View
5
Download
0
Category
Preview:
Citation preview
RA
IL
WA
Y B
OU
ND
AR
Y
RA
IL
WA
Y B
OU
ND
AR
Y
A1
P1P2 P3 P4 P5 P6 P7
A2
℄ P
RO
VIS
IO
N F
OR
F
UT
UR
E T
RA
CK
℄ P
RO
VIS
IO
N F
OR
F
UT
UR
E T
RA
CK
A
A
B
B
C
C
D
D
PR
OP
OS
ED
R
OB
IN
L
IE
U O
F L
C N
O. 99
AT
K
M. 247/1-2 S
PL
C
LA
SS
RA
ILW
AY
B
OU
ND
AR
Y
C/L
O
F E
XIS
T T
RA
CK
RA
ILW
AY
B
OU
ND
AR
Y
℄ P
RO
VIS
IO
N F
OR
F
UT
UR
E T
RA
CK
℄ P
RO
VIS
IO
N F
OR
F
UT
UR
E T
RA
CK
℄℄ ℄
C/L
O
F E
XIS
T T
RA
CK
P3 P4
FRL.+436.082 m.
P2 P5
C/L
O
F E
XIS
T T
RA
CK
C/L
O
F E
XIS
T T
RA
CK
RDSO/B-10411/8/R
TP/DC-BR/HL-PC/2018-49
TP/DC-BR/HL-PC/2018-49
TP/DC-BR/HL-PC/2018-46
TP/DC-BR/HL-PC/2018-46
RIL.LVL+428.332 m.
℄P3 ℄
75MM WEARING COAT 2.5%2.5%CRASH BARRIER
P2℄
℄℄ ℄
C/L
O
F E
XIS
T T
RA
CK
P3 P4
FRL.+436.082 m.
A1 P1 P2 P5 P6 P7 P8 A2
RW - 1
RW - 2
C/L
O
F E
XIS
T T
RA
CK
C/L
O
F E
XIS
T T
RA
CK
RIL.LVL+428.332 m.
℄
℄
P
R
O
V
I
S
I
O
N
F
O
R
F
U
T
U
R
E
T
R
A
C
K
E
X
I
S
T
I
N
G
L
C
N
O
.
9
9
℄
℄
P
R
O
V
I
S
I
O
N
F
O
R
F
U
T
U
R
E
T
R
A
C
K
LC NO. 99 AT KM. 247/1-2 SPL CLASS
TVUS-1307787_12.05.14
LC GATELODGE
TP 247/2
TP 247/1 PROPOSED LHS AT KM. 247/1-2 SIZE (4X2.5)M
P1
℄
HALF PLAN AT TOP /HALF PLAN AT BOTTOM OF LHS
529.81
150
1000
PROP.ROAD Lvl.
533.91
1000
1:1
4570
EXG.G.Lvl. 532.62
3960
1290
12001000
500
1:3
4250
1000
C/L
O
F F
UT
UR
E T
RA
CK
C/L
O
F F
UT
UR
E T
RA
CK
C/L
O
F E
XIS
TIN
G T
RA
CK
SLO
PE
1:40
HA
LF ELEVA
TION
AN
D H
ALF SEC
TION
HALF PLAN AT TOP / HALF PLAN AT BOTTOM
LONGITUDINAL ELEVATION
SECTION B-B AT LONGITUDINAL ELEVATION
NANDED DIVISION
GENERAL ARRANGEMENT DRAWING
SOUTH CENTRAL RAILWAY
MANMAD - MUDKHED SECTION
REV.R0SCALE :- AS SHOWNDRG.NO.MRIDC / NED/ ROB / GAD / 2018 /SCR/ LC-99/01
JOB NO.
SECTION A-A
SECTION C-C
TRIAL PIT
TITLE
SECTION A1-A1
LEGEND -:
1. EXISTING WORK SHOWN IN BLACK
2. FUTURE TRACK SHOWN IN MAGENTA
3. PROPOSED ROB AND LHS SHOWN IN RED
4. RAILWAY BOUNDRY SHOWN IN
FOR RAILWAY DRAWING REFERENCE
1) RDSO / B-10411/8/R FOR 60M BOW STRING STEEL
GIRDER CLEAR SPAN
2) RDSO / B / 10152 / 3R
3) G.M.(W) BB / 10467
PWD DRAWING REFERENCE
1) PWD DWG.NO TP/DC-BR/HL-PC/2018-46 FOR 20M SPAN
2) PWD DWG.NO TP/DC-BR/HL-PC/2018-49-1/3.
