Quality in the Concrete Paving · PDF fileQuality in the Concrete Paving Process CPU 6- 6 ......

Preview:

Citation preview

Quality in the Concrete Paving Process

Module 2 CPU 6- 1

Quality in the Concrete Paving Process

Workshop Introduction

Quality in the Concrete Paving Process

CPU 6- 2

Instructors

Dennis Dvorak

Jim Grove

Mike Praul

FHWA Resource Center

(708) 283-3542

dennis.dvorak@dot.gov

ATI Inc. / FHWA

Office of Infrastructure, Washington D.C. (515) 294-5988

jim.grove@dot.gov

FHWA Maine Division

(207) 512-4917

michael.praul@dot.gov

Quality in the Concrete Paving Process

CPU 6- 3

Agenda Workshop Introduction

Module 1: Quality Assurance Concepts

Module 2: Concrete Materials

Module 3: Concrete Properties and Testing

Module 4: QC and Agency Acceptance

Module 5: Pre-Paving and Mix Production

Module 6: Paving

Module 7: Utilizing Quality Concepts

Module 8: Quality in Field Practice

Quality in the Concrete Paving Process

CPU 6- 4

What is this Workshop about?

Common Sense Tools

Quality in the Concrete Paving Process

CPU 6- 5

Goal: Plant Seeds

What do you do today? What are you striving to accomplish? What should the agency test and inspect? What should the contractor test and inspect? How should we accept concrete pavement? What new tools and technologies can you use

to build better pavements?

Quality in the Concrete Paving Process

CPU 6- 6

CPU 6 Learning Objectives

By the end of this module, you will be able to • Name four key inspection items of dowel bar

placement • Identify three inspection items for aggregate

stockpiles • Describe four advantages of stringless paving • Explain the purpose of the two types of texture

provided by the burlap drag and the tining. • Name two aspects of sawing that are critical to

preventing random cracks.

Quality in the Concrete Paving Process

Module 2 CPU 6- 7

Pre-Paving and Mix Production

Quality in the Concrete Paving Process

CPU 6- 8

Pre-Paving Activities

Pre-Paving (Chapter 4) Subgrade/Subbase Construction Staking, Stringline and Stringless Construction Fine Grading Dowel Basket Placement Steel Placement (CRCP) Paver Preparation

Quality in the Concrete Paving Process

CPU 6- 9

Pre-Paving Activities

Pre-Paving (Chapter 4) Subgrade/Subbase Construction Staking, Stringline and Stringless Construction Fine Grading Dowel Basket Placement Steel Placement (CRCP) Paver Preparation

Quality in the Concrete Paving Process

CPU 6- 10

Foundation System

Stiffness Stability Uniformity

Quality in the Concrete Paving Process

CPU 6- 11

Pre-Paving Activities

Pre-Paving (Chapter 4) Subgrade/Subbase Construction Staking, Stringline and Stringless Construction Fine Grading Dowel Basket Placement Steel Placement (CRCP) Paver Preparation

Quality in the Concrete Paving Process

CPU 6- 12

Staking and Stringline

Paving hubs and construction stakes • Set to the proper offset and projected grade

Stringline • Securely place pins • Adjust tension with winches and tie-offs • Eyeball for smoothness

Quality in the Concrete Paving Process

CPU 6- 13

Stringless

Quality in the Concrete Paving Process

CPU 6- 14

Stringless Construction

Advantages • Smoother pavement • Safer construction site • Eliminates staking operation • Facilitates one-lane construction

Quality in the Concrete Paving Process

CPU 6- 15

Pre-Paving Activities

Pre-Paving (Chapter 4) Subgrade/Subbase Construction Staking, Stringline and Stringless Construction Fine Grading Dowel Basket Placement Steel Placement (CRCP) Paver Preparation

Quality in the Concrete Paving Process

CPU 6- 16

Fine Grading

Controls pavement thickness and smoothness • Check tolerances • Blend trimmed material with granular subbase to

avoid segregation • Fill low areas, blend, recompact and fine grade

Quality in the Concrete Paving Process

CPU 6- 17

Pre-Paving Activities

Pre-Paving (Chapter 4) Subgrade/Subbase Construction Staking, Stringline and Stringless Construction Fine Grading Dowel Basket Placement Steel Placement (CRCP) Paver Preparation

Quality in the Concrete Paving Process

CPU 6- 18

Dowel Basket Placement

Improper load transfer Faulting

Quality in the Concrete Paving Process

CPU 6- 19

Dowel Basket Placement

Securing the baskets

Quality in the Concrete Paving Process

CPU 6- 20

Group Activity

Which way is the paver moving?

