Project Management
BMCF
BMCF
Page 2Eric Abhyankar - Instructor
Agenda – Oct. – Dec. 2011 Instructor Introduction
Timetable and Syllabus
Group Setup
Session 1 : Projects in Contemporary Organizations; The Project Manager; Project Organization; Introduction; Defining the Project
Session 2 : Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling; The Planning Process
Session 3 : Resource Allocation; Monitoring and Information Systems; Project Control; Controlling the Project
Session 4 : Risk Management; Project Auditing; Project Termination; Putting the Discipline to work
Session 5 : Future of project Management
Project/Oral Presentation
Final Exam
BMCF
Page 3Eric Abhyankar - Instructor
Instructor Introduction – Eric Abhyankar
Consultant in Prague – customers include DHL, CSOB, US Hedge Funds
Teach at UNVA, VSFS, VSM, UJEP
Investment Banker at Swiss Bank (UBS)
10 years progressive Management Consulting experience at AT&T, IBM, UBS, DHL
PM experience in USA, Asia, Europe
Masters in CS, Masters in PM, MBA
BMCF
Page 4Eric Abhyankar - Instructor
Overview of Course Activities Assignment and Credit
Overview of Required Assignments Credit
Class participation and full attendance 30%
Project Presentation in Class 70%
BMCF
Page 5Eric Abhyankar - Instructor
Sessions
Session 3 : Controlling the Project
Resource Allocation; Monitoring and Information Systems; Project Control
Session 2 : The Planning Process
Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling;
Session 1 : Defining the Project
Projects; The Project Manager; Project Organization; Introduction to Project Planning
Session 4 : Putting the Discipline to work
Project Auditing; Project Termination
BMCF
Page 6Eric Abhyankar - Instructor
1.1 Projects in Contemporary Organizations
Why manage projects?
Need for Management of ever expanding Knowledge
Growing demand for customized solutions
Globalization and global competition
General direct objectives of any project – performance (scope), time (schedule), cost (under budget), quality
Indirect objectives – client satisfaction (impact), project efficiency, organizational improvement, business development (sales opportunities)
BMCF
Page 7Eric Abhyankar - Instructor
1.2 Project Stakeholders
Project Manager
Project Team
Senior Management
The Client
The Client’s End Customers
Others?
BMCF
Page 8Eric Abhyankar - Instructor
1.3 Project Management defined
PMI Definition of a Project: A project is a temporary endeavor undertaken to create a unique product or service. Temporary means that every project has a definite beginning and a definite end. Unique means that the product or service is different in some distinguishing way from all similar products or services.
PMI definition of Project Management: Project Management is the application of knowledge, skills, tools and techniques to project activities in order to exceed or meet stakeholder needs and expectations from a project.
BMCF
Page 9Eric Abhyankar - Instructor
1.4 Project Lifecycle
All projects are divided into phases: A project phase is completed when a verifiable work product (deliverable) is completed. The completion of a project phase is marked by reviews to determine a) if project should continue and b) detect and correct errors cost effectively.
Collectively, the project phases are known as the project lifecycle.
Example : See power point slide
Completion & Closure
Build & Test
System Design
Project
Start up
Approve Plan
Architecture and Design document
Prototype Review
BMCF
Page 10Eric Abhyankar - Instructor
1.4 Project Management Maturity
Project Management Maturity models are used to allow organizations to benchmark the best practices of successful project management firms.
Development of better project management practices is an evolutionary process involving a systematic commitment to continuous improvement.
Example CMMI (Capability and Maturity Model)
Level 4
Level 3
Level 2
Level 1
Level 5
BMCF
Page 11Eric Abhyankar - Instructor
1.5 Project Organization
A hierarchy where each employee has one clear superior. Staff are grouped by specialty such as production, marketing, engineering etc.
Pure functional, pure project and Matrix co-exist
A pure project organization overlaid on the functional divisions of the parent firm.
Mixed
Matrix FunctionalPure Project
The project is a self contained unit with its own technical staff, own administration tied to the parent firm by tenuous strands of periodic progress reports and oversight.
BMCF
Page 12Eric Abhyankar - Instructor
1.6 Group Exercise
Student Introductions
Project Experience/Background
Identify some typical projects in your company/organization
If you do not have typical projects in your organization think of a business you would like to do
Who are the stakeholders?
What is the Project Organization like?
