San Bernardino Associated GovernmentsMAJOR PROJECTS
PROJECT STATUS REPORTApril – June 2016
1170 West Third Street, Second FloorSan Bernardino, California 92410-1715
Telephone: (909) 884-8276www.sanbag.ca.gov
Page No. P1 M2 In3 G
P M4 I-5 I-6 I-7 I-8 I-9 S10 S11 U
In12 I-13 I-14 I-15 I-16 I-17 I-18 I-19 I-20 I-21 I-22 I-23 I-24 I-25 S26 S27 S28 S
Env
roject Locat
Mainline Projenterchange PrGrade Separat
roject Name
Mainline Proje10 Corridor 15 Corridor 215 Bi-Count215 Widening215 WideningR-210 ConstrR-210 Lane A
US-395
nterchange P10 and Cherr10 and Citrus10 and Rivers10 and Tippe10 and Tippe10 and Ceda10 and Peppe10 and Unive10 Mt. Verno15 & I-215 Im15 and Ranch15 and Basel215 and BartR-210 and PeR-210 Base LR-60 and CeR-60 and Arc
vironmen
SAN BERNMAJ
P
ORDE
ion Maps cts rojects tion Projects
ects
ty HOV Gap Cg – Central g – South ruction Addition
Projects ry Avenue s Avenue side Avenue
ecanoe Phaseecanoe Phaser er Avenue
ersity Street n
mprovement (Dhero Road line Avenue on Road epper AvenueLine ntral Avenue chibald
ntal
Desi
NARDINO ASJOR PROJEPROJECT ST
ER OF PR
TABLE O
Closure
e I e II
Devore)
e
ign
R
SSOCIATEDCTS – GARTATUS – JU
ROJECT D
OF CONT
Phase
EnvironmentEnvironmentConstructionLandscapeLandscapeLandscapeEnvironmentDesign & RO
LandscapeLandscapeLandscape Landscape ConstructionDesign / ROConstructionEnvironmentPlanningDesign / BuilClose-OutConstructionDesign/ROWDesign/ROWEnvironmentPlanningPlanning
Right‐of‐W
D GOVERNMRRY COHOEUNE 2016
DELIVER
TENTS
tal tal n
tal OW
n OW n tal
ld
n W W tal
Way
Con
MENTS E
RY
Corrid
I-10 I-15 I-215 I-215 I-215 SR-21SR-21US 39
I-10 I-10 I-10 I-10 I-10 I-10 I-10 I-10 I-10 I-15 &I-15 I-15 I-215 SR-21SR-21SR-60SR-60
nstruction
dor
10 10 95
& I-215
10 10 0 0
n
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
TABLE OF CONTENTS (Continued)
Grade Separation Projects 29 Monte Vista and UPRR Design/ROW Local Streets 30 Palm Avenue and BNSF Close-Out Local Streets 31 Lenwood Road and BNSF Close-Out Local Streets 32 Laurel Street and BNSF Construction Local Streets 33 South Milliken and UPRR Construction Local Streets 34 Vineyard Avenue and UPRR Construction Local Streets 35 Mt. Vernon Viaduct Design Local Streets
Special Projects 36 Metrolink ATP Design Local Streets
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
PROJECT STATUS -DEFINITIONS-
Complete for Beneficial Use: Satisfactory completion of the project's stated purpose to allow public use of
facilities without restrictions
Construction: Project phase after Construction Notice to Proceed (NTP) through end of Project Design & ROW: Project phase after Project Report (PR) Approval and before Construction NTP PS&E: Development of the final Plans, Specifications and Estimates for use in bidding the construction "Early": Work along a Mainline or Segment that is performed first to assist execution of a major project EEP: Establish Existing Planting Environmental Clearance: Project phase after Project Initiation Document (PID) approval. Includes
development of Project Approval (PA) documentation, and Environmental Documents (ED) Final Design Approved: Completion of all design activities and environmental certifications and ROW.
Grade Separation: Work to change elevations of road and/or rail intersections to expedite traffic flow
HOV: High Occupancy Vehicle (i.e. car pool) Interchange: Connectors between Interstates and/or major roads Interstate Highway: Federally monitored high speed roads Local Streets: State/City owned and maintained streets Mainline: Interstate freeway corridor project that is new and/or widened (added lanes - general purpose,
HOV, auxiliary, etc.)
NTP: Notice to Proceed. Planning: Project phase after Start of Project and before Project Study Report (PSR) Approval
Preliminary Engineering: Part of the Environmental Clearance phase that includes the design effort required to sufficiently define the project's alternatives and support the development of the Environmental Documentation (ED). Completion of preliminary engineering will approximate 30% of the overall design effort of the project.
End of Project: Final completion of all construction activities and formal close-out of construction contracts and ROW activities
Project Report (PR): Report documenting the Preliminary Engineering (up to 30% of Design) to recommend the preferred alternative used for Project Approval (PA). All Environmental Documentation (ED) is contained in this report.
Project Initiation Document (PID): Report documenting the early scoping definition of a project used to determine viability of proceeding with Preliminary Engineering and Environmental approvals, project alternatives and preliminary project costs by phase.
Right-of-Way (ROW) Certification: Identification, appraisal and purchase of required land parcels for the project. Also includes the right of possession of land through condemnation. ROW Certification is a prerequisite for Construction bidding.
RTL: Ready to List. Segment: A specified portion of an Interstate freeway corridor project that is widened (added lanes - general purpose, HOV, auxiliary, etc.)
Sound Walls: Self supported walls that are of sufficient height to reduce roadway noise to an acceptable level
Start of Project: Board action to begin project. Utility Relocation: Modification of all utilities (i.e. Electrical, Gas, Water, Sewer, Communications, etc.) to
alleviate conflicts with project's construction or use. Utility Certification is a prerequisite for Construction bidding.
Closeout: Construction complete and completing formal close out of all contracts.
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
PROJECT STATUS
-FUNDING PROGRAM DESCRIPTIONS-
FEDERAL
ARRA – American Recovery and Reinvestment Act CMAQ – Congestion Mitigation & Air Quality Program STP – Surface Transportation Program TIGER – Transportation Investment Generating Economic Recovery TEA – Transportation Enhancement Activity TE – Transportation Enhancement DEMO – Demonstration Project PNRS – Project of National & Regional Significance IMD – Interstate Maintenance Discretionary
STATE
CMIA – Corridor Mobility Improvement Account TCRP – Traffic Congestion Relief Program RIP – Regional Improvement Program STIP – State Transportation Improvement Program ITIP – Interregional Transportation Improvement Program LLP/IIP – Interregional Improvement Program TCIF – Trade Corridor Improvement Fund SHOPP – State Highway Operation and Protection Program TLSP – Traffic Light Synchronization Program SLPP – State Local Partnership Program PUC – Public Utilities Commission
LOCAL
DIF – Developer Impact Fees IVDA – Inland Valley Development Agency
PROJECT LOCATION MAP MAINLINE
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
1
PROJECT LOCATION MAP INTERCHANGE
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
2
PROJECT LOCATION MAP GRADE SEPARATION
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
3
Act
I-10
Ma
M
StPrApEnCoPHCoPHCoEn
CoStPrFiROCo
FuFeFeStToM
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved (by othnvironmental Construction NTH I) onstruction NTH II) omplete for Bend of Project
Budgetary Es
ost Item tudy Report roject Report nal Design OW Certificatioonstruction
Funding
unding Sourceederal - CMAQederal - STP tate – RIP oll Revenue easure I
ct:
Schedule Sum
Document (PIhers)
Clearance (PA/ETP (Design Buil
TP (Design Buil
eneficial Use
stimate Summ($ 000’s
on
g Summary (E($ 000’s
e Q
SAN BERNMAJ
P
mmary Ac
[ ForJuly
D) June
ED) [ 2d [ 2
d [ 2
[ 2[ 2
mary (Express s)
Am- C
$1Total $1
Express Laness)
Am
Total $1
NARDINO ASJOR PROJEPROJECT ST
I-10 C
ctualrecast ] y 2007 e 2005
2017 ] 2018 ]
2020 ]
2023 ] 2028 ]
Lanes)
mountCaltrans -
$28,127$130,386$184,891
1,267,0671,610,471
s)
mount$55,171$27,100
$122,620$764,900$640,680
1,610,671
SSOCIATEDCTS – GARTATUS – JU
4
CORRIDO
Project ScoThis project
1. Alte2. Alte
Occto F
3. Alteknoline
Project Ben Constructionincrease ca
Project Sta SANBA
lanes asto the e
The ma
been coApprova
The Dr
May 20 Coordin
continue
Project Not
Assembly BOctober 9, authority onmove forwa
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
OR
ope Summart consists of th
ernative One: ernative Twocupancy VehiFord Street, aernative Threown as high o to Ford Stree
nefit:
n of additionpacity and im
atus: AG Board ofs the Locally nvironmental
ajority of the eompleted andal Drawings a
raft Environm16, and three
nation with Ces for the pro
tes of Interes
Bills 914 an2015. AB 9
n Interstates 1ard with the Ex
ncy:
anager:
edia Contact:
MENTS E
ry: hree alternati
‘No Build’ Ao: Includes icle (HOV) lapproximately ee: Providesccupancy tollet, approxima
nal lanes willmprove travel
f Directors aPreferred Alt
l review.
environmentald approved bare being dev
mental Docume public meeti
Caltrans Los Aoject transition
st:
nd 194 were914 provides10 and 15 shxpress Lanes
SANBAG
Chad Cosccostello@
: Tim Watkitwatkins@
Phase: Env
Type
ves under stu
lternative. extending
ne from Have25 miles.
