artice 7 heende. In the event of such temination, the Prchase may
compete o have comleted the pefomance of te wok nde the Oe by such meas as the
Rabigh Non-Pocess udings ef# : RZP-orde299
7/24/2019 Rabigh Requirement
12/33
Purchse selects and the Vndor shall be esponsbe o ay addtona costs incurrd by the
Purchse in so dong Ay amounts du to the Vendo o tems o the Oder pro to such teminaton
sa be subect to setof of the Purchasers dditiona costs o completing th Od as aentoned
and oth damages costs or xpenses incured by the Puchase asng om the occurrnc e o any o
the events specid hren
33 PurchsesRight
o Cancelaton
he Pucsr sha have th rght to cance urthr pefomace of all o any sepaat pat of te Ord t
ny tme by gving witten notic to the Vndor On th date of cancton stated n sad notce the
Vendor sal
A. Dscontinue al work pertaning to t Odr
B. Pace no additiona orders with any thd paty;
C Use its best efots to eect the medate caceton o ordes whc it my hav p ac wth ny thrd
party reatio to te Orde i so equstd by th Purchaser
D Peserve and protect the Materals or ay pat theeo on hand purchased r or committd to theOrder;
E. Psrve and protect both wok n progress and all copeted wok whether in the Vendors pant or
that o its supplrs pendig th Purchases nstuctons concerning disposition
F spose o th sad work in accordnce with the Purchase's satsaction to the dte o cance aton
including rembursement o easonabe ovehead and poit pus reasonabe and necess expenses
esulting rom such cancelation providd such mount claimed are substantiated by documentaton
satisfactory to the Puchasr The abov items o embusent and payment fo work permd sha
constitute the entire ablty o th Puchasr und th Order and th Vndor shal not be enttled to
recover o any othe expenses damges proits o disbrsements in connecton with said cancelltion
314 Non-Waver:
othng heein sal be constued as mting the Puchaser's ights otherwise povded by law h
Purcasers delay o fai ue to enoce any of ts ights hereunde sha not be consdered a waive o such o
its ights er under shall not be considrd a wavr o such ights by th Purchasr whther as to that
occasion o any subsquent occasion unlss the Purchse xprssy stipuats such n writing
15S cr cy:
Al specifictons designs drawngs data and other nomaton ( coectvey calld the Infomtion")unised by th Purchas shall b usd by th Vendo only fo th purposes o ful ing its obigatos
und the Orde and or no other pupose. he Inormaton sha be kept conidenta sve whr th
Vendo poves, to the Purchasers satsfction that any such nomaton is avaable to te publc o was
alady in ts lawfu possession at the time such Inormation ws urnished to the Vendo or was ightfuy
received ro a thid party subject to no secrecy obgto hs oblaton o secrecy sh suvve any
teminaon of th Order
36 Publct
he Vendor sall not make news rases or ssu othe advetising petaning to the Oder wthout irst
obtinng te written pprov o the Purchaser.
Rabigh I on Pocess Bungs Re# : R2P orde 299
7/24/2019 Rabigh Requirement
13/33
1317Passing of
Prop rty:
Ful encumbered title to the Materials or any art thereof furnished by the Vendor n accordance wth the
terms and conditions of the Order shall vest in the Purchaser upon the Purchaser or ts apontee taking
delvery at the point of delvery secfed in the Order. Wthout rejudice to the oregoing where any
condtons of the Order rovide for rogress payments or payments on account to be made before such
delvey roperty in such tems of the Materals shall ass to the Purchaser at the tme of such payents nthe same proportion as the value of the articular ayment reresents, of the total value of the relevant
tems of the Materials, provded always that risk n resect of the Materals shall not ass to the Purchaseruntl delivery of the same. Uon roerty passng the Vendor or ts suplers shall mark clearly on all such
materal or parts of the Materals that they are the roerty of the Purchaser
13.18 Arbtration:
All dsutes controversies or dfferences which may arse between the parties out of or in relaton to or n
connecton wth the Order or any breach, validity or cancellation thereof, shall be fnally settled by
arbitration in Geneva, Swtzerland n accordance with the latest ules of Arbitraton of the nternatonal
Chamber of Commerce The award rendered by such arbitration shall be fnal and bindng upon the partesthereto without any right of apeal there from.