In what part of the Project Lifecycle are they in?
BMCF
Page 13Eric Abhyankar - Instructor
1.7 Project Selection – What are the criteria for model selection?
Realism
Capability
Flexibility
Ease of Use
Cost
EXERCISE: What is your criteria in selecting a project? See Examples on Page 92, 93
BMCF
Page 14Eric Abhyankar - Instructor
Sessions
Session 3 : Controlling the Project
Resource Allocation; Monitoring and Information Systems; Project Control
Session 2 : The Planning Process
Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling
Session 1 : Defining the Project
Projects in Contemporary Organizations; The Project Manager; Project Organization
Session 4 : Putting the Discipline to work
Risk Management; Project Auditing; Project Termination
BMCF
Page 15Eric Abhyankar - Instructor
2.1 The Project Planning process
Also known as Project Scope Management (PMI)
Initiation or Initial Project Coordination – committing the organization to begin the next phase of the project.
Scope planning – developing a written scope statement as the basis for future project decisions.
Scope definition – subdividing the major project deliverables into smaller more manageable components
Scope Verification – formalizing acceptance of the project scope
Scope Change Control – controlling changes to project scope
BMCF
Page 16Eric Abhyankar - Instructor
2.2 Work Breakdown Structure (WBS) *****
Definition – A WBS is a deliverable oriented grouping of project elements that organizes and defines the total scope of the project. WORK NOT IN THE WBS IS OUTSIDE THE SCOPE OF THE PROJECT.
A WBS is presented in chart form (similar to a spreadsheet) where each descending level represents an increasingly detailed description of the project elements.
Each item in the WBS is assigned a unique identifier; these identifiers collectively are known as code of accounts. The items at the lowest level of the WBS are referred to as work packages.
In very complex projects, work element descriptions are often collected in a WBS dictionary. A WBS dictionary will typically include work package descriptions as well as other planning information such as schedule dates, cost budgets, staff assignments.
EXERCISE: WBS
BMCF
Page 17Eric Abhyankar - Instructor
2.3.1 Inputs to Initiation
Product description
Strategic plan
Project selection criteria
Historical information
BMCF
Page 18Eric Abhyankar - Instructor
2.3.2 Inputs to Scope planning
Product description
Project charter
Constraints
Assumptions
BMCF
Page 19Eric Abhyankar - Instructor
2.3.3 Inputs to Scope Definition
Scope statement
Constraints
Assumptions
Other planning outputs
Historical information
BMCF
Page 20Eric Abhyankar - Instructor
2.3.4 Inputs to Scope Verification
Work results
Product documentation
BMCF
Page 21Eric Abhyankar - Instructor
2.3.5 Inputs to Scope Change Control
Work breakdown structure
Performance Reports
Change Requests
Scope Management plan
BMCF
Page 22Eric Abhyankar - Instructor
2.4 Project Planning
What is Project Integration Management? – includes the processes required to ensure that the various elements of the project are properly coordinated.
Project plan development
Project plan execution
Overall Change control
BMCF
Page 23Eric Abhyankar - Instructor
2.4.1 Elements of a Project Plan (PMI) Project Charter
A description of the project management approach or strategy (a summary of the individual management plans from the other knowledge areas).
Scope statement which includes project deliverables and the project objectives
Cost estimates, scheduled start dates and responsibility assignments to the level of the WBS at which control will be exercised.
Performance measurement baselines for schedule and cost
Major milestones and target dates for each
Key or required staff
Key risks, including constraints and assumptions, planned responses for each management plans, including scope management plan, schedule management plan, etc.
Open issues and pending decisions
BMCF
Page 24Eric Abhyankar - Instructor
2.4.2 Group Exercise
Each Group should pick one project from the list of typical projects in their organization or companies
Write the Project Plan incorporating the elements of the project plan (Assume that the project has not yet started).
Hint: Use the WBS you have prepared earlier
BMCF
Page 25Eric Abhyankar - Instructor
2.4.3 Project Plan Execution What are the tools and techniques required for Project plan execution?
General Management skills
Product skills and knowledge
Work authorization system
Status review meetings
Project Management information systems
Organizational procedures
QUESTION: What percentage of a project’s budget will be expended in Project Plan execution?
BMCF
Page 26Eric Abhyankar - Instructor
2.4.4 Overall Change Control ***** Overall Change Control is concerned with (a) influencing the factors which create changes to
ensure that changes are beneficial, (b) determining that a change has occurred and (c) managing the actual changes when and as they occur.
