BASIN1

0.000

24.075

30.000

212.853

213.621

15.000

30.000

45.000

60.000

75.000

90.000

105.000

120.000

135.000

150.000

165.000

180.000

195.000

210.000

0.000

13.001

215.756

216.524

15.000

30.000

45.000

60.000

75.000

90.000

105.000

120.000

135.000

150.000

165.000

180.000

195.000

210.000

SA

G 90.681

89.534

115.534

138.813

187.534

213.534

-15.000

15.000

30.000

45.000

60.000

75.000

90.000

105.000

120.000

135.000

150.000

165.000

180.000

195.000

210.000

225.000

SAG -10.725

CREST 0.000

SAG 210.717

13.602

15.000

30.000

45.000

283.884

283.884

240.000

255.000

270.000

300.000

315.000

330.000

345.000

360.000

375.000

390.000

405.000

420.000

435.000

450.000

465.000

480.000

495.000

SA

G 294.423

CREST 0

75.000

90.000

SAG 79.534

SA

G 8.372

BM NAIL IN FENCE POST

37.946

BM ON

HEAD WALL

RL 37.011

BM NAIL IN

POWER POLE

RL 37.348

SEE SHEET

59&60

DOWN BATTER 3(H):1(V)

0.000

10.000

BM DH IN

PIT

SURROUND

37.428

BM DHW

38.957

PM 29837

RL 38.102

(AHD

ORIGIN)

PM 29838

RL 38.454

SA

G 90.681

45.000

60.000

75.000

90.000

105.000

120.000

135.000

SA

G 1

08.676

6

0

0

d

ia

0.000

3

2

.1

3

4

10.000

20.000

30.000

4

0

.

0

0

0

5

0

.

0

0

0

6

0

.

0

0

0

INSET

WAINE MITCHELL

4

R.S.

70

FOR THE PROPOSED SUBDIVISION OF LOT 11&12 DP 522165, LOT A&B

DP 364087, LOT 16 SECT P DP 712, LOT 17 DP 660227, LOT18 DP 656972

MCCULLOCH STREET, RIVERSTONE L.G.A. BLACKTOWN

C.W.

C.W.

M.G.A.

M.L.Z.

M.L.Z.

AHD

-

- 14517

QARTABA HOMES

 

ENGINEERING PLAN

CC31/08/2016

CC ORIGINAL ISSUE FOR CONSTRUCTION 31/08/2016 -

       

       

       

       

       

8

A

7654

B

C

D

321

A

B

C

D

E

F

G

H

SHEET

OF

PROJECT REFERENCE:

8

SHEETS

TITLEDATUM:GRID:

DRAFTING CHECK: HORIZONTAL RATIO:

REVISION:DATE:

7

PROJECT MANAGER:DESIGN CHECK:

6

VERTICAL RATIO:

SURVEYED:

DRAWN:

Surveyors, Engineers & Water Servicing CoordinatorsNorth Western Surveys

DESIGNED:

54

Phone: 9831-2040 Fax: 9622-5716 Email: nws@nwsurveys.com.au

1/11 Romford Road, P.O. Box 1045, Blacktown N.S.W. 2148

E

F

G

CLIENT/ PROJECTBAR SCALE

APPR.

32

DESCRIPTIONREV.

H

1

DATE

THIS PLAN MUST NOT BE USED FOR CONSTRUCTION UNLESS

SIGNED AS APPROVED BY PRINCIPAL CERTIFYING AUTHORITY

THIS DRAWING IS SUBJECT TO COPYRIGHT. IT MUST NOT BE REPRODUCED IN WHOLE

OR PART WITHOUT PRIOR WRITTEN CONSENT OF NORTH WESTERN SURVEYS Pty. Ltd.

EXISTING KERB

EXISTING KERB

EXISTING EDGE

OF BITUMEN

EXISTING PIT

AND PIPE TO

REMAIN

LIMIT OF WORKS

TRANSITION TO

EXISTING PAVEMENT

EXISTING EDGE

OF BITUMEN

HEAD WALL

PROVIDE GUIDE POSTS

AT 5m CENTRES.

PROVIDE 1m HIGH HANDRAIL

AROUND HEADWALL MAKE SMOOTH

WITH EXISTING WATER COURSE

JO

IN

T

O S

HE

ET

3

LIMIT OF WORKS

SEE SHEET 31

FOR TRANSITION

DETAILS

CAPPED

END

PROVIDE SCOUR

PROTECTION AND VELOCITY

DISSIPATER, min. 0.5%. MAKE

SMOOTH JUNCTION WITH

EXISTING TABLEDRAIN.

PROVIDE PINNED DOWN

TURF TO TAILOUT.

HEAD WALL

PROVIDE 1m HIGH HANDRAIL

AROUND HEADWALL MAKE SMOOTH

WITH EXISTING WATER COURSE

SEE INSET

FUTURE MAINTENANCE ACCESS

RAMP 4m WIDE TO BE

CONSTRUCTED BY OTHERS

PROVIDE 1% REVERSE

CROSS FALL

CONNECT

EXISTING Ø900

PIPE TO NEW PIT

REMOVE

EXISTING PIT

AND Ø375 PIPE

PROVIDE GUIDE POSTS

AT 1.5m CENTRES.

SEE SHEET 52 TAILOUT 1

LONGITUIDNAL SECTION.

Recommended