POST DELIVERY SERVICES INFO MEMO
POST DELIVERY SERVICEPARTNERING CLIENTS DELIVERING SOLUTIONS
• Offshore Rig Modifications, Upgrades &Conversions
• Transit & Carry Over Works• Survey and Equipment Works for Marine,
Safety , Well Control & Drilling Packages• Quality, Ahead of Time & Within Budget
Engineering Operational ExcellenceCustomer Intimacy
• Design & Detailed Engineering• Repair, Conversions & Upgrades• Safety & Operational Procedures• Construction Methodology• Delivery of Drawing &
Documentation Dossier
• Meeting & Exceeding Client Requirements• 24 – Hr Hotline for Clients & Rapid
Mobilization• Provision of Turnkey , Customized Work
Packages for Clients• Partnering Clients , Delivering Solutions
1
POST DELIVERY SERVICES INFO MEMO
Agenda
1. Company Introduction
1.1 PDS Organization Chart1.2 PDS Vision, Mission and Value Proposition
2. Post Delivery Work Service
2.1 PDS Scope of Works2.2 PDS Project Framework2.3 PDS Project Planning & Control
3. PDS Project Reference (Selected)
3.1 PDS Account Summary Matrix3.2 Project Reference ~ Transocean International3.3 Project Reference ~ Ensco3.4 Project Reference ~ Pacific Drilling3.5 Project Reference ~ Seadrill
4. Key Contact Information
2
POST DELIVERY SERVICES INFO MEMO
1 Company Introduction1.1 PDS Organization Chart
PRIMARY SERVICES
GOM EXECUTIVEMANAGEMENT
TRANSIT &OFFSHORE WORKS
AS PER CLIENT’SREQUIREMETNS
DESIGN &DETAILED
ENGINEERING
PROCUREMENT &INSTALLATION OF
EQUIPMENTPACKAGES
ADMINISTRATION• FINANCE• HUMAN RESOURCE• COMMERCIAL
CONSTRUCTION ,NEW BUILDS &CONVERSION ,
UPGRADES
PROJECTMANAGER (PDS)
COMMERCIALMANAGER
• Project Sponsor• Responsible for Overall Strategy
& Direction• Arbitrator & Ultimate Decision
Maker for internal and externalstakeholders
• Ensures PDS projects is defined ,planned & executed in accordanceto client objectives
• Ensure Project Deliverables arecommunicated and implementedeffectively
• Ensure that management ofresources is effective and efficient
• Ensures that projects undertakenare commercially viable
• Ensures Safety during at all times
ENGINEERINGMANAGER
• Ensures PDS engineeringdeliverables are in line withproject requirements
• Ensures Design & DocumentationDossier is updated and deliveredin time for client.
• Ensures design and detailedengineering are in accordancewith relevant regulations
• Ensures that solutions provided toclient result in operationalefficiency and safety for client.
3
PROJECTDIRECTOR
• Responsible for Overall InternalCoordination to Meet ProjectObjectives
• Ensures Resources are Availablefor project planning & execution
• Ensures Clients Expectations areExceeded
POST DELIVERY SERVICES INFO MEMO
1 Company Introduction1.2 PDS Vision Statement , Mission Statement and Value Proposition
VISION STATEMENTGlobal Offshore & Marine Shall be a HIGH QUALITY , INTEGRATED POST DELIVERY SERVICE (PDS) SOLUTION PROVIDER for theOFFSHORE OIL & GAS INDUSTRY
MISSION STATEMENTTo direct our vision, we are committed; As a provider of choice, providing a high quality, innovative, cost-effective and efficient service to all our clients. As a contractor of choice, offering integrated PDS services for all our clients. As a company of choice, focusing on quality, speed and customer satisfaction as a competitive advantages for our PDS Clientele.
VALUE PROPOSITIONTo GROW with OUR CLIENTS by PROVISION & EXECUTION of a BEST TOTAL SOLUTION in POST DELIVERY SERVICES.
