Question 2941 for written reply
MINISTRY FOR HUMAN SETTLEMENTSREPUBLIC OF SOUTH AFRICA
NATIONAL ASSEMBLY
QUESTION FOR WRITTEN REPLY
QUESTION NO.: 2941
DATE OF PUBLICATION: 14 AUGUST 2015
Mr S M Gana (DA) to ask the Minister of Human Settlements:
(1) How many human settlement projects did the National Home Builders Registration Council
inspect in the (a) 2013-14 and (b) 2014-15 financial years;
(2) how many of the specified projects were stopped due to (a) the quality of material used and (b)
defective structures;
(3) whether her department carried the cost of demolishing and rebuilding defective structures; if so,
what amount did her department spent in respect of each province? NW3445E
REPLY:
(1) (a) The National Home Builders Registration Council inspected the following projects in the 2013-14 financial yearProvince Enrolled
Projects 2013/2014
Enrolled Houses 2013/2014
Total Number of Inspected Houses 2013/2014
Total Number of Inspections Conducted 2013/2014
Eastern Cape 43 15 745 11 634 32 014
Free State 5 1 885 3 473 9 503
Gauteng 27 15 565 12 477 29 203
KwaZulu-Natal 53 34 001 26 465 68 761
Limpopo 10 71 4 691 13 810
Mpumalanga 397 19 983 414 864
North West 67 20 984 16 771 43 956
1
Question 2941 for written reply
Province Enrolled Projects 2013/2014
Enrolled Houses 2013/2014
Total Number of Inspected Houses 2013/2014
Total Number of Inspections Conducted 2013/2014
Northern Cape 7 580 1 571 4 895
Western Cape 47 14 241 11 021 29 229
Total 656 123 055 88 517 232 235The NHBRC conducts at least four inspections per house at different times during the construction period of the house (foundation, walls, roof, etc.), hence the number of total number of inspections is higher than the number of houses inspected.
(b) The National Home Builders Registration Council inspected the following projects in the 2014-
15 financial year
Province Enrolled Projects 2014/2015
Enrolled Total Number of Inspected Houses 2014/2015
Total Number of Inspections Conducted 2014/2015
Houses 2014/2015
Eastern Cape 81 54 741 12 857 37 143
Free State 148 32 426 3 949 12 340
Gauteng 19 10 070 5 363 10 762
KwaZulu-Natal 39 31 920 28 605 82 059
Limpopo 487 10 878 3 899 8 664
Mpumalanga 131 9 183 7 110 23 542
North West 60 17 060 14 539 33 880
Northern Cape 39 2 529 2 402 7 603
Western Cape 35 4 813 10 672 29 834
Total 1 039 173 620 89 396 245 827
(2) The National Home Builders Registration Council stopped projects due to non-
compliance with technical standards as per Home Building Manual and SANS10400
2
Question 2941 for written reply
Province Number of Projects issued with Non-Compliances 2013/2014
Number of Home Units issued with Non-Compliance 2013/2014
Number of Projects issued with Non-Compliances 2014/2015
Number of Home Units issued with Non-Compliance 2014/2015
Eastern Cape 16 35 1 1
Free State 14 395 14 151
Gauteng 27 314 7 48
KwaZulu Natal 60 904 21 328
Limpopo 15 197 4 16
Mpumalanga 7 26 36 155
North West 15 145 3 15
Northern Cape 7 31 14 67
Western Cape 39 913 14 86
Total 200 2 960 114 867
The National Home Builders Registration Council stopped the projects due to Non-Compliance
in the 2013-14 financial year.
