Presentation to The Traffic Law Enforcement Technical Committee November 2003

Preview:

DESCRIPTION

Operation Juggernaut. Presentation to The Traffic Law Enforcement Technical Committee November 2003. - PowerPoint PPT Presentation

Citation preview

Presentation to The Traffic Law Enforcement

Technical CommitteeNovember 2003

Operation Juggernaut

600

700

800

900

1000

1100

1200

1300

JanFeb

MchApr

MayJun

JulAug

SepOct

NovDec

JanFeb

MchApr

MayJun

JulAug

SepOct

NovDec

JanFeb

MchApr

MayJun

AccidentsFatalities

No. of Fatal Accidents and FatalitiesJan 2001 - Jun 2003

0.9

1

1.1

1.2

1.3

1.4

1.5

JFMAMJJASONDJFMAMJJASOND

Fatal Accidents per 10 000 Reg Veh'sMoving 3-month Average

This position, which is totally unacceptable, cannot be allowed to continue - Enough is enough. Consequently, a vigorous campaign to claim back our roads and to stop the slaughter of innocents on our roads needs to be embarked upon – Operation Juggernaut over the next three months, including the forthcoming festive season.

Contributory Factors to Crashes

Unroadworthy and Unfit Vehicles – particularly- Buses- Trucks - Minibus Taxis

Unfit and unlicenced drivers of these vehicles, and General reckless, negligent and inconsiderate driver behaviour

Supportive Statistics

• There is a total of 60,127 vehicles of which the Certificate of Roadworthiness (CRW) expired which need to be targetted.

• 15,130 (25,16%) are Heavy Passenger Transport vehicles, licenced to transport 12 or more passengers (buses, bus trains and certain minibus taxis), 24,583 (40,89%) Trucks (to draw) and 20,414 (33,95%) heavy load Trailers (>3,5t).

0

2000

4000

6000

8000

10000

12000

GA KZ WC EC FS MP NW NP NC

Heavy PassengerTruck Heavy Trailer

No. of Vehicles of which CRW ExpiredOctober 2003

Supportive Statistics

The total number of unlicenced vehicles is 279,597 of which 111,518 (39,89%) are in Gauteng.

0

1

2

3

4

5

6

7

GA KZ WC EC FS MPNW LI NCTotal

Unlicenced Veh's as % of Reg Veh'sper Province

0 2 4 6 8 10

Motorcars & stationwagons

Minibuses

Buses, bus-trains & midibuses

Motor/Tri/Quadrocycles

Ldv's & panelvans (<3,5t)

Trucks (heavy load draw >3,5t)

Heavy load trailers (GVM>3,5t)

Total

Unlicenced Veh's as % of Reg Veh'sper Type of Vehicle

Supportive Statistics

The high number of Professional Driving Permits (PrDP’s) that are shown as expired, 337,119 (28,62%) out of a total of 1,177,766, on the National Traffic Information System (NaTIS).

0

20000

40000

60000

80000

100000

120000

GA KZ WC EC FS MPNW LI NC

No. of Expired PrDP's per ProvinceOctober 2003

0 5000 10000 15000 20000 25000 30000 35000

PretoriaJohannesburg

Cape TownDurban (Windsor Park)

Port ElizabethBoksburg

BloemfonteinGermiston

PietersburgKempton Park

BenoniPietermaritzburg

WitbankRoodepoort

Reg Auth's with most Expired PrDP's

Purpose of Juggernaut

Although the thrust of Operation Juggernaut, in support of Arrive Alive, is against unroadworthy freight vehicles, buses and minibus taxis, all other unroadworthy and unlicenced vehicles, as well as unlicenced drivers, drivers whose PrDP’s expired and drivers under the influence of alcohol, will also be targeted through intensified law enforcement.

Juggernaut Time Frame

• Major period with high visibility and high level of operations : Sun 9 Nov – Sat 29 Nov

• Lower scale, but continuous from 1 Dec 2003 to the end of Jan 2004

Major cities with multi jurisdictional enforcement partnerships will be surrounded by a ring of steel so that every suspect vehicle within a 20 kilometre radius of a weighbridge or vehicle testing station will be escorted in for examination to determine the safety of the vehicle. As many as possible additional special roadblocks will also be set up.

Juggernaut Operations

Mandate for JuggernautThe Arrive Alive Business Plan, recently

approved by both COTO and MINCOM contains, amongst others, intensified law enforcement and control of driver and vehicle fitness aspects prior to the start of the school holidays and the December 2003 / January 2004 festive season.

The proposed project, which describes the required actions to be taken over this period, is in line with this decision.

The END

Thank you