s express lal lanes, from ately 33 miles
decrease ctime reliability
approved theternative (LPA
l technical stuby Caltrans. veloped.
ment was cirings were hel
Angeles Distrn at the Coun
e signed int SANBAG would the Boa
s alternative.
tello 909 884@sanbag.ca.g
ns (909) 884-@sanbag.ca.go
vironmental
e: Mainline
udy:
a High en Avenue
anes, also LA County
s.
ongestion, y.
e express A), subject
udies have Geometric
rculated in d.
rict 7 staff ty line.
to law on with tolling ard elect to
4-8276 gov
-8276 ov
Active Phase: Environmental
I-15 Corridor Type: Mainline
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
5
I-15 CORRIDOR Map of Project:
Schedule Summary
Milestone Actual
[ Forecast ] Start of Project Oct 2012 Project Initiation Document (PID) Approved
Sept 2014
Environmental Clearance (PA/ED) [Feb 2018] Construction NTP (Design Build) [2021] Complete for Beneficial Use [2024] End of Project [2028]
Budgetary Estimate Summary ($ 000’s)
Cost Item AmountProject Report and Env Document $13,000
Final Design $16,000Right of Way $5,000Construction Support $64,218Construction Capital $276,470
Total $374,688
Total $374,688
Funding Summary ($ 000’s)
Funding Source AmountFederal - CMAQ $63,562Federal - STP $7,938State – STIP/RIP $11,456Toll Revenue $266,173Measure I $25,559
Project Scope Summary: Study the addition of 2 express lanes in each direction on the I-15 from SR-60 to SR-210.
Project Benefit: Provide reliable travel times, manage traffic, and increase capacity.
Project Status and Continuing Activities:
A Project Study Report was completed in the fall of 2014.
Currently working on traffic studies, geometric design, field surveys, and environmental technical studies.
Project Notes of Interest: This project ties to the I-15 Express Lanes project in Riverside County which extends from SR-60 to south of SR-91 in Corona.
Lead Agency: SANBAG
Project Manager: Dennis Saylor (909) 884-8276 dsaylor@sanbag.ca.gov
Public/Media Contact: Tim Watkins (909) 884-8276 twatkins@sanbag.ca.gov
Act
I-21
Ma
M
StPrApEnFiCoCoEn
CoPr
FiROCoCo
FuFe
StStStRi
M
tive
15 Corridor
I-215 Bap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budg
ost Item roject Report a
nal Design OW onstruction Suonstruction Ca
unding Sourceederal - CMAQ
tate – STIP/RIPtate - CMIA tate- IIP verside County T
easure I
BI-COUNTct:
Schedule Su
Document (PI
Clearance (PA/proved – (RTL)tice to Proceed
eneficial Use
getary Estima($ 000’s
and Env Docum
pport pital
T
Funding Sum($ 000’s
e Q
P
Trans Commissio
T
SAN BERNMAJ
P
TY HIGH
mmary A
[ FoFebru
D) -incl. i
ED) Ma) Jund Jan
Jun[2
te Summary s)
Amment
Total
mmary s)
Am
on
Total
NARDINO ASJOR PROJEPROJECT ST
OCCUPA
Actualrecast ]
uary 2009 n PA/ED-
ar 2011 ne 2012 n 2013
ne 2015 2017]
mount$6,120
$11,000$14,461$16,631
$142,151$189,227
mount$49,003
$65,469$18,548$4,961$1,305
$49,941$189,227
SSOCIATEDCTS – GARTATUS – JU
6
ANCY VE
Project Sco This projecsystem in eRoad in thethe SR-60/S
Project Ben Project will of San Bern
Project Sta
Constrlanes a
Projectresolut
InstallaCadenconstruOperat
Constradvertiin July
Project Not
Lead Agenc
Project Man
Public/Med
D GOVERNMRRY COHOEUNE 2016
EHICLE (H
ope Summar
ct will add aeach directio
e City of San SR-91/I-215 ju
nefit:
provide a conardino to the
atus and Con
ruction of theare open for u
t is in Constrution of outstan
ation of signaa Drive is puction cost wtion and Proteruction contrased in April 22016.
tes of Interes
cy: CS
nager:
dia Contact: T
T
MENTS E
HOV) GAP
ry:
a High Occuon of I-215 b
Bernardino aunction in the
ontinuous carpe City of River
ntinuing Activ
e project is cuse.
uction and Rinding items.
als at I-215 planned in 2ill be funded ection Prograact for the sig2016. Contra
st:
Caltrans – CoSANBAG – S
Paul Melocotpmelocoton@
Terri KasingaTerri.kasinga
Phase: C
Type
P CLOSU
upancy Vehicbetween Oranand Spruce Se City of River
pool lane fromrside.
vities:
complete and
ght of Way cl
Iowa Avenu016. A portithrough State
am (SHOPP) fgnal improvemact award is a
onstruction Signal Project
ton (909)884-@sanbag.ca.g
a (909) 383-46@dot.ca.gov
onstruction
e: Mainline
URE
cle (HOV) nge Show
Street near rside.
m the City
d the HOV
loseout for
ue and La ion of the e Highway funds. ments was anticipated
-8276 gov
646
On
I-21
Ma
M
StPrApEn(PFiCoCoEn
CoFiROROCoCoLa
FuFe F F F FStStM
-Hold
15 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved (by othnvironmental C
PA/ED) nal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item nal Design OW OW Support onstruction Suonstruction andscape
unding Sourceederal – CMAQ
Federal - PNRSFederal – ARRAFederal - TEA Federal – DEMOtate - RIP tate – TCRP easure I
I-215ct:
Schedule Su
Document (PIhers)
Clearance
proved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
pport
Tot
Funding Sue
Q S (IVDA Co-op)A
O
Tot
SAN BERNMAJ
P
5 WIDENI
ummary Ac
[ ForJuly
D) June
Dec
) Mayd Oct
Jan[2
Summary ($ 00Am
als
mmary ($ 000Am
)
als
NARDINO ASJOR PROJEPROJECT ST
ING – CE
ctualrecast ] y 1988 e 1992
c 2005
y 2009 t 2009 n 2014 2022]
00’s)mount
$27,609 $67,233 $10,090 $37,903
$174,924 $8,158
$326,250
’s) mount
$29,006 $31,303
$128,227 $3,597
$271 $91,640 $8,887
$33,319 $326,250
SSOCIATEDCTS – GARTATUS – JU
7
ENTRAL S
Project Sco This projectI-215 freewgeneral-purAvenue andreconfigure Street, Base
Project Ben The added traffic opera
Project Not The constru The landscato the State
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
SAN BER
ope Summar
t will build or way through S
pose lane id Massachus
ramps at Seline, and SR
nefit:
lanes will eaations.
tes of Interes
uction phase w
ape portion of of California
ncy:
anager:
edia Contact:
MENTS E
RNARDINO
ry:
replace 16 bSan Bernardiin each diresetts AvenueSecond Stre
R-259 intercha
ase traffic co
st:
was complete
f this project iwater conser
Caltrans –SANBAG Brian Smitbsmith@s
: Tim Watkitwatkins@
Phase:
Type
O
bridge structuno, add a caection betwee. The projecet, Third St
anges.
ongestion an
ed in 2014.
is currently onrvation manda
– Landscape D– Landscape Constructioth (909) 884-8
sanbag.ca.gov
ns (909) 884-@sanbag.ca.go
Landscape
e: Mainline
res on the arpool and een Rialto ct will also reet, Fifth
d improve
n hold due ates.
Design e on 8276 v
-8276 ov
On
I-21
Ma
M
StPrApEnFiCoCoEn
CoStFiROROCoCoLa
FuFeFeFeFeStM
-Hold
15 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report / Pnal Design OW OW Support onstruction Suonstruction andscape
Budgetaunding Sourceederal - CMAQederal - STP ederal - PNRS ederal - ARRA tate - RIP easure I
I-21ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
Project Report
pport
Tot
ary Estimate Se
Q
(IVDA Co-op)
To
SAN BERNMAJ
P
15 WIDEN
ummary
[ FJ
D) C
ED) D) Ad D
A
Summary ($ 00Am
als
Summary ($ 00Am
otal
NARDINO ASJOR PROJEPROJECT ST
NING – S
ActualForecast ] uly 1988
Caltrans
Dec 2005 April 2007 Dec 2007 Aug 2010
[2022]
00’s)mount
- Caltrans - $8,323
$59,749 $4,676
$14,603 $89,433 $3,525
$180,309
00’s)mount
$23,176 $29,307 $22,107
$0 $103,767
$1,952 $180,309
SSOCIATEDCTS – GARTATUS – JU
8
OUTH SA
Project Sco
Project will in each dire
Project Sta Constru
construc
RequesCaltranssuspend
Project Not The constru The landscato the State
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
AN BERN
ope Summar
add one carction, and bu
atus and Con
uction Manctability revie
st for Authorizs for landscaded due to wa
tes of Interes
uction phase w
ape portion of of California
ncy:
anager:
edia Contact:
MENTS E
NARDINO
ry:
rpool and oneild/replace 6
ntinuing Activ
nagement ew of the land
zation (RFA)ape construcater mandate
st:
was complete
f this project iwater conser
Caltrans –LandscapeSANBAG Constructi Brian Smitbsmith@s
: Tim Watkitwatkins@
Phase:
Type
O
e general-purbridge structu
vities:
firm compscape plans.
package suction fundinge.
ed in 2010.
is currently onrvation manda
– Constructione Design – Landscapeion
th (909) 884-8sanbag.ca.gov
ns (909) 884-@sanbag.ca.go
Landscape
e: Mainline
rpose lane ures.
pleted a
bmitted to , but was
n hold due ates.
n &
e
8276 v
-8276 ov
Act
SR
Ma
M
StPrApEnFiCoCoEn
FuFeStMTo
CoPrFiCoTo
tive
-210 Corrido
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Landscaping
unding Sourceederal – STP tate – RIP-TE Seasure I otal
Landscape
ost Item roject Report nal Design onstruction otals
or
SR-2ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
Segments 8-1
($ 000’se
STP-RIP
e Budgetary E($ 000’s
SAN BERNMAJ
P
210 FREE
ummary A
[ Fo1
D)
ED) 199) Apd Jan
Jul[Sep
11 Funding Sus)
Am
Estimate Summs)
Am
NARDINO ASJOR PROJEPROJECT ST
EWAY EX
Actualorecast ] 1980 N/A
96/2004 pr 2004 n 2005 y 2007 pt 2020]
ummary
mount$1,707$4,127
$13,901$19,735
mary
mount$80
$720$18,935$19,735
SSOCIATEDCTS – GARTATUS – JU
9
XTENSION
Overall ProThis project Los AngelesI-215 Interchlanes and o Current ProThis project
Overall ProConstructionprovides ancongestion Current ProLandscape Avenue in Bernardino.and native wwater use.
