View
216
Download
1
Category
Preview:
DESCRIPTION
Overall Production
Citation preview
ProductionProduction
Oct 31, 2012Oct 31, 2012
Dan FraserDan Fraser
Current Production FocusCurrent Production FocusTransition to RPMsTransition to RPMs 52(44) sites using RPM based installs52(44) sites using RPM based installs 49(59) sites still using Pacman install49(59) sites still using Pacman install All the main RPMs have been releasedAll the main RPMs have been released
Incl. Gums and GratiaIncl. Gums and Gratia Still working on a few issues / bugsStill working on a few issues / bugs
No more Blocker BugsNo more Blocker Bugs Plan to phase out Pacman by mid next yearPlan to phase out Pacman by mid next year BCDT bringing Tim up to speedBCDT bringing Tim up to speed
Tim is doing a good job of jumping inTim is doing a good job of jumping in
Overall ProductionOverall Production
Some Production Issues…Some Production Issues…Effort from the entire teamEffort from the entire team New root vulnerabilities in CondorNew root vulnerabilities in Condor Procedure for handling CA releases w/o manual interventionProcedure for handling CA releases w/o manual intervention New critical bug in certain Condor configurationsNew critical bug in certain Condor configurations Encouraging sites to upgrade to OSG1.25+Encouraging sites to upgrade to OSG1.25+
Critical bug in condorCritical bug in condor SE-only publishing issueSE-only publishing issue GRAM-5 production issues settling down (memory leaks, GRAM-5 production issues settling down (memory leaks,
scaling, etc.)scaling, etc.) CA updates no longer automated by OSG (RPM)CA updates no longer automated by OSG (RPM) GUMS-Voms compatibility with CERN (progress ongoing)GUMS-Voms compatibility with CERN (progress ongoing) ……
Production ChallengesProduction Challenges
New monitoring tools suitable for a glide-in New monitoring tools suitable for a glide-in based system.based system. Working with Ashu to define and visualize Working with Ashu to define and visualize
new tools.new tools.
How “autonomous” are the sites?How “autonomous” are the sites? Now that we promise security through a Now that we promise security through a
central glide-in systemcentral glide-in system What is OSG’s policy on encouraging sites to What is OSG’s policy on encouraging sites to
upgrade?upgrade?
Campus Grid StatusCampus Grid StatusCampus grid working in production:Campus grid working in production: Glow, Diagrid (All Condor campus grids)Glow, Diagrid (All Condor campus grids) NebraskaNebraska University of Florida (not used much)University of Florida (not used much) UC3 (testing the latest Campus Grid Release)UC3 (testing the latest Campus Grid Release)
Pre-Production/testing:Pre-Production/testing: RENCIRENCI Virginia Tech (Bio-tech)Virginia Tech (Bio-tech)
http://gratiaweb.grid.iu.edu/gratia/xml/glidein_hours_bar_smry?probe=condor:dhcpseven237.bioinformatics.vt.edu
Virginia Tech (Belle, DayaBay)Virginia Tech (Belle, DayaBay) FIUFIU
Launching the Campus Launching the Campus Infrastructure CenterInfrastructure Center
Center where researchers can learn about Center where researchers can learn about and adopt campus technologies.and adopt campus technologies. Led by Rob GardnerLed by Rob Gardner
First meeting planned for NovemberFirst meeting planned for November UC Santa CruzUC Santa Cruz
Campus Grids Project PlanCampus Grids Project Planhttps://twiki.grid.iu.edu/bin/view/CampusGrids/https://twiki.grid.iu.edu/bin/view/CampusGrids/CampusInfrastructureProjectPlanCampusInfrastructureProjectPlan
Pushing toward BOSCO V1.1Pushing toward BOSCO V1.1 Target for NovemberTarget for November
Multi-user capabilityMulti-user capabilityFile transfer over SSHFile transfer over SSHUse multiple OS’s Use multiple OS’s
Included Documentation and usability testing.Included Documentation and usability testing.Offered to two users (Uwash not a Bosco candidate but is a campus Offered to two users (Uwash not a Bosco candidate but is a campus grid candidate via flocking, Pegasus team tested successfully)grid candidate via flocking, Pegasus team tested successfully)
Features needed for v1.2 (quick releases):Features needed for v1.2 (quick releases): Accounting (integrated probe)Accounting (integrated probe)
Campus Grid IssuesCampus Grid Issues
Need more interest in adopting BoscoNeed more interest in adopting Bosco Plan to widen distribution when Bosco is Plan to widen distribution when Bosco is solidsolid
Condor users mailing list is proposed targetCondor users mailing list is proposed target
Use OIM for campus mapUse OIM for campus map Campus registration is in OIMCampus registration is in OIM
New Issue with Campus FactoryNew Issue with Campus Factory
Recommended