Project: "KAUSTAVA"
Emerging INDIA’s: ORISSA
Project : Kaustava
………Lets take the Road less traveled by,And that will make a Big Difference……..
Project: "KAUSTAV"
ORISSA
Project: "KAUSTAVA"
Structure of PresentationStructure of Presentation
Orissa’s Vision
Competitive advantages
Orissa – the State on path of progress
Human Resources Development
Infrastructure
Opportunity Orissa
Project: "KAUSTAVA"
State at a GlanceState at a Glance Capital – Bhubaneswar Area – 1,55,707 square kilometers
Same as New York + Connecticut Population 2001 – 36,804,660
Same as the population of California in 2006 Major industries – Steel, Aluminum, Power, Cement, Mineral-
based, Paper, Higher Education Connectivity
Air: Bhubaneswar Roads: A leg of the Golden Quadrilateral passes through it Rail: Howrah –Chennai and Howrah – Mumbai Major Port: Paradeep
Project: "KAUSTAVA"
Vision of Orissa
““To usher in balanced socio-economic To usher in balanced socio-economic growth of Orissa that hinges on growth of Orissa that hinges on sustainable development with strong sustainable development with strong fundamentals of industrial growth, right fundamentals of industrial growth, right harnessing of natural resources and harnessing of natural resources and actualization of employment potential.”actualization of employment potential.”
Shri Naveen PatnaikShri Naveen Patnaik HonourableHonourable Chief MinisterChief Minister OrissaOrissa
Project: "KAUSTAVA"
Did you know this about Orissa?
A “MIT” (NISER Bhubaneswar), a Berkeley (NU Bhubaneswar) and a Stanford (Vedanta University Puri) are currently being built in the Bhubaneswar - Puri area of Orissa. IIT’s First batch started AIIMS MOU Signed, Second in the country Vedanta University in Puri – a $3 billion university with a $1
billion initial pledge 10 existing universities, 15 more being made; 39 existing
engineering colleges, 12 more in pipeline; 15+ Management colleges, 4 Medical Colleges and many more……..
Rated as “OXFORD” of India
Project: "KAUSTAV"
Project: "KAUSTAVA"
Did you know this about Orissa? The making of a transportation “CHANNEL”!
Ports (existing and in pipeline) Paradeep Dhamara Gopalpur Kirtania Jatadhari (for POSCO) Astaranga, Puri Bahuda Muhana, Ganjam Baliharchandi, Puri Barunei, Kendrapada Chudamani, Bhadrakh Inchudi, Balasore Palur, Ganjam National waterway 5
Project: "KAUSTAVA"
Emerging PortsEmerging Ports
Dhamra Gopalpur
Developers Tata Steel and Larsen & Toubro
Orissa Stevedores and Noble Shipping (Hong Kong)
Capacity 80 mtpa (13 mtpa by 2009)
30 mtpa (10 mtpa by 2010)
Berths 13 6
Channel 18 metres 13.5 meters
Vessels Cape size Panamax
Project: "KAUSTAV"
Project: "KAUSTAV"COAL
Mineral % Reserve
Iron Ore 34%
Bauxite 63%
Nickel 95%
Chromite 98%
Coal 24%
Mineral sand
32%
Graphite 77%
Project: "KAUSTAVA"
Power TariffPower Tariff
State Industrial Power Tariff (Rs./ KWH)
Orissa 2.90
West Bengal 3.50
Jharkhand 3.20
Andhra Pradesh 3.80
Kerala 3.50
Gujarat 4.00
Maharashtra 5.00
Haryana 4.00
• Orissa is a power surplus State
• Orissa has successfully carried out power sector reforms - Distribution privatized
Project: "KAUSTAVA"
Density of RoadsDensity of Roads
Road length per 1,000 square kilometer of area
States 1991-92 2002
Orissa 1,260 1,522
Andhra Pradesh 553 713
Chhattisgarh 321 262
Jharkhand 492 144
West Bengal 700 1,037
India 615 776
Project: "KAUSTAV"
Project: "KAUSTAVA"
Number of Strikes & LockoutsNumber of Strikes & Lockouts
Number of strikes & lockouts (2002)
State Strikes Lockouts Man days lost :2001
Orissa 7 - 32,676
Andhra Pradesh 30 30 10,48,457
Jharkhand 4 - -
West Bengal 21 172 1,48,16,437
India State Average
8 8 10,74,931
• Source: Indian Labor Year Book, Labor Bureau, Ministry of Labor, GoI, 2002
• Industrial Disputes in India, 2001
Project: "KAUSTAVA"
Competitive AdvantagesCompetitive Advantages
In a Global scenario, Orissa has drawn attention of investors with strengths:
Natural Rich mineral resources Coastline – gateway to SE Asian & Far Eastern markets Adequate fresh water available for industrial use
About 10% of India’s utilizable water (surface & ground): 108.147 Billion Cubic Meters.
