PORT WARATAH COAL SERVICES

For 40 years, we have been receiving, stockpiling, blending and loading

export coal for the Hunter Valley Coal Chain in the Port of Newcastle.

WHAT WE DO

OUR FIVE DRIVERS

4

LICENCE TO OPERATE

5

FRAMEWORK

CHOOSING GRI & UN’S SDGS

A PATHWAY TO MORE MATURE REPORTING

MOST COMMON

GLOBAL TOOL

ALIGNMENT WITH

OUR SYSTEMS

SDG COMPASS

7

MATERIAL ISSUES

SUSTAINABLE DEVELOPMENT GOALS

8

LTO IMPROVEMENTS

• Operational for 12 months now –

commissioned Nov-2017

• Manages the quality of site water

discharges to the Harbour

• Developed in consultation with the EPA

as a PRP.

• Provides the ability to maintain sufficient

capacity to capture larger rain events

• In 2018, the CDFS has removed >93% of

sediment from the ‘raw’ water drawn

from our Settling Pond.

9

CONTROLLED DISCHARGE FILTRATION SYSTEM

LTO IMPROVEMENTS

• Additional pumps and sump connectivity to

increase storage and pumping capacity

• Increases reliability of the sump return system at

the wharf during intense rain events and in the

event of a power failure.

10

WHARF SUMP PUMP ENHANCEMENT PROJECT

LTO IMPROVEMENTS

11

CCT YARD MACHINE LIGHTING UPGRADES

• A two-fold improvement: HPS to LED lighting, and the top half of the machine is now lighting activated via a local switch or remotely from the Control Room

• An estimated >90% saving in electricity consumption, GHG emissions and associated costs.

• Electricity savings are equivalent to the annual consumption of 24 ½ Newcastle households.

90.1% reduction on each Reclaimer

93.1% reduction on each Stacker

91.8% reduction across all Yard Machines

LTO IMPROVEMENTS

12

2018 COMMUNITY ATTITUDES SURVEY

13