1. NAME OF ORGANISATION:
Protect Nature (PRONAT)-Sierra Leone
2. PROJECT DURATION:
Five years 2011-2015
3. VISION:
To ensure and enhance a better participatory management/governance practice and
conservation of the Sierra Leonean coastal and marine resources faced with the threat of
climate change and environmental degradation. Phenomena highlighted in the first, seventh
and eighth millennium development goals Eradicating extreme poverty and hunger;
ensuring environmental sustainability; developing a global partnership for development.
4. MISSION:
To promote efficient and improved communication and information sharing system on
sustainable coastal and marine resources with the total use of Participatory Governance
techniques with stakeholders, partners and line ministries. Also, as its mission, PRONAT-SL
will lobby and advocate in drafting and implementation of a strategic national action plan for
sustainable management of marine resources, conservation, drafting of a law on coastal and
marine activities.
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
2/17
Over the years, the mangrove ecosystem and its resources played a significant role on the
level of biodiversity and profited both animal species and human beings. It did not only
provide breeding ground, food and nursery sites for resources such as shrimps, oysters, crabs,snappers, tarpons but also helped in reducing the impact of high sea tide and flooding which
resulted from the indiscriminate exploitation of this ecosystem. The mangrove ecosystem had
also provided adequate shelter and breeding grounds for over wintering birds (migrated from
Europe and America due to bad winter weather and poor food supply) that stopped by to feed
and breed.
8. JUSTIFICATION:
The project when fully implemented would empower the local communities with knowledge
about the negative impact of their activities on the coastal and marine resources. It would
also enable the communities to adopt and promote better management practices that would
ensure the sustainable utilization of coastal and marine resources whilst maintaining their
potentiality. By providing alternative livelihoods for communities, the project would also
minimize the direct exploitation of coastal and marine resources thus enhancing the
restoration of balanced ecosystems. Finally, through the involvement of key stakeholders
(political leaders, traditional etc) the project would create a legal framework that seeks to
enhance the formulation of laws and bye-laws that promote the sustainable management and
conservation of marine and coastal resources.
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
3/17
b. Strengthen the legal and institutional legal framework from PRAIA convention on
the restoration, conservation and rational use of mangrove ecosystem
c. Establish structure and better organization of marine product and by-product
marketing
d. Support the establish of sustainable funding mechanism, improve communication and
information sharing on coastal and marine resources conservation and best
management practice
11. Project Activities :
a. Identify project operational areas
b. Identify and support project partners and focal persons
c. Conduct baseline survey on empowering mangrove dwellers to improve their
livelihood quality
d. Conduct a nationwide sensitization on coastal and marine areas on recommended
management behavior and conservation practices
e. Facilitate project structures formation
f. Support project beneficiaries with alternative livelihood options
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
4/17
10.3 Baseline survey conducted by consultant firm
10.4.1. 100 beneficiaries, 50 MPs, 40 local representatives sensitized on coastal marine
areas protection
10.4.2. 2500 school going pupils and tutors and coastal and marine environmental clubs
formed
10.4.3. Two schools, one tertiary institution learning quiz competitions organized
10.4.4 Five (5) radio panel discussions held, one float parade on coastal and marine areas
conservation
10.4.5 Twenty community interaction sensitization programmes to be undertaken
10.5.1 Four project communities formed
10.5.2 Four project activity quarterly review meetings held
10.5.2 Three project steering committees and stakeholders meetings held
10.5.3 One project inception workshop held10.6.1 2000 coastal and marine beneficiaries trained in alternative income generation
activities
10.6.2 Support beneficiaries with startup kits to engage in livelihood options
10.7.1 Beneficiaries trained in lobbying and advocacy techniques on coastal resource
management
10.8.1Laid down laws and principles on marine and coastal resource management
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
5/17
12. Project outcome:
12.1 Coastal and marine areas and resources are better managed by its inhabitants
12.2 laws on coastal and marine areas conservation and best management practices adhered to
12.3 Diversify environmental friendly income generating activities taken place
12.4 Transformation in beneficiaries earning power due to alternative livelihood skills
activities in the coastal and marine ecology
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
6/17
13. Action plan:
12 Action Plan
ACTIVITY person responsible Time frame1 Year 2Year 3year
1 2 3 4 1 2 3 4 1 2 3 4
1 Identify stakeholders, target beneficiaries,
operational areas,
PRONAT
2 Conduct baseline survey on empowering
mangrove dwellers improve their livelihoodquality
PRONAT AND Consultants
3 Conduct a nationwide sensitization on
coastal and marine areas on recommendedmanagement behaviour and conservationpractices
PRONAT
4 Facilitate project structures formation PRONAT
5 Support 200 project beneficiaries withalternative livelihood options
PRONAT
6 Support 200 project beneficiaries and key
project partners with lobbying and advocacy
skills
PRONAT
7 Promote the formation of legal frameworkon sustainable management and
conservation of coastal and marine areas
PRONAT, Project partners,Beneficiaries, Political leaders
8 Training on Lobbying and advocacy Community leaders and otherstakeholders
9 Strategic national action plan on coastal andmarine resource
PRONAT, Parliament
6
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
7/17
10 Undergraduate internships PRONAT, Universities/ college
11 Conduct post intervention surveys PRONAT
7
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
8/17
14. Country Profile:
Sierra Leone is located in the western coast of Africa bounded by the Guinea republic on its N/E,
Liberia on the S/E and the Atlantic Ocean on its N/W with growth of mangrove vegetation
stretches along the estuaries of the Scarcies, Rokel, Sherbro River and Yawri bay. This mangrove
ecology survive at the tropical latitude and at temperature of 16 degree centigrade with
beautification of ridge of the peninsula forest overlooking the coastal areas and beaches far
stretched especially in the western area . It is known to have a total surface area of 28,000 sq. miles
with soil types which range from clay, sand, loamy, gravel and silt that influence the range of
activities prone to the marine ecology
The country has a population of about 5million from the recent national projections by Statistics
Sierra Leone, the institution responsible for population studies, with a heterogeneous population
which includes; Mende, Themne, Limba, Fullah, Loko, Sherbro, Kissy, Vai, Kurankoh, etc. who practice a wide range of livelihood activities on a day to day basis and practice multiparty
democratic governance system and a devolved local government of recent time.
15 Target group Profile
PRONAT Salone, among others, will engage groups of beneficiaries including the following thus;
learning institutions, legal and state actors, Parliamentarians, Councilors, Mayors, Local
community leaders, Naval security, and Media practitioners
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
9/17
It will further engage actors, key ministries and institutions on transit and field work on coastal and
marine endangered ecosystem in a bid to come up with possible suggestions on a better and
sustainable management practices.
In addition to the said approaches, PRONAT-SL/ will support identified emerging beneficiaries
with after skills training startup packages to engage in alternative income livelihood generation
option to improve household income.
Rallies, radio discussions and float parades will form part of the campaign in a bid to enact laid
down policies laws and protocols.
PRONAT will also train community and stakeholders on lobbying and advocacy and its
importance in attaining conserved coastal and marine areas resources.
17 Project Indicators:
The project indicators in order to achieve a result driven outcome will include the following:
Stake holders discuss issues sustainable best management behavior of coastal and marine
ecology in development policies and agendas
Community habitant Management practice better coastal and marine area conservation and
management
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
10/17
18. Project Monitoring and Evaluation
The monitoring of activities implemented over the project life cycle in the strategic coastal and
marine areas will include a list of interventions such as, supervisory monitoring of visible project
activity respective project committees structures, line ministries, parliamentarians , sister countries
networking members/ representatives, Youths, women groups, navy sector and other partners.