SOUTH CENTRAL RAILWAY
AUTHORITY OF WORK - PINK BOOK ITEM NO.240 OF 2018-19
PLAN
N
NE
SE
NW
SW
S
E
W
MAHARASHTRA RAIL INFRASTRUCTURE DEVELOPMENT CORPORATION LTD.
DESIGNATION
SIGNATUREDESIGNATIONSIGNATURE
MRIDC
(ROSHAN MHAMUNKAR)
DRAWN BY
GOVERNMENT OF MAHARASHTRA
PWD DEPARTMENT
PROPOSED CONSTRUCTION OF 2-LANE ROB AND LIMITED
HEIGHT SUBWAY(5.00x3.00)M IN LIEU OF L.C. NO.99 AT KM
247/1-2 BETWEEN SELU-SATUNA STATIONS.
KEY PLAN
N
NE
SE
NW
SW
S
E
W
(SUNIL HAWALDAR)
DY. GENERAL MANAGER
CIVIL
CHECKED BY
(SANJU REDDY)
ASST. MANAGER CIVIL
AEE PWD
SUPERINTENDING
ENGINEER PWD
EXECUTIVE
ENGINEER PWD
EXECUTIVE DRAWING
SECTION D-D
GENERAL NOTES:
1. UNLESS OTHER WISE SPECIFIED, ALL MEASUREMENTS ARE SHOWN IN MM AND LEVELS ARE SHOWN IN
METRES.
2. THE FOUNDATION LEVELS SHOWN IN THE DRAWING ARE TO BE VERIFIED AT SITE BASED ON
CONFIRMATORY SUB SOIL INVESTIGATION PRIOR TO COMMENCEMENT OF WORK.
3. MAX. PRESSURE ON THE SOIL AT FOUNDATION LEVEL IS TO BE SPECIFIED IN CONCERNED DETAILED
DRAWINGS PERTAINING TO FOUNDATION.
4. THE BRIDGE SHALL BE DESIGNED TO IRC CLASS 'A' LOADING OR 70R LOADING FOR TWO LANE/SINGLE
LANE WHICHEVER GIVES WORST EFFECT FOR TWO LANE CARRIAGE WAY.
5. STAIR CASES ARE TO BE PROVIDED ON BOTH SIDES OF THE ROB OUTSIDE RAILWAY BOUNDARY
DIAGONALLY TO SUIT PEDESTRIAN TRAFFIC.
6. 4.00M WIDE STRIP M WITH POLYSULPHIDE PAINT PREFERABLY IN BLACK COLOUR SHALL BE PROVIDED IN
THE SOFFIT OF DECK AND FOOT PATH SLABS OVER RUNNING TRACK.
7. DURING EXECUTION OF COMMON PIER ON EITHER ENDS OF ROB AN OFFSET SHOULD BE PROVIDED IN THE
PIER CAPS TO SUIT THE DEPTH OF CONSTRUCTION OF ADJACENT SPANS OF STATE R&B DEPARTMENT.
8. GUARD RAILS SHALL BE PROVIDED ON TRACKS BELOW ROB IF NECESSARY.
9. NO CONSTRUCTION JOINTS SHALL BE NORMALLY ALLOWED IN CONCRETE WORKS UNLESS IT IS SPECIFIED
IN DETAILED DRAWINGS AS PER DESIGN CONSIDERATIONS.
10. THE DETAILS, TYPE AND DIMENSIONS OF FOUNDATIONS, SUB-STRUCTURE AND SUPER-STRUCTURE
ELEMENTS SHOWN IN DRAWING ARE ONLY INDICATIVE AND MAY VARY AS PER ACTUAL DESIGN AND
DETAILED DRAWINGS. HOWEVER OBLIGATORY CLEARANCES MENTIONED IN THE DRAWINGS SHALL NOT BE
REDUCED UNDER ANY CIRCUMSTANCES WITHOUT PRIOR APPROVAL OF CBE.
11. HIGH CONTAINMENT CRASH BARRIER OF 1.55 M HEIGHT OVER RAILWAY BOUNDARY AND APPROACHES
BEYOND RAILWAY BOUNDARY FOR A MINIMUM LENGTH OF 90.00 M SHALL BE PROVIDED AS PER IRC 5&6
GUIDELINES OVER ROB.
12. THE LAND BOUNDARIES INDICATED IN DRAWING MAY NOT AFFECT THE ACTUAL RAILWAY BOUNDARY
AND RECKONING ACTUAL RAILWAY LAND. THE CERTIFIED LAND PLAN IN HQ OR DIVISIONAL OFFICERS
ONLY IS THE FINAL AUTHORITY. THE LAND BOUNDARIES SHOWN IN THIS PLAN CAN NOT BE AN
AUTHORITY FOR THE PURPOSE.
