Presentation to: SWEDE Conference Austin, TX May 2, 2013 Tom Weaver, PE

Preview:

DESCRIPTION

Historical Voltage Range. 128. American Electric Power’s Experience with Volt/Var Optimization. 124. “B” Service. “A” Service. 120. “A” Utilization. “B” Utilization. 116. VVO Range. 112. Presentation to: SWEDE Conference Austin, TX May 2, 2013 Tom Weaver, PE. 108. 104. - PowerPoint PPT Presentation

Citation preview

1

Presentation to:SWEDE Conference

Austin, TXMay 2, 2013

Tom Weaver, PE

Historical VoltageRange

VVO Range

120

124

128

116

112

108

104

“A”

Se

rvic

e

“A” U

tilizatio

n

“B” U

tilizatio

n

“B” S

erv

ice

American Electric Power’s Experience with

Volt/Var Optimization

2

Volt VAR Impacts on Customer’s Motors

Real Power consumption is 8% lower @ 115V than at

125V

kVAR ↓ ~ 20%

kW ↓ ~ 8%

3

Volt VAR Optimization Architecture

3

Volt VAR Controllers

Mesh Network

Mesh Master

EOL Monitors

Line Regulators

Line Capacitors

DMS - GENe

Fiber or Mesh

4

AEP’s Volt / VAR Optimization Technology Deployments

• AEP Ohio :– 17 circuits in service– Additional circuits being considered to meet EE State Targets

• Indiana & Michigan Power Co.:– 9 circuits in service– Planning to include VVO as an EE Program

• Public Service Company Oklahoma :– 11 circuits in service

• Kentucky Power Co. :– 25 circuits going in service in 2013– Planning to include VVO as an EE Program

55

AEP Ohio: Gahanna – 4505 Voltage Profile

Substation

EOL 2CAP 2 CAP 3

Without AdaptiVolt™ = 6-7-11 @ 4:30 pm With AdaptiVolt™ = 6-6-11 @ 4:30pm

REG

Flatter voltage profile, lower voltage, reduced tap changer operations

6

AEP Ohio: East Broad 1406 Voltage Profile

Normal Operation = 7-23-10 @4:44pmVolt / Var Control Operating = 7-24-10 @4:44pm

Substation

EOL 55CAP 1 CAP 3 CAP 4REG 1 REG 2CAP 2

116.0

118.0

120.0

122.0

124.0

126.0

Normal Operation With VVC

7

Demand and Energy Reduction Results

• VVO technology works as-expected Testing demonstrates ~2-4% energy and demand reduction is

achievable.

8

Example of Energy Savings on Circuit 4503

9

SCADA / PI View

10

SCADA / PI View

11

“Value” of VVO Compared to

Generation Alternatives

Levelized cost of VVO is in the low part of the Energy Efficiency range due to low initial capital cost and no on-going fuel cost

“LEVELIZED COST OF ENERGY ANALYSIS “– VERSION 3.0 Lazard, February 2009

12

VVO for Energy Efficiency / Capacity Reduction

• Energy Efficiency (24/7 Operation)– Help meet state Energy Efficiency targets– Receive incentives / participate in DR markets – TRCs 2 to 3 – better than many current programs– Reduce Energy Consumption by Customers– Not limited by “participation rates”– Reduce Emissions – Relieve Transmission Congestion

• Capacity (Demand Reduction Only )– Reduce amount of capacity required at peak / critical times– Short payback period if generation charges are based on peak demand– Defer investment in capacity replacement or upgrades– Engage in DR Market– Relieve Transmission Congestion

13

Questions?Tom Weaver – tfweaver@aep.com