Project StaSegments 8maintenancMay 2017, a Project NotThe plantinthrough 11maintenancimplementa Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
N CONST
oject Scope St extends the s-San Bernarhange (Segm
one HOV (i.e.
oject Summat is in the land
oject Benefitn of the SR-
n additional eon I-10, SR-6
oject Benefitbeautification
Fontana to Use of drowildflower se
atus and Con8 through 11 ace with Segmand Segment
tes of Interesng concepts 1 projects ce costs andation of efficie
ncy:
anager:
edia Contact:
MENTS E
TRUCTIO
Summary: existing SR-2
rdino County ment 11) with t
“car pool”) la
ary: dscape phase
: -210 through east/west free60 and other l
t: n of the SR-2o the I-215 ought toleranteding to mini
ntinuing Activare in a four ent 8 schedut 11 completin
st: developed
are intended help consnt irrigation s
LandscapeProject Ad Tim Kirkletkirkley@s
: Tim Watkitwatkins@
Phase:
Type
N
210 freeway fline (Segmenthree generalne in each di
e on Segment
San Bernardeway, therebylocal arterial r
210 corridor frInterchange
t plants, dripimize mainten
vities: (4) year exten
uled to be comng in Septem
for the Seed to reducserve water trategies.
e Design – Cdmin. – SANB
ey (909) 884-8sanbag.ca.go
ins (909) 884@sanbag.ca.g
Landscape
e: Mainline
from the nt 1) to the l-purpose rection.
ts 8-11.
dino valley y relieving routes.
rom Sierra e in San irrigation, nance and
nded plant mpleted in ber 2019.
gments 8 ce overall
with the
altrans BAG
8276 ov
4-8276 ov
Act
SR
S
Ma
M
StPrApEnFiCoCoEn
CoStPrFiROROCoCo
FuFeStM
tive
-210
SR 210 LA
ap of Projec
ilestone
tart of Project roject Initiation pproved (by Canvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design OW OW Support onstruction Suonstruction
Budgetaunding Sourceederal - STP tate - RIP easure I
ANE ADD
ct:
Schedule Su
Document (PIaltrans)
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
pport
Tot
ary Estimate Se
To
SAN BERNMAJ
P
ITION –H
ummary
[ F
D) M
ED) [O) [ Fd [A
[M
Summary ($ 00Am
als
Summary ($ 00Am
otal
NARDINO ASJOR PROJEPROJECT ST
IGHLAND
ActualForecast ]
2011
May 2008
Oct 2016] Feb 2018] Aug 2018] May 2020]
[2025]
00’s)mount
Caltrans $3,052 $8,818 $4,000
$768 $16,525 $99,000
$132,163
00’s)mount
$43,523 $25,000 $63,640
$132,163
SSOCIATEDCTS – GARTATUS – JU
10
D AVENUE
Project Sco This gap cloflow lane in generally beBernardino Redlands.
Project Ben The improvetraffic period
Project Sta
Environ
Award
anticipa Project Not As the SR-2Interchangedelivery schright of wayschedule.
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
E TO SAN
ope Summar
osure project each directio
etween Highlaand San Bern
nefit:
ements will dds and improv
atus and Con
nmental appr
of contracated.
tes of Interes
210 Lane Adde projects alighedules, they y, and constru
ncy:
anager:
edia Contact:
MENTS E
N BERNAR
ry:
includes the on within the mand Avenue, nardino Aven
ecrease congve traffic ope
ntinuing Activ
roval schedule
ct for final
st:
dition and SRgn geographic
will be combuction phases
SANBAG
Brian Smitbsmith@s
: Tim Watkitwatkins@
Phase: Env
Type
RDINO AV
addition of onmedian of SRin the City of
nue in the City
gestion duringrations.
vities:
ed for Fall-20
design se
-210 Base Lincally and sharined for the d to save cost
th (909) 884-8sanbag.ca.gov
ns (909) 884-@sanbag.ca.go
vironmental
e: Mainline
VENUE
ne mixed R-210
San y of
g peak
016.
ervices is
ne re similar design,
and
8276 v
-8276 ov
Active Phase: Design/ROW
US-395 Type: Mainline
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
11
US-395 WIDENING PROJECT – PHASE I Map of Project:
Schedule Summary
Milestone Actual
[ Forecast ] Start of Project July 2002 Project Initiation Document (PID) Approved
Aug 2005
Environmental Clearance (PA/ED) Dec 2009 Final Design Approved – (RTL) [Mar 2018] Construction Notice to Proceed [Dec 2018] Complete for Beneficial Use [Sept 2020] End of Project [July 2021]
Budgetary Estimate Summary ($ 000’s)Cost Item AmountProject Report and Env Document
$2,000
Final Design $6,015 ROW $12,189 Construction $32,520
Total $52,724
Budgetary Estimate Summary ($ 000’s)Funding Source AmountFederal – STP $32,698 Federal-DEMO $360 State - RIP $5,550 Measure I $13,187 Local Funds $929
Total $52,724
Project Scope Summary: Widen US-395 between SR 18 and Chamberlain from two lanes to four lanes. Install turn lanes and signals at various intersections within the project limits
Project Benefit: The project will relieve congestion and enhance the operational efficiency of US-395.
Project Status and Continuing Activities:
65% Plans were submitted to Caltrans for review.
ROW appraisal maps are finalized and appraisal preparation has begun.
Utility potholing began in June.
Project Notes of Interest: Environmental clearance was approved for all phases in
December, 2009. Future phases call for widening between I-15 and SR 18
and between Chamberlain Way and Desert Flower Road.
Lead Agency: SANBAG
Project Manager: Andrea Nieto (909) 884-8276 anieto@sanbag.ca.gov
Public/Media Contact: Tim Watkins (909) 884-8276 twatkins@sanbag.ca.gov
Act
I-10
Ma
M
StPrApEnFiCoCoEn
CoStPrFiROCo
CoFeFeStCoMCi
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design OW onstruction
Fuost Item ederal – TCIF ederal - IMD tate - STIP/RIPounty of San Beasure I ity of Fontana
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
To
unding Summa
P Bernardino
To
SAN BERNMAJ
P
I-1
ummary
[ F
D)
ED) F) Sd O
J
Summary ($ 00Am
C
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
0 AND C
ActualForecast ]
1998 2001
Feb 2009 ept 2011
Oct 2012 an 2015 [2020]
00’s)mountCity/Caltrans
$781 $6,600
$13,003 $60,281 $80,665
mount$30,520 $1,215 $3,908
$18,035 $16,897 $10,090 $80,665
SSOCIATEDCTS – GARTATUS – JU
12
HERRY A
Project Sco This projectbridge with ramp.
Project Ben This projectand greatly at Cherry Av
Project Sta The new
2015.
Constru
A new
contract Project Not
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
AVENUE
ope Summar
t will replace tan eight-lane
nefit:
t will make opreduce trafficvenue.
atus and Con
w bridge wa
uction is comp
four-year Et was awarde
tes of Interes
ncy:
anager:
edia Contact:
MENTS E
ry:
the existing fie bridge and
perational anc congestion
ntinuing Activ
s opened to
plete and in fe
Establish Exed in May 201
st:
SANBAG
Mike Barnmbarnum@
: Tim Watkitwatkins@
Phase:
Type: I
ive-lane Cher add one lan
nd safety imprat the I-10 in
vities:
traffic on Ja
ederal close o
xisting Planti16 and is ongo
num (909) 884@sanbag.ca.
ns (909) 884-@sanbag.ca.go
Landscape
Interchange
rry Avenue ne to each
rovements nterchange
anuary 17,
out phase.
ng (EEP) oing.
4-8276 gov
-8276 ov
Act
I-10
Ma
M
StPrApEnFiCoCoEn
CoStPrFiROCo
CoFeFeStMCoCi
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design OW onstruction
Fuost Item ederal - STP ederal - CMAQtate – STIP/RIPeasure I ounty of San Bity of Fontana
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
To
unding Summa
Q P
Bernardino
To
SAN BERNMAJ
P
I-1
ummary
[ F
D)
ED) F) Jud A
M
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
10 AND C
ActualForecast ]
1998 2001
Feb 2009 une 2011 Apr 2012 May 2014
[2019]
00’s)mount
City $1,138 $5,609
$10,755 $40,232 $57,734
mount$24,419 $2,243 $3,238 $5,663
$118 $22,053 $57,734
SSOCIATEDCTS – GARTATUS – JU
13
CITRUS A
Project Sco This project10 with a se
Project Ben This projecsafety.