SPECIFICATION AND DESIGN RELATED NOTES:
1. THE GRADE OF CONCRETE FOR VARIOUS RCC/MASS CEMENT CONCRETE WORKS SHALL BE IN ACCORDANCE
WITH IRS CONCRETE BRIDGE CODE 1997 AND NEW IS 456-2000 AND IRS CODES AND SPECIFICATIONS.
2. EXPANSION JOINTS SHALL BE STRIP SEAL JOINTS AS PER MORTH SPECIFICATIONS.
3. CONFINED POT/PTFE & ELASTOMERIC BEARINGS SHALL MANDATORY BE PROVIDED AS PER MORTH
STANDARDS AND SPECIFICATIONS.
4. PROTECTIVE COATINGS FOR REINFORCEMENT AGAINST CORROSION SHOULD BE PROVIDED AS PER CLAUSE
NO. 7.1.5 OF CORRECTION SLIP NO. 8 AT IRS CONCRETE BRIDGE CODE EDITION.
5. DRAINAGE SPOUTS SHALL BE PROVIDED 2.00 M AWAY FROM CENTRE LINE OF EXISTING/FUTURE TRACK
CONSIDERING THE TRACTION FUTURE TRACTION AND SAME HAS TO BE ENSURED IN THE DRAWINGS AND
BY THE ENGINEER-IN-CHARGE AT SITE.
6. DURING CONSTRUCTION A MINIMUM CLEARANCE OF 2360 MM TO BE MAINTAINED BETWEEN CENTRE LINE
OF EXISTING TRACK TO THE FACE OF TEMPORARY ARRANGEMENT STRUCTURES.
7. IT IS PERMITTED TO LAY MAXIMUM 65 MM THICK UNIFORM WEARING COAT OVER RAILWAY PORTION
ALONG WITH APPROACHES AS PER MORTH STANDARDS AND SPECIFICATIONS (LATEST) BY R&B
AUTHORITIES. VARIATION OF TRANSVERSE SLOPES SHALL BE MAINTAINED IN DECK/ SUPER STRUCTURE
ONLY. UNDER ANY CIRCUMSTANCES WEARING COST THICKNESS SHOULD NOT EXCEED 75 MM THICK
DURING THE EXECUTION AND MAINTENANCE PERIOD. THIS SHALL BE ENSURED BY R&B DEPARTMENT
UNDER RAILWAY SUPERVISION FROM TIME TO TIME.
SPECIFICATIONS:
1. ALL WORKS ARE TO BE CARRIED OUT AS PER THE FOLLOWING.
i. INDIAN RAILWAYS UNIFIED STANDARD SPECIFICATIONS FOR MATERIALS AND WORKS 2010.
ii. IRC SPECIFICATION AND CODE OF PRACTICE FOR ROAD BRIDGES FOR SECTION I, II AND III.
iii. LATEST EDITION OF IRC 5-2000(7
TH
EDITION) FOR SECTION I IRC 5-2000(4
TH
REVISION)
iv. THE LATEST GUIDE LINES GIVEN IN IRC SPECIAL PUBLICATION NO. 83-1989 HAVE TO BE FOLLOWED.
2. THE GRADE OF CONCRETE FOR VARIOUS RCC/MASS CONCRETE WORKS SHALL BE IN ACCORDANCE WITH
NEW IS 456-2000, IRS CONCRETE BRIDGE CODE 1997 AND IRC CODES AND SPECIFICATIONS.
3. FOOTINGS CONTROLLED CONCRETE RCC M-35 GRADE USING 20MM MAX SIZE GRADED HARD STONE
AGGREGATE OF APPROVED QUALITY.
4. RCC TRESTIES CONTROLLED CONCRETE RCC M-35 GRADE USING 20MM MAX SIZE GRADED HARD STONE
AGGREGATE OF APPROVED QUALITY.
5. BED BLOCK CONTROLLED CONCRETE RCC M-35 GRADE USING 20MM MAX SIZE GRADED HARD STONE
AGGREGATE OF APPROVED QUALITY.
6. BEARINGS: POT/PTFE & ELASTOMERIC BEARINGS SHOULD BE DESIGNED AND PROVIDED AS PER IRC
CODE-83 (PART-III) 2002.
