PIN 950112 I-81 Pedestrian Bridge, Planning Study · 2013. 10. 10. · Summary of Spiedie Fest...

Preview:

Citation preview

PIN 950112 I-81 PedestrianBridge, Planning Study

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

Introductions

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

Purpose of the Meeting

• Discuss Need for a Study

• Provide Overview Needs, Objectives, andOutcomes of the Study

• Review Study Analyses & Information

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

• Review Study Analyses & Information

• Receive Public Input

• Distribute Community Survey

Why a Study?

• Bridge Condition

• Low Clearance OverI-81

• Americans with

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

• Americans withDisabilities ActRequirements

• Advantages of a Study

Study Objectives

Primary Objective:

Identify the pedestrian needs of the community in the vicinity ofthe existing I-81 pedestrian bridge and to develop alternatives

that will meet those needs in a practical way to be addressed as afuture capital project

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

future capital project

Secondary Objective:

Document bicycle needs in the project area and identify solutionsto address those needs to the extent that they do not conflict withpedestrian needs of primary objective and can be addressed in a

practical way by a future capital project.

Study Analyses & Information

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

Pedestrian Counts

Summary of Pedestrian CountsMay 16- 29 & July 3- 22, 2013

Total Pedestrians 1350

Average Daily Pedestrians 40

Lowest Use Day (Friday, 7/19) 17

Highest Use Day

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

Highest Use Day(Memorial Day, Monday, 5/27)

75

Summary of Spiedie Fest WeekendPedestrian CountsAugust 2- 4, 2013

Total Pedestrians 3549

Average Daily Pedestrians 887

Engineering Analysis

• Feasibility

• Accident Screening

• Environmental Resources

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

• Cost

Inventory of Pedestrian GeneratingEvents and Locations

• Spiedie Fest

• Otsiningo Park &Farmers Market

• Employers

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

• Employers

• Sunrise Terrace

• BCC

• Others?

Public Outreach & CommunityInput

• Tonight’s Meeting

• Local Officials Meetings

• Community Survey

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

• Future Outreach

https://www.Surveymonkey.com/s/I81PedestrianBridge

Conceptual Alternatives

• Null/Removal Alternative

• Rehabilitation of Pedestrian Bridge

• Retrofit of Front St./US Route 11 Bridge overI-81 with Pedestrian Accommodations

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

I-81 with Pedestrian Accommodations

• Replacement on Existing or New Alignment

• Pedestrian Underpass

• Others?

Next Steps

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

Contact Information

Jillian Newby, Project Manager

NYSDOT- Region 9

44 Hawley St.

Binghamton, NY 13901

Region 9 New York State Department of TransportationRegion 9 New York State Department of Transportation

Binghamton, NY 13901

607-721-8576

81PedestrianBridge@dot.ny.gov

www.dot.ny.gov/i81pedestrianbridge

https://www.Surveymonkey.com/s/I81PedestrianBridge

Recommended