Names of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
26 Disaster Houses In Chibini 1 KwaZulu Natal
97 Ugu Disaster Rural Housing
Project 2 KwaZulu Natal
Alexandra Far East Bank 2
(Botlhabela) 9 Gauteng
Amatikwe Phase 1a & 5b 28 KwaZulu Natal
Applesbosch Rural-uMshwathi 23 KwaZulu Natal
Arniston IRDP 1 Western Cape
Ashbury 12 4 Free State
Ashton Ph2 Revised 10 Western Cape
BCM 988 Storm Damage 1 Eastern Cape
Bashaweni Rural 20 KwaZulu Natal3
Question 2941 for written replyNames of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
Bhekeshowe Rural 3 KwaZulu Natal
Bhongweni Area 5&6 14 KwaZulu Natal
Bhongweni Area 9&10 19 KwaZulu Natal
Bloemendal North Block 23 1 Eastern Cape
Bloemspruit IV & V (BMD) 2 Free State
Bloemspruit IV & V (Mob) 3 Free State
Bloemspruit IV & V (Polokoe) 3 Free State
Bloemspruit IV & V (Shale) 6 Free State
Bloemspruit IV & V (Ziqoqe) 7 Free State
Blue Downs Erf 1892 25 Western Cape
Bomvini 3 Eastern Cape
Bomvini Rural 1 Eastern Cape
Bongani 150 2 Northern Cape
Borderview Rural 6 KwaZulu Natal
Botrivier Infill Ph1 20 Western Cape
Botshabelo (Makoya Trading) 5 Free State
Caledon-Sidesaviwa Ph2 2 Western Cape
Chief Albert Luthuli Park Ext
6 3 Gauteng
Chris Hani Tulbagh 9 Western Cape
Commercia Ext. 34 1 Gauteng
Cwaka Rural Housing 5 KwaZulu Natal
De Aar 61 2 Northern Cape
De Doorns Ph1 11 Western Cape
De Doorns Project Ph2 49 Western Cape
Doornkop (Thulani) 16 Gauteng
Doringbaai IRDP 47 Western Cape
Driezik Ext 3 5 Gauteng
Drommendaris Ph1 27 Western Cape
Dukathole 1 Eastern Cape
4
Question 2941 for written replyNames of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
Dundonald 3 Mpumalanga
Dundonald-A Ext 1 3 Mpumalanga
Eden Park West & Ext. 1 5 Gauteng
Edubeni Mabhunu 1 KwaZulu Natal
Ekudubekeni Rural 1 KwaZulu Natal
Elandspoort (3320) And
Danville (1441/2) 2 Gauteng
Elias Motsoaledi 1 Gauteng
Embalenhle Ext10 1 Mpumalanga
Etafuleni 43 KwaZulu Natal
Ethembalethu 8 Gauteng
Etwatwa Ext 34 3 Gauteng
Etwatwa Ext. 37 6 Gauteng
Fleurhof 12 Gauteng
Franklin 23 KwaZulu Natal
Ga Phaahla Ward 1 10 Mpumalanga
Ga-Thoka 30 2 Limpopo
Galeshewe Infill Areas 370 3 Northern Cape
Gingindlovu Slums Clearance 1 KwaZulu Natal
Glencoe Sithembile Ext 2 20 KwaZulu Natal
Golden Triangle Phase 4 & 5 1 Gauteng
Graafwater 4 Western Cape
Grabouw Pine View Ph2 141 Western Cape
Groutville Priority 2 5 KwaZulu Natal
Groutville Priority 5 2 KwaZulu Natal
Hospital Hill (Lenasia South
Ext. 28) 8 Gauteng
Ikageng Ext 11 Ph 3 1 North West
Ikageng-Prom-261 2 North West
Ilitha Lomso PHP Housing
Project 12 Western Cape
5
Question 2941 for written replyNames of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
Imvumelwano Project 4 Western Cape
Inyoni Slums Clearance 8 KwaZulu Natal
Isiphosethu-PHP - Site C 1 Western Cape
Izingolweni Rural Flagship
Project 1 KwaZulu Natal
Kakamas 177 1 Northern Cape
Kanonkop-Atlantis 2 Western Cape
Khathide Rural 9 KwaZulu Natal
Khutsong X 1-3 3 North West
Klapmuts Ph2 4 Western Cape
Kleinvlei 1 Western Cape
Kruisrivier 13 North West
KwaCele Rural 3 KwaZulu Natal
KwaJali Rural 10 KwaZulu Natal
KwaMashu B6 10 KwaZulu Natal
KwaMbotho Rural 16 KwaZulu Natal
KwaMthimude Rural Housing
Project 9 KwaZulu Natal
KwaNyuswa Rural Project 1 KwaZulu Natal