7. COMPOSITE CONCRETE DECK SLAB CONCRETE USED SHOULD BE CONTROLLED TO ATTAIN A STRENGTH OF
NOT LESS THAN 400 KGS/CM2 ON 150MM SIZE CUBES AT 28 DAYS USING 20 MM MAX SIZE GRADED HARD
GRANITE STONE AGGREGATE OF APPROVED QUALITY.
8. WEARING COST RCC M 30 GRADE USING 20 MM MAX SIZE GRADED HARD STONE AGGREGATE OF APPROVED
QUALITY.
9. RAILING MS HAND RAILING WITH MS WELD MESH WELDED TO FLAT.
10. EXPANSION JOINTS ARE TO BE PROVIDED AS PER MORTH SPECIFICATIONS.
11. DRAINAGE SPOUTS WITH CI PIPES 100 MM DIA WITH GRATING AT 3000 MM CENTRES ARE TO BE
PROVIDED AVOIDING AT LEAST 2000 MMM OVER THE ONE WIRE.
12. DURING CONSTRUCTION A MINIMUM CLEARANCE OF 2360 MM TO BE MAINTAINED BETWEEN CENTRE LINE
OF EXISTING TRACK TO THE FACE OF TEMPORARY ARRANGEMENT STRUCTURE.
13. VARIATION OF TRANSVERSE SLOPE SHALL BE MAINTAINED IN DECK/SUPERSTRUCTURE ONLY. UNDER ANY
CIRCUMSTANCE WEARING COAT THICKNESS SHOULD NOT EXCEED 75 MM THICK DURING EXECUTION AND
MAINTENANCE PERIOD. THIS SHALL BE ENSURED BY ROAD AUTHORITY UNDER RAILWAY SUPERVISION
FROM TIME TO TIME.
IMPORTANT NOTES
1. A COMMON BENCHMARK SHALL BE ESTABLISHED BY RAILWAYS AND R&B ENGINEERS BEFORE STARTING
THE WORK.
2. IN TERMS OF PRINCIPAL SECRETARY TO STATE GOVERNMENT TR & B DEPARTMENT LR. NO. ………….. ON
COMMISSIONING OF ROB. LC SHALL BE CLOSED. MRIDC HAS TO ENSURE SIMULTANEOUS CLOSURE OF
LEVEL CROSSING (LC) ALONG WITH COMMISSIONING ROAD TRAFFIC ON ROB AS PER BOARD DIRECTIVES
LR. NO. 97/CE-I/BRO/158/POLICY DT. 27.11.1997, IN CASE EXISTING LEVEL CROSSING IS NOT CLOSED
AFTER OPENING OF ROB THE ENTIRE COST OF ROB WILL HAVE TO BE BORNE BY THE STATE GOVERNMENT
WHO HAVE SPONSORED THIS WORK. NANDED DIVISION HAS TO ENSURE BEFORE TAKING UP THE BRIDGE
FOR MAINTENANCE.
3. DY/CE/BRIDGE LINES OFFICE HAS TO SUBMIT COMPLETION DRAWINGS OF DETAILED DRAWINGS AND GAD
AND FINAL DESIGN IN ORIGINAL DULY SIGNED BY OFFICIALS TO OPEN LINE DULY GIVING 3 SETS OF
COPIES TO DIVISION AFTER IMMEDIATE COMPLETION OF THE WORK IN ACCORDANCE WITH PARA 911 OF
INDIAN RAILWAY WORKS MANUAL.
4. LOAD TEST HAS TO BE CARRIED OUT IMMEDIATELY AFTER COMPLETION OF THE SUPER-STRUCTURE
CONSIDERING THE PROVISIONS OF IRC SP 51-1999 GUIDE LINES FOR LOAD TESTING OF BRIDGES.
5. ALL SITE RECORDS AND RELEVANT DOCUMENTS OF THE WORK AFTER IMMEDIATE COMPLETION OF THE
ROB IN DUPLICATE SHALL BE HANDED OVER TO DIVISION FOR PROPER UPKEEP AND MAINTENANCE OF THE
ROB.
6. CRS PERMISSION SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF WORK CONSIDERING PARA 1302
(CLAUSE-2(G) OF INDIAN RAILWAY P.WAY MANUAL).
7. APPROACH LENGTH OF ROB SHOULD BE AS PER GUIDE LINES PROVIDED IN IRC AND BEAR MINIMUM AS PER
CODAL REQUIREMENT SHOULD ONLY BE CONSIDERED FOR COST SHARING AS PER RAILWAY BOARD'S
POLICY LR. NO. 2002/CE-I/BRO/POLICY DATED 08.02.2005
8. IN CASE TRANSFER OF RAILWAY LAND IF ANY INVOLVE CONSTRUCTION. ORGANIZATION HAS TO TAKE
INITIATIVE THE PROCESS CONSIDERING RLY BOARDS LR. NO. 97/CE-I/BRO/POLICY DT. 27.11.97.