Project Sta A new four-was awarde Project Not Constructionhas been su
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
AVENUE
ope Summar
t will replace teven-lane brid
nefit:
ct will reduc
atus and Con
-year Establised in June 20
tes of Interes
n is completeubmitted.
ncy:
anager:
edia Contact:
MENTS E
ry:
the existing fodge and add o
ce traffic con
ntinuing Activ
sh Existing P15 and is ong
st:
e and the fed
SANBAG
Mike Barnmbarnum@
: Tim Watkitwatkins@
Phase:
Type: I
our-lane bridgone lane to ea
ngestion and
vities:
Planting (EEPgoing.
deral close ou
num (909) 884@sanbag.ca.
ns (909) 884-@sanbag.ca.go
Landscape
Interchange
ge over I-ach ramp.
d improve
P) contract
ut package
4-8276 gov
-8276 ov
Act
I-10
Ma
M
StPrApEn
FiCoCoEn
CoStPrFiROCo
CoMCi
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental C
nal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design OW onstruction
Fuost Item easure I ity of Rialto
ct:
Schedule Su
Document (PI
Clearance (PA/E
proved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
To
unding Summa
To
SAN BERNMAJ
P
I-10
ummary
[ F
D) M
ED) MF
) Jd S
N[D
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
0 AND RIV
ActualForecast ]
1995 Mar 1997
May 1999 Feb 2008
un 2009 ept 2009
Nov 2011 Dec 2018]
00’s)mount
- Rialto - - Rialto -
$2,324 $2,000
$35,700 $40,024
mount$3,425
$36,599 $40,024
SSOCIATEDCTS – GARTATUS – JU
14
VERSIDE
Project Sco This projecAvenue brid
Project Ben This project Project Sta The p
establisDecemb
Project Not Landsca
provided
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
AVENUE
ope Summar
ct will replacdge over I-10
nefit:
t will improve
atus and Con
project is cshment periober 2018.
tes of Interes
aping is beid by the City
ncy:
anager:
edia Contact:
MENTS E
E
ry:
ce the existiwith a nine-la
traffic flow an
ntinuing Activ
currently inod schedule
st:
ing irrigated of Rialto.
SANBAG
Tim Kirkletkirkley@s
: Tim Watkitwatkins@
Phase:
Type: I
ng five-lane ane bridge.
nd safety.
vities:
a four-yeed for comp
with reclaim
y (909) 884-8sanbag.ca.go
ns (909) 884-@sanbag.ca.go
Landscape
Interchange
Riverside
ear plant pletion in
med water
8276 v
-8276 ov
Act
I-10
Ma
M
StPrApEnFiCoCoEn
CoPrFiCo
CoStMLo
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item roject Report nal Design onstruction
Fuost Item tate - CMIA easure I
ocal - STPL
I-ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
Tot
unding Summa
To
SAN BERNMAJ
P
10 AND T
ummary
[ FM
D) A
ED) J) Jd A
MJ
Summary ($ 00Am
als
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
TIPPECA
ActualForecast ] May 1997 Aug 2002
an 2011 Jan 2012 Aug 2012 Mar 2014 un 2016
00’s)mount
$1,866 $6,388
$16,650 $24,904
mount$10,000 $12,244 $2,660
$24,904
SSOCIATEDCTS – GARTATUS – JU
15
NOE AVE
Project Sco Project will and add turSan Timotedrainage ch
Project Ben This projectramp, result
Project Sta Constr
packag The 4-y
Project Not The fo
(EEP) 10/Tipp
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
ENUE – P
ope Summar
widen the I-rn lanes. To o Creek Bridg
hannel will be
nefit:
t will improve ting in reduce
atus and Con
ruction is coge has been syear landscap
tes of Interes
llow up four phase will
pecanoe PH I
ncy:
anager:
edia Contact:
MENTS E
PHASE I
ry:
10/Tippecanoaccommodatge will be widenclosed.
operations ofed congestion
ntinuing Activ
mplete and submitted. pe maintenan
st:
(4) year Estabe complete
II project.
SANBAG
Ghassan D(909) 884-gdagher@
: Tim Watkitwatkins@
Phase:
Type: I
oe eastboundte these lanesdened and the
f the eastboun.
vities:
the federal
nce project is
ablish Existined as part
Dagher -8276
@sanbag.ca.g
ns (909) 884-@sanbag.ca.go
Landscape
Interchange
d off-ramp, s of travel, e adjacent
nd off-
close out
ongoing.
g Planting of the I-
ov
-8276 ov
Act
I-10
Ma
M
StPrApEnFiCoCoEn
CoStFiROLaCo
CoFeMStLoCiCi
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report nal Design OW andscape Mainonstruction
Fuost Item ederal easure I tate – IIP ocal – IVDA ity of San Bernity of Loma Lin
I-1ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
ntenance
Tot
unding Summa
nardino da
To
SAN BERNMAJ
P
10 AND T
ummary
[ FD
D) D
ED) J) Sd F
M[O
Summary ($ 00AmInc
als
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
TIPPECAN
ActualForecast ] Dec 2005 Dec 2008
an 2011 ept 2014
Feb 2015 May 2016 Oct 2021]
00’s)mountcl in Phase I
$2,532 $34,176
$610 $16,914 $54,232
mount$30,337 $7,518
$11,691 $1,562 $1,562 $1,562
$54,232
SSOCIATEDCTS – GARTATUS – JU
16
NOE AVE
Project Sco This projecAvenue inte
Project Ben This projecinterchangereduced con
Project Sta The new The 1 y
Project Not Constru Final ele
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
ENUE – P
ope Summar
ct will reconerchange.
nefit:
ct will improe and the angestion.
atus and Con
w westbound year plant esta
tes of Interesuction is approectrical testin
ncy:
anager:
edia Contact:
MENTS E
PHASE II
ry:
nfigure the
ove traffic floadjacent inte
ntinuing Activ
off ramp opeablishment st
st: oximately 95%g and punchl
SANBAG
Ghassan D8276 gdagher@
: Tim Watkitwatkins@
Phase: C
Type: I
I-10 and T
ow and safersections, re
vities:
ened in May 2tarted in May
% complete.list work is on
Dagher (909
@sanbag.ca.g
ns (909) 884-@sanbag.ca.go
onstruction
Interchange
ippecanoe
ety of the esulting in
2016. 2016.
ngoing.
) 884-
ov
-8276 ov
Active Phase: Design/ROW
I-10 Corridor Type: Interchange
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
17
I-10 / CEDAR AVENUE INTERCHANGE Map of Project:
Schedule Summary
Milestone Actual
[ Forecast ] Start of Project Nov 2001 Project Initiation Document (PID) Approved (by others)
Mar 1997
Environmental Clearance (PA/ED) July 2013 Final Design Approved – (RTL) [Jan 2019] Construction Notice to Proceed [Aug 2019] Complete for Beneficial Use [July 2021] End of Project [May 2026]
Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report County Project Report $493 Final Design $4,300 ROW $12,954 Landscaping $0 CM and Construction $54,200
Total $71,947
Funding Summary ($ 000’s) Cost Item AmountState - STP $4,200 Measure I $50,928 County $16,819
Total $71,947
Project Scope Summary: Reconstruction of the interchange includes widening the I-10 overcrossing, roadway improvements along Cedar Avenue from Bloomington Avenue to Slover Avenue, and adding lanes to the ramps.
Project Benefit: The improvements will decrease congestion and improve traffic operations during peak traffic periods.
Project Status and Continuing Activities: Caltrans has completed initial project survey and base
maps for the preliminary design plans. Caltrans has initiated the preliminary geometric plans
and structure designs. Project Development Team (PDT) and stakeholder
meetings are ongoing.
The County of San Bernardino Right-of-Way team is performing an initial review of the preliminary ROW requirements.
Project Notes of Interest: Caltrans is responsible for the PS&E, and the County is
responsible for the Right-of-Way phase. Agreements are being negotiated between the County
of San Bernardino and Caltrans. Subsequent agreements are being developed between
the County and SANBAG for each phase.
Lead Agency: County of San Bernardino
Project Manager: Chad Costello (909) 884-8276 ccostello@sanbag.ca.gov
Public/Media Contact:
Tim Watkins (909) 884-8276 twatkins@sanbag.ca.gov
Act
I-10
Ma
M
StPrApEnFiCoCoEn
CoStPrFiCoTo
CoFeFeStMCiByTo
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design onstruction Caotal
Fuost Item ederal - Demo ederal - IMD tate - TCIF easure I ity of Colton y Others otal
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
pital
unding Summa
SAN BERNMAJ
P
I-10/PEP
ummary
[ FMa
D)
ED) F) Jud M
[A[A
Summary ($ 00Am
ary ($ 000’s) Am
NARDINO ASJOR PROJEPROJECT ST
PPER AV
ActualForecast ] arch 2013
N/A
Feb 2015 une 2015
Mar 2016 Aug 2017] Apr 2018]
00’s)mount
$358 $120 $506
$9,580 $10,565
mount$6,128
$904 $1,158
$697 $842 $836
$10,565
SSOCIATEDCTS – GARTATUS – JU
18
VENUE IN
Project Sco The reconsta 5-lane brid
Project Ben The projeccongestion
Project Sta Federal
and pro
Project for the FLabor H
Approxi
Improveallocate
Project Not Contrac
January2016.
