2017 Construction CPM Conference

Part 2: P6™ Part 2: P6™ Part 2: P6™ Part 2: P6™ CalculationsCalculationsCalculationsCalculations

1

by Ron Winter, FAACE, PSP

Schedule Analyzer Software

Ron Winter, FAACE, PSP

• Bachelor of Science in Engineering

• Construction Scheduler

• US Air Force Navigator

• Construction Scheduler

• Master of Science in Systems Management• Master of Science in Systems Management

• Programmer, Project Manager, Customer Support,

and Industrial Trainer

• Construction Scheduler

• Developer of

Schedule Analyzer Software

2

• Part 1: P6 Durations and Dates

• Part 2: P6 Calculations– CPM Calculations

– Longest Path Calculations

– Multiple Float Path Calculations

Today We Will Cover

– Multiple Float Path Calculations

– Schedule Calculation Options

– Putting This All Together

3

CPMCPMCPMCPMCalculationsCalculationsCalculationsCalculations

42017 Construction CPM Conference

P3 v P6 CPM Calculations

• P3 subtracts one

– Early Start + Duration – 1 = Early Finish

– 02APR14 08:00 + 1 hour - 1 = 02APR14 08:00

– Next activity Early Start = Early Finish + 1

• P6 does not subtract one but ‘overlaps’

– Early Start + Duration = Early Finish

– 02APR14 08:00 + 1 hour = 02APR14 09:00

– Next activity Early Start = Early Finish

5

• If P3 Uses a Whole Day for smallest time unit:– One-day activity start 02APR14 & end on 02APR14

– Next activity would start 03APR14

• If P6 Used a Whole Day for smallest time unit:– One-day activity start 02APR14 & end on 03APR14

– Next activity would start 03APR14

• Hard to see because P6 uses minute as unit of

P3 v P6 CPM Calculations

• Hard to see because P6 uses minute as unit of measure– One-day start 02APR14 08:00 & end on 02APR14

16:00

– There is no 16:00 hour in our example calendar

– 02APR14 16:00 = 03APR14 08:00

• Therefore, time must always be shown using P6

6

How P6 Calculates the CPM

• Example diagramed calculation

This is the CPM

7

• Resultant re-calculation

This is the CPM

Diagram!

This is the Start &

Finish diagram!

Summary

• CPM calculations begin with the Data Date

• Every activity is calculated using

– Remaining Duration

– Existing logic

– Activities with actuals are still calculated

• Start and Finish columns show

– Early dates if not started

– Actual dates if started

• Barchart displays Start and Finish dates

• Logic is drawn between displayed bars

8

CPMCPMCPMCPMCalculationCalculationCalculationCalculationOptionsOptionsOptionsOptions

92017 Construction CPM Conference

Schedule Options

To bediscussed:

10

Multiple Float Paths

• Calculate multiple float paths using

– Total Float – Relationship Float

– Free Float – Longest Path

• Display multiple float paths ending with

– ‘Dangerous’ to leave blank

– Designate Substantial Completion activity

– Can use to investigate milestone completion

• Specify the number of paths to calculate

– Blank to calculate all paths

• Group activities in the Activity Table by Float

Path and sort by Float Path Order11

General Schedule Options

• Ignore relationships to/from other projects– Backups affected by setting (External Constraints)

• Use Expected Finish Dates– Option to define in schedule but not use

• Automatically level resources• Automatically level resources– Setting not exported with backups

– Optional report not automatically shown

• When scheduling progressed activities use– Retained Logic

– Progress Override

– Actual Dates12

Out-of-Sequence Progress Scheduling Options

• Retained Logic

• Progress Override

• Actual Dates

13

P6 Actual Dates

• If successor (Activity 2) is incomplete

– Calculation acts like Retained Logic

• If successor is complete• If successor is complete

– Calculation acts like Progress Override

– Can create negative Total Float without constraints

14

Why Use Actual Dates?

• Actual Dates with actuals in the future

• Retained Logic with actuals in the future

• Progress Override with actuals in the future

15

RD=0

Calculate Start-to-Start Lag

• from Actual Start– Once started, continue

• from Early Start– Count earned lag

– Begin remaining lag

from Early Start 16

General Schedule Options

• Calculate float based on the finish date of

– Each project

– Opened Projects

• Used when multiple schedules are open

• Float based on latest finish• Float based on latest finish

– Each schedule open

– Latest schedule

• New option gives single critical path

– Longest Path still only by project

• Setting not exported in backups

17

• Calendar for scheduling relationship lag

– Successor activity calendar – default pre-P6v4

– Predecessor activity calendar – new default

– 24-hour calendar

– Project Default calendar – like MS Project

• Used even for relationships with 0 lag

General Schedule Options

• Used even for relationships with 0 lag

• Finish-to-Finish always uses successor’s

calendar

– Causes discontinuous longest paths

• Always uses predecessor’s calendar for

hour/day duration conversions18

Admin TabAdmin TabAdmin TabAdmin TabCalculationsCalculationsCalculationsCalculations

192017 Construction CPM Conference

Set Baseline Source

• Make Baseline Bars show actual, not Planned Dates.

