Porotherm - BBS Granite Concepts · 2019. 5. 1. · Trident House, 106 Barnsley Road Sandal,...

Preview:

Citation preview

Porotherm

Wakefield Office

Trident House, 106 Barnsley Road

Sandal, Wakefield

West Yorkshire WF1 5NX

01924 241100

sales@bbsbrickandstone.co.uk

Leicester Office

Kimcote House, Walton Road

Kimcote, Lutterworth

Leicestershire LE17 5RU

01455 559474

sales@bbsgraniteconcepts.com

www.bbsnaturalstone.com

Benefits of Porotherm

All blocks 10N/mm2 (only one block type on site) and can generally achieve 4 storey structural build

without the need for a frame.

Improved programme benefit offering earlier project completion and handover.

LABC and NHBC accepted for cavity and monolithic construction.

Programme certainty as far less affected by adverse weather conditions.

Show home arena potential to be opened sooner.

Porotherm offers improved air tightness performance and remains a breathable masonry solution.

Movement joints only required in walls over 20lm.

Long term maintenance costs reduced due to the materials stability.

Excellent acoustic performance - Robust detail for party walls E-WM-25 & E-WM-29.

Speed of construction in line with Timber frame without the fire risk.

1000s of litres of water less used in the construction of walls therefore drying time reduced considerably.

(Traditional Block work 5000 litres water / 1000m2. Porotherm 335 litres water / 1000m2).

Psi values offer improvements over concrete blocks with greatly reduced standard details in the

constructive details handbook.

Most walls provide Green Guide rating A+.

950kg/m3 density (i.e. comparable in weight to aircrete with the strength of concrete, offering a potential

saving in foundation costs).

A unique clay block walling system; precision engineered

for the same use as a normal building block but faster and

more cost effective.

* Porotherm is a precision engineered clay block walling system with reassuringly traditional values.

* It is revolutionising the UK construction industry through exceptionally fast, virtually dry

construction combined with high strength and thermal efficiency.

Porotherm

Wakefield Office

Trident House, 106 Barnsley Road

Sandal, Wakefield

West Yorkshire WF1 5NX

01924 241100

sales@bbsbrickandstone.co.uk

Leicester Office

Kimcote House, Walton Road

Kimcote, Lutterworth

Leicestershire LE17 5RU

01455 559474

sales@bbsgraniteconcepts.com

www.bbsnaturalstone.com

McCarthy & Stone - Porotherm Success - 51 Apartments and Communal Facilities

Masonry setting out commenced - 1No. Course concrete blocks

Porotherm commenced

First Floor PC planks - Phase 1

First Floor PC planks - Phase 2

Roof Trusses commenced

Roof complete

Sales Opened - (15.5 weeks early)

First CMLs

First CML 46 weeks - 7 months faster than programmed

23rd October 2014

3rd November 2014

24th November 2014

9th December 2014

17th December 2014

20th March 2015

12th May 2015

1st August 2015

Testimonials

* McCarthy & Stone have also gone onto to use it successfully on this future scheme:

http://specificationonline.co.uk/articles/2016-06-14/mccarthy-and-stone-specifies-porotherm-for-third-time-in-west-midlands

* BAM Construction have also taken advantage of the benefits that Porotherm offer. They offered a 30% programme

saving to their client on a project in Witney, Oxfordshire. The client (Richmond Villages who are part of BUPA) have

now instructed further schemes to be designed and built using Porotherm.

* Clearview Homes, a developer in North London, now use Porotherm solely for their developments -

https://www.youtube.com/watch?v=p4PF0Vm4JQ8

Recommended