Construthe conValley W
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
TERCHA
ope Summar
truction of thdge and inter
nefit:
ct will improalong Pepper
atus and Con
l authorizationoject was adve
includes provFederal HighwHiring Initiative
imately $1.2Mement Fund ped to the proje
tes of Interes
ct for constry and constru
uction of a ponstruction conWater District
ncy:
anager:
edia Contact:
MENTS E
ANGE
ry:
e interchangersection impro
ove traffic or Avenue.
ntinuing Activ
n to proceed ertised for a c
visions for a feway Administe.
M of State Traprogram (TCIFect
st:
ruction serviuction Notice
otable water ntract to be t.
SANBAG
Paul Melopmelocoto
: Tim Watkitwatkins@
Phase: C
Type: I
e includes coovements.
perations an
vities:
(E-76) was reconstruction c
federal pilot ptration (FHWA
ade Corridor F) funding wa
ces was awe to Proceed
pipeline is inpaid for by
coton (909) 8on@sanbag.c
ns (909) 884-@sanbag.ca.go
onstruction
Interchange
onstructing
nd reduce
eceived contract.
rogram A) Local
as
warded in in March
ncluded in the West
884-8276 ca.gov
-8276 ov
Act
I-10
Ma
M
StPrApEnFiCoCoEn
CoStPEFiROCoTo
CoMCiTo
tive
0 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report EER/ED nal Design OW onstruction otal
Fuost Item easure I ity of Redlandsotal
I-ct:
Schedule S
Document (PI
Clearance (PA/proved – (RTLtice to Proceed
eneficial Use
ary Estimate S
unding Summ
s
SAN BERNMAJ
P
10 / UNIV
Summary
[
D)
ED) [J) [Md [S
[J[J
Summary ($ 00A
$$
mary ($ 000’s) A$$$
NARDINO ASJOR PROJEPROJECT ST
VERSITY
ActualForecast ] Dec 2014
N/A
July 2016 ] May 2017 ] Sept 2017] July 2018 ] July 2023 ]
00’s)mountN/A
$200 $270 $290
$4,440 $5,200
mount$4,187 $1,012 $5,200
SSOCIATEDCTS – GARTATUS – JU
19
STREET
Project Sc The projeinterchangand also lanes, traffexisting rig
Project Be The projeoperationsand Centra
Project St The Fi
approv Field in
been c The en
complework h
Project No
The interchRedlands a
Lead Age Project M
Public/M
D GOVERNMRRY COHOEUNE 2016
INTERCH
cope Summa
ect will impre, between implement m
fic signals anght of way.
enefit:
ect will redus along Univeal Avenue.
tatus:
nal Traffic Stuved by Caltran
nvestigation wcompleted.
nvironmental eted. The prehave been init
otes of Intere
hange servesand Redlands
ency:
Manager:
edia Contac
MENTS E
HANGE
ary:
rove UniversCitrus Avenu
minor ramp d operational
uce congestiersity Street
udy Report hns and the Ci
work and geo
technical studeliminary destiated.
est:
s as the gatews High Schoo
SANBAG
Chad Coccostello
ct: Tim Wattwatkins
Phase: Env
Type: I
sity Street ue and Cenwidening, adl improvemen
ion and impbetween Ci
as been revieity of Redland
otechnical bor
dies have beeign plans and
way for the Unol.
G
ostello 909 8o@sanbag.ca
tkins (909) 88@sanbag.ca.
vironmental
Interchange
at the I-10 tral Avenue, dded turning nts within the
prove traffic trus Avenue
ewed and ds.
rings have
en d field survey
niversity of
84-8276 a.gov
84-8276 .gov
Active Phase: Planning
I-10 Corridor Type: Interchange
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
20
I-10 / MOUNT VERNON Map of Project:
Schedule Summary
Milestone Actual
[ Forecast ] Start of Project Jan 2016 Project Initiation Document (PID) Approved
[Nov 2017]
Environmental Clearance (PA/ED) [Dec 2019 ] Final Design Approved – (RTL) [Mar 2021 ] Construction Notice to Proceed [Nov 2021] Complete for Beneficial Use [Aug 2023 ] End of Project [2028 ]
Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report $100 PA/ED $1,901 Final Design $1,862 ROW $6,907 Construction $26,455 Total $37,225
Funding Summary ($ 000’s) Cost Item AmountMeasure I $32,095 DIF $5,130 Total $37,225
Project Scope Summary: The project will replace the existing bridge over I-10 and Mount Vernon and will provide local circulation improvements.
Project Benefit: This project will make operational and safety improvements and reduce local traffic congestion at the I-10 interchange.
Project Status: Procurement for Professional Services for the Planning
Phase is anticipated to be complete in July 2016. Project Notes of Interest: SANBAG will lead the Planning Phase.
Lead Agency:
SANBAG
Project Manager:
Brian Smith 909 884-8276 bsmith@sanbag.ca.gov
Public/Media Contact: Tim Watkins (909) 884-8276 twatkins@sanbag.ca.gov
Act
I-15
Ma
M
StPrApEnFiCoCoEn
CoStPrPrROCo
CoFeFeFeStStStMPaMPr
tive
5/I-215
I
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report reliminary EngiOW onstruction
Fuost Item ederal- STP ederal - DEMOederal IMD tate - CMIA tate – SHOPP tate - RIP easure I (2010 ass easure I (Majorivate Utility Co
-15 AND
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
ineering
To
unding Summa
O
– 2040) Cajon
or Projects) ompanies
To
SAN BERNMAJ
P
I-215 INT
ummary
[ FJ
D) M
ED) F) Jd A
Ju
Summary ($ 00Am
In
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
TERCHAN
ActualForecast ] uly 2007
Mar 2009
Feb 2012 Jan 2016 Aug 2013 une 2016 [2017]
00’s)mountncl in PA/ED
$10,295 $6,580
$41,877 $266,253 $325,005
mount$65,708 $2,000 $3,341
$53,743 $83,865 $45,145 $53,696
$10,490 $7,017
$325,005
SSOCIATEDCTS – GARTATUS – JU
21
NGE IMPR
Project Sco This projectlanes in eacadding truBoulevard.
Project Ben This projectthe I-15 correconnectio
Project Sta Final
underw
Project Not Project is co
Lead Agen
Project Ma
Public/MeContact:
D GOVERNMRRY COHOEUNE 2016
ROVEME
ope Summar
t will reconfigch direction ock by-pass
nefit:
t will reduce rridor, and im
on of Cajon Bo
atus and Con
punch-list away.
tes of Interes
omplete for be
ncy: CS
anager: d
edia Tt
MENTS E
ENTS (DEV
ry:
gure the interon the I-15. Th
lanes and
congestion amprove local oulevard.
ntinuing Activ
activities and
st:
eneficial use.
Caltrans – DeSANBAG impright of way, u
Dennis Saylodsaylor@san
Tim Watkins twatkins@san
Phase: D
Type: I
VORE)
rchange to prhe project als reconnectin
at the bottlencirculation th
vities:
d close out
esign Build plementing agutilities, and r
or (909) 884-8nbag.ca.gov
(909) 884-82nbag.ca.gov
Design/Build
Interchange
rovide four so includes ng Cajon
neck along hrough the
work is
gency for railroad.
8276
76
Act
I-15
Ma
M
StPrApEnFiCoCoEn
CoStPrFiROROCoCo
CoFeStLo
tive
5 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design OW OW Capital onstruction Suonstruction Ca
Fuost Item ederal (IM, IMDtate (CMIA, STocal (Meas. I, S
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
pport pital
To
unding Summa
D funds) TIP/RIP) SLPP, Hesperia
To
SAN BERNMAJ
P
I-15/RAN
ummary
[ FM
D) J
ED) M) Md N
F[O
Summary ($ 00Am
C
C
otal
ary ($ 000’s) Am
a)
otal
NARDINO ASJOR PROJEPROJECT ST
NCHERO
ActualForecast ] Mar 2012 Jul 2006
Mar 2010 May 2012 Nov 2012 Feb 2015 Oct 2016]
00’s)mountCity Funded
1,056 $4,129
City Funded $9,204 $7,700
$36,254 $58,343
mount$3,006
$35,293 $20,044
$58,343
SSOCIATEDCTS – GARTATUS – JU
22
ROAD IN
Project Sco The projecconnects Man 8-lane ov
Project Ben Project proHesperia congestion
Project Sta
Project is 10 Project Not The Ci
environproject.
