PRESENTATION - Green Fleet Update...2018/06/06  · PRESENTATION - Green Fleet Update Author Wilson,...

Preview:

Citation preview

GREEN FLEET UPDATE Contract Award for

CNG Sewer Cleaner Trucks and Medium and Heavy Duty Electric Vehicles

Background Fleet Current State Green Fleet Plan Electrifying the Fleet Medium and Heavy Duty Electric Trucks Fueling the Fleet CNG Sewer Cleaner Trucks

TODAY’S AGENDA

2

Greenest City Action Plan (Adopted 2011)

Renewable City Strategy (Adopted 2015)

STRATEGIC ALIGNMENT

3

Renewable Energy

GHG Emissions

100%

-50% -30%

55%

-80% 2020 2030 2050

GHG Emissions

-30% 2007 2020

BASELINE

59%

31%

17%

19%

12%

30%

8%

6%

3%

14%

Fleet Composition GHG Emissions

1,860 units in the City’s fleet

16,300 tonnes of CO2e annually

Other Construction Equipment

Heavy Duty

Medium Duty

Light Duty

FLEET CURRENT STATE

4

Electrifying the Fleet All vehicle replacements firstly consider an electric option

Fueling the Fleet All fuel used in the fleet contain a high proportion of renewable, biologically-derived content

GREEN FLEET PLAN

5 2007 2017 2020 2030 2050

-30%

-50%

2020 target reached in 2020

2030 target reached in 2023

Transitioning to electric vehicles will lead to a reduction of 1,300 tonnes of C02e annually by 2023

ELECTRIFYING THE FLEET

6

Diesel 47%

Gasoline 35%

CNG 8%

Electricity 8%

Fuel Composition (2018)

2009: First Mitsubishi IMiEV in Fleet

2018: 100th EV in Fleet

2019: First Electric Truck in Fleet

2021: Projected 200th EV in Fleet

MEDIUM/HEAVY DUTY ELECTRIC TRUCKS Types of Units Included: ‒ 44 units – Tractor Trailers, Refuse Collection Trucks, Aerial Trucks Budget Impact: ‒ $4.1 million capital premium for electric ‒ Capital premium offset by annual fuel and maintenance savings Emissions Reduced: ‒ 1,200 tonnes of CO2e reduced annually

Using low emission fuels will lead to a reduction of 7,500 tonnes of C02e annually by 2023

FUELING THE FLEET

8

Diesel 47%

Gasoline 35%

CNG 8%

Electricity 8%

Fuel Composition (2018)

2010: All Diesel is B5

2016: City Fleet CNG Station Constructed

2018: 35th CNG Vehicle in Fleet

Q4 2018: Explore trial opportunities for new Renewable Fuel options

2018: Forthcoming Fuel Contract Focusing on Renewable Fuels

CNG SEWER CLEANER TRUCKS Types of Units Included: ‒ 5 units – Sewer Cleaner Trucks Budget Impact: ‒ $2.9 million in total capital costs ‒ No increase to annual operating costs Emissions Reduced: ‒ 130 tonnes of CO2e reduced annually