14
Delivery Chages
Transportaton of the al materals from oll For Tradng co Ltd to SAB/abghNPB ste shall be arranged
by Roll For Tradng co Ltd without any additional charges
Best Regards ,
Emre MUSUL
Procurement Offcer
Rabigh II Non Process Buildings
Deputy Logistcs Chef
Ref# : R2P order 299
Atilla OGU
Procurement Chef
7/24/2019 Rabigh Requirement
14/33
9 6 3
4
13
99
9
1
11
2
16
14
3
15
12
7
2
5
DOCK LEVELER COMPONENTS:
1. ELECTRO- HYDRAULIC GROUP
2.POINTS OF EVENTUAL LEVELLINGS
3.POINT OF WELDING
4.LIFTING CYLINDER
5.SECURITY STEEL ROD (FOR MAINTENANCE)
6.FRAME
7.FRONT FRAME STEEL PLATE
8.RUBBER BUMPERS
9.CYLINDER JOINTS
10.THREAD HOLES FOR LIFTING HOOKS
11.SAFETY STEEL SIDE PLATES
12.LIP ROTATION CYLINDER
13.UPPER PLATE
14.PLATE - FRAME HINGE
15.PLATE - LIP HINGE
16.SIDE SAFETY PLATES HOLDERS
HEIGHT
500
SEE ENLARGED
DETAIL-110
16
8
10
10 10
A
A
WIDTH 6'
LENGTH6.0
'
7/24/2019 Rabigh Requirement
15/33
7/24/2019 Rabigh Requirement
16/33
QTY.SIZE
W(inches) L (inches)
DL-1 6' 6'12
Hydraulic Dock Leveler MODEL
WIDTH 6'
LENGTH6
'
508
WIDTH 6'
HEIGHT
500
LENGTH 6'
HEIGHT
500
DOCK
BUMPERS
HC 6630
12'' up & down
7/24/2019 Rabigh Requirement
17/33
7/24/2019 Rabigh Requirement
18/33
7/24/2019 Rabigh Requirement
19/33
7/24/2019 Rabigh Requirement
20/33
Engineered for Safety!
Hydraulic Dock Leveler HC Series
The HC series hydraulic dock leveler is designed and built to provide superior product
value and prolonged, trouble-free performance. Convenient push button activation and
proven hydraulic technology increase the efciency and safety of the loading/unloading
process. All Pentalift dock levelers are factory tested before shipping.
Description:
Specications:
Hydraulic dock leveler(s) to be Pentalift model (see model chart below) HC6630as manufactured by Pentalift
Equipment Corporation. The nominal deck size will be6.0
wide x6.0
long with a rated capacity of 30,000 lb.Dock leveler(s) will be fully hydraulic with a wall-mounted, push button control station. The power unit will be
1 Hp, self-contained, TENV unit installed on the dock leveler frame. The power supply will be 230V/1PH/60
All hydraulic functions will be controlled by the Pentalogic hydraulic manifold. The nominal lip length will be 16
and will be self-retracting. The lip hinge will be a full width, piano style with a full width hinge pin. The lip hing
will be welded to a high tensile headboard. The rear hinge design will be a full width, xed style. The deck desig
will accommodate canted trucks/trailers up to 4. Dock leveler(s) will be equipped with full range toe guards, nigh
lock, hydraulic fallsafe and a maintenance stand. The lift cylinder shall be top-fed and forward-positioned behind
the headboard. Two molded rubber bumpers will be provided. Dock leveler(s) will have Pentalift gray nish.
Model* Width Length
HC6630 6.0 6.0
HC6830 6.0 8.0
HC61030 6.0 10.0
HC6.5630 6.5 6.0
HC6.5830 6.5 8.0
HC6.51030 6.5 10.0
HC7630 7.0 6.0
HC7830 7.0 8.0
HC71030 7.0 10.0
Dock Leveler To Be Equipped With The Following Available
Options (Specify):
pour-in-place installation styleautomatic return-to-stored position
deck stop with independent lip control
weatherseal (rubber or brush)
interlock to Pentalift vehicle restraint (specify model)
interlock to overhead door
interlock to inatable shelter
master control panel
easy sweep frame design
lip hinge grease ttings
foam insulated deck
18 or 20 lip length
PENTALIFT EQUIPMENT CORPORATION
*Models available in rated capacity of 30,000 lb only.