• The Earned Value tab should be set to either:either:

– At Completion values with current dates

– Budget Values with current dates

• (some versions use ‘Planned Values with current

dates’)

20

Set Baseline SourceAdmen Menu /

Admin

Preferences /

Earned Value Tab

21

Suggested setting

Set Baseline Source

• A Baseline is set using menu Project / Assign Baseline

– Not <Current Project> for Baseline schedule

name

• Set the Primary User Baseline name

– (Not assigned using a Layout created by

import)

22

ProjectProjectProjectProjectCalculationsCalculationsCalculationsCalculations

232017 Construction CPM Conference

Unlink Remaining Duration

• Project window / Calculations tab setting / Activities

– “Link Budget and At Completion for not

started activities”

• How RD works for unstarted activities

– Checked

• Remaining Duration always equals Original

Duration

– Un-Checked

• Remaining Duration can be set different from

Original Duration 24

• Project window / Calculations tab

• Uncheck

Unlink Remaining Duration

25

Longest PathLongest PathLongest PathLongest PathCalculationsCalculationsCalculationsCalculations

262017 Construction CPM Conference

Longest Path Calculations

• Longest continuous string of activities

– Determines shortest possible time to complete project

• Calculate the forward (early) CPM dates

• Find activity with latest Early Finish

• Trace a path ‘backwards’ of controlling • Trace a path ‘backwards’ of controlling

relationships

– P3 designated driving during forward pass calculation

– P6 uses activity’s Free Float

• Ignores Total Float changes due to calendars

– More accurate than Total Float < 1

27

Longest Path Latest Early Finish

Sample CPM network

Longest Path Calculations

28

Lowest Total Float

Note: Controlling = Predecessor activity has Zero Free Float

• Does not ignore forward-pass early date constraints

– Start On

– Start On or After

– Finish On

– Finish On or After

• Constraints can make longest path discontinuous

Longest Path Calculations

29

• Constraints can make longest path discontinuous

Multiple Multiple Multiple Multiple Float PathFloat PathFloat PathFloat PathCalculationsCalculationsCalculationsCalculations

302017 Construction CPM Conference

Multiple Float Paths

• Identifies secondary critical paths

• Based upon calculating relationship float

– Calculate relationship early/late start/finish dates

– Calculates relationship Total Float and Free Float

– Dates viewable on Relationship Tab

31

Relationship Float

• Relationship dates computed on start-up & re-scheduling

• Early and Late dates allow for relationship float

• Relationship float may not be same as activity floatactivity float

• Exact measurement of controlling relationship

• Basis of Longest Path Software™– Schedule Analyzer Software (released December 2003)

• Basis of P6 Multiple Float Paths™– “‘Enhanced’ PDM – Concepts and Benefits”, Scott Herold,

Black & Veach (AACE Annual Convention 2004)

– Introduced in P6 in Version 5 in 2005

32

Relationship Float Example

Finish-to-start relationship with 0 lag

33

Relationship Lags Visualized

34

Relationships Computed

Q: Is Activity FF = Relationship Total Float?

Ans: No, lowest Relationship FF

35

Types of Multiple Float Paths

• Total Float– Find latest, lowest relationship Total Float

– Follow predecessor’s lowest relationship Total Float

– Tag activity with Float Path Number

– Stop when activity does not have a predecessor

– Go back and start again with next lowest relationship

Total Float

• Free Float– (Same instructions using relationship Free Float)

– Lowest Free Float equals ‘controlling relationship’

– Float Path 1 the same as Longest Path

36

Sample MFP Calculations

‘Standard’ CPM calculations showing activity Total and Free Float

37

Relationship Total Float and Free Float added

Sample MFP Calculations

38

Free Float Float-Path 1 Latest Early Finish Activity

Multiple Float Path 1 identified

Sample MFP Calculations

39

Total Float Float-Path 1

Same example entered into P6

MFP Using Total Float

40Relationship Float for Last Activity Predecessors

Total Float/Free Float Comparisons

Multiple Float Paths – Total Float setting

41

Multiple Float Paths – Free Float setting

MFP Using Total Float

Grouped by Float Path and sorted on Float Path Order

42

Grouped by Float Path and sorted on Float Path Order

MFP Using Free Float

43

Advanced Schedule Options

• Calculate MF Paths using

– Total Float – Relationship Float

– Free Float – Longest Path

• Display MF Paths ending with– ‘Dangerous’ to leave blank

– Designate Substantial Completion activity

– Can use to investigate milestone completion

• Specify the number of paths to calculate

– Blank to calculate all paths

• Group activities in the Activity Table by Float

Path and sort by Float Path Order44

Putting It Putting It Putting It Putting It AltogetherAltogetherAltogetherAltogether

452017 Construction CPM Conference

Putting This All Together

• P6 calculates the CPM like MS Project except

– Always begins from the Data Date

– Considers every activity using remaining duration and

logic

• Time should be shown when viewing dates

• CPM scheduling methods produce different results• CPM scheduling methods produce different results

– Retained Logic is the best method for estimating overall

schedule completion

– Progress Override allows for ‘automatic’ activity

sequence rescheduling

– Actual Dates best if actual dates in the future allowed

46

• Multi-schedule programs can calculate a single

critical path using Total Float

• Relationship calendars settings can cause

discontinuous longest paths

• Also check the Admin Tab and Project Window

Putting This All Together

• Longest Path is best option for showing

remaining work

• Lowest Total Float setting is best for showing

milestone impacts

47

• Multiple Critical Paths shows near-critical paths

– Uses concept of relationship float to analyze schedule

– Two major settings can produce wildly different

results

– Best to designate the path-ending activity

Putting This All Together

48