Quality in the Concrete Paving Process

CPU 6- 21

Basket Layout

Transverse spacing as specified (joint layout) Aligned correctly

Quality in the Concrete Paving Process

CPU 6- 22

Basket Placement Stakes or clips are adequate for anchoring the

basket Adequate number of stakes/clips per basket Bond breaker

Quality in the Concrete Paving Process

CPU 6- 23

Poor Dowel Alignment

Quality in the Concrete Paving Process

CPU 6- 24

Basket Inspection

Specified coating and condition of coating Specified dowel diameter Correct basket height Dowel spacing Clean

Quality in the Concrete Paving Process

CPU 6- 25

Basket Location Marking

Durable marking Pins Both sides of the pavement!

Quality in the Concrete Paving Process

CPU 6- 26

Pre-Paving Activities

Pre-Paving (Chapter 4) Subgrade/Subbase Construction Staking, Stringline and Stringless Construction Fine Grading Dowel Basket Placement Steel Placement (CRCP) Paver Preparation

Quality in the Concrete Paving Process

CPU 6- 27

Steel Placement (CRCP)

Affects crack spacing • Adequate chairs for support • Periodically anchored into subbase to resist

movement from the paver • Correct bar size and spacing • Staggered laps

Quality in the Concrete Paving Process

CPU 6- 28

Pre-Paving Activities

Pre-Paving (Chapter 4) Subgrade/Subbase Construction Staking, Stringline and Stringless Construction Fine Grading Dowel Basket Placement Steel Placement (CRCP) Paver Preparation

Quality in the Concrete Paving Process

CPU 6- 29

Paver Preparation

Extrusion process

Quality in the Concrete Paving Process

CPU 6- 30

Slipform Paver Functions

Consolidation Shaping Surface finish Pavement smoothness

Quality in the Concrete Paving Process

CPU 6- 31

Paver Preparation

Vibrator spacing and operation Tie bar inserter location Fix hydraulic leaks

Hydraulic fluid is not a concrete admixture!

Quality in the Concrete Paving Process

CPU 6- 32

Paver Preparation

Shaping • Slab dimensions

o Side form dimensions

• Pan settings o Cross slope o Crown breaks o Angle of attack

Quality in the Concrete Paving Process

CPU 6- 33

Paver Preparation

Tie bar inserter location

Quality in the Concrete Paving Process

CPU 6- 34

Pre-Paving Activities

Plant Site and Mixture Production (Chapter 5) Aggregate Stockpile Management Plant Set-Up and Calibration Mixture Production Transporting Concrete

Quality in the Concrete Paving Process

CPU 6- 35

Pre-Paving Activities

Plant Site and Mixture Production (Chapter 5) Aggregate Stockpile Management Plant Set-Up and Calibration Mixture Production Transporting Concrete

Quality in the Concrete Paving Process

CPU 6- 36

Aggregate Stockpile Management

Minimize segregation • Build long and wide-NOT high! • Build stockpiles in tiers to avoid

segregation

Fines at the top

Coarse at the bottom Picture courtesy of Martin Marietta Materials

Quality in the Concrete Paving Process

CPU 6- 37 II - 37

Group Activity

What’s wrong with this picture? Sampling

Quality in the Concrete Paving Process

CPU 6- 38

Aggregate Stockpile Management

Uniform Moisture • Stable and well drained foundation underneath

stockpiles • Place a separation layer on top of soil • Draw from areas of known moisture content

Quality in the Concrete Paving Process

CPU 6- 39

Aggregate Stockpile Management

Contamination • Mud balls

Quality in the Concrete Paving Process

CPU 6- 40

Pre-Paving Activities

Plant Site and Mixture Production (Chapter 5) Aggregate Stockpile Management Plant Set-Up and Calibration Mixture Production Transporting Concrete

Quality in the Concrete Paving Process

CPU 6- 41

Plant Set-up and Calibration

Calibrate scales and water meters • Each time the plant is set-up • At regular intervals

Verify that the batch control computer • The correct mix design(s) • Appropriate aggregate moisture contents

TEST BATCH!