Discovery of natural gas off the coastInstitutional Proactive policy framework for developing key economic
sectors and for infrastructure buildup
Project: "KAUSTAVA"
Competitive AdvantagesCompetitive Advantages
Developmental: Land contiguous to ports available for industries Surplus quality power at most competitive rate Part of the mainline national rail and road grid
Economic: Low cost labour and availability of skilled workforce Predominance of organized industrial activity
Infrastructural: Major port at Paradeep moving 50 mtpa 90 industrial parks / growth centers (9000 hectares) Seamless connectivity by rail & road Highest density of roads in eastern India
Project: "KAUSTAV"
Competitive AdvantagesCompetitive Advantages
Investor Investor friendly policiesfriendly policies
Investor Investor friendly policiesfriendly policies
Port facilityPort facilityPort facilityPort facility
Mineral Mineral resources resources
in proximityin proximity
Mineral Mineral resources resources
in proximityin proximity
Plentiful Plentiful waterwater
Plentiful Plentiful waterwater
Land bankLand bankLand bankLand bank
Rail connectivityRail connectivityRail connectivityRail connectivity
CompetitiveCompetitivepower tariff power tariff CompetitiveCompetitivepower tariff power tariff
Skilled Skilled manpower manpower
Skilled Skilled manpower manpower
Government Government facilitationfacilitation
Government Government facilitationfacilitation
Road networkRoad networkRoad networkRoad network
Lowest cost producer Lowest cost producer of Steel / Aluminaof Steel / Alumina
Lowest cost producer Lowest cost producer of Steel / Aluminaof Steel / Alumina
Project: "KAUSTAVA"
The state on the move…Developments during the last three years
Metal Sector
Preferred destination for Foreign & Domestic Investors
45 projects for over 70 mtpa of Steel (28 plants partly commissioned). More than US$45 Bn investment
4 new aluminum complexes with more than 4 mtpa alumina and 1 mtpa aluminum smelter capacity under implementation (US$ 10 Bn)
Rare earth projects thru FDI mode (US$ 0.50 Bn)
Major investors in the metal sector - POSCO, Arcelor-Mittal, Tata Steel, Bhusan, Jindal, Essar, Aarti, Hindalco, Vedanta, L&T – Dubai Aluminium,
Rourkela Steel Plant
Workshop
Project: "KAUSTAVA"
The state on the move…Developments during the last three years
Chemical & Petrochemical
15 mtpa mega petrochemical complex by IOC (US$ 6Bn)
Deepak Fertilizers implementing 2 chemical projects at Paradeep
Mega Petroleum, Chemicals & Petrochemicals Investment Region (PCPIR) under development in Paradeep area (284 Square kilometers)
Cement 3 Cement Projects- Rs 2180 Cr
Chemicals
Petrochemicals
Project: "KAUSTAVA"
The state on the move…Developments during the last three years
Energy and Power