KwaVukuzithathe Rural 11 KwaZulu Natal
KwaXimba Rural 10 KwaZulu Natal
KwaYanguye Rural 3 KwaZulu Natal
Laastehoop 50 44 Limpopo
Lawley Ext. 3 & 4 49 Gauteng
Limehill Rural 8 KwaZulu Natal
Loeriesfontein 307 12 Northern Cape
Lomanyaneng Village 13 North West
Lotana Project 1 Eastern Cape
Lotusville 1 Eastern Cape
Louisiana Rural 31 KwaZulu Natal
Ludeke 1000 2 Eastern Cape
6
Question 2941 for written replyNames of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
Luxolo Housing Association 29 Western Cape
Machunwini Rural 1 KwaZulu Natal
Maclear 1 Eastern Cape
Mafikeng Emergency Houses 3 North West
Mafikeng PHP 4 North West
Mahokoni 50 3 Limpopo
Makgaile 14 22 Limpopo
Makhushaneng 20 2 Limpopo
Manthe Village 9 North West
Marobo/Sebjeng 29 26 Limpopo
Marobo/Sebjeng 4 4 Limpopo
Masikhanye PHP Project 14 Western Cape
Masiphumelele Ph2 PHP 5 Western Cape
Masizakhele-PHP-
Wallacedene 1 Western Cape
Masizakhele-PHP-
Wallacedene Additional 2 Western Cape
Masodi 15 3 Limpopo
Masomonce Rural 5 KwaZulu Natal
Matimatolo Rural 1 KwaZulu Natal
Matshelapata 20 1 Limpopo
Mayfield 1000 1 Eastern Cape
Mayflower Gate 4 Mpumalanga
Meriting Ext 4&5 5 North West
Mhlangandlovu Rural 2 KwaZulu Natal
Missionvale Garden Lots 1 Eastern Cape
Mlamula Rural-Ndwedwe 5 KwaZulu Natal
Mmatau 4 North West
Moilwa Groot Marico 15 North West
Moletsamongwe 9 North West
Monnakato Ext 4 37 North West
7
Question 2941 for written replyNames of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
Moses Kotane Housing Project 2 Western Cape
Motherwell NU 29 7 Eastern Cape
Mqedandaba Rural 13 KwaZulu Natal
Mulati 20 2 Limpopo
Mvundlwini Rural 24 KwaZulu Natal
Mzamomhle 5 Eastern Cape
N2 Gateway Delft Symphony
Precints 3&5 Stage 4 80 Western Cape
N2 Gateway Joe Slovo Phase3 11 Western Cape
Ncambele Village 3 Eastern Cape
Nibela Rural Housing 5 KwaZulu Natal
Nomponjwana Rural Housing
Project 1 KwaZulu Natal
Nomzabalazo - Wallacedene 7 Western Cape
Ntsako 10 1 Limpopo
Ntuzuma D 38 KwaZulu Natal
Ntuzuma H 35 KwaZulu Natal
Obed Mthombeni Nkosi 2 Gauteng
Obuka Rural 1 KwaZulu Natal
Orange Farm Ext 8 14 Gauteng
Osizweni E 197 KwaZulu Natal
Palm Ridge Ext 1-8 8 Gauteng
Pelican Park IRDP Phase1 55 Western Cape
Phillipi East Phase 5 Part2 9 Western Cape
Phillipstown 331 10 Northern Cape
Potsdam Khayelitsha Stage 2 5 Eastern Cape
Ramaphosa Housing 8 KwaZulu Natal
Ramatope 120 3 Limpopo
Ramogale 34 50 Limpopo
Ramphire 9 33 Limpopo
Rondevlei 7 Western Cape
8
Question 2941 for written replyNames of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
Sandton Phase 3 15 KwaZulu Natal
Saulspoort-450 11 North West
Scottsdene Housing Project
IRDP 4 Western Cape
Sebokeng Ext. 24 (Zone 19) 2 Gauteng
Serurutung 20 1 Limpopo
Sikhonyane Rural 32 KwaZulu Natal
Silvertown PHP 64 Western Cape
Siyanda 1 Eastern Cape
Siyaphumelela - Makhaza PHP 44 Western Cape
Siyifumene PHP Project 74 Western Cape
Sophumelela - Silvertown 43 Western Cape
Soshanguve Ext 8, 9 & 10 10 Gauteng
Soshanguve SS Ext 5 23 Gauteng
Sponya Rural 28 KwaZulu Natal
Stretford Ext. 4 1 Gauteng
Stretford Ext. 6 5 Gauteng
Stretford Ext.6 2 Gauteng
Swayimane Rural 5 KwaZulu Natal
Thaba Nchu (Jore) 172 Free State
Thaba Nchu (People's First) 86 Free State
Thaba Nchu (Rehahuwe) 17 Free State
