Phase 2a Route Overview for House of Commons Select CommitteeProfessor Andrew McNaughton

19 March 2018

P1 (1) HOC/10001/0002

High Speed Rail Network

2P1 (2) HOC/10001/0003

High Speed Rail is 53 Years Old

3P1 (3) HOC/10001/0004

International Technical Standards

4P1 (4) HOC/10001/0005

IndicativeRail Corridor

5P1 (5) HOC/10001/0006

HS1 Two Track Railway

6P1 (6) HOC/10001/0007

200m long trains which can be coupled to run in pairs 400m long

7P1 (7) HOC/10001/0008

HS2 Design Principles

8

1. Integrated noise protection and visual screening2. Further screen planting to supplement earthworks and fit with local landscape3. An earthworks solution removes the need for a fence type noise barrier (cutting costs + maintenance burden)4. Land returned to agriculture up to the railway (opportunity to improve agricultural land)5. This earthworks solution minimises the width of the rail corridor6. Protection of environmental features (e.g. ecology, heritage, landscape)7. Boundary fence visually concealed behind the earthworks8. The majority of the original land take is handed back for productive use

P1 (8) HOC/10001/0009

Phase 2a Route Overview

9P1 (9) HOC/10001/0010

1. Fradley to Kings Bromley

10P1 (10) HOC/10001/0011

2. Kings Bromley to Blithbury

Newlands Lane Auto Transformer Feeder Station

11P1 (11) HOC/10001/0012

Newlands Lane Auto Transformer Feeder Station

View from North looking South

12P1 (12) HOC/10001/0013

3. Colton to Colwich

Newlands Lane Auto Transformer Feeder Station

13P1 (13) HOC/10001/0014

4. Moreton to Ingestre

Great Haywood viaduct

14P1 (14) HOC/10001/0015

5. Staffordshire Show Ground to Marston

15P1 (15) HOC/10001/0016

6. Marston to Stone

Stone Infrastructure Maintenance Base - Rail

16P1 (16) HOC/10001/0017

7. Stone Infrastructure Maintenance Base to Swynnerton

Stone Infrastructure Maintenance Base - Rail

17P1 (17) HOC/10001/0018

Stone Infrastructure Maintenance Base - Rail

18P1 (18) HOC/10001/0019

8. Swynnertonto Stableford

19P1 (19) HOC/10001/0020

9. Whitmore Heath Tunnel to MadeleyTunnel

20P1 (20) HOC/10001/0021

High Speed Porous Tunnel Portal

21P1 (21) HOC/10001/0022

9. Whitmore Heath Tunnel to MadeleyTunnel

22P1 (22) HOC/10001/0023

10. MadeleyTunnel to Blakenhall

23P1 (23) HOC/10001/0024

11. Crewe Approaches

24P1 (24) HOC/10001/0025

Crewe Existing Layout

25P1 (25) HOC/10001/0026

Crewe Proposed Layout HS2 Trains Passing Crewe Highlighted

26P1 (26) HOC/10001/0027

Crewe Proposed Layout HS2 to WCML Highlighted

27P1 (27) HOC/10001/0028

28P1 (28) HOC/10001/0029

High Speed Rail Network

29P1 (29) HOC/10001/0030

Recommended