Terence O’Rourke

Terence O’Rourke

Project Manager

Finish Under Budget

Keep Client Happy

Keep Team Happy

Meet Requirements

Project Management Requirements:

Terence O’Rourke

• Timely & Appropriate Planning

• Collection

• Creation• Distribution

• Storage• Retrieval

• Management

• Control

• Monitoring

• Disposition of Project Information

Terence O’Rourke

Project Manager

Problems Occurred:

• Human Interactive• Develop scripts within the

model checker• Update the model with

IFC files• Refresh to keep

program from stalling

Terence O’Rourke

Project Manager

• Team Meetings schedule• Meeting Minutes• Design Information• Additional Project Issues

Terence O’RourkeTerence O’Rourke

• On Project Set-up

Name Mobile Number Email Discipline Access

John Smith 087-2169348 johnsmith@gmail.com Mechanical

Jane Ross 087-6849389 janeross69@gmail.com Electrical

Peter White 087-2868799 Peter.white@gmail.com Architect

• Delivery Conformation to Project Manager

• Avoid “out of office” reply's

• Enable users to access design files quicker

• Programme timeline

• Resolve issues in advance

Terence O’Rourke

• On Project Start-up

Specify:

• Discipline Tasks

• Discipline Stages

Task Stage Duration Start End

1 - Heat Loss Design 2 days Nov-21-2016

2 - Duct Sizing Design 3 days Nov-24-2016

15 – Fit-out Construction 6-weeks Jan-05-2017

• Task Duration

• Site Start Date

• Expected Finish Date

Nov-23-2016

Nov-27-2016

Jan-16-2017

Terence O’Rourke

• On Project Start-up

Allows:

Project Manager to show case

the overall design to the client

before work on site

commences.

Terence O’Rourke

Summary

1.0Introduction

2.0Objectives

2.1ProjectObjectives

2.2ListofObjectives

3.0SystemDesign

3.1PrimaryRequirements

3.2SecondaryRequirements

3.3GeneralUserInterface(GUI)

3.3GeneralUserInterface(GUI)

3.4Security

3.5DocumentManagement

3.6Database

4.0KnowledgeManagement

Conclusion

Bibliography

Appendix

Terence O’Rourke

Recommended