http://www.pentalift.com/dock-leveler-capacity.htmmailto:dock@pentalift.comhttp://www.pentalift.com/7/24/2019 Rabigh Requirement
21/33
Engineered for Safety
Pentalift dock bumpers
PENTALIFT EQUIPMENT CORPORATION
Laminated Dock
Bumper
Molded L ShapedBumper
Molded Dock
Bumper
Steel face dock bumpers provide max
life expectancy by spreading the stre
the bumper contact area. The plate st
face accommodates vehicle raising a
lowering as the suspension oats dur
loading/off loading cycle
4 projection
10 Wide
13 or 18 High
Bumper Extension Bumper Riser
4-1/2 or 5-1/2 projection
10 to 36 wide
10 or 20 high
4 projection
18 wide
18 high
2, 4 or 6 projection as standard
Custom projections available
Available for molded and laminated
bumpers
4,6,8 or 10 rise as standard
Customs available
Maximum bumper performance
Available in many sizes
See specic Steel face bumper
info sheet for more details
Steel Face Bumper
Bumper extensions are often installed at
a declined approach to the loading dock.
Extending the dock bumper projection
prevents the top of the vehicle from contacting
either the overhead door or the building wall.
Bumper risers are used when incoming
vehicles are higher than the loading
dock oor level. Bumper risers prevent
vehicle backing over top of the bumper.
Pentalift offers a wide range of molded and laminated loading dock bumpers.
Dock bumpers protect the building from the impact as the vehicle is backed into position. With many models, sizes and designs t
choose from the proper selection of dock bumpers will protect the facility and improve the aesthetics at the loading dock area.
http://www.pentalift.com/7/24/2019 Rabigh Requirement
22/33
Hydraulic Loading Dock Levelers
With over 30 years of experience manufacturing quality loading dock equipment, Pentalift is your single-source supplier for
loading dock levelers, dock lifts, dock seals & shelters, vehicle restraints, and much more
E n g i n e e r e d f o r S a f e t y
Conventional and Roll-Off Stop Lip
7/24/2019 Rabigh Requirement
23/33
Since 1983 Pentalift has grown to be recognized
as one of North Americas premier manufacturers
of Loading Dock and Dock Lift Equipment. The
simple business philosophy of manufacturing
a quality product with user safety in mind continuesto be our approach in the marketplace. Pentalifts
continuing success in designing, engineering,
and manufacturing loading dock solutions has
gained Pentalift an excellent reputation within the
materials handling industry.
Pentalift has a team of industry experts with
extensive experience that stands ready to assist
you with your most complicated applications.
Pentalift Company Information
2
7/24/2019 Rabigh Requirement
24/33
Pentalift Dock Design InformationPentalift has developed a comprehensive loading dock design guide that can be found on our website www.pentalift.com
safety-resources.php.Careful consideration should be given to all aspects when designing an efcient and safe loading
dock. Below are some aspects of loading dock design to consider.
Type of Dock Leveler:
LODEM is an industry group within MHI - The Material Handling Institute.TheLoading Dock Equipment Manu-
facturers (LODEM) members are the industry's leading suppliers of loading dock equipment. They supply solutions
worldwide and in virtually every major manufacturing and distribution sector.
In the document created in this group titled WHAT YOU ALWAYS WANTED TO KNOW ABOUT DOCK
LEVELERS, on page 7 states: "The hydraulic option gives you more versatility than either mechanical or air
dock levelers and typically would have lower service and maintenance costs." Hydraulic are preferred over
mechanical and air activated dock levelers.
Width of Dock Leveler:
There are three common widths 6 wide, 6.5' wide and 7' wide, nominal
7 wide provides the best access for loading / unloading side-by-side pallets
Length of Dock Leveler:
There are three common lengths 6' long, 8 long and 10 long, nominal
8 long is most popular
Dock Leveler Capacity:
Available in 25-30-35-40-45-50-60-80 and 100,000 lb capacity
Specifying a capacity higher than the calculated requirements will extend the life expectancy of the dock leveler
See link to understanding loading dock capacity here: www.pentalift.com/loading-docks/capacity.php
Lip Length:
There are 3 standard size dock leveler lips 16, 18 and 20
Ideally you want to have a lip that is 12 beyond the dock bumpers
16 lip length is standard with a 4 dock bumper
Other factors that may inuence dock leveler selection:
Door size
Dock height
Dock bumpers
Driveway approach: level, incline, or decline
Pentalift manufacturers dock levelers to suit ever
application from a 25,000 lb capacity mechanica
this 160,000 lb capacity hydraulic dock leveler
Featuring:
1/2" thick deck plate
1-1/2" thick lip plate
1" thick by 10" high headboard
10" deep deck beams
2-1/4" diameter lip hinge pin
4-1/2" diameter, gusseted hinge spools
Dual hydraulic lift cylinders
3
http://www.pentalift.com/safety-resources.phphttp://www.pentalift.com/safety-resources.phphttp://localhost/var/www/apps/conversion/tmp/scratch_1/Institute.Thehttp://www.pentalift.com/loading-docks/capacity.phphttp://www.pentalift.com/loading-docks/capacity.phphttp://localhost/var/www/apps/conversion/tmp/scratch_1/Institute.Thehttp://www.pentalift.com/safety-resources.phphttp://www.pentalift.com/safety-resources.php7/24/2019 Rabigh Requirement
25/33
Pentalift Series HD Hydraulic Dock LevelerThe Pentalift series HD hydraulic dock leveler offers many benecial operational and safety features. These featu
are shown on the following pages.
