R esponsibilities in the F irst S ix M onths of Sakarya University

Preview:

DESCRIPTION

DEVELOPING THERMAL INSULATION CURRICULUM ACCORDING TO THE CLIMATE CONDITIONS AND PILOT PROVINCIAL APPLICATIONS . R esponsibilities in the F irst S ix M onths of Sakarya University. W orking M eetings in the F irst 6 M onths. 8 Meetings and Results. - PowerPoint PPT Presentation

Citation preview

DEVELOPING THERMAL INSULATION CURRICULUM

ACCORDING TO THE CLIMATE CONDITIONS AND

PILOT PROVINCIAL APPLICATIONS

Responsibilities in the First Six Months of Sakarya University

Sakarya University - RESPONSIBILITIES STATUS

Drawing of Building Projects OK.

The Investigation and provide the Insulation Materials OK.

Building Construction OK.

Practice and Sharing of Insulation Materials OK.

Perform the Measurement Instruments (Thermal Camera, Plaster Machine and Tablet PC) Purchases

OK.

Preparing the Table of Measurement OK.

First Six Months reports OK.

Working Meetings in the First 6 Months

8 Meetings and

Results

Meeting with Representatives of the insulation companies

Drawing of Building Project

AB

Reinforced Concrete Slab (10 cm)

reinforced concrete foundation (30 cm)

+2.1 m

±0 m

+1.80

+2.1

0.00

General Layout of Insulation Structure

AB

LEFT SIDE

Reinforced Concrete Slab (10 cm)

+2.1 m

±0 m

+1.80

+2.1

0.00

- R.Concrete- No Insulation

- R. Concrete- XPS (4 cm)

- R. Concrete- EPS (4 cm)

- R. Concrete- Taş Y. (4 cm)

- Brick- No Insulation

- Brick- XPS (4 cm)

- Brick- EPS (4 cm)

- Brick- Taş Y. (4 cm)

- Gas Concrete- No Insulation

- Gas Concrete- XPS (4 cm)

- Gas Concrete- EPS (4 cm)

- Gas Concrete- Taş Y. (4 cm)

- Pumice- No Insulation

- Pumice- XPS (4 cm)

- Pumice- EPS (4 cm)

- Pumice- Taş Y. (4 cm)i. plaster i. plaster i. plaster i. plaster

Project Materials and Application List

Concrete C 20 Ready Mıxed Concrete

Insulation Plaster

2,5 cm

Stell ST420 XPS 4 CM 26-30 DNS

BIMS 19 * 29 * 33 EPS 4 CM 16 DNS WHITE

BRICK 29 * 19 * 23.5 LABOR CONCRETE LABOR

AAC 20 * 60 * 50 GLUE ADHESIVE SHEETSAND 0-3 cm PAINT 10 KG / BUCKETCEMENT 50 KG / BAG PÇ32.5 PLASTER BOARD RESISTANCE

WATER INSULATIONMATERIALS

BASED HYBRID UV and frost-resistant (BOSTİK Aoua BLOCKER) waterproofing material

Building Construction for Thermal Insulation

The Structure For Thermal Insulation

The Structure For Thermal Insulation

ENTRANCE

The Structure For Thermal Insulation

The Structure For Thermal Insulation

Thermal Camera

Contracts and service agreements with companies

Measurement with Thermal Camera

a one-year measurement

Climate Condition of Gumushane

Climate data for GümüşhaneMonth Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Rec. high °C (°F)

13.0(55.4)

18.0(64.4)

24.0(75.2)

28.8(83.8)

32.0(89.6)

35.7(96.3)

41.0(105.8)

40.0(104.0)

37.0(98.6)

32.0(89.6)

22.0(71.6)

19.2(66.6)

Av high °C (°F) 2.5(36.5)

4.7(40.5)

9.6(49.3)

16.0(60.8)

20.8(69.4)

24.6(76.3)

28.1(82.6)

28.6(83.5)

25.2(77.4)

18.8(65.8)

10.2(50.4)

4.4(39.9)

Av low °C (°F) −6(21.2)

−5.3(22.5)

−1.4(29.5)

3.7(38.7)

7.3(45.1)

10.5(50.9)

13.7(56.7)

13.5(56.3)

9.9(49.8)

5.8(42.4)

0.6(33.1)

−3.4(25.9)

Rec. low °C (°F) −22.8(−9.0)

−25.7(−14.3)

−22.6(−8.7)

−11(12.2)

−2.8(27.0)

1.8(35.2)

4.5(40.1)

4.9(40.8)

−1(30.2)

−4.8(23.4)

−15(5.0)

−21(−5.8)

Avg. rainy days 11.4 11.2 13.0 13.9 15.8 10.5 4.4 3.9 5.5 9.6 10.3 11.6

Mean mon. Sun. hours 43.4 103.6 158.1 183 235.6 276 313.1 306.9 243 173.6 66 24.8

Climate Condition of Hakkari

[hide]Climate data for HâkkariMonth Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Average high °C (°F) −0.7(30.7)

0.9(33.6)

6.2(43.2)

12.7(54.9)

19.1(66.4)

25.6(78.1)

30.6(87.1)

30.8(87.4)

26.4(79.5)

18.6(65.5)

9.7(49.5)

2.3(36.1)

Daily mean °C (°F) −4.8(23.4)

−3.2(26.2)

2.0(35.6)

8.2(46.8)

14.2(57.6)

20.3(68.5)

24.9(76.8)

24.7(76.5)

20.3(68.5)

13.1(55.6)

5.1(41.2)

−1.7(28.9)

Average low °C (°F) −8.3(17.1)

−7(19.4)

−2(28.4)

3.9(39.0)

9.0(48.2)

14.1(57.4)

18.2(64.8)

18.0(64.4)

13.9(57.0)

7.9(46.2)

0.8(33.4)

−5.1(22.8)

Avg. rainy days 10.9 10.5 12.4 13.3 12.1 4.4 1.4 1 1.6 8.7 9.5 10.1

Mean mont.sun.h. 130.2 145.6 189.1 201 282.1 360 381.3 359.6 306 229.4 162 124

Climate Condition of Sakarya

The Aim Of The Thermal Insulation

The framework of this purpose, the following aims are desired to be reached;

• The effect of precipitation• The effect of heat factor• The effects of mountainous (altitude)• The effect of the wind• The seasonal effect• The effect of climate on the heat insulation materials• The inspection of the building sections (groundwork, column, joist, tiling, wall, roof)• The detection of thermal conductivity• A comparison between the cities in which implementations were done• The comparison of the effects of climate on heat insulation.

The Aim Of The Structure For Thermal Insulation

• Sakarya University will collect the data in the implementation area daily. The collected data will be entered into a computer program. The thermal camera views will be recorded.

• Collecting and archiving of these data are on the responsibility of the institution in the pilot city.