Quality in the Concrete Paving Process

CPU 6- 42

Pre-Paving Activities

Plant Site and Mixture Production (Chapter 5) Aggregate Stockpile Management Plant Set-Up and Calibration Mixture Production Transporting Concrete

Quality in the Concrete Paving Process

CPU 6- 43

Verify Mixture Quality in the Field

Mixture verification stage • Compares field concrete to the mixture design

Is this the same concrete? Trial Batch

SAME ?

Quality in the Concrete Paving Process

CPU 6- 44

Mixture Production

Segregation resistance Air void system Uniformity Workability Strength Durability Shrinkage

Quality in the Concrete Paving Process

CPU 6- 45

Recommended Practices

Use aggregates from areas of known moisture content

Quality in the Concrete Paving Process

CPU 6- 46

Recommended Practices

Adjust moisture compensation as needed

Quality in the Concrete Paving Process

CPU 6- 47

Recommended Practices

Adequate mixing time • Uniformity • Air entrainment • Strength • Workability

Quality in the Concrete Paving Process

CPU 6- 48

Quality Control

Monitor mixture quality during production and react to changes • Aggregate moisture and gradation • Concrete temperature • Slump • Unit weight • Air content • Microwave water content • Heat Signature

Quality in the Concrete Paving Process

CPU 6- 49

Pre-Paving Activities

Plant Site and Mixture Production (Chapter 5) Aggregate Stockpile Management Plant Set-Up and Calibration Mixture Production Transporting Concrete

Quality in the Concrete Paving Process

CPU 6- 50

Transporting Concrete

Traffic considerations Anticipate the unexpected

Quality in the Concrete Paving Process

CPU 6- 51

Transporting Concrete

Maintain haul route

Quality in the Concrete Paving Process

CPU 6- 52

Transporting Concrete

Wash out trucks as necessary

Quality in the Concrete Paving Process

Module 2 CPU 6- 53

Paving

Quality in the Concrete Paving Process

CPU 6- 54

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 55

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 56

Spreading Concrete

Place concrete in front of the paver Distribute concrete evenly Avoid segregation => effects

• Permeability • Strength • Shrinkage

Quality in the Concrete Paving Process

CPU 6- 57

Spreading Concrete

Continuous supply of concrete to the paver Consistent head => smoothness Communication

• Spreader operator • Paver operator

Quality in the Concrete Paving Process

CPU 6- 58

QC Checklist Items

Spreader width – narrower than paver Steering alignment with respect to paver Concrete depth behind the spreader– account

for width and consolidation

Quality in the Concrete Paving Process

CPU 6- 59

QC Measurements Real Time / On-the-grade-tests All measure change

• Unit weight • Air content / system • Concrete temperature • Slump

Quality in the Concrete Paving Process

CPU 6- 60

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 61

Slipform Paver Functions

Consolidation Shaping Surface finish Pavement smoothness

Quality in the Concrete Paving Process

CPU 6- 62

Consolidation

Match vibrator frequency to workability and paver speed

Electronic vibrator monitor

Quality in the Concrete Paving Process

CPU 6- 63

Over-Vibration

Vibrator Trails Segregation

Quality in the Concrete Paving Process

CPU 6- 64

Shaping Extrusion pan – trueness and cross-slope/crown Adjust overbuild to form neat edges Curb dimensions

Quality in the Concrete Paving Process

CPU 6- 65

Shaping

Paver attitude and extrusion pressure • Bug holes • Tears

Quality in the Concrete Paving Process

CPU 6- 66

Smoothness

Don’t stop the paver

Quality in the Concrete Paving Process

CPU 6- 67

Smoothness

Pad line profile influences slab profile • Therefore pad line design and construction

impacts smoothness

Quality in the Concrete Paving Process

CPU 6- 68

QC Measurements

Vibrator monitor Smoothness Thickness

Quality in the Concrete Paving Process

CPU 6- 69

Key Inspection Items

One contractor example • Tape QC Inspection list on the paver • Offset alignment – every 50’ • Stringline – constant • Edge slump – every 50’ • Slab width – every 50’

Quality in the Concrete Paving Process

CPU 6- 70

Key Inspection Items

Visually inspect the pavement edge and surface for proper consolidation

Some voids are preferable to having too much water on pavement surface

Slurry from excess water

Quality in the Concrete Paving Process

CPU 6- 71

Appropriate Actions

Adjust vibrator frequency Adjust speed Refine mixture proportions Stop paving if the edge keeps falling

Quality in the Concrete Paving Process

CPU 6- 72

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 73

Dowel Bar Inserters Insert dowels at planned locations Insure bond breaker is applied Mark the location of the dowels Check consolidation around the bars

Quality in the Concrete Paving Process

CPU 6- 74

Recommended Practices

Mark dowel insertion locations for verification and sawing (BOTH SIDES!)