13 Thermal Power Projects under implementation with capacity of 13,500 MW (US$ 11 Bn)
Major names include Tata Power, Reliance Energy, Sterlite Energy, Mahanadi Aban, Monnet Ispat, Essar Power, Lanco Group, NavBharat Power, CESC and GMR Energy
Project by Reliance Industries Limited for hydrocarbon based power generation & gas grid (US$ 1.5Bn)
Various Mini-Hydel projects with a combined capacity of 200 MW
Non-conventional projects with 100 MW
Energy & Power
Power Sector
Project: "KAUSTAVA"
The state on the move…Developments during the last three years
Special Projects Mega shipbuilding & repair yard at Dhamra ($ 0.6
Bn)
Auto components park by RSB
Tourism 5.3 million tourists visited Orissa in 2006 (growth
rate >13%)
Foreign tourists 40,000 (growth rate 17%)
Hospitality sector investments by some of the most respected hotel chains
Special Tourism Area (STA) near Puri spread over 1000 acres already under implementation
Infrastructure up gradation projects in the Buddhist and beach-based circuitsExotic Beach at Puri
NALCO
Project: "KAUSTAVA"
The state on the move…Developments during the last three years
Mega Infrastructure Projects Development of industrial, economic & social
infrastructure in steel & mining corridors Major expansion of Paradeep Port underway 12 SEZs including 4 IT SEZs approved by GoI 4 new ports (US$ 2Bn) at Dhamra, Gopalpur, Jatadhari
Muhana and Kirtania in progress and more being explored on 480 km long coast line of the state
Bio-pharma Park in Bhubaneswar through PPP
Integrated Textiles Parks at Choudwar
Auto complex at Choudwar - Rs 365 Cr
Extensive rural electrification
Bhubaneswar Airport modernization – Rs. 250 Cr
International Convention Centre at Bhubaneswar
Infocity, Bhubaneswar
Paradeep Port
Project: "KAUSTAV"
Project: "KAUSTAVA"
The state on the move…Developments during the last three years
Information Technology Sector
Orissa emerging as an IT / ITES powerhouse with presence of Infosys, Satyam, Wipro, TCS, Mindtree, ICICI Bank, Genpact (200,000 software professionals by 2015)
SMEs: More than 300 units and 12000 software professionals engaged in the state
Group of investors from Silicon Valley setting up 5000 seater IT/ITES facility
Target of exporting software to the tune of US $ 1000 mn by 2011-12
Integrated IT City over 500 acres underway
Satyam Campus, Bhubaneswar
Infosys Campus, Bhubaneswar
Project: "KAUSTAVA"
Recent FDI projects in OrissaRecent FDI projects in Orissa
Largest FDI of US$12 Bn by Korean Steel Largest FDI of US$12 Bn by Korean Steel Giant POSCO in steel sectorGiant POSCO in steel sector
Other big FDI projects:Other big FDI projects:
SteelSteel Arcelor-MittalArcelor-Mittal
Alumina / Alumina / AluminumAluminum
Dubai Aluminum, Alcan, VedantaDubai Aluminum, Alcan, Vedanta
Titanium Titanium ProductsProducts