A fire onerected
Bridge Februar
As of Dehave ta
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
NTERCHA
ope Summar
ct provides ariposa Roadvercrossing in
nefit:
vides a newand surrounon the adjace
atus and Con
00% complete
tes of Interes
ty of Hespemental, desig
n May 5, 201 for the bridgeand ramps wry 20, 2015. ecember 201ken over mai
ncy:
anager:
edia Contact:
MENTS E
ANGE
ry:
a new freed and Calientncluding turn
w interchangending area,ent interchang
ntinuing Activ
e and in close
st:
eria was thegn, and right
4 damaged the. were opened
5, Caltrans antenance of t
SANBAG
Mike Barnmbarnum@
: Tim Watkitwatkins@
Phase:
Type: I
eway interchae Road by colanes.
e to serve th which wiges.
vities:
e out.
lead agencof way phas
he temporary
d for benefici
and the City othe facility.
num (909) 884@sanbag.ca.
ns (909) 884-@sanbag.ca.go
: Close-Out
Interchange
ange and onstructing
he City of ill relieve
cy for the ses of this
y falsework
ial use on
f Hesperia
4-8276 gov
-8276 ov
Act
I-21
Ma
M
StPrApEnFiCoCo
En
CoPrDoFiROCo
CoFeFeFeStMCi
tive
15 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item roject Report aocument nal Design OW onstruction Ca
Fuost Item ederal – Bridgeederal – Demo ederal – IMD tate – SLPP easure I ity of Rancho C
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
nd Env
pital To
unding Summa
e Disc SAFETEA-LU
Cucamonga To
SAN BERNMAJ
P
I-15 BAS
ummary
[ F
D) A
ED) N) Od A
[S
[O
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
SE LINE
ActualForecast ]
1999 Apr 2002
Nov 2011 Oct 2014 Aug 2014 ept 2016]
Oct 2017]
00’s)mount
$1,178
$4,630 $1,430
$43,421 $50,480
mount$419
$3,600 $3,754 $1,000
$20,854 $20,853 $50,480
SSOCIATEDCTS – GARTATUS – JU
23
ROAD IN
Project Sco The project reconfigure
Project Ben Increased cflow deman
Project Sta Constr
Project
Contraelectricinstallinpavem
Project Not The City of design phaslead on mproject.
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
NTERCHA
ope Summar
t will widen Bthe north and
nefit:
capacity to mds as well as
atus and Conruction began
t is 73% comp
actor is concal work onng retaining
ment on new fr
tes of Interes
Rancho Cucase and right-
management
ncy:
anager:
edia Contact:
MENTS E
ANGE
ry:
Base Line Rod south bound
meet current as improved sa
ntinuing Activ on October 2
plete.
ntinuing util Base Line
walls, andreeway ramps
st:
amonga was -of-way acquiof the cons
SANBAG
Mike Barnmbarnum@
: Tim Watkitwatkins@
Phase: D
Type: I
oad and Eastd on and off r
as well as futafety and effic
vities: 22, 2014.
ity relocatioand East
d installing s and city stre
the lead agenisition. SANB
struction phas
num (909) 884@sanbag.ca.
ns (909) 884-@sanbag.ca.go
Design/ROW
Interchange
t Avenue, ramps.
ure traffic ciencies.
ons and Avenue, concrete eets.
ncy for the BAG is the se of the
4-8276 gov
-8276 ov
Act
I-21
Ma
M
StPrApEnFiCoCoEn
CoStPrFiROCoTo
CoFeFeFeFeFeM
tive
15 Corridor
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design OW onstruction otals
Fuost Item ederal RIP ederal - STP ederal Section ederal Section ederal DEMO easure I
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
unding Summa
112 115
To
SAN BERNMAJ
P
I-2
ummary
[ FJu
D) A
ED) M) [Ad [A
[M
Summary ($ 00Am-Inc
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
215 AND
ActualForecast ] une 2006
April 2007
Mar 2014 Apr 2017] Aug 2017]
May 2019] [2025]
00’s)mountcl in PA/ED-
$2,794 $5,797
$27,508 $51,863 $87,962
mount$22,611 $28,941 $1,980
$501 $6,480
$27,448 $87,962
SSOCIATEDCTS – GARTATUS – JU
24
BARTON
Project Sco This projecincreasing tultimate maround-about
Project Ben The projectreduced con
Project Sta Design
Resolut
Nine pro Project Not Caltrans
Phase a This int
CorridoFreewa
The prprojectsmethodimprove
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
N ROAD
ope Summar
ct will reconthe length of ainline wident.
nefit:
t will improvengestion.
atus and Conand Right-of-
tion of Necess
operties have
tes of Interes
s is leadingand ROW engterchange pror project. Ty Program.
roject was ss to use the , the contract
e constructab
ncy:
anager:
edia Contact:
MENTS E
ry:
nstruct the f the structurening. This p
e traffic flow
ntinuing Activ-Way (ROW)
sity hearings
e been acquir
st:
g the develogineering. oject was se
The Measure
selected as CM/GC delivtor will assist ility.
Caltrans - SANBAG Andrea Nianieto@sa
: Tim Watkitwatkins@
Phase: D
Type: I
interchange, e to accomm
project also i
and safety re
vities: work is ongo
are ongoing.
red.
opment of th
parated from I funds are
one of six very method. Caltrans with
Design - ROW eto (909) 884anbag.ca.gov
ns (909) 884-@sanbag.ca.go
Design/ROW
Interchange
including modate the
ncludes a
esulting in
ing.
he Design
m the I-215 e from the
statewide With this
h design to
4-8276 v
-8276 ov
Act
SR
Ma
M
StPrApEnFiCoCoEn
CoStPrFiROROCoCo
CoFeM
tive
210
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Bend of Project
Budgetaost Item tudy Report roject Report nal Design OW Support OW Capital onstruction Suonstruction Ca
Fuost Item ederal STP easure I
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
pport pital
To
unding Summa
To
SAN BERNMAJ
P
SR-2
ummary
[ FJan
D)
ED) J) Jd [F
[D
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
210 AND
ActualForecast ] nuary 2011
N/A
uly 2015 un 2016
Feb 2017] Dec 2017]
[2022]
00’s)mount
N/A $1,250 $1,250
$100 $3,792 $1,994
$15,384 $23,770
mount$13,131 $10,639 $23,770
SSOCIATEDCTS – GARTATUS – JU
25
PEPPER
Project Sco This projectthe City of R
Project Ben The projecttransportatio
Project Sta 100% d
final rev The Rig
2016 A Not
issued bimpactsRat (SBSection
Project Not The stru
This primprove
The proone yeconstrucwill thenprogram
Construproject, Water Dfacilitate
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
R AVENUE
ope Summar
t will provide Rialto.
nefit:
will provide fon system.
atus and Con
design plans hview. ght of Way fo
Likely to Adby the Uniteds to the endaBKR). Purcha 7 consultatio
tes of Interes
ucture was coroject compleements. oject will inclear plant esction roadwan be followed
m uction of a 30
which woulDistrict, will be construction
ncy:
anager:
edia Contact:
MENTS E
E
ry:
a new freewa
freeway acces
ntinuing Activ
have been su
or the projec
dversely Affed States Fish angered Sanase of mitigaon was compl
st:
ompleted withetes the ram
lude landscastablishment
ay improvemed by a four-y
0” potable wald be fundede included inn.
SANBAG
Paul Melopmelocoto
: Tim Watkitwatkins@
Phase: D
Type: I
ay interchang
ss to and from
vities:
ubmitted to C
ct was certifie
ect determinand Wildlife S
n Bernardino ation credits leted in June
h the freewayps and othe
ape constructperiod star
ents are comyear plant ma
ater line as pd by the We
n the project c
coton (909) 8on@sanbag.c
ns (909) 884-@sanbag.ca.go
Design/ROW
Interchange
ge to serve
m the local
Caltrans for
ed in June
ation was Service for Kangaroo as part of 2016.
y mainline. er ancillary
tion and a rting after plete, and
aintenance
part of the est Valley contract to
884-8276 ca.gov
-8276 ov
Active Phase: Planning
SR-60 Type: Interchange
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
26
SR-210 AND BASELINE Map of Project:
Schedule Summary
Milestone Actual
[ Forecast ] Start of Project February 2013 Project Initiation Document (PID) Approved
Environmental Clearance (PA/ED) [Oct 2016] Final Design Approved – (RTL) [Mar 2018] Construction Notice to Proceed [Dec 2018] Complete for Beneficial Use [Sept 2020] End of Project [July 2021]
Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report 214 Project Report $1,253 Final Design $1,507 ROW $199 Construction Support $0 Construction Capital $12,600
Total $15,773
Funding Summary ($ 000’s) Cost Item AmountMeasure I $9,165 City of Highland $6,608
Total $15,773
Project Scope Summary: The project will widen Baseline at the SR-210 Interchange as well as widen the existing westbound on and off-ramps, and eastbound on-ramp to the SR-210.
Project Benefit: This project will make operational and safety improvements and reduce local traffic congestion at the SR-210 interchange.
Project Status and Continuing Activities:
The Draft Environmental Document was circulated for public comments from May 9, 2016 to June 7, 2016 and a public hearing was held on May 25, 2016.
Environmental approval is scheduled for Fall 2016.
A contract for final design services was awarded in June 2016.
Project Notes of Interest: As the SR-210 Baseline Interchange and SR-210 Lane Addition projects align geographically and share similar delivery schedules, they will be combined for the design, right of way, and construction phases to save cost and schedule.
Lead Agency: SANBAG
Project Manager: Brian Smith (909) 884-8276 bsmith@sanbag.ca.gov
Public/Media Contact: Tim Watkins (909) 884-8276 twatkins@sanbag.ca.gov
Act
SR
Ma
M
StPrApEnFiCoCo
En
CoPrDoFiROCoCo
CoMCi
tive
-60
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item roject Report aocument nal Design OW/Utilities Caonstruction Suonstruction Ca
Fuost Item easure I ity of Chino
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
nd Env
apital pport pital
To
unding Summa
To
SAN BERNMAJ
P
SR
ummary
[ FM
D) [A
ED) [J) [Jud [F
[Ju
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
R-60 / CE
ActualForecast ] May 2014 Aug 2016]
uly 2017] une 2018] Feb 2019] une 2020]
[2025]
00’s)mount
$938
$875 $876
$1,151 $16,751 $20,591
mount$8,097
$12,494 $20,591
SSOCIATEDCTS – GARTATUS – JU
27
NTRAL A
Project Sco The projecintersectionsfreeway acc
Project Ben The projecentering the60/Central standard robicycle featu
Project Sta
The enapprov
The Pr(PSR-P
Traffic Project Not High Occupadded to bo
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
AVENUE
ope Summar
ct will imprs, and wide
cess.
nefit:
ct will provide freeway andAvenue Brid
oadway shouures.
atus and Con
nvironmental ved by the Bo
roject Study RPDS) is antici
studies are u
tes of Interes
pancy Vehicleoth on-ramps.
ncy:
anager:
edia Contact:
MENTS E
ry:
rove the fren the existi
de additionald improve trafdge. The prlders, and im
ntinuing Activ
and design oard in March
Report – Projeipated to be a
underway.
st:
e (HOV) prefe.