Model HD6835 shown
24
5 6
3
7
8
10
1
9
Series HD Hydraulic Dock Leveler Structural Features
F
1 High-strength, 4-way safety tread plate, deck and lip assembly: 55,000 psi yield.
2 Full-width self cleaning, heavy-wall hinge tube: 70,000 psi yield.
3 Gussets on lip and headboard hinge maximize support.
4 3/8" Thick, 50,000 psi yield, headboard with bridged gaps.
5 Structural, precision-formed "C" beams; 65,000 psi yield. Specially designed beams allow Pentalift to create a
build the deck support with optimal strength-to-weight ratio for a dock leveler. Utilizing 10 beams assures an
load distribution and maximum deck support.
6 Central deck beam for added support of three wheeled vehicles.
7 Rear frame assembly features four vertical structural members with six points of even support for the full wid
of the rear hinge.
8 Heavy-duty front frame provides full width, cross trafc support and superior building aesthetics.
9 Night locks prevents unauthorized entry when overhead door is locked on top of dock leveler.
10 Full width, structural channel tail board and one piece, full width rear hinge, complete with heavy steel
gussets. Pentalift's unique, welded assembly provides a box section for superior support and strength.
4
A
C
B
D
G
H
E
7/24/2019 Rabigh Requirement
26/33
Pentalift Series HU Ultima Hydraulic Dock LevelerThe Pentalift series HU Ultima hydraulic dock leveler provides the ultimate value in function and structure
available in a dock leveler.
Series HU Ultima Hydraulic Dock Leveler Structural Features(45,000 lbs capacity)
Model HU6845 shown
2
45
637
8
10
1
9
F
A
C
B
D
G
H
E
11
12
5
1. Deck plate high-strength, 4-way safety tread plate, deck and lip assembly: 55,000 psi yield.2. Lip plate assembly high-strength safety checker plate lip assembly. 1" rear laminated; c/w 3/8" x 6"
reinforcing plate, 55,000 psi yield.
3. Full-width self cleaning, heavy-wall hinge tube, 2-1/2" OD X 1-1/2" ID: 70,000 psi yield.
4. 3/8" thick gussets on lip and headboard hinge maximize support.
5. 3/8" Thick, 50,000 psi yield, headboard with bridged gaps.
6. "I" Beam deck support 6" structural "I" beams @ 12 lbs per foot.
7. Central deck beam for added support of three wheeled vehicles.
8. Rear frame assembly features ve vertical structural members with eight points of even support for the
full width of the rear hinge.
9. Heavy-duty front frame provides full width, cross trafc support and superior building aesthetics.
10. Night locks prevents unauthorized entry when overhead door is locked on top of dock leveler.
11. Full width, structural channel tail board and one piece, full width rear hinge, complete with heavy steel
gussets. Pentalift's unique, welded assembly provides a box section for superior support and strength.
12. Dual deck lift cylinders.
Note: In addition to the 45,000 lbs capacity model shown here, Series HU Ultima Hydraulic dock levelers are
available in 30,000 and 35,000 lbs capacities. These capacities maintain "I" beam construction. Lip plate thickn
"I" Beam sizing, lip hinge tubes and lip hinge pin diameters are all reduced in size relative to the 45,000 lbs cap
model reected above to correspond with the capacity ratings reduction. These two capacities incorporate singl
deck cylinders. Contact your Pentalift representative for more details.
7/24/2019 Rabigh Requirement
27/33
Pentalift's offset hinge design automatical
provides a barrier when the lip is parked in th
vertical position.
