Pearl Hospital Project

Preview:

DESCRIPTION

This file is where you can see all the details about our hospital project.

Citation preview

Pearl Hospital Trust

Awaiting eyes foundation

AEF (Awaiting Eyes Foundation) is a charity founded by Estaq Malik in response to the earthquake which devastated the Bagh region in Pakistan in 2005. The foundation seeks to provide relief to victims. Recently we offered aid to those in Mahildara and Bani Minhasan, after the catastrophic floods in 2010.

 

Our next project is the building of the Iqbal Begum Complex; containing a school, medical facilities, orphanage, religious buildings... We are aiming to start construction in 2012, so every penny counts if we are to achieve this goal.

Pearl Hospital Trust

The project is the building of a hospital to serve the Sialkot population. The hospital will have 115 beds and employ more than 800 members of staff to provide 24-hour accident and emergency care.

The project started in January 2011. It is a compact design created to optimize land utilization in Pakistan. It is suitable for sustainability; it is trying to respect the environment as much as possible.

How you can help AEF

We thank you for your cooperation and assistance that will contribute to improve the situation of the population.

There are many ways you can help us. We of course accept monetary and online donations but the foundation is also in dire need of equipment, materials and resources (e.g. computers, printers, ambulance vehicles, cement and other building material).

This will help us to work more efficiently and give us the opportunity to hire new volunteers.

public relations Team public relations Team

Anna faineantArtur Binkowski clemence damionDavid PercebeiroEsteban PenalverGabriela UlloaGiacomo TubianaGwladysk RajaonaHara Lee Htet Htet SoeIacomo TubianaJulia MehlfieldKatarzyna KoniarekKatie VandenHeuvenkhadija mohamedKrzysztof Csyzewski

Liz SassoLoretta ThomasMara SimonettiMarco CampagneMaryam Khan Muhammad Umer ShoaibNina Eder-Haslehnerpascale tranPaul LambertPerrine VacherRose marison blardonySara TripodiSofija donevskaSuze FrickerThuy Van Le NguyenValentina PernecheleXenia Wertinski

Public Relations TeamOffice Manager:Zunaira Sabih

Architects Interior designers Engineers Public relations Team

Alan Lau Diogo de LimaGabriele ZorinoGerard WalshMaria SolovievaNarges MousaviOlga PolyanskayaRiccardo Radaelli

Adam cookJoan Ma Roig OrtizRossella Scalia

Karoliina LaaksonenKohie MatsuyaMichael McclintockRahella Titan

Iva ZugicJuan Garcia Kenneth OkaforLilit MnatsakanyanKatia CarbyMiguel CaceresPilar sierra

István HorváthMauro Ventura

Manager:Zunaira Sabih

anna faineantclemence damionGwladysk Rajaonakhadija mohamedMuhammad Umer Shoaibpascale tranrose marison blardonySofija donevska

Architectural teamProject coordinators

Narges Mousavi Maria Solovieva

Tomas Baar

Buildings:HospitalMosque

Staff accommodationGuest accommodation

Doctors’ HouseRestaurant and Coffee shop

Service BuildingsParking Area

Educational department

Landscape

• Land Requirement for the whole complex: 70,000 m2

Hospital

• 115 Bed Hospital

• Central Courtyard design

• Including:• Main Entrance, Emergency (A & E), Laboratory, Physiotherapy, Radiology,

Clinic, Administration office, Birth Unit, Gynaecology Ward, Children Ward, Urology Ward, E.N.T Ward, Orthopaedic Ward, Surgery Ward, ICU, CCU, Conference Hall, CSR, Kitchen, Laundry, Mortuary and two more Wards for Further Extension.

• Central staircase and two main lifts • Two lifts for Emergency cases• One service lift• Four fire exit staircases

Main entrance

• Reception, Security, Waiting area, Coffee shop, Flower shop, Pharmacy, Central Staircase, Lifts and Ramp, Toilets.

Emergency (A&E)

• Reception, Security, Waiting area, General consultant room, CPR room, Plaster room, Xray room, Emergency Operation Room, Recovery, Short Admission room, Nurse Station, Staff room, Toilets.

Laboratory

• Reception, Waiting area, Consultant room, Blood Sampling room, Sample collection, Laboratories, Blood bank, Staff Entrance, Staff room, Toilets.

Physiotherapy• Reception, Waiting area, Consultant room,

Hydro therapy, Heat therapy, Ergo therapy, Dressing room, Staff Entrance, Staff room, Toilets.