19. Means of verification
The project will be verified through the series of criteria such as:
Beneficiaries list
Stakeholders list
Memorandum of understanding and signatories
Meetings, workshop and interaction sessions attendance
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
11/17
Draft bill on coastal and marine resources management
Survey reports
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
12/17
20. ACTIVITY PLAN /WORKPLAN:
ACTIVITY
person
responsible
Time frame
1 Year 2Year 3year
1 2 3 4 1 2 3 4 1 2 3
1 Identify 15 coastal and marine areas PRONAT
2 Identify 7 project partners
3 Formation of project structures
4 Conduct baseline survey
5 Sensitisation of stakeholders
6
Formation of coastal and marine environmental
clubs in schools (2500 pupils and teachers)
7 Hold project inception workshop
8 Formation of four project communities9 Training of beneficiaries in alternative livelihoods
10 Support beneficairies with start-up kits
11
Training of beneficiaries in lobbying andadvocacy techniques
12 Student internship attachment 13 Conduct radio panel discussions 14 Organise Float parade 15
Legislation of laws & bye-laws on marine and
coastal resource management 16 Conduct 4 Post intervention surveys
12
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
13/17
21. Risks and Assumptions:
Governing agencies and partners provide financial support for the implementation of project
activities
Current regional alliance of parliamentarians and local elected representatives network on
climate and coastal marine ecosystem management lobby and advocate for implementation of
draft policies and bills
Peoples behavior towards sustainable climate and environmental best practices are replicated
Beneficiaries employed sustainable household and commerce energy sources
Replanting of adaptable mangrove tree species along coastal and marine intervention areas
Increase in environmental friendly house hold income earning sources
Health and sanitation condition of coastal and marine ecosystem improved
Drastic reduction in mangrove wood use as fuel by communities along mangrove areas
22. Sustainability.
PRONAT-SL will be sustained with the employment of the following guidelines criteria and
regulation through the development of a national strategic action plan; legal framework and
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
14/17
23. Project Budget.
No COST CATEGORIES UNIT QTY PERIOD
UNITCOST
(Le)
TOTAL
COST (Le)
1 PERSONNEL COST
Director/Admin/Finance 1 60months 2,000,000/00 120,000,000/00Field Coordinator 1 60months 1,500,000/00 90,000,000/00
Secretary/typist 1 60months 7,000,000/00 420,000,000/00
Field assistants 2 60months 1,000,000/00 60,000,000/00
Driver 1 60months 600,000/00 36,000,000/00
Office cleaner/aide 1 60months 400,000/00 24,000,000/00
Total Personnel cost 7 Le 750,000,000/00
2 DIRECT PROGRAMME COST
Supplies ?
Materials ?
Quiz 3 3days 5,000,000/00 15,000,000/00
Radio discussions 5 5days 3,000,000/00 15,000,000/00
Float parade 1 1day 10,000,000/00 10,000,000/00
Training 100 6months 5,000,000/00 30,000,000/00
S ki 200 3 000 000/00 600 000 000/00
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
15/17
Desktop computers 2 3,000,000/00 6,000,000/00
Photocopier 1 5,000,000/00 5,000,000/00
Scanner 1 2,000,000/00 2,000,000/00
Printer 1 5,000,000/00 5,000,000/00
Office equipment(assorted)
1 10,000,000/00 10,000,000/00
Slide projector 1 4,000,000/00 4,000,000/00
Digital camera 1 2,000,000/00 2,000,000/00Office furniture (assorted)
15,000,000/00 15,000,000/00
Vehicles 1 36months 100,000,000/0 100,000,000/00
Motor bikes 3 36months 10,000.000/00 30,000,000/00
Office space 1 36months 2,000,000/00 72,000,000/00
Generator 1 36months 5,000,000/00 5,000,000/00
Others
Total capital cost Le 266,000,000/00
4 PROGRAMME SUPPORT COST
Lubricants litres 450 36months 10,000/00 4,500,000/00
Fuel Gals 3,600 36months 16,500/00 59,400,000/00Bills 36months 15,000,000/00
Licences and insurance 36months 12,000,000/00
8/2/2019 PRONAT- Sierra Leone Project Proposal-Reviewed
16/17
GRAND TOTAL Le 3,312,500,000/00