9. NARROW ROAD OVER BRIDGE HAVING WIDTH OF DECK LESS THAN OF APPROACHES, TRAFFIC SAFETY
MEASURES ON APPROACHES TO NARROW ROAD OVER BRIDGE SHALL BE APPROVED BY CONCERNED ROAD
AUTHORITY AS PER MORTH LR. NO. RW/NH/33044/23/2007 I&R DETAILED 31.10.2008. DY. CE/BR. LINES
OFFICE AND CONCERNED RAILWAY DIVISION HAS TO ENSURE IT.
10. PARA 1816 TO 1818, 1033, 1617 & 1618 OF INDIAN RAILWAYS CODE FOR ENGINEERING DEPARTMENT
MUTATIS MUTANDIS WILL APPLY FOR ROB WORK AND DY. CE/BR. LINES OFFICE AND NANDED RAILWAY
DIVISION HAS TO ENSURE IT FOR TIME TO TIME.
11. HEIGHT GAUGES NEED TO BE PROVIDED AT STARTING OF APPROACHES OF ROB.
12. INITIALLY SERVICE ROAD OF 3.5 METER WILL BE PROVIDED ON EITHER SIDE WITH IN THE
EXISTING ROW. SUBSEQUENTLY AFTER THE ACQUISITION OF LAND, REHABILITATION &
RESETTLEMENT OF AFFECTED PEOPLE BY PWD, THE SERVICE ROAD WILL BE WIDENING TO 7.0
METRE ON EITHER SIDE OF ROB.
REFERENCE NOTES/DRAWINGS (ROB)
1. WEARING COAT WITH UNIFORM THICKNESS AND MISC ITEMS SUCH AS DRAINAGE
SPOUTS WITH GRATING ARRANGEMENTS ETC. SHALL BE SIMILAR TO MORTH
DRAWING NO. SD/205. LOCATION OF DRAINAGE SPOUTS SHALL BE INVARIABLY
SHOWN IN DETAILED DRAWING.
2. EXPANSION JOINTS, ELASTOMERIC BEARING & CONFINED POT/PTFE &
ELASTOMERIC BEARING SHALL BE PROCURED ONLY FROM PREQUALIFIED
MANUFACTURES OF MORTH. WARRANTY AND MAINTENANCE CONDITIONS ON
THESE ITEMS HAVE TO BE ENSURED AS PER MORTH GUIDE LINES/CIRCULARS
ISSUED FROM TIME TO TIME.
SECTION PLAN OF LHS
MODUS OPERANDI FOR RUB:
1. RCC BOX SEGMENTS AND BASE SLAB SEGMENTS SHALL BE CASTED AS PER APPROVED DRAWING NEAR
PROPOSED SITE. ALL RCC SURFACES COMING IN CONTACT WITH SOIL SHOULD BE PAINTED WITH
BITUMEN OR COAL TAR OF APPROVED QUANTITY @ 1.464 KG/SQ.M.
2. REFERENCE LINES ARE TO BE MARKED ON THE TRACK AND LEVELS ARE TO BE FIXED BY USING
LEVELLING INSTRUMENT WITH REFERENCE TO RAIL LEVEL. CENTRE LINE IS TO BE MARKED ON ALL THE
PRECAST BOX SEGMENTS. CENTRAL LINE OF SUBWAY SHALL BE TRANSFERRED TO GROUND.
3. ARRANGEMENT OF MATERIALS, MANPOWER AND MACHINERY AS PER REQUIREMENT AT SITE.
i) SUFFICIENT QUANTITY OF BALLAST, SAND, BOULDERS AND BACK FILL MATERIAL PREFERABLY
LOADED IN TRACTOR-TROLLY DURING BLOCK.
ii) SUFFICIENT EMPTY SAND BAGS FILLED WITH STAND.
iii) ARRANGEMENT OF SKILLED LABOUR, ENGINEERING BLACK-SMITH WITH RAIL CUTTING AND
DRILLING MACHINE.
4. MINIMUM EQUIPMENT TO BE ARRANGED FOR LINE BLOCK ARE GIVEN BELOW:
a) TWO ROAD CRANES OF SUITABLE CAPACITY WITH ONE ADDITIONAL AS STAND/BY CRANE.
