Oracle‟s Primavera Portfolio ManagementWhat‟s New in Release 8March 2010

3

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - One for All and All for One

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

4

• “In this world, nothing is certain but death and

taxes and change” – Benjamin Franklin

Our Changing World

Every Exit

5

Enterprise Portfolio GPS

Portfolio Benefits Portfolio Selection

Portfolio Assessment

• Efficiently and

effectively arrive

at your strategic

destination

• Deliver on your

goals

• Identify your

strategic destination

and map to it with

the right

investments

• Continuously evaluate your progress to

your destination

• Make appropriate course corrections

6

Enterprise GPS Powered By:

• Easy access to historical data and creating versions

• Faster portfolio analysis with greater visual aids

• Greater enterprise investment portfolio support

• Enhanced data management with dynamic lists

• Expanded data exchange options using the

Primavera Portfolio Management Bridge to P6

• Improved administration saves time and minimizes

end user training reducing the total cost ownership

7

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - One for All and All for One

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

8

One Click Access to Selecting a Specific Date

New “Data as of”

drop-down

Specific Date

Selected

Shading indicates

past/future data

9

One Click Access to Selecting a Specific Version

10

Creating Versions

11

Smart Trending Analysis

• Graphs enable

comprehensive

analysis by

being:

• Anchored to

a specific

date or

version

• Changed on

the fly by

using dates

or versions

• Viewed by

specific

intervals of

time

12

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - One for All and All for One

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

13

Greater Enterprise Support - One for All and All for One

• Simplifies managing different types of investments to

deliver global enterprise value

• Specific investment types intelligently paired with the

corresponding portfolio evaluation views

• Optimizes speed and performance as use expands

• Greater analytic support through multiple back-end servers to

distribute the calculation load

• Ties enterprise portfolio analysis together across the

globe

• More Locale settings (date, time and currency) support

• German speaking regions of Switzerland

13

14

Greater Enterprise Support - One for All and All for One

Enterprise

Architects

Application

Managers

IT Staff

Sales &Marketing

Managers

Plant

Managers

Product

Managers

Asset

Managers

Reliability

Staff

Developers

CXOs, Strategic Planners,

Governance Staff,

LOB Management

15

Selecting Evaluation Views

15

Only forms

belonging to

current item‟s

domain (or marked

as „All‟) are listed.

16

Selecting Investments

If user select Item

from a different

Domain….

17

Intelligently Reconciling Pairings

… form will be

blank. And then

the user may select

from the Form list

based on this

Item‟s domain.

18

Defining Evaluation Views by Type of Investment

18

Domain for

Forms/Dashboards

defined. “All” is

the default.

Domain for

Items/Portfolios.

19

• Scale out using multiple Analytic (Back-End) Servers

Improve Performance of Analytic Calculations

19

20

Additional Locale Setting Support

• Locale and settings may be set for:

• German speaking regions of Switzerland

• German (for Germany)

• French (for Canada and France)

• English (for UK and USA)

• Spanish (for Spain)

21

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - One for All and All for One

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

22

Speeding Decision Analysis and

Enhancing Collaboration

- Enhanced

visualization

- Improved

collaboration

Smoothes out the

hills and valleys

of progress

delivering faster

and greater

enterprise value

22

23

Enhanced Visual Aids Improves Portfolio

Analysis

• Additional indicator colors

and shapes

• Shortens the time between

analysis and securing

approval

• Tightens indicator thresholds

(up to 7) enabling earlier

signals of issues allowing for

more time to correct

• Offers flexibility through

changing indicator names for

greater organizational context

24

Enhanced Visual Aids Improves Portfolio

Analysis

24

New indicators are

shown throughout

the product

25

Speed Portfolio Analysis by Optimizing the

Display of Analytics in Scorecards

26

Specifying Category Values and/or

Indicators to Display in Scorecards

27

Unlock Investor Map Power through

Streamlined Access to Analysis Capabilities

28

Copy / Paste Data Between Dynamic Lists

and Microsoft Excel

29

Trigger Alerts Using Dynamic List Category

Values

• Earlier notification of risks minimizes obstacles to delivering value

30

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - One for All and All for One

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

31

Strengthening P6 Integration Connections

• Offers additional options to share relevant data for

better portfolio analysis

• New alternative for managing summarized resource information

at the project level

• Data over time support for cost summarizations at WBS Level 2

31

32

Project - Resource Data Management Options- Example

Resource – Current Option

• Summarized hours based on

Primary Role• OPPM Summarized Planned DBA

hours - 70

• Impacts role availability based on

primary role

Role – New Option• Summarized hours based on

Role• OPPM Summarized Planned

DBA hours – 50

• OPPM Summarized Planned QA

hours – 20

• Impacts role availability based on

specific roles

• Data in P6• Primary Role – DBA

• Planned DBA hours – 50

• Planned QA hours – 20

33

Data Over Time Support for Summarizations

at WBS Level 2

P6 – Schedule spans

multiple years

OPPM 8 – Shows

costs by Phase (WBS)

and year

34

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - One for All and All for One

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

35

Primavera Portfolio Management 8 - Additional Enhancements

• Increased flexibility in product access and management for users and administrators• Inclusion of Type User to create advanced functions

• Secured access to dynamic list “Add, Remove or Edit” buttons to prevent accidental changes

• Easier display of disabled value list values and ability to re-enable them

• Enhancements to Database Clean-up Utility

• Lower cost of ownership• Elimination of Java for Investor Map functionality

• Greater 64-bit support

• Simultaneous install of the core and add-on modules

• New Oracle Primavera Portfolio Management product branding

36

Primavera Portfolio Management 8 - High Level Technical Requirements

• Support for five operating system platforms

• Windows Server 2003 32-bit

• Windows Server 2003 64-bit

• Windows Server 2008 32-bit

• Windows Server 2008 64-bit

• Windows Server 2008 R2 64-bit

• Support for Internet Explorer (IE) 8 and (IE) 7

• Support for Oracle 10.2.0.4

• Support for Microsoft SQL Server 2005 and 2008

• Support no longer offered for Microsoft SQL Server 2000

37

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - All for One and One for All

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

38

Oracle‟s Primavera Portfolio Management 8The Enterprise GPS

• Gives organizations foresight to steer clear of “dips” in the road…

39

Oracle‟s Primavera Portfolio Management 8The Enterprise GPS

… and drive towards high value portfolio opportunities

40

Agenda

• A Better Way to Manage Change

• Charting a Progressive Course to Portfolio Value

• Greater Enterprise Support - One for All and All for One

• Speeding Decision Analysis and Enhancing Collaboration

• Strengthening P6 Integration Connections

• Additional Enhancements and Technical Requirements

• Delivering the Goods

• Questions?

41

Questions

<Insert Picture Here>

Oracle‟s Primavera Portfolio Management

What‟s New in Release 8

Recommended