POST INSTALL INSTRUCTIONS
Layout your deck or patio to
optimize the railing sections and
posts.
Use speed square for placement of post.
Important to have blocking below decking
and fastened to or through the blocking or
substructure.
Start fastening the post
flange to deck and use
shims for plumbing posts.
Pre Drill and use the APPROVED Building
Code methods to attach and install the
POST. CHECK WITH YOUR LOCAL BUILDING
CODE OFFICIAL. Fasten and shim, check for
plumb.
Trim shims with utility knife, score and snap.
Finalize the plumbing of the post, then take
the 2 pc Flange Cover and slide 3 sided
flange into place and then snap final piece
of the flange to complete assembly
To detach the flange cover, simply pull
straight up and twist the side of the casting
to remove the 2nd piece.
Railing Installation Guidelines For:
ULTRA MAX
• Please read all instruction completely before starting any installation of our Pro Railing systems
• Railing Boxed Kits come complete with Top/Bottom Rails, In Rail Connectors, brackets, balusters and hardware
• Rail Sections come in 4ft, 6ft & 8ft
• Posts are available in RESIDENTIAL Rated (2.5” & 3.0”) and COMMERCIAL (3” .125 wall with 6 Boss channels)
• MAX railings should be installed using accepted building principles in accordance with Local Building codes and
the installation guidelines.
• MAX has been tested by ATI and meets the current testing standards for IRC and IBC construction codes
• If you have any questions, Please call YOUR Distributor or check their website for more install details
• SAFETY: Always be safe and follow all instructions when using power tools and always wear safety goggles!
• NOTE: consult your local building code official and check all Code Requirements.
• Any Questions? Call 800-656-4420 and Ask for your Railing Specialist!
• Visit our website www.ultrarailing.com
All fasteners are included in box kits
ULTRA MAX Boxed Railing kits include Top Rail, Bottom Rail, ¾” Square balusters, Two (2) Top MAX Drop In Brackets, Two (2)
Bottom Drop In Brackets, 18/8 Stainless Steel Fasteners 12-#14-Type F self-Threading, Foot-block and shoe.
#14 Type F, 12 self-threading screws included, 2 screws for bracket attachment to post and 1 painted screw for securing profile to
the top bracket. Use a # 3 screwdriver bit for a sure fit. Stairs brackets include 5-#14 TEK screws. Foot-block assembly has 3-#8’s,
1-TEK for the connector and two Type A for the shoe.
STAIR BRACKETS
INSTRUCTIONINSTRUCTIONINSTRUCTIONINSTRUCTIONSSSS
BUILDING MATERIALS: HARDWARE & PROFILES
R
Layout the deck or patio for the
best for optimizing the railing
sections.
Use speed square for placement of post and
flange. Important to have blocking below
decking and fastened to or through the
blocking or substructure
Start fastening the post
flange to deck and use
shims for plumbing posts,
snap on Flange covers.
Level, Rubber Mallet, 2-speed square, cordless Drill and impact driver, Quick clamp grips, Measuring Tape, meter
saw with high tooth count, 13/64” drill bit, #3 screwdriver bit, ratchet set, Portable Band Saw
TOOLS
MAX Railing kits are packaged for secure and
safe shipment. Rails and balusters are
separated by a corrugated compartments and
bracket kit is packaged securely and placed in
compartment of the box.
Picket template provided in the box to help
stabilize the top pickets when installing and
aligning top rail. Brackets can be installed on
the post manually or with the Install Guide
Template. Sold separately
MANUALLY: place BOTTOM BRACKET, 1- 3/8”
from top of post plate. Measure from bottom
of INSTALLED BOTTOM BRACKET and mark at
32.5”. Draw line for placement of Top bracket.
Place BRACKETS on marks, mark the holes or
use bracket as template for drilling 13/64” pilot
holes. Attach all (4) brackets with 2- #14 1”
Type F screws. Place the BOTTOM RAIL
adjacent to the 2 post and use speed square to
transfer cut lines and mark. Double check the
length at bottom and top of posts with tape
measure for square. Cut the top and bottom
railing profiles to size. Assemble the top and
bottom rail by inserting the baluster into the In
Rail Connector and build railing section.
Fully assembled panel is lifted and placed
onto the 4 pre-installed Brackets.