4
Engineering & Innovation“ Best Product”
Customer Intimacy“ Best Total Solution ”
Operational Excellence“ Best Total Cost ”
POST DELIVERY SERVICES INFO MEMO
2 POST – DELIVERY WORKS SERVICE2.1 GENERAL SCOPE OF WORKS
ADDITIONAL 3rd PARTY ®ULATORY WORKS
STRATEGIC SOURCING &PROCUREMENT
• Equipment & Parts notsupplied by shipbuilder
• Extensive global network ofsuppliers
• Strategic partnerships withleading OEM’s
TRANSIT WORKS
• Fulfillment of OilCompanies’ andclient requirementsduring tow todeployment
• Efficient utilization oftime onboard tocomplete requiredworks.
STRUCTURE, PIPING &MECHANICAL
• Outstanding Works& PunchlistCompletion
• Additional OilCompanyRequirements
• Additional DrillingContractorRequirements
• Structural additions& upgrades
• Additional safetyrequirements eg:NORSOK , PSA
• Additionaloperationalrequirements
DOCUMENTATION &DELIVERY
• Drawing &DocumentationDossier & As Built’s
• Lesson LearntRegister
5
MEETING & EXCEEDING EXPECTATIONS
POST DELIVERY SERVICES INFO MEMO
2 Project Structure2.2 GOM ~ PDS Project Framework
PD
ST
OT
AL
SO
LU
TIO
NP
AR
TN
ER
• PRE – DESIGN MEETING• QUICK AFC DESIGN
TURNAROUND• AS BUILT DOCUMENTATION
C/W COMPLETE DRAWINGDOSSIER FOR CLIENT
• GLOBAL NETWORK OFSUPPLIERS
• GLOBAL NETWORK OF OEMPARTNERS
AHEAD OF SCHEDULECOMPLETION
Engineering & ProcurementExpertise
COST REDUCTIONPre Planning & Resource Mobilization
Operational Excellence
REPEATCLIENTS
• PERSONNEL & TOOLS HIGHSPEED DEPLOYMENT
• SAFE & EFFICIENTEXECUTION
• SURVEY, RECTIFICATIONAND COMMISSIONING OFSYSTEMS
HIGH QUALITY
CLIENTSATISFACTION
6
• CLIENT FEEDBACK SURVEY• DVELOP & MAINTAIN LESSON LEARNT
REGISTER W CLIENT• IMPLEMENT LESSON LEARNT IN
FUTURE PROJECTS
• RIG SURVEY & CLIENTMEETING
• DEFINE SCOPE OF WORK,DELIVERABLES ANDSCHEDULE
• PARALLEL ENGINEERING &FABRICATION
POST DELIVERY SERVICES INFO MEMO
2 Project Structure2.3 GOM ~ PDS Project Planning & Control
CL
IEN
T
Project Execution Phase
Project Completion &Handover Phase
Define Work Scope& Deliverables
Planning & PreparationPhase
OnshorePreparation
• Rig survey & ClientMeeting
• Define projectdeliverables /milestones& critical path
• Define Project schedule• Define 3rd party
requirements• Develop master
integrated schedule• Develop construction
methodology• Develop PEP
• Parallel EngineeringCoordination
• Parallel Fabrication• Resource Deployment
(PDS Team, Tools , ETC )• Construction methodology
approved and issued• Master integrated schedule
approved and issued• Project deliverables agreed,
approved and issued.• Critical path defined,
accepted and focus teamprepared.
• Daily Safety Meeting• Daily Project Agenda
and Targets toachieve &Monitoring
• Constantcoordination withclient and 3rd partyservice providers &classificationsocieties.