JSC Technochim Holding (Russia)JSC Technochim Holding (Russia)
LimeLime Lhoist (Belgium)Lhoist (Belgium)
PortsPorts Noble Shipping (Hong Kong)Noble Shipping (Hong Kong)
Industrial Industrial GasGas
Air Liquide (France)Air Liquide (France)
Biju Patnaik International Airport
Nine hole Golf Course at Infocity
Project: "KAUSTAVA"
InfrastructureInfrastructure
ROADS & RAILWAYSROADS & RAILWAYS Monitoring by Prime Minister’s office of priority infrastructure projects catering to the steel and mines
corridor Over $ 5 Bn investment in road sector in next 5 years
About $ 1.5 Bn investment in railways in next 5 years
Massive urban infrastructure up gradation through national level programmes
Investment through public funding and private participation
Road in PPP mode
XIM, Bhubaneswar
States Cement Consumption per capita in Kg 2005
Orissa 101.26
Andhra 97.67
Chhattisgarh 92.16
Jharkhand 80.05
West Bengal 73.73
Project: "KAUSTAV"
SUNDARGARH
B A R A G A R H
B A L A N G I R
NUAPARHA
NABARANGAPUR
KALAHANDI
DHENKANAL
SAMBALPUR
JHARSUGUDA
MALKANGIRI
KORAPUT
RAYAGARHAGAJAPATI
GANJAM
KANDHAMAL
CUTTACK
KHURDA
S O N E P U R
B O U D H
NAYAGARH
A N U G U L
DEOGARH
MAYURBHANJ
BALESHWAR
P U R I
JAGATSINGHPUR
KENDRAPARA
BHADRAK
Rourkela
BHUBANESWAR
RAJ AMUNDA
KENDUJHAR
Kanaktora
Chitrakonda
Balimela
Malkangiri
SunabedaDamanjori
Koraput
PANIKOI LI
Udala
Karanjia
Nilagiri
Basudebpur
Soro
Anandapur
Athargarh
Chaudwar
Parsala
Balugan
KhallikotAsika
Gunupur
Junagarh
Nabarangapur
Bhawanipatna
Sambalpur
J HARSUGUDA
Sundargarh
Deogarh
Boudh
Balangir
Phulabani
Chhatrapur
BrahmapurDigapahandi
Nayagarh
Puri
Jagatsinghpur
Kendraparha
Jajpur
Cuttack
Bhadrak
Baleshwar
Baripada
KEONJ HAR
Sonepur
Bhanjanagar
Dhenkanal
Rayagarha
Kantabanji
ANUGUL
Dashapalla
Khandaparha
Kantilo
Rairangapur
Jaypore
Umarkot
Nuaparha
Padmapur
Barpali
Burla
Binika
Redhakhol
Sarapali
Jamankira
Bhojpur
Biramitrapur
Panposh
Gorakhapur
Kashipur Gurbari
J K Pur
Daringbarhi
Nisha
Chhendipada
Ambani
Ganjam
MANGULI
Hindola
Chikiti
Jaleswar
Patamundai
Paradwip Port
BhubanKamakhyanagar
Pala Laharha
BARAKOT
Banei
Dhenkikot
Barbil
Mankamanacha
Nuapatna
Banki
Chandragiri
Lanjigarh
Kesinga
Titlagarh
Patnagarh
BrajarajnagarKUCHINDA
Hirakud
Banapur
Khurda
Paralakhemundi
JAJPUR
Gopalapur
LEGEND
DISTRICT BOUNDARY...............
VI S A K H A P A T N A M
F J N B NJF
G K O C G K O
H HL L PP D
E I E IM A
F J N B
G K O
64 73
65 74
NF
NE
44 45
NF
NEBAY OF BENGAL
INDEX TO 1:2,50,000 SHEETS
44 45
Talcher
G.Udaygiri
STATE BOUNDARY................
NATIONAL HIGHWAY........
Motu
ChordaDuburi 12
Dangadi
Brahmani Rd.
3
4
11
Bramanipal
5
Bamberi
7Bamshapani
Bhadrasahi
6
KoiraTensa 9
Kalunga
12
8
10
13
SH. .......
MDR ..............EXPRESS WAY .........ODR ..............
INDUSTRIAL HUB .........
MINNING HUB .........
NH-6
NH
-201
NH-200
EXISTING NH...............