(CAPACITY OF CRANE SHALL BE MINIMUM OF 150T ENSURING LIFTING CAPACITY AT 8 M RADIUS
WILL BE AT LEAST BE 60T)
b) AT LEAST 2 PROCLAIN (HAVING BUCKET CAPACITY OF 1.0 TO 1.5 CUM) AND 2 JCBS.
c) ONE HYDRA OF 14 T CAPACITY.
d) SIX DUMPER/TRACTOR-TROLLY WITH HYDRAULIC SYSTEM FOR UNLOADING.
e) WIRE ROPES/SLING (STEEL ROPES DIA SUITABLE) AND CLIPS FOR EACH RCC BOX SEGMENTS.
f) JACK HAMMER ALONG WITH COMPRESSORS, TOOLS AD PLANTS FOR BLASTING PURPOSE.
g) GAS CUTTER AND OTHER T & P FOR TRACK WORKS.
h) LEVELLING INSTRUMENT WITH STAFF.
i) ONE SUITABLE LENGTH OF RH GIRDER WITH ALL ACCESSORIES.
5. CAUTION OF 20 KMPH MAY BE IMPOSED 24 HOURS BEFORE THE PROPOSED LINE BLOCK.
6. ISOLATE 26 M OF LENGTH OF TRACK FROM THE EXG LWR/CWR ON THE TRACK AS FEASIBLE. FURTHER
CONVERT THIS 26M TRACK INTO THREE EQUAL PARTS OF EASY HANDLING AND REMOVAL BY CRANE.
7. PRECAST RCC BOXES TO BE PLACED IN VERTICAL POSITION, ALONG THE TRACK ON BOTH SIDES.
PRECAST SLABS SHOULD ALSO BE KEPT READY NEAR LHS SITE.
8. NOTICE TO PUBLIC FOR TRAFFIC BLOCK AND TRAIN CANCELLATION DIVERSION, IF ANY, BE GIVEN.
9. EXCAVATION ON BOTH SIDES OF RAILWAY BANK SHOULD BE DONE IN ADVANCE WITH SUITABLE RAMPS.
STABILITY OF THE SIDE SLOPES MUST BE ENSURED WHILE DOING EXCAVATION.
10. APPROACH ROAD FOR MOVEMENT OF ROAD USER AND OTHER HEAVY MACHINERIES BE MADE.
B.WORKS DURING BLOCK (BLOCK PERIOD OF 6HRS DURATION APPROXIMATELY)
1. THE BLOCK SHALL NOT BE PLANNED IF RAIN IS EXPECTED/FORECAST IN RAINY DAY.
2. DURING LINE BLOCK, REMOVE THE RAIL PANEL AND SLEEPERS USING THE ROAD CRANES. REMOVE THE
EXG. BALLAST AND EARTH UPTO REQUIRED DEPTH BY EXCAVATOR.
3. WATCHMEN SHOULD BE POSTED TO WATCH STABILITY OF CUT SLOPE AND CONTROL TRAFFIC
MOVEMENT AT SITE. NECESSARY PLASTIC SHEET TO BE KEPT AT SITE TO PROTECT CUT SURFACE IN
CASE OF UNUSUAL RAIN ETC.
4. NO MATERIAL SHOULD BE KEPT OR MEN ARE ALLOWED TO STAND WITHIN 2M FROM CUT EDGE.
5. AFTER ASCERTAIN DESIRED LEVEL AT BOTTOM OF RUB, PROVIDE DESIRED THICKNESS OF SAND FILLING.
6. PRECAST BASE SLABS SHOULD BE PLACED IN POSITION BY CRANES, STARTING FROM CENTRE OF
FORMATION TOWARDS BOTH ENDS. CENTRE LINE OF PRECAST SLAB SHALL BE PLACED AT THE CENTRE
LINE OF TRACK. HOOKS ON SLABS SHOULD BE CUT BY DISC CUTTER OR GAS CUTTING ARRANGEMENT
AND EPOXY MORTAR TO BE APPLIED.
7. PLACE RCC BOX ELEMENTS WITH HELP OF ROAD CRANES IN FINAL POSITION OVER BASE SLABS, EDGE
OF BOX SEGMENT BE PLACED AT CENTRE OF TRACK. I.E. TRACK WILL BE SUPPORTED ON TWO
SEGMENTS. THE JOINTS BETWEEN BASE SLAB AND SEGMENTAL BOXES SHOULD BE STAGGERED.
SEGMENTS SHOULD PERFECTLY FLUSH WITH EACH OTHER. HOOKS ON BOX TOP SHOULD BE CUT.