• Engineeringcoordination
• Primary point of sitecontact
• Parallel Fabrication
• Develop Lesson Learnt Registerwith clients
• All drawings ( new & as built )signed and compiled inconstruction drawing dossier
• All client/class certifications &reports compiled & delivered inDocument Dossier
Project Start Date Project End Date
Onboard/TransitExecution
7
POST DELIVERY SERVICES INFO MEMO
3 PDS Project Reference (Selected)3.1 PDS Account Summary Matrix
8
S/N Client Account VesselName /Year
Design/Yard Remarks
Dhirubhai DeepwaterKG 1/2009
Samsung 96000/SamsungHeavy Industries
• Awarded repeat project KG2
Dhirubhai DeepwaterKG 2/2010
Petrobaras 10,000
DS - 3 Samsung 96000/SamsungHeavy Industries
• Repeat projects x 3 awarded
DS – 4
DS – 5
DS - 6
Pacific Sirocco Samsung 96000/SamsungHeavy Industries
• Repeat projects x 2 awarded
Pacific Mistral
Pacific Santa Anna
West Vela
West Tellus
Sevan Louisiana
West Tellus
West Neptune
West Mira
Atwood Achiever
Samsung 96000/SamsungHeavy Industries
Daewoo ShipbuildingDSME 12000
• Complete & repeat project awarded
• Ongoing
• Complete project awarded
5
4
3
2
1
POST DELIVERY SERVICES INFO MEMO
3 Project Reference ~ Transocean International3.2 Vessel Name ~ Dhirubhai Deepwater KG 1 KG2 PetroBras 10,000
Client : Transocean InternationalYear : 2009Vessel Type : 6th Generation Ultra Deepwater DrillshipDesign : Samsung 96000 Double HullClassification : ABS, DP - 3Shipbuilder : Samsung Heavy Industries (SHI)
VESSEL SPECIFICATIONS
GOM KEY SCOPE OF WORK (SELECTED)
9
COST REDUCTIONAHEAD OF SCHEDULE
COMPLETIONQUALITY
GOMFOCUS
CUSTOMER SATISFACTIONCUSTOMER SATISFACTION
REPEAT PROJECTS X 1 AWARDEDREPEAT PROJECTS X 1 AWARDED
POST DELIVERY SERVICES INFO MEMO
3 Project Reference ~ Transocean International3.2 Vessel Name ~ Dhirubhai Deepwater KG 1 KG2 PetroBras 10,000
10
POST DELIVERY SERVICES INFO MEMO
3 Project Reference ~ Ensco3.3 Vessel Name ~ Ensco DS-3 DS- 4 DS-5
Client : EnscoYear : 2010Vessel Type : 6th Generation Ultra Deepwater DrillshipDesign : Samsung 96000 Double HullClassification : ABS, DP - 3Shipbuilder : Samsung Heavy Industries (SHI)
VESSEL SPECIFICATIONS
GOM KEY SCOPE OF WORK (SELECTED)
CUSTOMER SATISFACTIONCUSTOMER SATISFACTION
11
REPEAT PROJECTS X 3 AWARDEDREPEAT PROJECTS X 3 AWARDEDCOST REDUCTION
AHEAD OF SCHEDULECOMPLETION
QUALITY
GOMFOCUS
DS-6
POST DELIVERY SERVICES INFO MEMO
3 Project Reference ~ Ensco3.3 Vessel Name ~ Ensco DS-3 DS- 4 DS-5
12
DS-6
POST DELIVERY SERVICES INFO MEMO
3 Project Reference ~ Pacific Drilling3.4 Vessel Name ~ Pacific Sirocco Pacific Mistral Pacific Santa Anna
Client : Pacific DrillingYear : 2011Vessel Type : 6th Generation Ultra Deepwater DrillshipDesign : Samsung 96000 Double HullClassification : ABS, DP - 3Shipbuilder : Samsung Heavy Industries (SHI)
VESSEL SPECIFICATIONS
GOM KEY SCOPE OF WORK (SELECTED)
13
COST REDUCTIONAHEAD OF SCHEDULE
COMPLETIONQUALITY
GOMFOCUS
CUSTOMER SATISFACTIONCUSTOMER SATISFACTION