RAI PUR
GUM
LA
Motu
Daitari
Chandikhol
Bargarh
Zone I
Zone III
Zone VI GOPALPUR PORT
PARADEEP PORT
DHAMRA PORT
Zone II
Zone IV
Zone V
Circle I Steel, Power, IT, Tourism & PortsZone III Mining, Power, SteelZone VI Alumina
INDUSTRIAL ZONES AND BIG PORTSINDUSTRIAL ZONES AND BIG PORTS
KIRTANIA PORT
Project: "KAUSTAV"
State Capital - Bhubaneswar
• Bhubaneswar is the 2nd planned city in the country and is the safest and most economical Capital in the country making it very popular with the young masses in Eastern India
• Well connected to major cities in the country • Among 5 fastest growing cities in real estate• Pollution free environment with very pleasant and
comfortable living conditions• Excellent residential, recreation and entertainment
facilities• Top quality schools & colleges.• Large multidisciplinary hospitals by AIIMS & Apollo;
Specialty Centers for cancer, heart, eye, diabetic research, spinal injury and trauma care.
• Fascinating weekend getaways, pristine beaches, exotic flora & fauna and wildlife sanctuaries, at proximity
Shopping Malls
Hotel Swosti Plaza, Bhubaneswar
Well planned Residential Complexes
Project: "KAUSTAVA"
Bhubaneswar as a knowledge hub
Existing Universities
IIT Bhubaneswar NISER Bhubaneswar Utkal University Orissa Univ of Agriculture and
Tech. Ravenshaw University IIIT Bhubaneswar Utkal Univ. of Culture Sri Jagannath University KIIT deemed University SOA deemed University 39 additional four year
engineering colleges, 30+ Colleges offering Bachelors in
non engineering subjects
Upcoming universities
Vedanta University National University (WCCU) AIIMS Bhubaneswar National Law University Sri Sri University ICFAI University Jagadguru Kripalu University Orissa open university National Institute of Design (?) 6 deemed university applications
in pipeline 12 four year engineering colleges
Project: "KAUSTAV"
Medical Colleges Around Bhubaneswar
Existing
SCB Medical College Hi-tech Medical College Kalinga Institute of Medical
Sciences SUM Hospital and Medical
College
Upcoming
Medical College of Vedanta University
AIIMS Bhubaneswar Capital Medical College Medical College of Sri Sri
University Medical College of National
University
Project: "KAUSTAVA"
Human Resources Development Human Resources Development in Orissain Orissa
Higher Education
Hub of engineering, management & medical education in Eastern India
Tripling of engineering/MCA technical education capacity since 2001
30,000 B.Tech / MCA, 3000 Management professionals and 50,000 general graduates pass out every year
Apeejay implementing integrated Knowledge Park
Besides IIT, NISER, & World-Class Central University, a central University in Koraput and a IIIT in Berhampur.
Utkal University, Bhubaneswar
RIE, Bhubaneswar
Project: "KAUSTAVA"
Orissa: What the experts say
Mckinsey 2005: “Orissa’s economy is poised to grow at 7.1% over the next 10-12 years, the highest in Eastern India”
CMIE 2006 & 2008: “Orissa accounts for 15% of total investment in hand in the country. It tops in terms of Industrial investment ($133 Bn) and project implementation ahead of Maharashtra & Gujarat”
World Bank 2008: “Orissa is a State on the move. GSDP has grown at the rate of 8.5% on average during 2002-07”
Alastair King, CEO of UK-based India investor Eredene Capital (Quoted in a Reuter article): "Relative to building the 10th new retail mall in a suburb of Mumbai ... I'd much rather build the first distribution park in the steel industry of Orissa, where you've got great demand."
Project: "KAUSTAVA"
Why Orissa?
Vibrant industry sector
Proactive and positive Government with a modern outlook
Stability of political regime and policy framework for developing key economic sectors and for infrastructure buildup (Legislative framework to reduce transaction time & cost for investors)
Strong institutional support and Single Window facilitation by Team Orissa
Harmonious industrial climate and relations Team Orissa
Chief Minister is the captain of TeamInstitutional framework of the Government that is
engaged in industrial facilitation and investment promotion
Mukteswar
Secretariat Building, Bhubaneswar
Project: "KAUSTAVA"
Why Orissa?