Quality in the Concrete Paving Process

CPU 6- 75

Check Dowel Location

Real-time Non Destructive Testing (NDT) Core verification after first day

Quality in the Concrete Paving Process

CPU 6- 76

Real Time

Verify dowel bar location behind the paver

Quality in the Concrete Paving Process

CPU 6- 77

NDT Inspection Options

Periodically verify steel location behind the paver • Cover meter (pachometer) • GPR after hardened • MIT-SCAN-2

Ground Penetrating Radar

Pachometer

Quality in the Concrete Paving Process

CPU 6- 78

MIT-SCAN-2

One limitation • Cut the tie wires

Quality in the Concrete Paving Process

CPU 6- 79

Typical Practices

Insert tie bars at planned locations

Quality in the Concrete Paving Process

CPU 6- 80

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 81

Recommended Practices

Fill surface voids Avoid over-finishing

Quality in the Concrete Paving Process

CPU 6- 82

Recommended Practices Identify bumps and dips

• Overlap straightedge by 1/2

Correct bumps and dips

Quality in the Concrete Paving Process

CPU 6- 83

Effect of Hand Finishing

492+20 492+40 492+60 492+80 493+00 493+20

Distance (ft)

20

40

60

80

100

120

140

160

Roughness Profile (in/mi)

at the pan

behind hand finishers

Quality in the Concrete Paving Process

CPU 6- 84

Recommended Practices

Burlap drag is clean • May need to clean or replace during the day

Check hand tools for trueness

Quality in the Concrete Paving Process

CPU 6- 85

Typical Practices

Wetting of the burlap • Uniform • Light application • Consistent

Quality in the Concrete Paving Process

CPU 6- 86

Not Recommended Practices

“Blessing” the slab Adding water to the surface

Quality in the Concrete Paving Process

CPU 6- 87

Water/Cementitious Ratio

How close are the duckies in your hot tub?

Quality in the Concrete Paving Process

CPU 6- 88

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 89

Texturing

Micro texture • Drag texture with adequate contact area • Dry pavement friction

Quality in the Concrete Paving Process

CPU 6- 90

Texturing

Macro Texture • Wet weather skid resistance • Reduce hydroplaning

Quality in the Concrete Paving Process

CPU 6- 91

Recommended Practices

Steering and elevation controlled automatically

Consistent operating speed Goal is:

• Uniform/true grooves

Quality in the Concrete Paving Process

CPU 6- 92

Recommended Practices Adjust tine angle and length

• Texture depth • Tine spacing

Quality in the Concrete Paving Process

CPU 6- 93

Minimize Positive Texture

Results in more noise • Clean drags • Clean tines • Straight tines

Quality in the Concrete Paving Process

CPU 6- 94

100 dBA

106 dBA

Longitudinal

Tining

Quality in the Concrete Paving Process

Module 2 CPU 6- 95

0.00

0.05

0.10

0.15

0.20

0.25

0.30

96 98 100 102 104 106 108 110

A-weighted Overall OBSI Level, 60 mph, SRTT (dB ref 1 pW/m²)

Pro

bab

ilit

y D

en

sit

yDiamond Grinding

Drag

Longitudinal Tining

Transverse Tining

Quality in the Concrete Paving Process

CPU 6- 96

Appropriate Actions

Do not delay texturing at the expense of curing Don’t let the tine rake stop in the down position

