NORTH-SOUTH 400 kVINTERCONNECTION DEVELOPMENT

PROPOSED HAUL ROUTESSHEET 2 OF 5

G.FilDamien Grehan

FIGURE 13.10 (CMSA)

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P

!P!P

!P!P

186 184181

176

169

166

161

157

154

149

142

140

Scale @ A3:

Client:

Project:

Title:

Prepared by: Checked: Date:

Project Director:

Consulting, Civil and Structural Engineers,Block 10-4, Blanchardstown Corporate Park, Dublin 15, Ireland.tel: +353-(0)1-8030406fax:+353-(0)1-8030409e-mail: info@tobin.iewww.tobin.ie

Issue:6244

No part of this document may be reproduced or transmitted in any form or stored in any retrieval system of any nature without the written permission of Patrick J. Tobin & Co. Ltd. as copyright holder except as agreed for use on the project for which the document was originally issued. B

1:50,000

0 500 1,000 1,500 2,000250Metres

Ordnance Survey Ireland Licence No EN 0061515 ©Ordnance Survey Ireland and Government of Ireland

Proposed Haul Routes

LegendProposed Angle Tower Location

Proposed Line Route!P

Proposed Alterationsto Existing Electricity Line

A

Issue Date Description By Chkd.

JAN-14 Issued G.F E.C.

B APR-15 Issued G.F. O.McA.

O.McAlister April 2015

Recommended