Inputs to Overall Change control System: (a) Project Plan (b) Performance Reports (c) Change Requests
Tools and Techniques for overall change control
Change Control Systems
Configuration Management
Performance measurement
Additional planning
Project Management Information system
BMCF
Page 27Eric Abhyankar - Instructor
2.5 Conflicts and Negotiation
Under what circumstances do conflicts arise on projects?
When should the PM use negotiation to resolve conflicts?
Project Team conflicts
Customer conflicts – Scope creep
Change Control conflicts
Vendor/Sub contractor conflicts
BMCF
Page 28Eric Abhyankar - Instructor
2.5.1 Categories of Conflict
Groups working on projects may have different goals and expectations
There is considerable uncertainty about who has the authority to make decisions
There are interpersonal conflicts between people who are parties-at-interest in the project
BMCF
Page 29Eric Abhyankar - Instructor
2.5.2 Conflicts in the Project Team
Dynamics of team formation
Forming
Storming
Norming
Performing
Adjourning
BMCF
Page 30Eric Abhyankar - Instructor
2.5.3 Principled Negotiation
Separate the people from the problem
Focus on interests, not positions
Before trying to reach agreement, invent options for mutual gain
Insist on objective criteria
BMCF
Page 31Eric Abhyankar - Instructor
2.5.4 Why do Project Teams fail?
Poorly developed or Unclear goals
Poorly defined Project Team roles and interdependencies
Lack of Project Team motivation
Poor communication
Poor Leadership
Turnover Among Project Team Members
Dysfunctional behavior
BMCF
Page 32Eric Abhyankar - Instructor
2.5.4 Group Exercise
Group A - Customer
Group B – Project Team
Group C – Sub contractor
Identify areas of potential conflict. How will you use Principled Negotiation to resolve conflicts?
BMCF
Page 33Eric Abhyankar - Instructor
2.6 Project Cost Estimation
Project Cost Estimation and Management includes the processes required to ensure that the project is completed within the approved budget.
Resource Planning – determining what resources (people, equipment, materials) and what quantities of each should be used to perform project activities.
Cost Estimating – developing an approximation (estimate) of the costs of the resources needed to complete project activities.
Cost Control – controlling changes to the project budget
BMCF
Page 34Eric Abhyankar - Instructor
2.6.1 Inputs to Resource Planning
Work breakdown structure
Historical information
Scope statement
Resource pool description
Organizational policies
BMCF
Page 35Eric Abhyankar - Instructor
2.6.2 Inputs to Cost Estimating
Work breakdown structure
Resource Requirements
Resource Rates
Activity duration estimates
Historical information
Chart of accounts
BMCF
Page 36Eric Abhyankar - Instructor
2.6.3 Inputs to Cost Budgeting
Cost Estimates
Work breakdown structure
Project schedule
BMCF
Page 37Eric Abhyankar - Instructor
2.6.4 Inputs to Cost Control
Cost Baseline
Performance Reports
Change requests
Cost management plan
BMCF
Page 38Eric Abhyankar - Instructor
2.7 Scheduling
Also known as Project Time Management. What does Scheduling consist of?
Activity Definition – identifying the specific activities that must be performed to produce the various project deliverables
Activity sequencing – identifying and documenting interactivity dependencies.
Activity Duration Estimating – estimating the number of work periods which will be needed to complete individual activities
Schedule Development – analyzing activity sequences, activity durations and resource requirements to create the project schedule
Schedule control – controlling changes to the project schedule.
BMCF
Page 39Eric Abhyankar - Instructor
2.7.1 Inputs to Activity Definition
Work Breakdown structure
Scope statement
Historical information
Constraints
Assumptions
BMCF
Page 40Eric Abhyankar - Instructor
2.7.2 Inputs to Activity Sequencing
Activity List
Product description
Mandatory dependencies
Discretionary dependencies
External dependencies
Constraints
Assumptions
BMCF
Page 41Eric Abhyankar - Instructor
2.7.3 Inputs to Activity Duration Estimating
Activity List
Constraints
Assumptions
Resource requirements
Resource capabilities
Historical information
BMCF
Page 42Eric Abhyankar - Instructor
2.7.4 Project Network Diagrams - Homework
Find the Network, expected activity time and critical path
Modern PM software such as Microsoft Project can automatically generate CPM networks
BMCF
Page 43Eric Abhyankar - Instructor
2.7.5 Inputs to Schedule Development
Project Network Diagram
Activity duration estimates
Resource requirements
Resource pool description
Calendars
Constraints
Assumptions
BMCF
Page 44Eric Abhyankar - Instructor
2.7.6 Inputs to Schedule Control
Project Schedule
Performance reports
Change requests
Schedule management plan
BMCF
Page 45Eric Abhyankar - Instructor
2.7.7 Group Exercise
Develop a project schedule and project network diagram for the Project you have chosen for earlier exercises.