Government promoting inclusive growth for sustainable & balanced development:
People oriented R & R policy
Strong institutional mechanism to promote periphery development with involvement of all stakeholders
Stress on environment management
Focus on SME sectors
Strategy to leverage natural resources for all-round prosperity and enabling rural livelihoods
Rapid infrastructure development through PPP framework and policy
KIIT University, Bhubaneswar
Well planned Roads
Project: "KAUSTAVA"
Opportunity OrissaOpportunity Orissa
Education and Knowledge Sector Automobile sector Ancillary / downstream / construction phase projects of mining /
steel / aluminum / petrochemicals Equipment and technology suppliers & vendors Heavy engineering and fabrication Plant and machineries for ports, roads, industrial water supply, mining
equipments, etc Power projects – coal washing, modernization of existing units,
renewable energy Marine fisheries & infrastructure Services sector Tourism Information Technology / ITES
Project: "KAUSTAVA"
Opportunity OrissaOpportunity Orissa
Development of industrial parks and Special Economic Zones
Critical economic & social infrastructures in industrial and mining corridors – roads, water supply, housing, hospitals, etc
Construction domain including industrial construction, townships, roads, ports, real estate and other infrastructure
Technology applications in utilization of flash and blast furnace slag
Clean development mechanisms projects – green manufacturing processes and technology
Project: "KAUSTAVA"
Focused Investment Sectors Roads ,Rail and Township
Capital Region Ring Road -87km Estimate Cost- 600Cr Bhubaneswar – Paradip Roadd-94Km- 650 Cr Four laning of Sambalpur-Rourkela Road from existing two lane road. 86 Km Integrated Residential Township, Ranasinghpur, DBT, the estimated project
cost(cr) – 493 Aviation Training Academy at Bhubaneswar Establish a Convention Complex and Golf Course at Bhubaneswar
Infrastructure-Ports, Airport Airport at Jharsuguda in PPP mode International Airport in PPP mode New Ports at Bali-harichandi( Puri),Palur (Ganjam), Astaranga (Puri), Inchuri
(Balasore),Chandipur (Puri) Ship building at Dhamra (Bhadrak) and Gopalpur (Ganjam)
Project: "KAUSTAVA"
Focused Investment Sectors
Renewable Energy
Orissa has a potential to generate 4500Mw from renewable source. Orissa Electricity Regulatory Commission has made mandatory to Govt.
to purchase 10% of Power from Renewable Energy source. Govt of India has identified 8sites for setting up wind mills generating
1500Mw. Gopalpur, Chandbali, Puri, Paradip,Konark and Damonjodi are the
potential sites. Power Purchase Agreement with Govt Potential from Solar Energy is 2000Mw. Orissa has signed MOU to generate 100Mw from Solar Photo Voltaic. 8nos of Projects finalized to generate 200Mw from biomass source. Mini/Micro/Small hydel projects have potential to generate about
1000Mw. Grid connectivity for commercial production
Project: "KAUSTAVA"
Invest in Orissa and be a
preferred partner
CAPEX database of The Centre for Monitoring Indian Economy (provider of project-wise information of new and ongoing capital expenditure projects in the country)
Ranks Orissa first in terms of value of total envisaged projects for the period ending December 2007.
Estimated investment of Rs 599,181 crores (= $150 billion) Ranks Orissa first in terms of value of total projects under
implementation in the country at Rs 308,589 crore. There are 483 projects being carried out in Orissa: 52% are
under implementation stage while 48% are in the announced stage.
Project: "KAUSTAVA"
Issues and Challenges
Providing encroachment free land for the projects. Providing support for removal of utilities and stopping of future
encroachments. Providing adequate legislative &administrative support Suitably structuring the concession agreements to insulate against
future political/ administrative changes keeping in view the long concession periods.
Setting up of robust dispute redressed mechanism. Protecting rights of all Stake holders including exempt categories of
users. Availability of equity and long term debt. Continued Government and Concessionaire’s interest in the projects
keeping in view their long gestation and concession periods.
Project: "KAUSTAVA”
Lets take the Road less traveled by,And that will make our Future a Big difference
Thank You