Foot Block provided needs to be added to the
center point of all sections, attach connector to
bottom profile with 1-#8 1” TEK screw and
install. Friction fit pre-cut foot block (2”) and
place shoe on baluster. Set in place and take
remaining #8 5/8” Type A screws and attach
shoe to substrate. (screw provided for wood or
composites)
POST
Pre Drill with 13/64” Drill Bit from bottom
of Top Rail into the Top Drop In Bracket,
Use 2- #14 1” Type F PAINTED HEAD, screw
and fasten the top rail to Bracket.
AIRSAIRSAIRSAIRS
MAX PIVOT STAIRSMAX PIVOT STAIRSMAX PIVOT STAIRSMAX PIVOT STAIRS or Friction Fit Stairsor Friction Fit Stairsor Friction Fit Stairsor Friction Fit Stairs
THE MAX PIVOT STAIRS PIVOT FROM 0 TO 38, FRICTION FIT WORKS FROM RANGE 30 TO 40 DEGREES
ELIMINATING THE CALCULATION OF RISE AND RUN, FOR YOUR ANGLES ON STAIRS.
Mark your length of RUN by setting
BOTTOM RAIL on the nose of the steps and
clamp to the two posts. Use (2) speed
squares (see pic) on steps to keep BOTTOM
RAIL off the steps and allow for clearance of
flange cover on TOP post installation.
NOTE: Place Flange cover on post base for
clearance of bottom rail
Mark with speed square and cut the profiles
square, use Chop saw, cut at the marks and
view your location mark to match how you pre-
measured the Stair Railing originally, VERY
IMPORTANT to LINE UP AND PLACE STAIR
SECTION BACK THE SAME AS ORIGINAL.
USE YOUR MARKS FOR PLACMENTS
After clamping Railing section, mark TOP and
BOTTOM RAILS with pencil, use your POST as
your straight edge. (Use white mark on dark
profiles) Clearly label your TOP and Bottom
Rails for identification when cutting and
installation. T for TOP, B for Bottom, L and R
Double check your measurements by placing
the Upper and lower STAIR BRACKET flush to
the POST and check the distance for added
accuracy. IMPORTANT: MARK YOUR RAILING
FOR PROPER REALIGNMENT & Installation
Clamp Stair template, (see picture) to
outside of POSTS, using quick clamp grips,
when centered and sized so that top and
bottom BALUSTERS are symmetric and
plumb to the two posts.
MARK and CUT: TOP & BOTTOM RAIL OF STAIRS
TOP of MARKED RAILS (A1 and B1) Measure
from bottom of angle, 1.25” to the Right.
BOTTOM of MARKED RAILS (A2 and B2)
Measure from top of angle, 1.25” to Left.
After placing the assembled stair section
between the two posts, MARK your TOP and
BOTTOM BACKER plates.
Now make location MARKS on STAIR BACKER
PLATES. NOW, mark/outline the BACKER PLATE
position with the 4 BACKER PLATES. This is
important, as you will install the BACKER PLATES
to the POST with #14 TEK Screws, after removing
the stair section.
Drop TOP and BOTTOM Rail into position on the
installed BACKER PLATES. Set #14 TEK Screw on
TOP RAIL at the BOTTOM of the Stair Run. This will
allow the TOP RAIL to PIVOT, UP and DOWN for
Baluster placement. (see Pics).
Remove stair section in whole and remove all 4 stair
brackets. Separate the RAILING CUPS from the
BACKER PLATES (remove #14 set screws) Now install
the 4 BACKER PLATES and attach to the previous
marked position on the POSTS. Secure all (4) Stair
RAIL CUPS to the top and bottom rails. USE #14 TEK
screws.
When all Baluster are in position between
the POSTS. Secure last of #14 TEK Screws
into the Stair Brackets.
INSTALL GUIDE TEMPLATE INSTRUCTIONS
TEMPLATE FOR INSTALLATION OF MAX BRACKETS
Place ULTRA MAX template on the post
and using a BRACKET, Drill a 13/64” pilot
hole. Secure brackets by using the #14 x
1”-TYPE F-18/8 SS screws provided.
Place the posts in the position desired for
railing placement, fasten the post with the
proper fasteners and begin shim process.
Level, Plumb and SECURE.
The assembled panel will DROP IN to the
attached brackets on the posts. Connect top covers
for final install.
2 piece
flange
cover
simply
snaps
into
position.
NOTE: CORNER POST (2.5”)
MANDATORY, use template and pre
drill holes BEFORE INSTALLING.
INSTALLING BRACKETS ON ONE SIDE
WILL PREVENT FLUSH INSTALLATION OF
GUIDE TEMPLATE
Recommended