Develop a budget for your project keeping in mind the resource requirements and the Project schedule.
Hint: Use the Project Plan and WBS you developed earlier
BMCF
Page 46Eric Abhyankar - Instructor
Sessions
Session 3 : Controlling the Project
Resource Allocation; Monitoring and Information Systems; Project Control
Session 2 : The Planning Process
Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling;
Session 1 : Defining the Project
Projects in Contemporary Organizations; The Project Manager; Project Organization
Session 4 : Putting the Discipline to work
Risk Management; Project Auditing; Project Termination
BMCF
Page 47Eric Abhyankar - Instructor
3.1 Resource Allocation
The Resource Allocation problem – The problem of managing the trade offs among time, performance and cost utilizing the available resources.
The extreme points of relationship between time use and resource use are:
– Time Limited – The project must be finished by a certain time, using as few resources as possible. It is time, not resource usage that is critical.
– Resource limited – The project must be finished as soon as possible, but without exceeding some specific level of resource usage or some general resource constraint.
The points between these two extremes represent time/resource use trade offs
BMCF
Page 48Eric Abhyankar - Instructor
3.1.1 Critical Path Method - Definitions
Crashing definition – Taking action to decrease the total project duration after analyzing a number of alternatives to determine how to get the maximum duration compression for the least cost.
Critical Path definition – In a scheduling diagram, the series of activities which determines the earliest completion of projects.
Critical Path method definition - A technique used to predict project duration by analyzing which sequence of activities (or path) has the least amount of scheduling flexibility. Early dates are calculated by means of a forward pass using a specified start date. Late dates are calculated by means of a backward pass starting from a specified completion date.
Critical activities in real world projects typically constitute less than 10% of the total activities
BMCF
Page 49Eric Abhyankar - Instructor
3.1.2 Resource loading and Resource levelling - definitions
Resource loading describes the amounts of individual resources an existing schedule requires during specific time periods. It gives the demands a project or a set of projects will make on a firm’s resources.
Resource levelling aims to minimize the period by period variations in resource loading by shifting tasks within allowances.
Homework - Solved problem on Page 443 of the text
BMCF
Page 50Eric Abhyankar - Instructor
3.2 Monitoring and Information Systems
Planning, Monitoring, Controlling cycle – key things to be planned, monitored and controlled are time (schedule), cost (budget) and performance/quality (specifications)
PM must examine the project plan in order to extract performance, time and cost goals
These goals should relate in some fashion to each of the different levels of detail e.g. activities, tasks, work packages etc.
Data must be identified that measure achievement against these goals and mechanisms designed that gather and store such data.
BMCF
Page 51Eric Abhyankar - Instructor
3.2.1 How should Data be Collected? Frequency counts – For example, number of missed milestones (project is delayed), number of
defects in the project per week etc. Reported as events per unit time or events as a percent of a standard number.
Raw Numbers – Actual project data such as dates, dollars spent, hours worked on activities, physical amount of resources used etc. These numbers are reported in a wide variety of ways but often as direct comparisons with an expected or standard number. Variances are reported either as the difference between actual and standard or as ratio of actual to standard.
Subjective numeric ratings – These numbers are subjective estimates usually of a quality such as risk made by knowledgeable individuals or groups.
Indicators – When the PM cannot measure some aspect of system performance directly, it may be possible to find an indirect measure or indicator. For example, the speed with which change orders are processed and changes are incorporated into the project is an indicator of team efficiency.
Verbal measures – Measures for such performance characteristics such as “quality of team member cooperation”, “morale of team members” or “quality of interaction with the client” take the form of verbal characterizations. They may sometimes be measured by surveys.