Radiology• Reception, Waiting area, Consultant room,

Ultra sound, Xray, MRI, Staff Entrance, Staff room, Toilets.

Clinic• Reception, Waiting area, Gynaecologist,

Ophthalmologist, Urologist, Cardiologist, Psychologist, Surgeon, General Medicine specialist, E.N.T Specialist, Audiology, Optometry, Vaccination room, Staff room, Toilets.

Administration office• Waiting area, Hospital president, Hospital

manager, Secretary, Chief Administrative, Medical archive, Administrative archive, accountancy room, Social worker, Insurance office, Educational office...

All wards

• Gynaecology, Children, Urology, E.N.T, Orthopaedic and Surgery Ward

• Reception, Waiting area, Consultant room, Clinical supervisor room, Nurse station

• Single patient rooms, quarantine room, Common room, Clean stuff storage, Dirty stuff storage, Sheet storage, Staff room, Toilets.

Birth unit

• Reception, Waiting area, Consultant room, Delivery room, Labour room, Nursery,

• Staff room, Toilets.

ICU and CCU

• Reception, Waiting area, Visitor’s corridor, Consultant room, Clinical supervisor room, Nurse station, patient area, quarantine room, Clean stuff storage, Dirty stuff storage, Sheet storage, Staff room, Toilets.

Conference hall

• For 350 Persons• Waiting area, Stage and secondary areas, audience

seating area.

CSR, Kitchen and Laundry

Educational department

Table: number of beds

Floors Wards Number of Beds

Ground Floor

A & E 16

Birth Unit 7

Total 23

First Floor

Children Ward 13

Gynaecology Ward 13

Urology 12

ICU 10

Total 48

Floors Wards Number of Beds

Second Floor

Surgery Ward 13

E.N.T Ward 13

Orthopaedic Ward 12

CCU 10

Total 48

Third Floor

Surgery Ward (Theatres) 6

New Ward (Further Extension) 13

New Ward (Further Extension) 12

Total 21

Total 140

Table: area m2

Spaces Area (m2)

Basement

Laundry 348

2413

Kitchen 540

Storages 388

Dining Area 120

Circulation* 1017

Ground Floor

Entrance 725

6780

A & E 932

Administration office 558

Clinic 1000

Radiology 308

Physiotherapy 261

Laboratory 357

Birth Unit 677

Circulation* 1962

First Floor

Children Ward 886

5425

Gynaecology Ward 837

Urology 830

ICU 452

Administration office 409

Circulation* 2011

Second Floor

Surgery Ward 886

5425

E.N.T Ward 837

Orthopaedic Ward 830

CCU 452

Educational Area 409

Circulation* 2011

Third Floor

Surgery Ward (Theatres) 791

5425

CSR 405

Educational Area 309

Conference Hall 472

New Ward (Further

Extension)837

New Ward (Further

Extension)772

Circulation* 1839

Area of Plot 7815

Total Area (All Floors) 25468

Required Land for Building 7892

*- This area included the staircases, lifts and corridors.

Architectural design

Architectural design

Architectural design

Guest and Staff accommodation

Floors Area (m2)

Ground Floor 947

First Floor 947

Second Floor 947

Area of Plot 947

Total Area (All

Floors)2841

Architectural design

Architectural design

Mosque

Spaces Area (m2)

Ground Floor 816

First Floor 267

Area of Plot 816

Total Area (All

Floors)

1083

Required Land

for Building

1090

Architectural design

Architectural design

Doctors’ House

Spaces Area (m2 )

Ground Floor 630

Area of Plot 630

Total Area (All

Floors)630

Required Land for

Building1209

Architectural design

Architectural design

Restaurant and coffee shop

Spaces Area (m2)

Ground Floor 682

First Floor 362

Area of Plot 682

Total Area (All

Floors)

1044

Required Land

for Building

1250

Restaurant and coffee shop

Architectural design

Architectural design

Service buildingsSpaces Area (m2)

Installation 200-300

Garbage area 30

Mortuary 50

Fire station 30

Workshops

Electricity workshop 40

140

Woodcraft workshop 40

plumber workshop 40

Medical workshops 20

Ambulance Station Parking 60

170

Car Repair 40

Car washing 40

Drivers rest area 30

Storages

Main storage 100

170Food Storage 50

Drug Storage 30

Total Area 900-1000

Parking area

Spaces Number of Parking Area (m2)

Visitors Parking 100 2400

Staff Parking 50 1152

Bike Parking 50 215