The full width, self cleaning, piano-style hin
ensures ongoing, reliable performance with lo
maintenance. The raised lip design spreads t
load on the hinge area over a larger area an
with better leverage, making this lip desig
stronger than the conventional lip designs.
By eliminating intricate sliding mechanism
Pentalift's Series "HDRS" levelers maintain th
roll-off stop feature at all times, even durin
higher risk, below level, end-loading operation
Roll-Off Stop feature further enhances safety at the loading dock
Pentalift Series HDRS Roll-Off Stop Hydraulic Dock Levele
Pentalift's Series "HDRS" Roll-Off Stop lip hydraulic dock
levelers feature all of the design, structural and operational
benets of the HD and HU Series Pentalift hydraulic dock
levelers shown in this brochure, with the added safety
enhancement of a Roll-Off Stop lip. The Roll-Off Stop
dock leveler is available in either the HD or HU Seriesdock leveler congurations.
The Roll-Off Stop lip is a formidable barrier. It prevents
lift truck roll-off from the loading dock, whenever the
dock leveler is in the parked positioned.
The Roll-Off Stop lip also serves to protect roll-up doors
on truck trailers positioned at the loading dock from
impact and damage.
Roll-Off Stop Dock Leveler Lip Features
6
The Pentalift Series HDRS Roll-Off Stop dock leveler offers
he following headboard and hinge features:
" High Roll-Off barrier stop:The Pentalift barrier is one of
he highest in the industry. This increases the stopping presence
f the dock leveler and further enhances loading dock safety.
tructural tubing headboard / hinge: The structural tubing
eadboard, heavy duty gussets and hinge construction of the
entalift Series HDRS dock leveler provides an extremelytrong headboard section at the front of the dock leveler. This
eadboard section will withstand substantial impacts if the Roll-
Off Stop feature is put to use. It also results in an improved and
tronger headboard and lip hinge arrangement for normal dock
eveler loading and unloading.
Note:
or 25,000 to 35,000 lbs. capacity dock levelers, Pentalift roll
ff stop dock levelers are designed to stop 10,000 lbs. at 4 miles
er hour. For 40,000 lbs. capacity dock levelers and higher,
entalift roll off stop dock levelers are designed to stop 14,000
bs. at 4 miles per hour.
7/24/2019 Rabigh Requirement
28/33
Pentalift Series HD,HU&RS Hydraulic Dock Leveler Operating Featur
APentalogicTMHydraulic Control Manifold
ESelf Retracting Hydraulic Lip
Operating every hydraulic function with only two moving parts, the
Pentalogic hydraulic control manifold revolutionized dock leveler hydraulic
control circuitry. Conventional hydraulic dock leveler control valve
circuitry is comprised of several individual function valve assemblies.
Their assemblies are constructed from many sub components, increasing
the potential of hydraulic component failure and oil leaks. Utilizing only
two moving components, the non-adjustable Pentalogic hydraulic manifold
eliminates all concerns related to on-site adjustment, oil leaks or hydraulic
component failure.
Pentalift hydraulic dock levelers incorporate unique and important operating features to achieve the most safe
and reliable operation available in a hydraulic dock leveler. These operating features are described in more
detail below.
Pentalogic hydraulic manifold allows the lip assembly to gently retract into the pendant position prior to the arriva
the next incoming vehicle. An illustration and more detailed explanation is provided on page 8.
Full range telescopic toe protection; upper and lower sections feature a "bend relief" to increase strength.
Fixed rear hinge remains ush with the rear of the pit to eliminate pinch points and surface obstructions. Small gap
deck plate and frame conjunction reduces impact or bump for fork lift operator compared to competitive designs.
HFixed Rear Hinge
Integral maintenance stand facilitates support during routine support and maintenance.
Pentalift maintenance stand supports the lip as well the dock leveler deck assembly.
GIntegral Maintenance Stand (See page 4 for photo in dock leveler & shown in stored position)
FFull Range Toe Protection
DTop-Fed Forward Positioned Lift CylinderTop feeding the hydraulic cylinder automatically ejects air from the hydraulic system. It also maintains the
hydraulic connection and hoses away from dirt and debris on the pit oor.