8. GEO-TEXTILE TO BE WRAPPED ON ENTIRE OUTER SURFACE OF THE BOX TO PREVENT SEEPAGE AND
LEACHING OF EARTH. ALL JOINTS TO BE SEALED WITH SUITABLE SEALANT/WATER PROOFING
COMPOUND.
9. BOULDERS TO BE FILLED BEHIND THE RCC BOX. REMAINING SPACE SHOULD BE FILLED WITH SUITABLE
BACK FILL MATERIAL AND TO BE COMPACTED PROPERLY.
10. PLACE THE ALREADY COLLECT BALLAST OVER FORMATION TO REQUIRED DEPTH AND CORRECT
PROFILE. CLEAR THE BLOCK AFTER LINKING THE TRACK AND ALLOW THE FIRST TRAIN AT A RESTRICTED
SPEED OF STOP-DEAD AND PROCEED AT 10 KMPH, THEREAFTER TRAFFIC SHOULD BE ALLOWED AT A
SPEED OF 10 KMPH DULY ENSURING THE TRAFFIC PARAMETERS.
C.FOOT BLOCK WORKS
1. MARK SLEEPER NOS ON EITHER SIDE OF THE PROPOSED LHS FOR A LENGTH OF 15M FOR MONITORING
TRACK PARAMETERS I.E. CROSS LEVEL MEASUREMENTS.
2. AFTER ALLOWING INITIAL SETTLEMENT OF BOXES (IF ANY), THE GAPS BETWEEN TWO SEGMENTS BE
SEALED BY USE OF CEMENT MORTAR OR EPOXY, TO MAKE JOINTS WATER TIGHT.
3. MAKING OF BALLAST PROFILE AND THROUGH PACKING OF TRACK. WELDING OF FISH PLATED JOINTS TO
CONVERT IT TO LWR AND DESTRESSING.
4. CONSTRUCT STEEPED ABUTMENTS AND RETAINING WALL ON EITHER SIDE OF RUB. CONSTRUCT
APPROACH ROAD TO LHS AND DRAIN AGE SYSTEM.
5. PROVIDE HEIGHT GAUGE ON EITHER SIDE, AS PER REQUIREMENT AND STANDARD SPECIFICATION.
6. COMPLETE THE BRIDGE IN ALL ASPECTS AND COMMISSION THE RUB.
7. CLOSE THE LEVEL CROSSING.
8. AS SOON AS FIRST RAINFALL OCCURS AFTER COMPLETION OF WORK. SSE/SE(P.WAY) SHOULD VISIT THE
SITE AND INSPECT FOR ANY UNUSUAL OCCURRENCE LIKE SETTLEMENT, LOOSE PACKING, CROSS-LEVEL
VARIATION ETC.
GENERAL NOTES
1. UNLESS OTHERWISE SPECIFIED, ALL MEASUREMENTS ARE SHOWN IN 'MM' AND LEVELS ARE SHOWN IN
'METRES'.
2. NO CONSTRUCTION JOINT SHALL BE ALLOWED IN CONCRETE WORK UNLESS IT IS SPECIFIED IN
DETAILED DRAWINGS AS PER DESIGN CONSIDERATIONS.
3. THE MAXIMUM BEARING PRESSURE AT THE BOTTOM OF BOX AND STEPPED ABUTMENT IS T/SQ.M. THE
ENGINEER-IN-CHARGE THAN THIS VALUE UNDER ANY CIRCUMSTANCES.
4. A BITUMEN LAYER OF AT LEAST 2MM THICKNESS OR EQUIVALENT INSULATING LAYER ON THE TOP AND
SIDES OF THE BOX SHALL BE PROVIDED.
5. TVU AT THIS LC GATE IS 130778, YEAR OF CENSUS- 12.05.2014
6. SUITABLE SPEED BREAKERS SHALL BE PROVIDED ON APPROACHES BY ROAD AUTHORITY IN
CONSULTATION WITH RAILWAYS.
7. THE TENDERER SHOULD NOT THE CUSHION AVAILABILITY WHILE QUOTING AND UNDERTAKE THE WORK
ONLY IF HE IS CONFIDENT OF TAKING OF WORK WITHOUT JEOPARDISING SAFETY.
IMPORTANT NOTES
1. IN TERMS OF DISTRICT COLLECTOR, DISTRICT- MAHARASHTRA STATE, LR. NO. ………… DT…….. ON
COMMISSIONING OF SUBWAY, THE LC SHALL BE CLOSED. DIVISION HAS TO ENSURE SIMULTANEOUS
CLOSURE OF LEVEL CROSSING (LC) ALONG WITH COMMISSIONING OF ROAD TRAFFIC THROUGH
SUBWAY.