Thaba Nchu 250 (Your Trade) 70 Free State
Thorntree View 98 Gauteng
Thulamahashe C 2 Mpumalanga
Uitval Rural 2 KwaZulu Natal
Umhlathuze Phase 7 1 KwaZulu Natal
Umlazi Infill Part 5 Phase 1 6 KwaZulu Natal
Umnini Rural Zone 2 3 KwaZulu Natal
Van Zylsrus 326 1 Northern Cape
Viljoenskroon Northleigh 13 Free State
9
Question 2941 for written replyNames of Projects issued with Non-Compliances 2013/2014
Number of Home Units in the Project issued with Non-Compliances 2013/2014
Province
Project
Vlakfontein West Lehae
Proper & Ext 1 12 Gauteng
Volkrust 3 Mpumalanga
Vredendal Ph3 26 Western Cape
Vryburg Ext 25 16 North West
Vryheid Ext 16 2 KwaZulu Natal
Vulamehlo Wards 8,9 & 10 5 KwaZulu Natal
Vulindlela Rural-Umsunduzi
Municipality 12 KwaZulu Natal
Watergang Ph2 6 Western Cape
Weltevreden-Klapmuts A-2 58 Western Cape
Wesselsbron (Alita) 4 Free State
Wesselsbron 200 (Alita) 3 Free State
Westonaria South (Borwa) 8 Gauteng
Westrich Housing Rectification
Project 73 KwaZulu Natal
Ximba Rural 2 KwaZulu Natal
Zidweni Rural Housing Project 35 KwaZulu Natal
Zwelethemba Phase 2 2 Western Cape
Total 2960
A total of 2,960 homes were stopped for failure to comply with technical norms and standards for
2013/2014 year
The National Home Builders Registration Council stopped the following projects due to Non-
Compliance in the 2014-15 financial year.
Names of Projects issued
with
Non-Compliances
2014/2015
Number of Home Units in
the Project issued with
Non-Compliances
2014/2015
Province
26 Disaster Houses In Chibini 3 KwaZulu Natal10
Question 2941 for written replyNames of Projects issued
with
Non-Compliances
2014/2015
Number of Home Units in
the Project issued with
Non-Compliances
2014/2015
Province
Armoed 30 2 Limpopo
Avontuur 4 Mpumalanga
Bethulie 110 5 Free State
Boelang Trust 1 Mpumalanga
Bongani 150 1 Northern Cape
Botrivier Infill Ph2 1 Western Cape
Calcutta 9 Mpumalanga
Caledon-Sidesaviwa Ph2 24 Western Cape
Cinci Rural Housing 5 KwaZulu Natal
Cork 2 Mpumalanga
Daggakraal 3 Mpumalanga
De Doorns Project Ph2 2 Western Cape
DeBeershoogte Bufferzone 220 5 Northern Cape
Diepdale 2 Mpumalanga
Dundonald-A Ext 1 1 Mpumalanga
Eden Park West & Ext. 1 4 Gauteng
Elandspoort (3320) And
Danville (1441/2) 1 Gauteng
Embalenhle Ext 18 10 Mpumalanga
Embalenhle Ext 26 15 Mpumalanga
Embalenhle Ext19 1 Mpumalanga
Emjindini X 15 1 Mpumalanga
Emzinoni Ext 5 5 Mpumalanga
Emzinoni Ext7 2 Mpumalanga
Enkanini 2 Mpumalanga
Ermelo 1 Mpumalanga
Etafuleni 174 KwaZulu Natal
Eziphunzini 2 Mpumalanga
Franklin 21 KwaZulu Natal11
Question 2941 for written replyNames of Projects issued
with
Non-Compliances
2014/2015
Number of Home Units in
the Project issued with
Non-Compliances
2014/2015
Province
Galeshewe Infill Areas 370 9 Northern Cape
Goromane 1 Mpumalanga
Grabouw Pine View Ph2 4 Western Cape
Groot Marico HP-117 5 North West
Gugulethu Housing Project
Paddock 8 KwaZulu Natal
Hobhouse 60 3 Free State
Ikhutseng/Warrenvale 1000 7 Northern Cape
Imvumelwano Project 1 Western Cape
Jim Brown 3 Mpumalanga
Kanana Park Ext 3, 4 & 5 2 Gauteng
Kestel 100 9 Free State
Keurtjieskloo 50 3 Northern Cape
Khara Hais 250 BNG 1 Northern Cape
Khayelitsha UnBlocking
Project 1 Western Cape
Khula Village Housing Project 3 KwaZulu Natal
Klipspruit Ext 6 5 Gauteng