REPEAT PROJECTS X 2 AWARDEDREPEAT PROJECTS X 2 AWARDED
POST DELIVERY SERVICES INFO MEMO
3 Project Reference ~ Pacific Drilling3.4 Vessel Name ~ Pacific Sirocco Pacific Mistral Pacific Santa Anna
14
POST DELIVERY SERVICES INFO MEMO
3 Project Reference3.5 Vessel Name ~ West Auriga West Vela
Client : SeadrillYear : 2011Vessel Type : 6th Generation Ultra Deepwater DrillshipDesign : Samsung 96000 Double HullClassification : ABS, DP - 3Shipbuilder : Samsung Heavy Industries (SHI)
VESSEL SPECIFICATIONS
GOM KEY SCOPE OF WORK
15
COST REDUCTIONAHEAD OF SCHEDULE
COMPLETIONQUALITY
GOMFOCUS
CUSTOMER SATISFACTIONCUSTOMER SATISFACTION
REPEAT PROJECTS X 1 AWARDEDREPEAT PROJECTS X 1 AWARDED
POST DELIVERY SERVICES INFO MEMO
3 Project Reference3.5 Vessel Name ~ West Auriga West Vela
16
POST DELIVERY SERVICES INFO MEMO
3 Project Reference3.6 Vessel Name ~ West Tellus | West Neptune | West Mira
Client : SeadrillYear : 2011Vessel Type : 6th Generation Ultra Deepwater DrillshipDesign : Samsung 96000 Double HullClassification : ABS, DP - 3Shipbuilder : Samsung Heavy Industries (SHI)
VESSEL SPECIFICATIONS
GOM KEY SCOPE OF WORK
17
COST REDUCTIONAHEAD OF SCHEDULE
COMPLETIONQUALITY
GOMFOCUS
CUSTOMER SATISFACTIONCUSTOMER SATISFACTION
REPEAT PROJECTS X 1 AWARDEDREPEAT PROJECTS X 1 AWARDED
POST DELIVERY SERVICES INFO MEMO
3 Project Reference3.6 Vessel Name ~ West Tellus | West Neptune | West Mira
18
POST DELIVERY SERVICES INFO MEMO
3 Project Reference - Seadrill3.7 Vessel Name ~ Sevan Louisiana
Client : Sevan DrillingYear : 2013Vessel Type : 6th Generation Ultra Deepwater SemisubDesign : COSCOClassification : DNV, DP - 3Shipbuilder : COSCO
VESSEL SPECIFICATIONS
GOM KEY SCOPE OF WORK
19
COST REDUCTIONAHEAD OF SCHEDULE
COMPLETIONQUALITY
GOMFOCUS
CUSTOMER SATISFACTIONCUSTOMER SATISFACTION
REPEAT PROJECTS X 1 AWARDEDREPEAT PROJECTS X 1 AWARDED
POST DELIVERY SERVICES INFO MEMO
3 Project Reference3.7 Vessel Name ~ Sevan Louisiana
20
POST DELIVERY SERVICES INFO MEMO
3 Project Reference – Atwood Oceanics3.8 Vessel Name ~ Atwood Achiever
Client : Atwood OcenanicsYear : 2014Vessel Type : Dynamic PositioningDesign , Classification : Daewoo Shipbuilding DSME 12000Shipbuilder : Daewoo Shipbuilding, South Korea
VESSEL SPECIFICATIONS
GOM KEY SCOPE OF WORK
21
COST REDUCTIONAHEAD OF SCHEDULE
COMPLETIONQUALITY
GOMFOCUS
CUSTOMER SATISFACTIONCUSTOMER SATISFACTION
REPEAT PROJECTS X 1 AWARDEDREPEAT PROJECTS X 1 AWARDED
POST DELIVERY SERVICES INFO MEMO
3 Project Reference3.8 Vessel Name ~ Atwood Achiever
22
POST DELIVERY SERVICES INFO MEMO
4 Key Contact Information
23
Daniel Foo Chief Executive Officer (CEO) Mobile No: (+65) 9622 2833Email: daniel.foo@globalone.com.sg
Min Swe Post Delivery Services Manager Mobile No: (+65) 9825 7764Email: minswe@globalone.com.sg
Esperanza Pow Administrator Mobile No: (+65) 9173 9918Email: esperanza.pow@globalone.com.sg
GlobalOne Yard & Corporate Office Address 48 Tuas Road , Singapore 638500Contact No (+65) 6265 0819Fax No (+65) 6265 8683