2. DIVISION HAS TO SUBMIT COMPLETION DRAWINGS OF DETAILED DRAWINGS & GAD IN ORIGINAL DULY
SIGNED BY DIVISIONAL OFFICIALS AFTER IMMEDIATE COMPLETION OF THE WORK IN ACCORDANCE
WITH PARA 911 OF INDIAN RAILWAY WORKS MANUAL.
3. CRS PERMISSION SHALL BE OBTAINED PRIOR TO COMMENCEMENT OF WORK CONSIDERING PARA 1302
OF INDIAN RAILWAY P.WAY MANUAL.
4. THE DRAINAGE ARRANGEMENTS INCLUDING SUMP AND PUMPING ARRANGEMENTS WHEREVER
NECESSARY BEYOND RAILWAY BOUNDARY SHOULD BE CONSTRUCTED BY RAILWAYS.
5. SUITABLE APPROACH GRADIENTS SHALL BE PROVIDED BY RAILWAY DULY KEEPING THE VIEW OF
DRAINING OUT WATER IN THE SUBWAY WITHIN RAILWAY BOUNDARIES.
6. COST OF DRAINAGE ARRANGEMENT SYSTEM & FORMING APPROACH ROADS DURING EXECUTION AND
MAINTENANCE PERIOD SHALL BE FULLY BORNE BY RAILWAYS.
7. SUITABLE MANHOLES ALONG PRO. DRAINAGE AT REGULAR INTERVALS TO BE PROVIDED BY DIVISION.
SPECIFICATION AND DESIGN RELATED NOTES (RUB)
1. THE GRADE OF CONCRETE FOR VARIOUS RCC/MASS CONCRETE WORKS SHALL BE IN ACCORDANCE WITH
IRS CONCRETE BRIDGE CODE 1997 & I.S. 456-2000 AND IRC CODES AND SPECIFICATIONS.
2. PROTECTIVE COATINGS FOR REINFORCEMENT AGAINST CORROSION SHOULD BE PROVIDED AS PER
CLAUSE NO. 7.1.5 OF CORRECTION SLIP NO. 8 AT IRS CONCRETE BRIDGE CODE EDITION.
3. ALL WORKS ARE TO BE CARRIED OUT AS PER THE FOLLOWING:
a) S.C. RAILWAY STANDARD SPECIFICATION FOR MATERIALS AND WORKS 2010.
b) IRS BRIDGE MANUAL
c) IRS CONCRETE BRIDGE CODE
d) IRS BRIDGE RULES.
e) IRS BRIDGE FOUNDATION AND SUBSTRUCTURE CODE
4. RCC BOX- M35 GRADE CONCRETE WITH 20 MM MAXIMUM SIZE WELL GRADED HARD STONE AGGREGATE
OF APPROVED QUALITY.
5. WEARING COURSE, PARAPET, COPING, DRAIN & DRAIN SLAB: M25 GRADE CONCRETE WITH 20 MM
MAXIMUM SIZE WELL GRADED HARD STONE AGGREGATE OF APPROVED QUALITY.
6. STEPPED ABUTMENTS, RETAINING WALLS: M25 GRADE CONCRETE WITH 40 MM MAXIMUM SIZE WELL
GRADED HARD STONE AGGREGATE OF APPROVED QUALITY.
7. RDSO DRAWING NO. RDSO / B - 10152 / 3R
DRAWING APPROVAL
HEAD QUARTERS RLY.
DESIGNATION SIGNATURE
DIVISIONAL RLY.
DESIGNATION SIGNATURE
CBE
DY CE / Br. D
AXEN / ROB
DRM / NED
Sr.DSTE / NED
Sr.DOM / NED
ADRM / NED
Sr.DEN(CO.) / NED
Sr.DEE / NED
(T RABHA)
(U.V.N.M.SWAMY)
(B.VISHWANATH EERYA)
(P.T.V. DURGA PRASAD)
(SUJIT KUMAR)
(V.J.VIJENDRA KUMAR)
(B. ASHOK)
(RAJIV KUMAR TANWAR)
(N.JANARDHANA REDDY)
SSE / ROB
(A.B. PRASAD)
JE / ROB
(V.A. BABU)
SSE / DRG.
(PRAMOD KUMAR)
DEN/ W / NED
KEY PLAN NOTE
RAIN WATER HARVESTING DRG
NO.G.M.(W)BB/10467 CROSS SECTION OF DRAIN
(RAJU BHADKE)
DIRECTOR
PROJECT & PLANNING
Recommended