SANBAG Paul Melopmelocoto
: Tim Watkitwatkins@
Phase
Type: I
reeway ramng bridge to
storage forffic flow acrosroject will alsmprove pede
vities:
services con2015.
ect Developmapproved in A
erential lanes
coton (909) 8on@sanbag.c
ns (909) 884-@sanbag.ca.go
e: Planning
Interchange
ps, ramp o improve
r vehicles ss the SR-so provide strian and
ntract was
ment Study August.
are being
884-8276 ca.gov
-8276 ov
Act
SR
Ma
M
StPrApEnFiCoCo
En
CoStFiROCoLa
CoMCi
tive
-60
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item tudy Report/Pronal Design OW/Utilities onstruction andscape Main
Fuost Item easure I ity of Ontario
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
oject Report
ntenance To
unding Summa
To
SAN BERNMAJ
P
SR-
ummary
[ FJu
D) [A
ED) [D) [Jd [N
[M
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
-60 / ARC
ActualForecast ] une 2015
Aug 2016]
Dec 2017] un 2019]
Nov 2019] Mar 2021]
[2021]
00’s)mount
$842 $888
$1,258 $11,125
$300 $14,563
mount$4,869 $9,694
$14,563
SSOCIATEDCTS – GARTATUS – JU
28
CHIBALD
Project Sco The project Avenue in thArchibald Av.
Project BenThe projeccongestion
Project Sta
The PS
An inteby Calt
Project Not This projec2010-2040
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
AVENUE
ope Summar
will reconfiguhe City of Ontvenue to incr
nefit: ct will improat the interch
atus and Con
SR/PR and P
ersection conttrans.
tes of Interes
ct is the ninthFreeway Inte
ncy:
anager:
edia Contact:
MENTS E
E
ry:
ure the rampstario. The pro
rease the left
ove traffic ohange.
ntinuing Activ
EAR are bein
trol evaluatio
st:
h highest prierchange Prog
SANBAG
Andrea Nianieto@sa
: Tim Watkitwatkins@
Phase
Type: I
s on SR-60 atoject will alsoturn capacity
perations an
vities:
ng revised.
n memo was
ority in the Mgram.
eto (909) 884anbag.ca.gov
ns (909) 884-@sanbag.ca.go
e: Planning
Interchange
t Archibald o widen .
nd reduce
s approved
Measure I
4-8276 v
-8276 ov
Active Phase: Design/ROW
Local Streets Type: Grade Separation
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
29
MONTE VISTA AVENUE AND UNION PACIFIC RAILROAD Map of Project:
Schedule Summary
Milestone Actual
[ Forecast ] Start of Project Apr 2001 Project Initiation Document (PID) Approved (by others)
Environmental Clearance (PA/ED) July 2013 Final Design Approved – (RTL) [July 2016] Construction Notice to Proceed [Mar 2017] Complete for Beneficial Use [Jun 2018]
End of Project [Apr 2019]
Budgetary Estimate Summary ($ 000’s)Cost Item AmountProject Report Final Design ROW Construction Support $3,315 Construction $23,370
Total $26,685
Funding Summary ($ 000’s) Cost Item AmountFederal – PNRS $14,715 State – TCIF $2,113 Measure I $2,029 City of Montclair $1,752 UPRR $1,016 PUC Sect. 190 $5,000 Total $26,685
Project Scope Summary: This project will bridge Monte Vista Avenue in the City of Montclair over the existing Union Pacific Railroad (UPRR) and State Street.
Project Benefit: This project will improve traffic operations, local circulation, air quality, and safety by eliminating the at-grade crossing between Monte Vista Avenue and UPRR.
Project Status and Continuing Activities: Final design and right-of-way activities are underway
and are being led by the City of Montclair.
Procurement for Construction Management Services was awarded by SANBAG in January 2016.
Ready to List package anticipated in July 2016.
Project Notes of Interest: SANBAG will lead the construction phase.
Lead Agency: City of Montclair – Design/ROW SANBAG – Construction
Project Manager: Brian Smith (909) 884-8276 bsmith@sanbag.ca.gov
Public/Media Contact: Tim Watkins (909) 884-8276 twatkins@sanbag.ca.gov
Act
Loc
Ma
M
StPrApEnFiCoCo
En
CoPrFiROROCoCo
CoFeFeFeStMCiBNPU
tive
cal Streets
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item roject Report nal Design OW Support OW onstruction Suonstruction Ca
Fuost Item ederal – DEMOederal - CMAQederal – PNRState – TCIF easure I ity of San BernNSF Railroad UC 130 & 190
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
pport pital
To
unding Summa
O Q S
nardino
Funds To
SAN BERNMAJ
P
PALM A
ummary
[ FJ
D) Ju
ED) Ju) Md O
D
[N
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
AVENUE A
ActualForecast ] an 2008
une 2009
uly 2011 Mar 2013 Oct 2013 Dec 2014
Nov 2016]
00’s)mount
$774 $2,024
$541 $8,314 $2,134
$10,414 $24,201
mount$1,440 $3,925 $1,016 $3,284 $2,681 $1,865
$690 $9,300
$24,201
SSOCIATEDCTS – GARTATUS – JU
30
AND BNS
Project Sco This projecBurlington N
Project Ben This projectcrossing bewill improvedelays at th
Project Sta Constr
Relief o
The Ci
the pro BNSF
of the a Project Not
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
SF RAILR
ope Summar
ct will grade Northern Sant
nefit:
t will improveetween Palm Ae air quality e existing cro
atus and Con
ruction comple
of maintenanc
ity of San Beoject on Septeis completingat-grade cros
tes of Interes
ncy:
anager:
edia Contact:
Ty
MENTS E
ROAD
ry:
separate Pta Fe (BNSF)
e safety by eAvenue and and local cir
ossing.
ntinuing Activ
eted in Augus
ce was grante
ernardino accember 11, 20g track work rsing.
st:
SANBAG
Tim Kirkletkirkley@s
: Tim Watkitwatkins@
Phase
ype: Grade
alm Avenue ) railroad track
eliminating thethe BNSF tra
rculation by e
vities:
st 2015.
ed to the con
cepted respon15. required by th
y (909) 884-8sanbag.ca.go
ns (909) 884-@sanbag.ca.go
e: Close-Out
Separation
from the ks.
e at grade acks and it eliminating
tractor.
nsibility for
he removal
8276 v
-8276 ov
Act
Loc
Ma
M
StPrApEnFiCoCo
En
CoStPrFiROCo
CoFeFeFeStMMCoCiBNTo
tive
cal Streets
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction
Fuost Item ederal - DEMOederal - STP ederal Section tate - TCIF easure I easure I ounty of San Bity of Barstow NSF Railroad otal
Lct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
on
To
unding Summa
O
125
Bernardino
SAN BERNMAJ
P
LENWOO
ummary
[ FO
D) J
ED) J) Jd D
S
[J
Summary ($ 00Am
In
otal
ary ($ 000’s) Am
NARDINO ASJOR PROJEPROJECT ST
OD ROAD
ActualForecast ] Oct 2008 an 2010
uly 2011 uly 2013
Dec 2013 ept 2015
uly 2016]
00’s)mount
N/A ncl in Design
$4,409 $5,131
$21,376 $30,916
mount$1,080
$12,339 $238
$8,275 $3,453 $3,453 $2,500 $1,995 $1,036
$30,916
SSOCIATEDCTS – GARTATUS – JU
31
D AND BN
Project Sco This projecBurlington N
Project Ben The project delay at theemergency
Project Sta The c
2013.
Constproce
Project Not The pro
2014. Lenwoo
2015.
Construpackage
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
NSF RAIL
ope Summar
ct will bridge Northern Sant
nefit:
will improve e existing at-response wil
atus and Con
construction c.
truction is cess will conclu
tes of Interes
oject was awa
od Road was
uction is come is in proces
ncy:
anager:
edia Contact:
Ty
MENTS E
LROAD
ry:
Lenwood Rta Fe (BNSF)
operation by-grade crossil be improved
ntinuing Activ
contract was
complete andude in July 20
st:
arded $5 Milli
opened to tr
mplete and ss.