7
BHydraulic Power UnitIncorporates internal ltration system and 1-1/2 HP Totally
Enclosed Non Ventilated motor. Provides hydraulic ow and
pressure to the Pentalogic hydraulic manifold. Simple andreliable even in the harshest applications. Hydraulic power un
are available in all common single and three phase AC voltag
CLift Cylinder Placement (See next page 8 for more details)The benecial advantage of the Pentalift lift cylinder placement is explained in more detail on page 8.
7/24/2019 Rabigh Requirement
29/33
On truck departure, the Pentalogic hydraulic manifold
allows the lip assembly to gently retract into the pendant
position prior to the arrival of the next incoming vehicle. The
Pentalogic hydraulic manifold assures that the lip is alwayspendant behind the protective bumpers. Units equipped with
automatic return-to-stored-position, work in conjunction with
the self -retracting
lip (eliminating false
signals common with
other manufacturers),
to return the deck
to the safe stored
position.
Conventional hydraulic dock levelers, yieldable lip circuits
utilize an "in line" pressure relief valve, maintaining the lip in the
extended position. Once a vehicle departs, the deck lowers with
the lip in the extended position. The next incoming vehicle willimpact the extended lip and any excessive force will push the lip
assembly back into the
pendant position. In
addition, a conventional
hydraulic circuit can
cause the lip to get
"caught on" a portion
of the incoming truck,
resulting in extensive
damage to the vehicle,
dock leveler and cargo.
Lift Cylinder Placement:Pentalift vs Other Manufacturers
Other manufacturers position their lift cylinders as
illustrated below. During a fallsafe condition, with the
front tire of the forklift past the upper cylinder support
point, a dangerous "teeter-tooter" situation occurs. The
back of the deck is forced upwards and out of the rear
frame. In addition, the positioning creates a mechanicaldisadvantage during fallsafe (1"stroke = 4" deck drop).
Other cylinders with the chrome plated piston facing
downward are prone to surface damage and chipping lead-
ing to hydraulic seal failure.
For most effective support, Pentalift's lift cylinder is
securely positioned at the junction of the deck and
the structural headboard. The base of the cylinder
is connected to a structural cross member. During a
hydraulic fallsafe situation the fork lift will be completely
supported between the cylinder position and the rearframe. All generated forces are downward, in the
direction that all dock levelers are designed to accept load
forces. The Pentalift lift cylinder is positioned correctly
away from debris found in the pit. It's position provides a
superior mechanical advantage.
Other Manufacturers: Pentalift:
Self-Retracting Lip:Pentalift vs Other Manufacturers
Other Manufacturers: Pentalift:
8
7/24/2019 Rabigh Requirement
30/33
Pentalift Hydraulic Dock Leveler Control PanelsPentalift adds value by designing and assembling its own control panels, "in house" at the factory to accommo
the interlocking of other dock equipment such as vehicle restraints, overhead doors and inatable dock seals/
shelters to create a safe and productive loading dock system. Please contact your Pentalift representative for
options available for your application.
Simple Basic Operation NEMA 12 wall mounted push button station, facilitates simple basic operation.
Protects against falling dirt, circulating dust, lint, bers, lings and against drippingand light splashing of liquids.
Other NEMA rated enclosures are available.
Optional Auto Return, Deck Stop with Independent Lip Control
Features
Auto Return: This feature allows the leveler to automatically reposition itself back to the stored
position. If a truck leaves the dock before the leveler is stored by the attendant the leveler wi
slowly travel to the bottom of the pit and then automatically re-store itself.
Included is a selector switch that enables the dock attendant to turn off the auto retufeature during below dock end loading / unloading operations.
Deck Stop with Independent Lip Control The Deck Stop feature adds the ability for the operator to fully stop the travel of the
leveler deck while in operation, all with one button. This enhances the operation
and assists with protecting product loaded at the end of the trailer.
The Independent Lip Control feature allows the dock attendant to have full and comcontrol of the dock leveler lip extension throughout the operating range of the level
allows easier positioning of the lip for end loading / unloading operations.
Master Control Panels Proven long term technology eliminates replacing costly touch pad circuit boards. H
wired components are more robust than circuit board designs. This is important in
loading dock environments in which dramatic temperature change typically take pl
Hard wired components are easier for the average electrician to trouble shoot and r
in lower maintenance costs. Operator confusion or error is addressed by providing
single interlocked and synchronized panel to operate all equipment at the loading d
Master control panels provide a productive and safe operating dock system and the
single panel signicantly reduces electrical hook-up costs.
