PLANNING COMMITTEE

12 OCTOBER 2017

8/15/0208/FUL

Avon Works Bridge Street

Change of use of the ground floor of former

Mostyn's workshop from B1/B2 use to a mixed

use comprising A1 shop and retail warehouse), A3

(cafe for sale of food and drink) and ancillary B1

(office) and B8 (storage) facilities and associated

alterations. Retrospective application

Existing

Proposed

CAFE

Brewery

8/17/1748/FULAvon Beach, Mudeford, Christchurch

To raise the middle section of Avon Beach Promenadeby 900mm over approx. 250m to improve flood andcoastal erosion risk protection; by joining the newretaining structure into existing raised defence’s ateither end of the promenade. Widen promenade by1.5m.New Surfacing and two bench seats.

Site Location Plan

Block Plan

A

A

B

B

Looking west towards site

of works compound

Existing Promenade and Beach Levels

Promenade Realignment and Cross Sections

Level change at Avon Beach shop

Trees overhanging

beach huts

Project publicity

EXISTING ACCESS ROUTES THROUGH SLOPE

BEACH HUTS

FROM

FOOTPATH

ABOVE

Level change

at eastern

end

Looking westLooking east