SANBAG
Hiep Bui 9hbui@san
: Tim Watkitwatkins@
Phase
ype: Grade
Road over th) railroad track
y eliminating ting. Public sd.
vities:
awarded in
d the federal016.
on PUC fund
raffic on Sept
the federal
909 884-8276nbag.ca.gov
ns (909) 884-@sanbag.ca.go
e: Close-Out
Separation
he existing ks.
the vehicle safety and
December
close-out
ding in July
tember 14,
close out
6
-8276 ov
Act
Loc
Ma
M
StPrApEnFiCo
Co
En
CoStPrFiROCo
CoStStStMLoBNUP
tive
cal Streets
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction No
omplete for Be
nd of Project
Budgetaost Item tudy Report roject Report nal Design OW Support/Construction Su
Fuost Item tate - TCIF tate – TCRP tate - PUC easure I
ocal Funds –CiNSF RailroadsPRR Railroad
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
Capital pport/Capital
To
unding Summa
ty of Colton
To
SAN BERNMAJ
P
LAUREL
ummary
[ FD
D)
ED) J) Md S
Ju
[F
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
STREET
ActualForecast ] Dec 2010
N/A
an 2012 May 2013
ept 2013
une 2016
Feb 2017]
00’s)mount
N/A $864
$4,656 $12,397 $41,937 $59,854
mount$23,713 $7,690 $5,000 $8,897 $4,960 $4,985 $4,609
$59,854
SSOCIATEDCTS – GARTATUS – JU
32
T AND BN
Project Sco This projectLaurel Stree
Project Ben This projecsafety, and to establish
Project Sta The co
2013.
Project
Current Project Not The new
crossing The new
Compan Ribbon Laurel S
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
NSF RAIL
ope Summar
t will bridge et in the City o
nefit:
ct will improvis part of seva Quiet Zone
atus and Con
nstruction co
is approxima
tly completing
tes of Interesw BNSF Bridgg in August 2w 8th Street ny was openecutting cerem
Street was op
ncy:
anager:
edia Contact:
Ty
MENTS E
ROAD
ry:
the BNSF sof Colton.
ve local traffiveral other proe within the C
ntinuing Activ
ontract was a
ately 99% com
g punch-list an
st: ge was comp015. access bridged on Novemmony was helpened to traffi
SANBAG
Jagdish Pjagdish@s
: Tim Watkitwatkins@
Phase: C
ype: Grade
six railroad tr
ic circulationojects that are
City.
vities:
awarded in S
mplete.
nd close out w
pleted and tra
ge to Williamsmber 11, 2015
d on June10,c on June 21
atel (909) 884sanbag.ca.go
ns (909) 884-@sanbag.ca.go
onstruction
Separation
racks over
, enhance e intended
September
work...
ains began
s Furnace . , 2016. , 2016.
4-8276 ov
-8276 ov
Act
Loc
Ma
M
StPrApEnFiCoCo
En
CoStPrFiROCo
CoStStMLoLoUP
tive
cal Streets
Sap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction
Fuost Item tate - SLPP tate - TCIF easure I
ocal Funds – Cocal Funds – CPRR Railroads
OUTH MIct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
on
To
unding Summa
City of Ontario CCO Repay s
To
SAN BERNMAJ
P
ILLIKEN A
ummary
[ FJ
D)
ED) Ju) Sd F
[M
[D
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
AVENUE
ActualForecast ] uly 2008
N/A
une 2010 ept 2013
Feb 2014 Mar 2017]
Dec 2017]
00’s)mount
N/A $750
$5,715 $8,297
$57,401 $72,163
mount$7,210
$21,846 $23,568 $13,936 $3,121 $2,482
$72,163
SSOCIATEDCTS – GARTATUS – JU
33
AND UN
Project Sco This projecexisting UniAvenue.
Project Ben Separating eliminates gimproves he
Project Sta SCE ov
Project Not The City
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
NION PAC
ope Summar
ct will bridgeion Pacific R
nefit:
the railroadgate down timeavy truck ac
atus and Con
verhead trans
tes of Interes
y of Ontario is
ncy:
anager:
edia Contact:
Ty
MENTS E
CIFIC RAI
ry:
e South MilliRailroad (UPR
d crossing fme easing comcess to the ca
ntinuing Activ
mission lines
st:
s the lead age
City of On
Andrea Nianieto@sa
: Tim Watkitwatkins@
Phase: C
ype: Grade
LROAD
ken Avenue RR) tracks an
from Millikenmmuter driveargo facilities
vities:
are now inst
ency.
tario
eto (909) 884anbag.ca.gov
ns (909) 884-@sanbag.ca.go
onstruction
Separation
over the nd Mission
n Avenue e time, and .
alled.
4-8276 v
-8276 ov
Act
Loc
Ma
M
StPrApEnFiCoCo
En
CoStPrFiROCo
CoStMLoUP
tive
cal Streets
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction
Fuost Item tate - SLPP easure I
ocal (City of OnPRR Railroad
VINEYAct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
on
To
unding Summa
ntario)
To
SAN BERNMAJ
P
ARD AVE
ummary
[ FJuly
D)
ED) J) Sd F
Ma
[J
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
ENUE AN
ActualForecast ] 2008
N/A
un 2010 ept 2013
Feb 2014 arch 2016
an 2017]
00’s)mount
$750
$4,065 $840
$50,800 $56,455
mount$19,490 $24,015 $10,876 $2,074
$56,455
SSOCIATEDCTS – GARTATUS – JU
34
D UNION
Project Sco This projecVineyard Av
Project Ben This projectthe UPRR c
Project Sta Dedicat
Constru
Project Not The City of
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
N PACIFIC
ope Summar
ct will bridgevenue.
nefit:
t will reduce crossing.
atus and Con
tion ceremony
uction was co
tes of Interes
Ontario is the
ncy:
anager:
edia Contact:
Ty
MENTS E
C RAILRO
ry:
e the existin
congestion o
ntinuing Activ
y was held on
mplete in Apr
st:
e lead agency
City of On
Andrea Nianieto@sa
: Tim Watkitwatkins@
Phase: C
ype: Grade
OAD
ng UPRR tra
on Vineyard A
vities:
n March 18, 2
ril 2016.
y.
tario
eto (909) 884anbag.ca.gov
ns (909) 884-@sanbag.ca.go
onstruction
Separation
acks over
Avenue at
2016.
4-8276 v
-8276 ov
Active Phase: Design
Local Streets Type: Grade Separation
SAN BERNARDINO ASSOCIATED GOVERNMENTS
MAJOR PROJECTS – GARRY COHOE PROJECT STATUS – JUNE 2016
35
Mount Vernon Viaduct Map of Project:
Schedule Summary
Milestone Actual
[ Forecast ] Start of Project June 2016 Project Initiation Document (PID) Approved
N/A
Environmental Clearance (PA/ED) Feb 2011 Final Design Approved – (RTL) [Oct 2019] Construction Notice to Proceed [June 2020] Complete for Beneficial Use [Feb 2023]
End of Project [2024]
Budgetary Estimate Summary ($ 000’s)Cost Item AmountStudy Report $1,250 Project Report $95 Final Design $7,289 ROW Certification $3,538 Construction $81,464
Total $93,636
Funding Summary ($ 000’s) Cost Item AmountState/Federal $82,237 Measure I $6,861 Local $4,538
Total $93,636
Project Scope Summary: This project will reconstruct the Mount Vernon Viaduct over BNSF Railway intermodal yard in San Bernardino.
Project Benefit: This project will improve safety by replacing the existing bridge.
Project Status and Continuing Activities: A Cooperative Agreement with the City of San
Bernardino was approved in June 2016 to have SANBAG take over this project.
Project Notes of Interest: SANBAG will lead the design, right of way, and construction phases.
Lead Agency: SANBAG
Project Manager: Brian Smith (909) 884-8276 bsmith@sanbag.ca.gov
Public/Media Contact: Tim Watkins (909) 884-8276 twatkins@sanbag.ca.gov
Act
Loc
Ma
M
StPrApEnFiCoCo
En
CoStPrFiROCo
CoATTD
tive
cal Streets
ap of Projec
ilestone
tart of Project roject Initiation pproved nvironmental Cnal Design Apponstruction Noomplete for Be
nd of Project
Budgetaost Item tudy Report roject Report nal Design OW Certificatioonstruction
Fuost Item TP DA Article 3
ct:
Schedule Su
Document (PI
Clearance (PA/Eproved – (RTL)tice to Proceed
eneficial Use
ary Estimate S
on
To
unding Summa
To
SAN BERNMAJ
P
ummary
[ FS
D)
ED) M) [Md [J
[N
Summary ($ 00Am
otal
ary ($ 000’s) Am
otal
NARDINO ASJOR PROJEPROJECT ST
Metr
ActualForecast ] ept 2015
N/A
Mar 2016 May 2017]
an 2018] Nov 2018]
[2019]
00’s)mount
$125 $125 $576
$0 $4,103 $4,929
mount$4,679
$250 $4,929
SSOCIATEDCTS – GARTATUS – JU
36
rolink AT
Project ScoThis projectaccess to keMontclair, Uand San Be
Project BenThis projecsafety withsidewalks, signalized c
Project Sta Procure
complet
Project Not SANBAG wphases.
Lead Agen
Project Ma
Public/Me
D GOVERNMRRY COHOEUNE 2016
TP
ope Summart includes proey corridors a
Upland, Ranchernardino.
nefit: ct improves ph the incorphigh-visibility
crossings.
atus and Con
ement for Dete in July 201
tes of Interes
will lead both t
ncy:
anager:
edia Contact:
MENTS E
ry: viding safe pe
at Metrolink stho Cucamong
pedestrian anporation of y crosswalks
ntinuing Activ
esign Service6.
st:
he Design an
SANBAG
Brian Smitbsmith@s
: Tim Watkitwatkins@
Pha
Type: Spe
edestrian andtations in the ga, Fontana,
nd bicycle acway finding, bicycle pa
vities:
es is anticipa
nd Constructio
th (909) 884-8sanbag.ca.gov
ns (909) 884-@sanbag.ca.go
ase: Design
ecial Project
d bicycle Cities of Rialto,
ccess and signage,
arking and
ated to be
on
8276 v
-8276 ov
Recommended