Other Control Panel Options: Lockable electrical disconnects
Overhead door controls
GFCI duplex outlets for dock light
Other NEMA rated enclosures
For special requests consult factory
9
7/24/2019 Rabigh Requirement
31/33
Pentalift Hydraulic Dock Leveler OptionsPour In Place
This option simplies installation and reduces costs in new
construction applications. A metal frame and pan encloses the
dock leveler. This allows the dock leveler to be placed into a
recess in the foundation and to have concrete poured around
it during the oor pour of the building. Installation welding is
completed at the factory. Overall costs of installing the dock
leveler are reduced substantially. See www.pentalift.com/safetresources.php. Pentalift Loading Dock Design Guide pg. 20 formore details.
This option provides a rubber or brush weatherseal along the sides
and rear of the dock leveler. The weatherseal reduces the passing o
outside elements (cold, heat or debris) from outside into the facilit
by sealing the edges of the dock leveler against the dock leveler piIn addition, brush weatherseal is effective in reducing the entry of
vermin into the facility as well. The weatherseal is provided with
metal carriers. As wear results to the seal, replacement seals can be
simply slid into the metal carriers.
Weatherseal
Other available options for Hydraulic Dock levelers
Longer Lip Lengths Upgraded Capacities
Hot Dip Galvanized or Epoxy Paint Finishes Pour In Place Installation (shown above)
Weatherseal Rubber or Brush (shown above) Spray Foam Insulation
Shim Kits (To t dock leveler to deeper pits) Easy Sweep Frame
Steel Face Dock Bumpers
This option provides a very durable dock bumper. The bumper
is comprised of laminated bumper sections behind a plate steel
bumper face. The laminated rubber sections absorb the impact of
the truck and trailer as it backs into the facility. The steel facing
prevents the trailer from cutting or overly compressing the rubber
absorption material as the trailer backs into the loading dock and
scrapes up and down on the bumpers as it raises and lowers with
the suspension. The combination of the two components makes th
steel face dock bumper an excellent solution for harsh loading doc
environments.
10
http://www.pentalift.com/safety-resources.phphttp://www.pentalift.com/safety-resources.phphttp://www.pentalift.com/safety-resources.phphttp://www.pentalift.com/safety-resources.php7/24/2019 Rabigh Requirement
32/33
Safety at the Loading Dock
The loading dock has been rated as one of the most hazardous areas of any facility. To increase safety at the loading doc
more and more companies are installing a combination of hydraulic dock levelers and vehicle restraints.
Pentalift vehicle restraints not only lock the trailer in position, they also provide clear communications between the truc
driver and the loading dock attendants.
Pentalift Vehicle Restraint SystemsPentalift manufactures and offers four styles of vehicle restraints. The variety of designs provided suit almost any loadin
dock application and create a safe productive loading dock system. All units can be interlocked to the dock leveler for
increased safety. Contact a Pentalift sales representative for additional information.
Model RVR32:
A raised, face mounted, off the ground design. The
front extension bar provides an operating range of 9
low to 25 high.
Model HFR32:
Reliable hydraulic operation is controlled by push
buttons. Suitable for harsh, busy environments.
Model LPR35:
Provides the same features and benets of the HFR32. In
addition features an extremely low lowered height as well
as a stepped hook for dual locking positions.
Model UHR40:
Installed under the dock leveler to provide the ultimate in
safety, performance and reliability. Suitable for severe and
extremely busy environments.
7/24/2019 Rabigh Requirement
33/33
"Our Primary Goal is to engineer and build the best products to ensure the ultimate in user safety and product reliability"
Paul Pedersen
President
Pentalift Equipment Corporation
Individual Product Catalogs are available and can also be found on our website.Pentalift also manufacturers a complete line of lift tables for your in plant material handling needs.
Note: Some photos may reect products with optional features. All Pentalift Equipment Corporation products are subject todesign improvement through modication without notice.
Pentalift Dock Lifts
Pentalift Mechanical Dock Levelers
Pentalift also provides a wide variety of equipment to create an efcient, secure, and safe loading dock environmen
In addition to the products shown in the photographs below Pentalift also offers the following products; including e
of dock levelers, safety barriers, wheel chocks, dock lights, and dock bumpers, making Pentalift your ideal, single-
source, loading dock equipment supplier.
Pentalift Truck Levelers & Dock Seals
Pentalift Vehicle Restraints (See page 11) Pentalift Dock Seals and Shelters
Pentalift Vertical Storing Dock Levelers
Recommended