Quality in the Concrete Paving Process

CPU 6- 97

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 98

Key Inspection Items

Cure as soon as practical Even and complete coverage Consistent operating speed

Quality in the Concrete Paving Process

CPU 6- 99

Key Inspection Items

Edge covered also Even and complete coverage

Quality in the Concrete Paving Process

CPU 6- 100

Key Inspection Items

Curing compound meets specification Emulsion

• Agitate • Prevent freezing

Quality in the Concrete Paving Process

CPU 6- 101

Recommended Practice Apply cure before surface drying occurs

Quality in the Concrete Paving Process

CPU 6- 102

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 103

Recommended Practices

Adequate number of saws on the project

Quality in the Concrete Paving Process

CPU 6- 104

Recommended Practices

Joints marked accurately

Quality in the Concrete Paving Process

Module 2 CPU 6- 105

Recommended Practices

• Saw in the window

• Timing is critical

Quality in the Concrete Paving Process

CPU 6- 106

Key Inspection Items

Specified sawing depth and width Record and log sawing depth Ample saw blades on-hand

Quality in the Concrete Paving Process

CPU 6- 107

Pre-Paving Activities Placement, Finishing, Texturing, Curing and Sawing (Chapter 6) Spreading Concrete Slipforming Insertion of Dowels and/or Tie Bars Hand Finishing Texturing Curing Sawing Weather Adjustments

Quality in the Concrete Paving Process

CPU 6- 108

Prepare for Weather Changes

Cold front sudden drop in temperature • Be prepared to cover

o Plastic o Burlap o Blankets

• Avoid thermal shock

Use HIPERPAV to predict impact

Quality in the Concrete Paving Process

CPU 6- 109

Recommended Practices

Use HIPERPAV to assess risk of cracking Refer to page 93 of the “Testing Guide”

Tensile

Strength

Critical Tensile

Stresses - Top

Critical Tensile

Stresses - Bottom

Quality in the Concrete Paving Process

CPU 6- 110

@ 9:00 P.M.

HIPERPAV Software tool for assessing cracking risk

@ 1:00 A.M. @ 5:00 A.M. Placement on the

night of 5/21/12

Quality in the Concrete Paving Process

CPU 6- 111

HIPERPAV Software tool for assessing cracking risk

@ 8:00 P.M. @ 12:00 A.M. @ 4:00 A.M. Placement on the

night of 5/22/12

Quality in the Concrete Paving Process

CPU 6- 112

Wet Weather Considerations (Rain) Be prepared to cover Schedule hand pours, shoulders, etc. Do not finish-in rain water Grind/groove texture to remove damaged

surface

Quality in the Concrete Paving Process

CPU 6- 113

Hot Weather Considerations Reduce mix temperature Sprinkle subbase Night placement Morning placements are most at risk

Quality in the Concrete Paving Process

CPU 6- 114

Cold Weather Considerations

Increase mix temperature Reduce SCM content in the concrete mixture Do not place on frozen subgrade/subbase Cover slab to protect from freezing for 48 hours Replace cover after sawing to avoid thermal shock Monitor concrete temperature with recording

devices

Quality in the Concrete Paving Process

Module 2 CPU 6- 115

Concrete Properties and Testing

Quality in the Concrete Paving Process

CPU 6- 116

Air Void System New Testing Devices

Super Air Meter (SAM) • Modification of existing air test • Measures air system quality

o Has its own scale to measure results

• Test o Test three times at different pressures o Repeat

• Small bubbles implode • Field friendly

Quality in the Concrete Paving Process

CPU 6- 117

Microwave Water Content

Developed in SHRP I

Sample from the truck

Indicator for: • Strength • Permeability • Uniformity • Shrinkage

Quality in the Concrete Paving Process

CPU 6- 118

Permeability (Surrogate Tests for Durability)

Rapid Chloride Penetrability Test (Indirectly)

Became standard in 1977 Most common test Indicator of vulnerability to

water and chloride ingress Generally 24 hours to

condition and 6 hours for testing

ASTM C1202

Quality in the Concrete Paving Process

CPU 6- 119

Permeability (Surrogate Tests for Durability)

Wenner Probe/Surface Resistivity Test (Indirectly)

Provisional AASHTO Standard TP 95-11 State specification Louisiana: DOTD TR 233 28-day age is being used Instant results on hardened concrete Easily measures the right property

Quality in the Concrete Paving Process

CPU 6- 120

Heat Signature (Calorimetry) Measures the heat of hydration

• Similar to maturity Measures temperature of in-place, field concrete

• Measure temperature under controlled conditions

About a day and half Equipment is relatively inexpensive Procedure is simple: 1. Cast a standard cylinder 2. Place it in the calorimeter 3. Push the ON button

Quality in the Concrete Paving Process

Module 2 CPU 6- 121

Thank you for your attention.