Koppies Forensics 2 Free State
Kroomkloof 45 1 Limpopo
Kroonstad 350 2 Free State
KwaMashabane Rural 1 KwaZulu Natal
KwaMashu B6 6 KwaZulu Natal
Kwaggafontein A 7 Mpumalanga
Lantana, Paarl 2 Western Cape
Lerato Park CRU Erf 39208
Block 6 3 Northern Cape
Lerato Park CRU Erf 39208
Block1 1 Northern Cape
Lerato Park CRU Erf 39208 11 Northern Cape12
Question 2941 for written replyNames of Projects issued
with
Non-Compliances
2014/2015
Number of Home Units in
the Project issued with
Non-Compliances
2014/2015
Province
Block7
Leroro 5 Mpumalanga
Lindelani/Transit Camp 3 Northern Cape
Lomanyaneng Village 1 North West
Machikiri 40 11 Limpopo
Madras 7 Mpumalanga
Mandiyane 9 Mpumalanga
Marite Trust 2 Mpumalanga
Marydale 55 BNG Housing 11 Northern Cape
Mashonamini 9 Mpumalanga
Matholesville 17 Gauteng
Matsamo 2 Mpumalanga
Mayflower Gate 1 Mpumalanga
Millinim Park 30 2 Limpopo
Mkhuhlu 7 Mpumalanga
Mqedandaba Rural 2 KwaZulu Natal
Mzamomhle 1 Eastern Cape
N2 Gateway Joe Slovo Phase3 5 Western Cape
Newlington 2 Mpumalanga
Nibela Rural Housing 5 KwaZulu Natal
Nomzabalazo - Wallacedene 24 Western Cape
Oakley 5 Mpumalanga
Obed Mthombeni Nkosi 14 Gauteng
Ocilwane Rural Housing
Project 1 KwaZulu Natal
Orange Farm Ext 9 5 Gauteng
Oshoek 2 Mpumalanga
Osizweni E 1 KwaZulu Natal
Qaweni / Bossiesgif 1 Western Cape
R293 Rehabilitation Of Two 31 KwaZulu Natal13
Question 2941 for written replyNames of Projects issued
with
Non-Compliances
2014/2015
Number of Home Units in
the Project issued with
Non-Compliances
2014/2015
Province
Room Houses In KwaMashu
Rocky Park 1 KwaZulu Natal
Rolle 4 Mpumalanga
Rooidakke Ph3 13 Western Cape
Rouxville 100 (Retention) 8 Free State
Sakhuxolo - Wallacedene 3 Western Cape
Sasolburg 200 1 Free State
Sasolburg 400 (B370) 2 Free State
Sesheng 490 9 Northern Cape
Sibongile Buffer Strip Housing
Project 18 KwaZulu Natal
Smithfield 10 (Retention) 2 Free State
Smithfield 90 13 Free State
Standerton Ext 8 14 Mpumalanga
Tekamahala 3 Mpumalanga
Thaba Nchu (People's First) 1 Free State
Thaba Nchu 250 (Your Trade) 2 Free State
Thekwane North 3 Mpumalanga
Thembisile Hani 1 Mpumalanga
Tloung Magogoe 9 North West
Trenance Park 1 KwaZulu Natal
Trenance Park. 21 KwaZulu Natal
Tsakane 7 Mpumalanga
Tweeling 300 67 Free State
Umlazi Infill Part 5 Phase 1 1 KwaZulu Natal
Uyaya Rural Housing Project 1 KwaZulu Natal
Vanwyksvlei 130 (Mud
Houses) 1 Northern Cape
Victoria West 270 2 Northern Cape
Viljoenskroon Northleigh 34 Free State14
Question 2941 for written replyNames of Projects issued
with
Non-Compliances
2014/2015
Number of Home Units in
the Project issued with
Non-Compliances
2014/2015
Province
Project
Vulindlela Rural-Umsunduzi
Municipality 3 KwaZulu Natal
Weltevreden-Klapmuts A+B-3 2 Western Cape
Westrich Housing Rectification
Project 21 KwaZulu Natal
Zwelethemba Phase 2 3 Western Cape
867
A total of 867 homes were stopped for failure to comply with technical norms and standards for 2014-
2015 financial year.
(3) The department does not carry the cost of demolition and reconstruction of defective structures.
As these are enrolled projects/home units, and non-compliance is identified by the NHBRC
Inspector during construction of the house, the Contractor/Builder is then responsible for such at
their own cost.