BMCF
Page 52Eric Abhyankar - Instructor
3.2.2 Project Reporting
Communications Planning – determining the information and communications needs of the stakeholders: who needs what information, when will they need it, and how will it be given to them.
Information Distribution – making needed information available to project stakeholders in a timely manner.
Performance Reporting – collecting and disseminating performance information. This includes status reporting, progress measurement and forecasting.
Administrative Closure – generating, gathering and disseminating information to formalize phase or project completion.
BMCF
Page 53Eric Abhyankar - Instructor
3.2.3 Common Reporting Problems
Too much detail – Unnecessary and too much detail both in the reports themselves and in the input being solicited from workers usually results in the reports not being read.
Poor interface between the Project information system and the parent system – The parent organization’s information system must serve as a definitional prototype for the project’s information system. Reports should be built from standard and system available data as much as possible.
Poor correspondence between the planning and the monitoring systems – If the monitoring system is not tracking information directly related to the projects’ plans, control is meaningless.
BMCF
Page 54Eric Abhyankar - Instructor
3.2.4 Earned Value Analysis
An aggregate performance measure for measuring the overall performance of the project.Earned Value Analysis is important in PMI examinations but in actual practice used in highly technical organizations such as Airbus or Boeing.
Formulae:
EV – AC = CV (Cost Variance, Cost overrun is negative)
EV – PV = SV (Schedule Variance, Behind Schedule is negative)
ST – AT = TV (Time Variance, Delay is negative)
EV = Earned Value
AC = Actual Cost
PV = Planned Value
ST = Scheduled Time
AT = Time Variance
BMCF
Page 55Eric Abhyankar - Instructor
3.3 Project Control
Fundamental objectives:
– The regulation of results through the alteration of activities
– The stewardship of organizational assets
Physical Asset Control – Project assets must be controlled
Human Resource Control - Controlling and maintaining the growth and development of project staff
Financial Resource Control – Project budget and capital investment control
BMCF
Page 56Eric Abhyankar - Instructor
3.3.1 Types of Project Control Processes
Cybernetic Control – Automatic negative feedback system to prevent deviation from standard.
Go/No-go control – To determine if next activity can be started based on current information. Often represented by Traffic Lights.
Postcontrol - Also known as “lessons learned”. Also reported through project performance analysis of Milestones, checkpoints, budgets, Final report on project results and concludes with recommendations for performance and process improvement.
BMCF
Page 57Eric Abhyankar - Instructor
3.3.2 Critical Ratio Control Charts
The Critical Ratio is made up of two parts : Ratio of actual progress to scheduled progress and the ratio of budgeted cost to actual cost:
Critical Ratio = (Actual Progress/Scheduled Progress) X (Budgeted Cost/Actual Cost)
A Critical Ratio of > 1 usually indicates no problems but a Critical Ratio < 1 usually predicts trouble in the project
BMCF
Page 58Eric Abhyankar - Instructor
3.3.3 Formal Change Control System
To review all requested changes to the project (both content and procedures)
Identify all task impacts
Translate these impacts into project performance, cost and schedule
Evaluate the benefits and costs of the requested changes
Identify alternative changes that might accomplish the same ends
Accept or reject the requested changes
Communicate the changes to all concerned parties
Ensure that the changes are implemented properly
Prepare monthly reports that summarize all changes to date and their project impacts
BMCF
Page 59Eric Abhyankar - Instructor
3.3.4 Implementation of Change Control Systems ***** All project contracts or agreements must include a description of how requests for a change in
the project’s plan, budget, schedule, and/or deliverables will be introduced and processed.
Once a project is approved, any change in the project will be in the form of a change order that will include a description of the agreed upon change together with any changes in the plan, budget, schedule and/or deliverables that result from the change. For any but the most minor changes, a risk identification and analysis study should be performed. In order to study the potential impact of change, a simulation study may be conducted.
Changes must be approved in writing by the clients agent as well as by an appropriate representative of senior management of the firm responsible for carrying out the project.
The project manager must be consulted on all desired changes prior to the preparation and approval of change order. The project manager’s approval is not required.
Once the change order has been completed and approved, the project master plan should be amended to reflect the change, and change order becomes a part of the master plan.
BMCF
Page 60Eric Abhyankar - Instructor
3.3.5 Group Discussion
Homework – Airbus A380 – read up on what is the latest on Airbus A380
Each Group has developed the WBS, Project and Budget cost estimate
Class discussion on:
– How the Project Resources will be allocated
– How will the Project be controlled
– What type of Project Reports should be generated
– How will Project Change Control be implement
BMCF
Page 61Eric Abhyankar - Instructor
Sessions
Session 3 : Controlling the Project
Resource Allocation; Monitoring and Information Systems; Project Control
Session 2 : The Planning Process
Project Planning; Conflict and Negotiation; Budgeting and Cost Estimation; Scheduling
Session 1 : Defining the Project
Projects in Contemporary Organizations; The Project Manager; Project Organization
Session 4 : Putting the Discipline to work
Risk Management; Project Auditing; Project Termination
BMCF
Page 62Eric Abhyankar - Instructor
4.0 Risk Management Projects have uncertainty regarding project funding, the availability of necessary resources,
potential technical problems, etc.
Project Risk can be defined as any possible event that can negatively affect the viability of a project.
– Risk = (Probability of event) (Consequences of Event)
Risk Management is the art and science of identifying, analyzing and responding to risk factors throughout the life of a project and in the best interest of its objectives.
Risk management consists of anticipating at the beginning of the project, unexpected situations that may arise that are beyond the project manager’s control.
BMCF
Page 63Eric Abhyankar - Instructor
4.0.1 Risk Management - Process Risk Management comprises of four distinct process:
– Risk Identification – process of determining the specific risk factors that can reasonably be expected to affect your project.
– Analysis of probability and consequences – the potential impact of these risk factors, determined by how likely they are to occur and the effect they would have on the project if they did occur.
– Risk mitigation strategies – steps taken to minimize the potential impact of those risk factors deemed sufficiently threatening to the project.
– Control and documentation – creating a knowledge base for future projects based on lessons learned.
BMCF
Page 64Eric Abhyankar - Instructor
4.0.2 Risk Identification Financial risk
Technical risk
Commercial risk
Execution risk
Contractual or legal risk
BMCF
Page 65Eric Abhyankar - Instructor
4.0.3 Analysis of probability and consequences Reasonable estimate of the likelihood of each of these risk events occurring
Probability combined with consequences provides a sense of overall project risk
Risks classified as having both high likelihood of occurring (probability) and high potential for harming the project (impact) are most relevant to project planning
Risks that fall into this category require detailed contingency planning in order to adequately protect the project’s development cycle.
BMCF
Page 66Eric Abhyankar - Instructor
4.0.4 Risk mitigation strategies Accept Risk – in situations where we either have no alternative or we consider the risk small
enough to be acceptable.
Minimize risk – lower exposure to risk through partnerships or joint ventures
Share risk – with stakeholders or other organizations
Transfer risk – to other project stakeholders
BMCF
Page 67Eric Abhyankar - Instructor
4.1 Project Auditing The project audit is a thorough examination of the management of a project, its methodology
and procedures, its records, its properties, its budgets and expenditures, and its degree of completion
The minimum six parts of a Project Audit Report:
– Current Status of the project: Does the work actually completed match the planned level of completion?
– Future status: Are significant schedule changes likely? What are the likely changes?
– Status of crucial tasks: What progress has been made on tasks that could decide the success or failure of the project?
– Risk assessment: What is the potential for project failure or monetary loss?
– Information pertinent to other projects: What lessons learned from the project being audited can be applied to other projects being undertaken by the organization?
– Conclusion: What assumptions or limitations affect the data in the audit?
BMCF
Page 68Eric Abhyankar - Instructor
4.2 The Project Audit Life Cycle
Project Audit Initiation: Starting the audit process, defining the purpose and scope of the audit, gathering information to determine proper audit methodology.
Project Baseline Definition: Identifying performance areas to be evaluated, determining standards for each area and determining management performance expectations.
Establishing an Audit database: Note: The required database for project audits should be specified in the project plan.
Preliminary Analysis of the project: The auditor must analyze the data and then present the analysis to Senior managers. The auditors duty is to brief the PM on all findings and judgments before releasing the audit reports.
Audit Report Preparation: The audit report as discussed in last slide.
BMCF
Page 69Eric Abhyankar - Instructor
4.3 Project Termination
Why is Project Termination important?
How are projects typically terminated?
– Termination by Extinction – normal completion of the project
– Termination by Addition – when projects are spun off as independent new sub projects
– Termination by Integration – When projects are successfully completed, the resources and project output is returned to the parent organization.
– Termination by Starvation – Project closes on its own due to lack of funding, disinterested Senior Management etc.
BMCF
Page 70Eric Abhyankar - Instructor
4.4 How should Project Termination be handled?
Ensure completion of the work, including tasks performed by subcontractors.
Notify the client of project completion and ensure that delivery is accomplished. Acceptance of the project must be acknowledged by the client.
Ensure that ALL documentation is complete including project Final Report.
Clear for final billings and oversee preparation of final invoices sent to the client.
Redistribute personnel, materials, equipment, and any other resources to the appropriate places.
Clear project with legal counsel or consultant. File for patents and record NDAs.
Ascertain product support requirements, decide how such support will be delivered and assign responsibility.
Oversee the closing of the project’s books.
BMCF
Page 71Eric Abhyankar - Instructor
4.5 Why do Projects fail?
A Project based organization is not required.
Insufficient support from Senior Management.
Appointing the wrong person as Project Manager.
Poor planning.
BMCF
Page 72Eric Abhyankar - Instructor
Sessions
Session 5 : The Future of Project Management (Extra)
Types of Roles; Portfolio Management; Knowledge Management; Oral Presentations
BMCF
Page 73Eric Abhyankar - Instructor
5.1 Current Project Management methodologies
Project Management Institute (PMI) – www.pmi.org
PRINCE (PRojects IN Controlled Environments) www.prince2.org.uk
.
BMCF
Page 74Eric Abhyankar - Instructor
5.2 Tool Set
What are some of the tools used in Project management?
Microsoft Project (universal)
Planview (Portfolio Management Tool)
Project Work Bench (PWB)
BMCF
Page 75Eric Abhyankar - Instructor
5.2 Project Portfolio Management ****
Project portfolio management groups projects so they can be managed as a portfolio, much as an investor would manage his stocks, bonds and mutual funds
It gives executives a bird's-eye view of projects so they can spot redundancies, spread resources appropriately and keep close tabs on progress
Previously, projects were approved and then managed independently. They were evaluated as a whole at the executive level only when it came time to put together annual reports. A company needs that overall view so it can keep an eye on projects in real time to make sure that all of them are working together to meet core business goals
Focus on projects as a portfolio of investments - how much a project will cost, its anticipated risks and returns in relation to other projects. This way, entire portfolios can be managed to produce the highest returns based on current conditions
Managed by a Portfolio Manager or Program Manager
BMCF
Page 76Eric Abhyankar - Instructor
5.3 Knowledge Management Anecdotes
”I call my field knowledge management but you can’t really
manage knowledge. What a company can do is manage the
environment that optimizes knowledge.”
(Larry Prusak, Managing Partner, IBM Global Services)
BMCF
Page 77Eric Abhyankar - Instructor
5.4 What is Knowledge Management?
Knowledge is the information that adds value and helps make the right choices
Knowledge Management is the management of this added value information.
We define added value information as industry info, competitor info, IT-info, experience, individual and departmental specific information
Wisdom
Knowledge
Information
Data Add context
Add understanding
Add judgment (values)
BMCF
Page 78Eric Abhyankar - Instructor
5.5 Types of Knowledge
Explicit:
Formal and systematic
Knowledge of rationality (mind)
Can be expressed in words and numbers
Easily communicated and shared in form of hard data,
formula, codified procedures, or universal principles
Can be expressed in computer code, chemical formula, sets of
general principles
Tacit:
Insights, intuitions, and hunches
Knowledge of experience
Not easily visible and expressible numbers
Highly personal, hard to formalize, difficult to communicate or share with others
Rooted in individual’s actions and experiences, including ideals, values, or emotions
Managed by toolsManaged by Mentoring, Q&A and practises
BMCF
Page 79Eric Abhyankar - Instructor
5.6 Knowledge management implementation strategy
Are the people in the organization enabled and motivated to share knowledge? Is the management exemplary in sharing knowledge? Do the experts have the feeling of transparent decisions?
How does the organization support their knowledge workers with IT-Infrastructure?
What is measured? Does it really match to the managements expectations?
TECHNOLOGY
MGT systemsCultureProcesses
Are the implemented processes supporting the accumulation and preparation of data as well as the distribution and use of explicit knowledge?
BMCF
Page 80Eric Abhyankar - Instructor
Best Wishes
Many thanks for your participation and Good Luck !